Document 6bopEn0EEe2Bey46BVz43nwq6

2^*4 VeU vkcT ve\\eA KeeXs 2, *g, C" iM Mz'l- <?i.<f ^ REVIEW ORGANIC PRODUCTION AND MATERIAL HANDLING DEPARTMENTS 1966 OBJECTIVES /, 8 A |> .........f February 14, 1967 LONG TERM OBJECTIVES A. Establish, maintain, and supervise procedures and policies to insure the safety of personnel and property. B. Maintain and improve the production, and on-time delivery of uniform quality products within competitive specification. C. To achieve by direct supervision, planning, and process control, the minimum short range costs. D. To generate, assist in development, and implementation of process improvements to achieve long term minimum costs. E. Effectively train and utilize all personnel to effect long term minimum costs, and provide for growth of facilities. 1966 GOALS AND ACTION A. Establish, maintain, and supervise procedures and policies to insure the safety of personnel and property. 1. Operate with no lost time accidents, no near-miss accidents, and achieve a serious injury index of less than 9.0. yp 1 lost-time accident - Martin j, fuwf j 3 serious (Jackson, Beard, Hughes) Index - 14.8 2. Complete a minimum of 20 significant safety improvements during the year. 3. Conduct Bi-annual safety audit on all operations and facilities. 4. Safety awareness, and training to-be constantly improved by monthly departmental meetings and day-by-day contacts. 5. Safety and Housekeeping inspection to be conducted by superintendent with responsible foreman and/or supervisor. Housekeeping level to be to satisfaction of Plant Manager. Responsibility - Superintendent B. Maintain and improve the production, and oh-time delivery of uniform quality products within competitive specification. 1. Achieve average quality score of 97.0 and R.F.T. Index of 98.0. Quality Score - 96.1 R.F.T. Index - 86.8 o*o C DSW 551873 STLCOPCB4090289 1966 Review Objectives -2- 2. Achieve a quality complaint index of 2.5 per 100 M pounds production, or no more than A justifiable complaints. u Complaint Index - A.3 Complaints TD - 10 (5 justified) ' 3. Achieve a service complaint index of A.O per 100 M pounds of production, or no more than 8 justifiable complaints. Index - 9.2 Complaints TD - 21 (10 justified) A. Attain a minimum of A significant product quality improvements, and 2 service improvements. PcH'- c^r&c^'t' P\0C- U'-i't 5. Achieve 98% on-time shipments. ^cc-\o* \e 183 late shipments out of 5,A72, or 96.7% on-time ,, C.. To achieve by direct supervision, planning, and process control, the minimum short range costs. 1. Generate raw material savings of $133,AOO from 1965 practices by obtaining the following yield improvements: Material 1965 Actual 1966 Target 1966 Actual Targeted Dollar Savings Savings or Loss* Biphenyl Group Benzene (% of theory) Isopropanol 99.760 0.727 99.000 0 99.900 0 $ 12,600* 17,600 $ 6,100 19,600 Acetone 0.189 0.650 1.057 7,200* 15,100* Santowax C (S.R.) Raney Nickel 119.000 0.057 116.500 0.050 112.A00 0.06A 7,A00 1,000 8,300 1,500* Santowax R 102.500 101.500 101.500 2.800 A .000 Aroclor Group $ 9,000 $ 21,A00 Biphenyl (% of 95.5 theory) HC1 Credit (L.A.) Santowax R (% of theory) HC1 Credit (S.A.) Limestone 95.5 37.2 85.5 70.A 6A.6 97.0 A9.0 87.0 75.5 AO.O 97.80 A1.06 73.10 63.98 AA.A0 $ 1A,200 59,000 2,300 5 ,A00 A,600 . $ 23,300 25,600 3A ,A00* 15,900* A,300 DSW 551874 STLCOPCB4090290 ._* i 1966 Review Objectives -3 Aroclor Group (Contd.) Material 1965 Actual Anhydrous HC1 117.65 1966 Target 116.0 1966 Actual 114.45 Targeted Dollar-Savings $ 4,700 $ 90,200 Savings or Loss* $ 10,300 $ 13,200 PNP Group KC1 PNCB NaOH 142.44 117.37 74.97 140.00 116.50 73.00 145.6 117.6 73.5 $ 11,100 15,500 7,600 $ 34,200 $ 24,900* 20,400* 6,000* $ 51,300* $133,400 $ 16,700* Total raw material usages for Organic Division products represents a loss of $156,500 from 1965's practice versus targeted savings of $184,450 for the period. Principal over usage is in mercury which accounts for a loss of $188,700. 2. Labor utilization (hrs/cwt.) to be improved to achieve the following: Product Biphenyl Santowax R HB-40 Liquid Aroclors Solid Aroclors Muriatic Acid Cl2 - NaOH KOH PNP 1965 Actual 0.067 0.090 0.151 0.062 0.202 0.034 0.046 0.062 0.164 1966 Target 0.063 0.085 0.140 0.058 0.170 0.031 0.044 0.060 0.130 1966 Usage 0.060 0.074 0.118 0.053 0.174 0.023 0.044 0.063 0.136 Total Equiv. Manhours 2,990 2,055 2,660 3,665^\ 2,395 2,165^ 800 -180 4,580 21,130 DSW 551875 STLCOPCB4090291 1966 Review Objectives -4- Total production manhours in 1966 was 139,465 versus 126,722 in same period of 1965, or a gain of 12,743 hours. The gain is principally attributable to the additional labor (7,356 hours) for PNP operations not required in first four months of 1965, 3,200 manhours required to man the Aroclor Utility job around the clock, and 1,100 manhours generated by additional Chief Operators in Biphenyl-Aroclor. 1965 1966 195.471 M Lbs. Lbs/produced/labor hours 126,772 = 1,545 Lbs. 228.806 M Lbs. 139,465 = 1,640 Lbs. 3. Improve variable direct manufacturing costs other than labor at a rate at least equal to volume increases. Product 1966 D.C. 1965 D.C. Savings Direct $/cwt. Gain or Loss* Biphenyl 0.973 1.029 0.056 $ 23,900 Santowax R HB-40 0.373 o.4ieT 0.494 ^0^404 0.121 0.012 15,500 1,000 Liquid Aroclors 0.643 0.548 0.095* 38,700* Solid Aroclors 1.484 2.101 0.617 55,200 Muriatic Acid 0.431 0.537 0.106 20,800 Cl2 - NaOH KOH 0.551 1,936 0.670 1.841 0.119 0.095* 47,700 16,900* PNP 1.440 1,741 0.301 49,200 $ 157,700 Dollar Improvement = 157.700 Total Dollar Directs 2,282,000 Volume Increase = 228.866 M lbs. 195,471 M lbs. 17% 4 Reduce process downtime to less than 1.5% and other downtime to less than 2.0%. Process downtime to be improved by elimination of pluggage, and bottlenecking problems; other downtime to be improved by better scheduling, and development of surge capacity between departments. Repair Process Other 3.9 3.2 2 1 3.6 Z.9% 0-71, O.ll On-Stream 89.3 30.1 6 DSW 551876 STLCOPCB4090292 1966 Review Objectives -5- 5. Actively generate, and assist in the development of specific cost reduction items to achieve savings of $420 M in 1966. 6. Improve material handling costs at least equal to rate of volume increases. D. To generate, assist in development, and implementation of process improve ments to achieve long term minimum costs. 1. Assist in development of scope, and provide liaison for Warehousing Facilities. Assisted as needed. 2. Assist in development of scope, and provide liaison for modernization of Aroclor-Biphenyl-HB-40 finished goods handling. Little or no achievement. 3. Provide production liaison for Biphenyl Still Project, and have start-up plans completed by 11/1/66. Achieve design premises by 1/1/67. Continuing 4. Complete start-up of silicon diodes rectifiers in Chlorine Plant, and achieve design premises 45 days of completion of construction. Continuing 5. Establish and supervise effective process control of Chlorine facilities by 6/1/66. Program and weekly liaison meetings achieving control. 6. Evaluate and implement improvements to Aroclor treatment, and filtration facilities. 6cope developed by 6/1/66. \crtf Assisting in evaluation. ''N ^ '< \X \ ' 7. Audit all reports and records for possible simplification, or elimination by 10/1/66. 8. Develop measurements and controls for "Work to Assist" and "Plant Improvement" costs by 5/1/66. 9. Generate a minimum of 3 significant increases in production capabilities. i * cV. (-C1j \w V DSW 551877 STLCOPCB4090293 1966 Review Objectives -6- 10. Actively assist, and provide process control and information on terphenyl recycle research program. 11. Develop program for upgrading of HB-40 facility - Project for dismantling by 2/1/66. Autoclave Project by 4/1/66. Dismantling Project completed. E. Effectively train and utilize all personnel to effect long term minimum costs, and provide for growth of facilities. 1. Complete F.L.I.T. training all personnel by 6/1/66. 2. Continue development of Process Function Outlines. All department PFO's, and operator training to be completed by 1/1/67. c 3. Devise next phase in Operator Training Program by 10/1/66. S>C\^ ^ V. 4. All Operating Instructions, and Standard Manufacturing Processes to jr^o be current by 10/1/66. 5. Develop more objective Position Guides for all personnel. Guides to be keyed to Objectives, and Position Specification by 3/1/66. 6. Conduct at least 2 Supervisory Training Meetings during the year. DSW 551878 STLCOPCB4090294