REVIEW ORGANIC PRODUCTION AND MATERIAL
HANDLING DEPARTMENTS 1966 OBJECTIVES
/, 8 A
|> .........f
February 14, 1967
LONG TERM OBJECTIVES
A. Establish, maintain, and supervise procedures and policies to insure the safety of personnel and property.
B. Maintain and improve the production, and on-time delivery of uniform quality products within competitive specification.
C. To achieve by direct supervision, planning, and process control, the minimum short range costs.
D. To generate, assist in development, and implementation of process improvements to achieve long term minimum costs.
E. Effectively train and utilize all personnel to effect long term minimum costs, and provide for growth of facilities.
1966 GOALS AND ACTION
A. Establish, maintain, and supervise procedures and policies to insure the safety of personnel and property.
1. Operate with no lost time accidents, no near-miss accidents, and achieve a serious injury index of less than 9.0.
yp 1 lost-time accident - Martin
j, fuwf j
3 serious (Jackson, Beard, Hughes)
Index - 14.8
2. Complete a minimum of 20 significant safety improvements during the year.
3. Conduct Bi-annual safety audit on all operations and facilities.
4. Safety awareness, and training to-be constantly improved by monthly departmental meetings and day-by-day contacts.
5. Safety and Housekeeping inspection to be conducted by superintendent with responsible foreman and/or supervisor. Housekeeping level to be to satisfaction of Plant Manager. Responsibility - Superintendent
B. Maintain and improve the production, and oh-time delivery of uniform quality products within competitive specification.
1. Achieve average quality score of 97.0 and R.F.T. Index of 98.0.
Quality Score - 96.1
R.F.T. Index - 86.8 o*o C
DSW 551873
STLCOPCB4090289
1966 Review Objectives
-2-
2. Achieve a quality complaint index of 2.5 per 100 M pounds production,
or no more than A justifiable complaints.
u
Complaint Index - A.3
Complaints TD - 10 (5 justified) '
3. Achieve a service complaint index of A.O per 100 M pounds of production, or no more than 8 justifiable complaints.
Index - 9.2
Complaints TD - 21 (10 justified)
A. Attain a minimum of A significant product quality improvements, and
2 service improvements.
PcH'- c^r&c^'t'
P\0C- U'-i't
5. Achieve 98% on-time shipments.
^cc-\o* \e
183 late shipments out of 5,A72, or 96.7% on-time
,, C.. To achieve by direct supervision, planning, and process control, the minimum short range costs.
1. Generate raw material savings of $133,AOO from 1965 practices by obtaining the following yield improvements:
Material
1965 Actual
1966 Target
1966 Actual
Targeted Dollar Savings
Savings or Loss*
Biphenyl Group
Benzene (% of theory)
Isopropanol
99.760 0.727
99.000 0
99.900 0
$ 12,600* 17,600
$ 6,100 19,600
Acetone
0.189
0.650
1.057
7,200*
15,100*
Santowax C (S.R.)
Raney Nickel
119.000 0.057
116.500 0.050
112.A00 0.06A
7,A00 1,000
8,300 1,500*
Santowax R
102.500 101.500
101.500
2.800
A .000
Aroclor Group
$ 9,000
$ 21,A00
Biphenyl (% of 95.5 theory)
HC1 Credit (L.A.)
Santowax R (% of theory) HC1 Credit
(S.A.) Limestone
95.5 37.2 85.5 70.A 6A.6
97.0 A9.0 87.0 75.5 AO.O
97.80 A1.06 73.10 63.98 AA.A0
$ 1A,200 59,000 2,300 5 ,A00 A,600 .
$ 23,300 25,600 3A ,A00* 15,900* A,300
DSW 551874
STLCOPCB4090290
._* i
1966 Review Objectives
-3
Aroclor Group (Contd.)
Material
1965 Actual
Anhydrous HC1
117.65
1966 Target
116.0
1966 Actual
114.45
Targeted Dollar-Savings $ 4,700
$ 90,200
Savings or Loss* $ 10,300
$ 13,200
PNP Group KC1 PNCB NaOH
142.44 117.37
74.97
140.00 116.50
73.00
145.6 117.6
73.5
$ 11,100 15,500 7,600
$ 34,200
$ 24,900* 20,400* 6,000*
$ 51,300*
$133,400
$ 16,700*
Total raw material usages for Organic Division products represents a loss of $156,500 from 1965's practice versus targeted savings of $184,450 for the period. Principal over usage is in mercury which accounts for a loss of $188,700.
2. Labor utilization (hrs/cwt.) to be improved to achieve the following:
Product
Biphenyl Santowax R HB-40 Liquid Aroclors Solid Aroclors Muriatic Acid Cl2 - NaOH KOH PNP
1965 Actual
0.067 0.090 0.151 0.062 0.202 0.034 0.046 0.062 0.164
1966 Target
0.063 0.085 0.140 0.058 0.170 0.031 0.044 0.060 0.130
1966 Usage
0.060 0.074 0.118 0.053 0.174 0.023 0.044 0.063 0.136
Total
Equiv. Manhours
2,990 2,055 2,660 3,665^\ 2,395 2,165^
800 -180 4,580
21,130
DSW 551875
STLCOPCB4090291
1966 Review Objectives
-4-
Total production manhours in 1966 was 139,465 versus 126,722 in same period of 1965, or a gain of 12,743 hours. The gain is principally attributable to the additional labor (7,356 hours) for PNP operations not required in first four months of 1965, 3,200 manhours required to man the Aroclor Utility job around the clock, and 1,100 manhours generated by additional Chief Operators in Biphenyl-Aroclor.
1965
1966
195.471 M Lbs. Lbs/produced/labor hours 126,772 = 1,545 Lbs.
228.806 M Lbs. 139,465 = 1,640 Lbs.
3. Improve variable direct manufacturing costs other than labor at a rate at least equal to volume increases.
Product
1966 D.C.
1965 D.C.
Savings Direct $/cwt.
Gain or Loss*
Biphenyl
0.973
1.029
0.056
$ 23,900
Santowax R HB-40
0.373 o.4ieT
0.494 ^0^404
0.121 0.012
15,500 1,000
Liquid Aroclors
0.643
0.548
0.095*
38,700*
Solid Aroclors
1.484
2.101
0.617
55,200
Muriatic Acid
0.431
0.537
0.106
20,800
Cl2 - NaOH KOH
0.551 1,936
0.670 1.841
0.119 0.095*
47,700 16,900*
PNP
1.440
1,741
0.301
49,200
$ 157,700
Dollar Improvement = 157.700 Total Dollar Directs 2,282,000
Volume Increase = 228.866 M lbs. 195,471 M lbs.
17%
4 Reduce process downtime to less than 1.5% and other downtime to less than 2.0%. Process downtime to be improved by elimination of pluggage, and bottlenecking problems; other downtime to be improved by better scheduling, and development of surge capacity between departments.
Repair Process Other
3.9
3.2 2 1 3.6 Z.9%
0-71, O.ll
On-Stream
89.3
30.1 6
DSW 551876
STLCOPCB4090292
1966 Review Objectives
-5-
5. Actively generate, and assist in the development of specific cost reduction items to achieve savings of $420 M in 1966.
6. Improve material handling costs at least equal to rate of volume increases.
D. To generate, assist in development, and implementation of process improve ments to achieve long term minimum costs.
1. Assist in development of scope, and provide liaison for Warehousing Facilities.
Assisted as needed.
2. Assist in development of scope, and provide liaison for modernization of Aroclor-Biphenyl-HB-40 finished goods handling.
Little or no achievement.
3. Provide production liaison for Biphenyl Still Project, and have start-up plans completed by 11/1/66. Achieve design premises by 1/1/67.
Continuing
4. Complete start-up of silicon diodes rectifiers in Chlorine Plant, and achieve design premises 45 days of completion of construction.
Continuing
5. Establish and supervise effective process control of Chlorine facilities by 6/1/66.
Program and weekly liaison meetings achieving control.
6. Evaluate and implement improvements to Aroclor treatment, and filtration
facilities. 6cope developed by 6/1/66.
\crtf
Assisting in evaluation.
''N ^
'< \X \ '
7. Audit all reports and records for possible simplification, or elimination by 10/1/66.
8. Develop measurements and controls for "Work to Assist" and "Plant Improvement" costs by 5/1/66.
9. Generate a minimum of 3 significant increases in production capabilities.
i
*
cV. (-C1j \w V
DSW 551877 STLCOPCB4090293
1966 Review Objectives
-6-
10. Actively assist, and provide process control and information on terphenyl recycle research program.
11. Develop program for upgrading of HB-40 facility - Project for dismantling by 2/1/66. Autoclave Project by 4/1/66.
Dismantling Project completed.
E. Effectively train and utilize all personnel to effect long term minimum costs, and provide for growth of facilities.
1. Complete F.L.I.T. training all personnel by 6/1/66.
2. Continue development of Process Function Outlines. All department PFO's, and operator training to be completed by 1/1/67.
c
3. Devise next phase in Operator Training Program by 10/1/66.
S>C\^ ^ V.
4. All Operating Instructions, and Standard Manufacturing Processes to jr^o be current by 10/1/66.
5. Develop more objective Position Guides for all personnel. Guides to be keyed to Objectives, and Position Specification by 3/1/66.
6. Conduct at least 2 Supervisory Training Meetings during the year.