Document 6bRx77VB9rRvQQLjQG10kGZJE

716 CHAPTER 67 1962 Guide And Data Book the United States withstands the average street load and is usually designed with 1 or lX*iu. pipe embedded in a steel reinforced concrete slab 5 to 6 in. thick. No sub-flccr is accessary because of the steel reinforcing incorporated in the slab. However, a sub-floor is used when the floor is insulated. Experience has shown that a few basic inexpensive designs have proved satisfactory over a long period of time. This refers particularly to sand fill and general purpose floors (Figs. 5, 6, and 7). In the United States, the Carpenter Monolithic Float ing Floor and Piping System (Fig. 9) has proved to be an eco nomical installation, especially when used for diversified ac tivities such as exhibits, roller skating, tennis, boxing, and other events. Floors need not be insulated unless quick changeovers are desired or unless there is a basement under the floor. Drainage. The suitability of the subsoil on which an ice rink is built has a great influence on its success. It has hap pened that a complete ice surface had to be rebuilt because of poor drainage and the ultimate heaving of the ice surface. Poor drainage and the failure of the ice surface may be a con tributing factor in the failure of a number of rinks. It is not economical to build a skating rink on cheap, swampy, or lowlying land. Moist subsoil will freeze in the ground to a depth of four feet or more. The frozen water will heave the ice surface when freezing takes place to a height of six inches or more. It creates an uneven skating surface, moves and raises walls, piers and header trenches, cracks walls and piping, and necessitates the eventual drainage and rebuilding of the rink floor. The correction of heaving on a 4-sheet curling.rink (56 X 156 ft), when built on a soil containing silt, costs upwards of $25,000. Not only should there be a complete drainage system around the footings of the rink to prevent seepage, but also under the rink surface itself. This is particularly important when sand fill floor is used to insure that the ice melted after the skating season will completely drain away and that the sand will dry out as quickly as possible. If ground conditions, tide, or river levels make it im possible to assure a dry base under the rink surface, a general purpose floor on piers may be constructed. Whether insulation of the rink floor is required or not, will be governed by the prevailing temperature in the locality in which the rink is to be located. Condensation on the underside of the concrete should be avoided. Preparation for rink floor. When built on natural ground, regardless of whether a sand fill or permanent general pur pose floor is intended, proper preparation of the bed is im portant, unless the rink is built on elevated sand and gravel subsoil. If the rink is to be built on clay, part clay or rock subsoil, it should be made certain that water cannot collect in the low points. The clay or rock should be excavated, or the rink level should be built up to a height of about 4 ft, with crushed fig. 9 .... Monolithic Rooting Floor (Carpenter) stone and gravel, after which it should be well rolled. Water should not be used for settling the fill. In the case of sand fill rinks, the quick drainage of the melted ice at the end of the Mkatmg season will insure quick drying of the sand and rink piping and result in longer life of the piping. In no case should cinders be used as fill in open sand fill rinks because of the possibility of sulfur in the cinders which, when damp, acclerates corrosion of the piping. Care must be taken to insure a perfectly level surface over the entire rink. Permanent general purpose rin& floor. When constructing a permanent general purpose floor, the same precaution in regard to subsoil must be taken as for open sand fill rinks, and the concrete floor should be constructed to withstand knyfa of the average pavement. It is considered good practice to embed the piping in concrete at a uniform thictrrw^ ^ around the pipe. For 1X in- pipe when placed on 4^ in. centers, the total thickness of concrete should be 4X in. plus X or X in. cement, trowel or preferably tereazzo finish If other than IX in. piping and 4X in. spacing are used, a concrete subfloor may be necessary to carry the possible floor loads. When local conditions make it advisable, the rink floor may be insulated, in which case a substantial, level subfioor. must be constructed on which the insulation is laid. The concrete mixture recommended is 3000 lb concrete and the work should be carried out only by an experienced and competent concrete contractor. Suitable cross reinforcing in addition to pipe supports is desirable. The pouring of the concrete floor, once started should be continuous, including the top finish. It should be well tamped to insure complete contact between pipe and concrete. General purpose rink floors should not be defrosted too frequently. When a rink constructed with a general purpose floor is intended to be used for purposes other than skating during the ice season, and an ice-free floor is required, it is preferable to place a portable section wood floor over the ice for the occasion and remove it after it has served its purpose. AU purpose floors. If a rink floor, as used in sports arenas, is to withstand the expansion and contraction of frequent frosting and defrosting, extra precautions must be taken in its construction. Provision must be made for the free move ment of the freezing slab with respect to the subfloor. Header trench. A well constructed concrete header trench of sufficient size to house the headers and connections is essential to permit access for periodic inspection and painting of the piping contained in the trench. Headers and piping in the trench, or the trench itself, do not generally require insulation. The trench should have re movable covers and be well drained to facilitate drying out. Unless required for walkways, brine headers may be cast in concrete slab as part of the ice rink floor. Provision for purging air from tank piping must be made. Snow pit. A snow melting pit'should be provided at a suit able point, usually at one end of the rink. It should be of sufficient size to handle the scraped off snow, ice accumulated during planing, or to accommodate the complete ice removal. Water from shell-and-tube condensers or hot water fro some other source must be provided to melt the snow and tee. Hot water is always required when evaporative condensers are installed. A large drain as well as an overflow should be provided as well as a large removable screen to remove trash. BUILDING THE ICE SURFACE Regardless of the type of rink floor used, when the pi**** is first placed in operation, the equipment should be operated Skating Rinks 717 kpg enough for a sharp frost to appear on the surface. Then the entire surface should be uniformly flooded with a fine fiDTSy nozzle. This process should be repeated until a ^ in. thickness of ice is built upon the concrete floor, or X in. thickness on a sand fill floor. The surface should not be frozen colder than required ^ter this build-up, in order to temper the ice before it is used for skating and to prevent cracking. Maintaining ice surface. To maintain an ice surface it is customary to scrape off the snow after each skating season or hockey period. For this purpose specially designed ice shovels are used. They should have a hardened steel scraper . har and be wide enough to enable two men to clear the snow off the rink in ten minutes. After this has been done, the ice is sprayed with hot water at about 180 F. The most satisfactory method of spraying the ice between fifwinnfl is to use a sprinkler tank filial with hot water, which is wheeled over the ice. The sprinkler has an adjustable valve to control the quantity of water which is sprayed into a terry eloth bag that wipes the fine snow off the ice surface and fills the crevices cut by the skaters. In this manner the least amount of water is added, reducing the ice build-up and refrigeration load. Such sprinklers are usually used in pairs. Automatic equipment for removing snow and sprinkling the ice is available. lee planer. A skating rink is designed for efficient operation of the mechanical equipment and provides thermostatic control for controlling the ice temperature within close limits to obtain a perfect ice surface. The floor contractor provides a perfectly level floor with adequate subsoil drainage. How ever, too often, due to incompetent ice making, improper sprinkling equipment, or deep cutting of the ice during public skating, the ice becomes uneven and excessively thick. There may be a variation of several inches in the ice thickness across tire rink, but the resulting variation in the condition of the ice is more serious. In any case, the low spots must be built up, increasing thickness and refrigeration requirements. For example, under assumed conditions where 18 F brine would be cold enough to hold a IX in. thirlmaafl of ice, cal culations show that 7.5 F brine would be required if the ice be permitted to build up to 6 in., with a corresponding in crease in the required compressor size. Since ice of X to 1 in. thickness is satisfactory for skating and is the most economical thickness to freeze Mid hold, the ice should be periodically planed to maintain the desired thickness. Motor driven planers are now available which will remove X in. of ice from the average size rink in 40 min. fee shaver. In the case of curling rinks where, due to the normal making of ice, the ice sheet may become thick and dirty from use due to ashes, etc., a new ice shaver designed especially for curling rinks is now available which will remove the pebble and cut about & in. of ice at a time to maintain a dean and perfect surface. It is electrically or gas driven and light enough to be operated by one man. FOG AND DRIP In mild weather, particularly in early fall and late spring, rinks and especially curling rinks because they have no in ternal heat load, often drip from the roof and roof supports. The condensate dropping on the ice ruins the curling surface *nd the fog obstructs the view. These conditions cannot be solved by ventilation because the introduction of outside air only aggravates the problem when the weather outside is mild and humid. Insulating the roof also aggravates drip under mild outside weather conditions. The same conditions may apply to skating rinks designed for small seating capacity, where the ice surface is relatively large in relation to the roof surface, and where there is little or no internal heat load. In northern climates with the curling rink building designed for a maximum infiltration of one-half air change per hour and where the wet-bulb temperature does not exceed 60 F during the curling season, experience has shown that 43 F air tem perature may be expected in the truss space with a 30 F ice surface temperature. Under these conditions, to prevent condensation in the roof space <urr) to clear the fog, it has been found that a sixpad curling rink would require the removal of 33 lb of mois ture per hr, necessitating about 6 tons of refrigeration. There are now available dehumidifying units, arranged for automatic electric defrosting, using the brine from the rink piping as the cooling maHinm, while others have - separate Refrigerant 12 condensing units. A new self-contained air cooled reverse cycle packaged type dehumidifying unit, re quiring only electric wiring to motors is available in sizes up to 5 hp. These units are marketed in Canada. On the other hand, skating rinks that are designed for large seating capacity, i.e., hockey and public skating--usually have sufficient reheat available from spectators, or heated parts of the building, lights, etc., so that ventilation will dis perse the' fog and prevent condensation. Individual cases must be treated for prevailing local conditions, and dehumidification and ventilation requirements should be treated as an air conditioning problem. VARIABLE DESIGN FACTORS The variable factors which enter into the calculation of the actual refrigeration capacity for a skating rink are graphically illustrated in Fig. 10. This chart was prepared from a log run on an existing arena by use of recording thermometers. Description of the Arena Rink surface Floor concrete Thickness of ice 80 X 180 ft = 14,400 sq ft 4X.in. (IX 1- above piping) IX in. 'fi fnlFr Jj