Document 6bL6QMx40pvwNGOmqj6wKdpad
!
Dow U.S.A
CONSDOOLWIDANTOERDTAHUADMITERPIRCOAGRAMoueTmheinDe owLoCuihseiamnaiPca70l0C7B6oo5mx-0p1a15n50y0
Date of Report:
6/19/95
Methanes Plant
Superintendent:
Don Taylor, Bldg. 4601
cc: Roddey Peebles, Bldg. 1601, LAD Maurice Oubre, Bldg. 6650, LAD Chris Messelt, Bldg. 3502W, LAD John Murphy, Bldg. 101, Freeport, TX
Buck Bailey, Bldg. 3301W, LAD Vick McMurry, Bldg. 4601, LAD Terry Leigh, Bldg. 1601, LAD Greg Schultz, Bldg. 1601, LAD
Enclosed are the recommendations from the Occupational Health Audit for your response. According to the Dow North American Area Consolidated Audit Program Guidelines and the OSHA Process Safety Management (PSM) standard 1910.119, you must develop an implementation plan as a response to the recommendations. The plan must include the name(s) of the employee(s) assigned to each action item along with an expected completion date for each item. Your plan must be reviewed and approved by the area Major Manager by July 21,1995.
Please note that efforts have been made by the Functional Audit Teams to help prioritize each recommendation. They will be identified as: M = Must Do, (based on compliance issues, government regulations, Dow policies or S&LP) and HR = Highly Recommended, (necessary to mitigate an anticipated or potential hazard).
Please send your approved implementation plans to Connie Kalencki, Bldg. 3502W by July 28,1995. We will forward a copy to members of the Core Audit Team and the Functional Team Leader.
h
Howard Wilkinson, Administrator
LAD Consolidated Audit Program
O32427
DO A COMF1
OFNT1AI
OCCUPATIONAL HEALTH AUDIT
(Thursday, May 18,1995)
AUDIT TEAM: Darlene Creel, Bruce Heinze, Maralee Marchant, John Jurgiel
PLANT IH CONTACT:
Hank Grace, Mike Brown
ATTENDING: Howard Wilkinson, Ronnie Fitzgerald, Jackie Paul, Darlene Creel, Terry Williams
WRITER:
Jackie Paul/Maralee Marchant
GENERAL INDUSTRIAL HYGIENE/MEDICAL
The IH Manual is complete and the OSHA form 2203 detailing the worker's rights under OSHA is posted.
Recommendations:
HR 1. The refrigerator and oven in B-4606, and the refrigerator in B-4610 maintenance break room need cleaning.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
HR 2. The area around outfall site #1521 needs housekeeping (i.e. broken, discarded PVC floating device, tape, rope).
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M = Must-Do
DOW CONFIDENTIAL Page 2
HR = Highly Recommended
00 A 03?4?s CONFIDFNTTA!
M 3. Some chemicals were stored behind the door in the lab. The leaking stem valve needs to be replaced on the box of Lang Caustic.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M 4. The boxes being stored need the eyewash need to be relocated.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M 5. Need to create a letter documenting compliance with benzene and vinyl chloride regulations during emergency burns from Vinyl II.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
HAZCOM PROGRAM
The labeling of plant equipment was good and process vessels, columns and pumps were all numbered. The HAZCOM/MSDS notebooks are readily available in the control room. Personnel received annual hazcom training in March, 1995.
Recommendations:
M 1. The following labeling related deficiencies need to be addressed:
a. 5 gallon containers of antifoam in old control room; one unlabeled and one with an illegible label
b. Chemical container with torn label and one outside shop area not labeled.
M = Must-Do
DOW CONFIDENTIAL Page 3
HR = Highly Recommended
DO A 037479 CONFIDFNTIAl
c. unlabeled pressurized sprayer on loading rack
d. AH-16 has several glass bottles not labeled properly
e. unknown substance in bucket under steps by outfall #1521
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M 2. The written hazcom program is dated April 1993 and needs review for currency.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M 3. The Chemical and Physical Agent Inventory was last updated in November, 1992 and needs updating to include maintenance chemicals.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
HEARING CONSERVATION
The plants' written Hearing Protection Program was last reviewed in August, 1992. The OSHA Occupational Noise Standard, 29 CFR 1910.95, is posted on the bulletin board. Annual training was presented in March, 1995. We support your efforts to make the entire plant a Hearing Protection Area.
M = Must-Do
DOW CONFIDENTIAL Page 4
HR = Highly Recommended
A 03?430 CONFIDFNTTAl
Recommendations:
M 1. The drill press located in the shop area needs to have a PPE sign to include "hearing protection required".
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M 2. Review the written hearing protection program for currency.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M 3. Addition area warning signs need to be posted (near K-1100).
Action Taken/To Be Taken:
Responsibility
Ejected Completion Date Actual Completion Date
RESPIRATORY PROTECTION
The plants' written Respiratory Protection Program was reviewed in 1994. The air line respirators are equipped with the correct match of regulator and exhalation valve and annual respiratory protection training was presented in March, 1995.
Recommendations:
M 1. Several mouth-bit respirators were found lying around without owner name. These should be discarded or appropriately labeled, (instrument shop; ladies restroom, lab)
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M = Must-Do
DOW CONFIDENTIAL Page 5
HR = Highly Recommended
DQ A 03?4 CONFIDENTI
x> U)
M 2. The written program needs to be reviewed for currency and should include visitors and non-Dow employees.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M 3. Several full-face respirators need to be properly stored (i.e. not in secondary containers, hanging by the straps).
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
HR 4. The respirator cleaning station needs to be cleaned up (remove the broken mask facepiece and the bottle of Shell oil.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M 5.
Several regulators in the old control room have inspection dates of September 1991 and October 1992 . These should be inspected by Vallen every 18 months. There is a regulator hanging on a fence in the
shop area which needs to be stored properly and
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
PERSONAL PROTECTIVE EQUIPMENT
The plant's written program is dated August 1994 and all personnel were trained in February 1995.
M = Must-Do
DOW CONFIDENTIAL Page 6
HR = Highly Recommended
QQ A 032432 CONFIDENTIAL
Recommendations:
M 1. The written program needs reviewing for currency.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
HR 2. There is a need for a place to store PPE in an accessible manner. PPE was found discarded in several places throughout the plant.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
HR 3.
There is a sign in the MAPP motor control center denoting the availability of protective clothing however the PPE is located in another MCC across the plant. We recommend the sign be modified to state where the PPE is located. This MCC does have 440 switches denoting PPE required.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
ERGONOMICS Recommendations: None at this time
THERMAL STRESS Recommendations: No recommendations at this time.
M = Must-Do
DOW CONFIDENTIAL Page 7
HR = Highly Recommended
DO A 032433 CONFIDENTIAL
VENTILATION
The laboratory fume hood is equipped with a flow sensing device. The comprehensive hood survey evaluation is current.
Recommendations:
M 1. Investigate the reason for the oxygen alarm in Analyzer house #12.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
HR 2. The air conditioner in the analyzer house #AH-1 was not operating, although entry requirements stipulate the need for it to be operational. Either repair unit or change entry requirement sign on door.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
WELDING
Health Hazard Warning Signs (for fumes and rods) were posted in welding areas of the shop. Sources of ventilation for the welding area include a floor fan, wall fan, and a large doorway nearby.
Recommendations:
M 1. Acquire new MSD sheets for welding rods used in the shop.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M = Must-Do
DOW CONBDENT1AL Page 8
HR = Highly Recommended
DO A 032434 confidfnttai..
ASBESTOS
There is an asbestos handling decision flow diagram posted on the bulletin board for general information; however it is not the latest version and should be replaced with current version. The inventory was last performed in 1993 and is still current provided any changes are documented.
Recommendations:
M 1. Need to perform and document annual inspection of asbestos containing material for condition.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M 2. There is an old piece of transite in a bag that needs to be disposed of outside the maintenance shop as well as some gaskets.
Action Taken/To Be Taken:
Responsibility
Expected Completion Date Actual Completion Date
M = Must-Do
DOW CONFIDENTIAL Page 9
HR = Highly Recommended