Document 6bKBQ18mGaJ4v5a6B8Nx861o3

The H. K* Ferguson Company Frederick, Maryland Specif!cation Section for ROOF TUB. PRECAST O'KAYLQ") Synthetic Fibers Research Building Carbide and Carbon Chemicals Company South Charleston, Vest Virginia 1. A. These specifications, together with the Owner's Standard Conatruction Contract Fora, oompletely filled in and proparly executed, including any and all dravinrs listed herein shall constitute the Contract. B. A schedule of all drawings to be used in connection with the new work is sup* lied herein* C. A schedule of all bills of material covering materials which are being furnished by others is included herein. Quantities furnished as shown on these bills of material are intended to be complete, but bills are submitted cnly for the convenience and guidance of the Contractor, and quantities shall not be binding upon the Owner. Should any material shortages occur during the work, this Contractor shall immediately notify the Engineer of such shortages, and he will arrange to have the required material furnished. Where indicated in these specifications, however, this Contractor shall furnish required materials, D. The submission of a proposal will be considered as an acceptance of all the requirements of the drawings, specifications, conditions at the building site and all governing oodes and ordinances, unless the proposal is accompanied by written exceptions. Such exceptions, if not acceptable to the Owner, shall be grounds for the rejection of the Bidder's proposal. May 26, 1952 W.O. 1575 RT-1 UCASB00248299 WV-17820 r.KKKRAL (Cont'dl ROOT THE. PRECA3T ("JUIiO"} E. Proposals shall be submitted as a lump sum and no part of the work will be awarded separately. F. The successful Bidder shall ajihmit to the Owner, for accounting end payment purposes, a price bre^down of hia proposal, in accordance with the list given in Section II, 'Accounting Breakdown". [, <r,OPB OF VOBK A.. The party performing the work ^ler this section of the specifications, hereinafter referred to Is the/hig "Contractor", also referred to as "The Precast Roof Tile Cortraotoi* in this and other sections of these specifications, shall finish all tools and equimaent and perform all labor and services, as mf be neceiary or reasonably incidental to complete the precast rootile wozk showi on the drawings, and/or as specified. B. The "Contractor" shall td in place, the standard steel subpurlins necessary for the instation of roof tile. XXI, XATSKIALS AND Vt)RK Bl OTHE}? A. The following materials', work in conjunction therewith will be furnished and/or perforty others, 1, Main Roof atructureting. 2, 3ub-purllns for ination by this Contractor. 3, Roof ("Kaylo") tilmt materials, etc., as required. IV. CnOPERATICH \ A. This "Contractor" shalllt the drawings and specifications to ascertain the extent o&rk to be done by other Contractors. B. This "Contractor" sbal> and cooperate with other Contractors to the extent necessary to the work to proceed rapidly and In an orderly manner. Itaj 26, 1952 ' 1575 BT-2 UCASB00248300 V,, MATERIALS ROOT TILS. FrOSOAST ("KAYLO") A. Sub-purlins will be Owmns-Illinois Class Company Structural steel rail sections Ho. 101* B. Hoof tile will be precast, reinforced *Kaylo" roof tile, 2-5/8 inches thick by 18 indies wide by 36 inches long as made by Owens-Illinois Glass Company, Toledo, Chio* C* Grout for end joints of tile shall be composed of the following materials, measured by volumei Gauging Plaster (quick setting) Expended Termiculite (Veraicullts plastering aggregate) Water (Approximate) Proportions Ratio Batch Volume 1*0 1 ou. ft. 0*6 0.6 cu. ft. 1.0 7\ gallcub D, Consistency of grout shall be such that it can be poured, but not so thin that the Yermiculite will float, (Note* Add water to provide proper consistency, then stir thoroughly to remove all lumps. Dry materials may be mixed in large quantities as desired, but water should be added only to small batches which can be used immediately.) VI. IKSTALLATICH A. Bub-purlins. 1, Veld to each support with one fillet weld 3/A inch long placed on alternate sides of sub-purlins. 2. At mds of sub-purlins plaoe welds on both sides, 3* Where joints of sub-purlins do not occur over supports, their ends shall be welded together. Where ends of sub-purline bear on masonry they shall be securely anchored to the masonry. May 26, 1952 v-'.O. 1575 RT-3 UCASB00248301 VI. IBSTALl^TICW <Oont*d) ROOP TUg. PRECAST (KAYLO") B, Roof Hie. 1. Shall be spaced evenly on sub-pufcllns to provide a minimum aid boaring of h inch. 2. Shall be butted tlgitly together at aides* 3. Shall be out to fit at ridges, hips, vaileye, parapets, curbs, walls, around vents, pipes, eta. C* Grout. 1. Pill Joints at ends of tile over sab-purlins, and at ridges and hips. 2. Pour grout from open-spout can into Joints until the grout protrudes sligjitly above the surface of the tile. 3. Scrape grout to flush with tile surface after its initial set. if. Remove surplus grout from roof at once, leaving the roof deck free of all foreign matter. D. saddles and Cants. 1. 'bore lightweight aggregate saddles or cant3 are used over "Kaylo" roof tile deck, prime surface of tiles under aame with asphalt primer (Federal Specification S3-S-701). 2, Hop primer on tile surfaces at the rate of 7.5 pounds (one gallon) per one hundred (100) square feet of roof* VII. 3AF5TY A. This Contractor and his employees shall abide by all Special Safety Rules in force in Owner*a Plant and comply in general with all provisions of the American Standard Safety Code for Building Construction, as sponsored by the American Institute of Architects and the Rational Safety Council, and approved June 7* 1944 by the American Standards Association, 76016.00 Kay 26, 1952 W.0. 1575 RT-4 UCASB00248302 ROOF TILS. PRECAST ("KAILO") FIH.. CLEANUP A, Leave tile deck clean and smooth for the Roofing Contractor. B, At completion of this contract, all tools, equipment surplus materials and debris remaining from this work shall he removed from the premises, C, Any work of this and/or other trades damaged in the execution of this contract, shall be thoroughly cleaned, repaired, and/or replaced, as directed by the Engineer, at this "Contractor1s" expense. May 26, 1952 v;.0. 1575 RT-5 UCASB00248303