This is the July 1, 1971 status of the PCB-Pollution Control P
I. PCB Level in Sewers
Aroclor sewer loss control data are attached. Average
monthly daily PCB losses from the plant and the
treatment plant influent and effluent values are plotted
to better see how well we are doing in our attempts to
. get to a daily loss of 2 #/day.
'
.
- ' A. Aroclor Department - In late May. and early June,high daily losses (15 - 148#/day) were showing up in sampler. No known losses were occurring. We believe this reflects the 500 gallon loss that happened in May. Since. June 10, daily losses have averaged about 1 #/day.
B. Total Plant - Plant exit losses as measured
from the 24 and 30 inch plant sewers continue
downward trend. June average about 16#/day.
However, treatment plant influent figures are
about five times greater. We are trying to
resolve this discrepancy.
.
-
C. -. -
Treatment Plant Effluent - June average about 40#/day. We should begin to see a downward trend as residual Aroclor within the entire sewer system is flushed by intermittent high flows. The only source for Aroclor loss within the plant is the Aroclor Dept. , the Aroclor Incinerator, andthe Repair Track.
`
n
7
DSW 247459
STLCOPCB4054025
Mr. J. R. Savage Status - PCB Pollution
Control Program_____ _
Page 2 WGK .. ' .7/2/71
II. Project Status
All Therminol units in the plant have been changed to non-PCB fluids.
Estimate No.
.
2095
"Aroclor Scrap Rework" - EDC changed from 7/1/71 to 8/1/71. To permit proper rework of returned material to Dept. 246.
2422 . ` .
"Paving and Curbing" - EDC changed from 8/1/71 to 9/1/71. To contain losses in tank car and storage area in Dept. 246.
. 2482
"Contaminant Collection at Rip Track" - EDC 9/1/71. To permit recovery of T/C washings and draining.
2675
"Air Pollution Control" - Design package to be issued in August. Nitrogen blanket on mix tanks to eliminate atmospheric pollution in Dept. 246.
2811
"Pave under Therminol Unit" --EDC 8/1/71. Contain material in Dept. 246.
3102
"Enlarge Aroclor Settling Basin" - Design package to be issued in July. .
III. Program Status
In addition to routine sewer samples`taken, a few other samples are
being taken to help resolve discrepancy between plant exit and treat
ment plant influent.
_
/emz Att. .
Edward Stewart
. DSW 247460
STLCOPCB4054026
r 2 0 X 2 0 TO THE IN C H 4 6 1 2 4 0
7 X lo IN C III-!*
A D I IN U S .A .
K ia iF T t L A ESSC.R C O .
STLCOPCB4054027