S TO: FROM: DATE: SUBJECT: Distribution /1fJ____Max Hekmat fiyfj January 25, 1990 1990 I. H. Monitoring Plan Enclosed is a copy of the 1990 Industrial Hygiene Monitoring Plan. This plan ' has changed from that of 1989. Some of'the major changesare: 1. Addition of Ethylene Dichloride Monitoring (due to lowered IPEL). 2. Addition of Tetra operation (1,1,2,2, tetra chloroethane) monitoring (due to the increase of activity in this area). 3. Elimination of "Monitoring for Medical Approval". 4. Increase in the number of samples for SPS (Amorphous Silica). 5. Update of the Noise Monitoring Strategy. 6. Change of the Special Project. Some people are receiving this copy for Informational purposes only. Others may need to arrange some activities based on the plan. Note to Lab: Due to Chemical Division requirements. Industrial Hygiene needs to report the Industrial Hygiene monitoring progress quarterly. Please make the appropriate arrangements so I can handle the progress report on time. MH/lbn Enclosure Distribution: Mark Wood - 3 copies Jim Wyche Dr. Looney Bob McCorquodale A1 Bresley/Shift Safety Safety Personnel Clyde Dennis tWim Barter - G.O. 36 Wl Loren Anderson - G. 0. 36 Wl Ron Williams Chuck Belion SL 043091 PPG INDUSTRIES, INC. Lake Charles, LA Industrial Hygiene 1990 Monitoring Strategy Contents I. II. III. IV. V. VI. Core Monitoring Program ........................................................................................................ General Monitoring Program ............................................................................................... Noise Monitoring ......................................................................................................................... Special Project ........................................................................................................................... 12-Hour Shift ................................................................................................................................ Summary and Approvals ............................................................................................................. 2 7 14 14 15 17 Introduction and Organization This document sets forth the minimum acceptable level of monitoring to be conducted during 1990. Any changes made are to be documented and may be made only after the prior joint approval of the Industrial Hygienist and the Manager of Environmental Programs. There are five parts to this strategy. Each shall be given equal priority. Each has a separate timetable for determining progress. Each lists the specific accountabilities for completion. Additional information on :he Lake Charles Indust*ial Hygiene Monitoring Program regarding program accounts! ilities, results reporting, etc., may be found in Safety Bulletin # 26. 043092 Sh 1990 I. H. Monitoring Strategy Page 2 1. CORE Program Purpose This activity insures that the air monitoring requirements of OSHA 191.0,1001 (Asbestos' - General Industry), 1926.58 (Asbestos - Construction). and 1910,1017 (Vinyl,Chloride) are met. Program Accountability The Environmental Lab Group will be responsible for conducting all sampling, conducting or arranging for all analyses, cooperating with Industrial Hygiene on any special project(s) for conducting extra samples and entering the data into the A/P System. The Industrial Hygiene group will be responsible for developing the monitoring strategy, altering the strategy throughout the year as the need arises and arranging the schedule(s) with Environmental Lab, back shift sampling, coordinating any necessary remedial actions, and reporting on progress to the Manager of Employee Health and Industrial Hygiene. Timetable The program year (1990) will be divided into two segments ending June 15 and November 15. Each cycle must be completed by these dates. Progress towards completion will be reported quarterly to Industrial Hygiene. Follow-up Samples In the event that any sample taken shows an exposure level in excess of the Action level, a second, follow-up sample will be collected within 6 months from receipt of the analysis. And in case any sample shows an exposure level above the IPEL, a second, follow-up sample will be collected within 7 working days of receipt of the analysis. Such follow-up samples shall not count towards the satisfaction of the required monitoring activity levels. Instead, they shall be considered special investigative samples. If the second sample verifies an exposure problem or potential problem, the respective Area Supervisor will be contacted to implement immediate corrective actions. Exceptions to this are known exposure problem areas where engineering controls are not feasible and use of personal protective equipment is already mandated. Samples to be Collected ASBESTOS (using OSHA Reference Method) A. Chlor/Alkali - Plant "A" Operations 1. Personnel monitoring, by job title and task - all to be 8 TWA samples - Cell Renewalman, working in processing room 2 per segment - Cell Renewalman, clng/water blasting old elements 2 per segment - Cell Renewalman, depositing new diaphragms 1 per segment - Cell Renewalman, reassembling cells 1 per segment - Cell Tenders, mixing slurries and "doping cells" 1 per segment - Cell Renewal Foreman, daily tasks 2 per segment SL 043093 1990 1. H. Monitoring Strategy Page 3 2, Area Monitoring - High Volume Samplers, 8 hour sample - Processing Rooms, between glove boxes, during use - Processing Rooms, at dust collector return air plenum - Manual wash stations, during element cleaning - Exterior balancing air discharge of dust collectors 2 per segment 2 per segment 1 per segment 1 per segment Total Plant "A" Operations Samples 15 per segment B. Chlor/Alkali Plant "A" Maintenance - Cell Related 1. Personnel Monitoring - 8 hour TWA samples - Machinists, repairing cell elements - Welders, repairing cell elements - Janitors, while cleaning cell maintenance areas - Any skill, performing maintenance on processing room or depositing equipment 3 per segment 2 per segment 1 per segment each work order 2. Area Monitoring - High Volume Samplers - 8 hour - General Maintenance Shop areas - Any area, during maintenance work on asbestos contaminated equipment 3 per segment each work order Total Plant "A" Maint. - Cell Related Samples 9+ per segment C. Chlor/Alkali Plant "C" Operations 1. Personnel monitoring, by job title and task - all to be 8 hour TWA samples - Cell Renewalman, working in processing room - Cell Renewalman, clng/water blasting old elements - Cell Renewalman, depositing new diaphragms - Cell Renewalman, reassembling cells - Cell Tenders, mixing slurries and "doping cells" - Cell Renewal Foreman, daily tasks 2 per segment 2 per segment 1 per segment 1 per segment 1 per segment 2 per segment 2. Area Monitoring - High Volume Samplers, 8 hour sample - Processing Rooms, between the glove boxes, during use - Processing Rooms, at dust collector return air plenum - Manual wash stations, during element cleaning - Exterior balancing air discharge of dust collectors 2 per segment 2 per segment 1 per segment 1 per segment Total Plant "C" Operations Samples 15 per segment S, ^ r 1990 I, H. Monitoring Strategy Page 4 D. Chlor/Alkali Plant "C" Maintenance - Cell related 1. Personnel Monitoring - 8 hour TWA samples. - Machinists, repairing cell elements - Welders., repairing cell elements - Janitors, while cleaning cell maintenance areas r any skill, performing maintenance.on processing room or depositing equipment 3 per segment 2 per segment 1 per segment 2. Area Monitoring - High Volume Samplers - 8 hour TWAs - General Maintenance Shop areas - any area, during maintenance work on asbestos contaminated equipment 3 per segment each work order Total Plant "C" Maint.-Cell related samples 9+ per segment E. Maintenance - Insulation Removal, Minor Jobs Both personnel and area monitoring are conducted under OSHA 1926,58 (Asbestos-Construction standard). It is reasonable to expect that at least 2 minor jobs per week will occur somewhere within the complex, though that may vary substantially. Each job monitored will require that at least 3 samples are collected (1 personnel and 2 area samples). Total Maintenance - Removal Samples 78 per segment F. Laboratory - Asbestos Related 1, Personnel Monitoring - 8 hour TWA samples. - Lab Analysts, conducting asbestos slurry Q.C, - Lab Analysts, conducting asbestos shipment Q.C. using "shaker" at Plant A Processing Room 3 per segment as performed 2. Area Monitoring - High Volume Samplers, 8 hour - Asbestos Quality Control Lab Area (Plant A) 2 per segment Total Laboratory Samples 5+ per segment TOTAL ASBESTOS SAMPLES 131+ per segment 043095 SL 1990 I. H. Monitoring Strategy Page 5 VINYL CHLORIDE - Personnel monitoring only, by jobtitle and type of sample, A. Operations - with 60% of samples done on Day Shift, 40% Backshifts. 1. Tri-Ethane II - Auxiliary Operator, TWA - Auxiliary Operator, STEL, catching/analyzing samples - Furnace Operator, TWA 2 per segin ht 4 per segment 2 per segment 2. VCM II - Auxiliary Operator, TWA - Auxiliary Operator, STEL, catching/analyzing samples - Process (Vinyl) Operator, TWA 2 per segment 4 per segment 4 per segment Total Operations Samples 18 per segment B. Maintenance - All TWA samples unless otherwise noted. Note: Work order numbers should be entered on data sheets. 1. T.E. II Shop - Instrument Mech., w/work order for Furnace Area - Machinist, w/work order for Furnace Area - Pipefitter, w/work order for Furnace Area - Welder, w/work order for Furnace Area - Yardcrew, dumping Tar Buggy from Furnace Area, TWA - Yardcrew, dumping Tar Buggy from Furnace Area, STEL 1 per segment 1 per segment 1 per segment 1 per segment 1 per segment 1 per segment 2. VCM II Shop - Instrument Mech., w/work order for Furnace Area - Instrument Mech., w/work order for Process Area - Machinist, w/work order for Furnace Area - Machinist, w/work order for Process Area - Pipefitter, w/work order for Furnace Area - Pipefitter, w/work order for Process Area - Welder, w/work order for Furnace Area - Welder, w/work order for Process Area - Yardcrew, dumping Tar Buggy from Furnace Area, TWA - Yardcrew, dumping Tar Buggy from Furnace Area, STEL - Yardcrew, w/work order for Process Area Total Maintenance Samples 1 per segment 2 per segment 1 per segment 2 per segment 1 per segment 2 per segment 1 per segment 2 per segment 1 per segment 1 per segment 2 per segment 22 per segment 043096 SL 1990 I. H. Monitoring Strategy Page 6 C. Shipping 1. Vinyl Loading Rack - Tankerman, TWA - Tankerman, STEL - disconnecting hoses - Tankerman's Helper - TWA - Tankerman's Helper - STEL, disconnecting hoses 2. Barge/Ship Loading Dock - Tankerman, STEL - Tankerman, STEL - disconnecting hoses - Tankerman Helper, STEL - Tankerman Helper, STEL - disconnecting hoses Total Shipping Samples D. Laboratory - All TWA Samples 1. Organics Quality Control Lab - Lab Analyst Performing Q.C. Samples 2. Vinyl Quality Control Lab - Lab Analyst Performing Q.C. Samples Total Laboratory Samples TOTAL VINYL CHLORIDE SAMPLES GRAND TOTAL CORE MONITORING SAMPLES 2 per segment 2 per segment 3 per segment 3 per segment as available as available as available as available 10+ per segment 2 per segment 2 per segment 4 per segment 54+ per segment 185+ per segment 0430971 Si* 1990 I. H. Monitoring StrategyPage 7 II. General Monitoring Purpose 1. Insure that employee exposure profiles remain current. 2.. Identify jobs or tasks which require that controls (engineering, . administrative or PPE). be implemented to prevent or minimize employee exposure; 3. Document, where respiratory protection is required, that the devices used provide the necessary protection factors. Program Accountabilities The Environmental Lab Group will be responsible for conducting all sampling (unless noted otherwise), conducting or arranging for all analyses, cooperating with Industrial Hygiene on any special project(s) for conducting extra samples and entering the data into the A/P System. The Industrial Hygiene group will be responsible for developing the monitoring strategy, altering the strategy throughout the year as the need arises, and arrange the schedule(s) with Environmental Lab, back shift sampling, coordinating any necessary remedial actions, and reporting on progress to the Manager of Employee Health and Industrial Hygiene. Focus for 1990 Program The General Monitoring Program for 1990 will focus primarily on those exposure hazards/jobs which received minimal attention during 1988 and 1989. Derivatives Area sampling, other than the Core Program will receive only that amount of sampling needed to verify and keep current the employee exposure profile. This approach will enable future monitoring strategies to balance sampling efforts between inorganic and organic hazards. Timetable The sampling "year" will end on November 30, 1990. Each targeted chemical (i.e., chlorine, mercury, etc.) must have all sampling completed (and resultant data entered) by that date. Progress towards completion will be entered monthly on a Quality chart. Satisfactory progress will be considered 25% by 4/30, 60% by 7/31, 80% by 9/30 and complete by 11/30, Follow-up Samples In the event that any sample taken shows an exposure level in excess of the Action Level, a second, follow-up sample will be collected within 6 months from receipt of the analysis. And in case any sample shows an exposure level above the IPEL, a second, follow-up, sample will be collected within 7 working days of receipt of the analysis. Such follow-up samples will not count towards satisfaction of the required monitoring activity levels. Instead, SL 043098 1990 I. H, Monitoring Strategy Page 8 they will be considered special investigative samples. If the second sample verifies an exposure problem or potential problems, the respective Area Supervisor will be contacted to implement immediate corrective actions. Exceptions to this are known exposure problem areas where engineering controls are not feasible and use of personal protective equipment is already mandated. Samples to be Collected Note: For any job title listed that works shift - at least 40% of sampling must be done on back-shifts. A. Chlorine (all STEL) 1. Chlor/Alkali Electrolyzers - Cell Tenders - during sampling rounds --------------------------- Cell Operator (days) - sampling............... - Renewalman - during all cut-out ---------------- Renewal Helper-------------------------- Total Electrolyzer Samples 10 5 10 10 35 Mercury Cells - Cell Tenders - during sampling and adjustments ------------------------ Cell Room Operator - during rounds.................................-........................ - Cell Renewer, during all cut-out----------------------------------------------------- Cell Cut-out Helper, during all cut-out................................................ Total Mercury Cell Samples..................................................................... 10 5 5 5 25 Chlorine "C" - Glanor Auxiliary Operator, during sample rounds........................ - Glanor Renewal Man, during cut-out----------------------- Glanor Renewal Man, during cut-out --------------------------------------------------- Total "C" Chlorine Samples --------------------------------------------------------------- 10 5 5 20 2. Shipping - Tankerman, disconnecting rail cars --------------------------------------------------- Tankerman, disconnecting barges-------------------- Tankerman Helper, disconnecting rail cars --------------------- Tankerman Helper, disconnecting barges------------------------ Total Shipping Samples ...................................................................................... 8 8 8 8 32. 3. Laboratory - Lab Analysts, catching Cl* samples ------------------ Lab Analysts, analyzing CI,, samples ------------------------------------------------- Total Lab Samples -------------------------------------------------------........................ 5 5 10 TOTAL CHLORINE SAMPLES 043099 SL 122 1990 I. H. Monitoring Strategy Page 9 B. CPC - (When Unit is Operating) Analyze all samples for CPC, DCPC & PvCl. 1. CPC Unit - CPC Operator, TWA sample ------------------------------------------------------------------------ CPC Operator, conducting rounds, STEL..................................................... * CPC Operator, unloading PvCl Shipments, STEL -.........................--- Total CPC Unit Samples -------------------------------------------------------------- 5 5 _4 14 2. Laboratory - Lab Analysts doing Q.C., TWA -..................-............-...................-............... - Lab Analysts doing Q.C., STEL -------------------------------------------------------------- Total Lab Samples------------------------------------------------------------------------- 2 4 6 3. Maintenance - Instrument Mechanic, working in Unit, TWA ------------------------------------ Machinist, working in Unit, TWA--------------------------------- Pipefitter, working in Unit, TWA..............................-................................ - Welder, working in Unit, TWA ............................................................................ - Yard Crew, working in Unit, TWA............................................................ Total Maintenance Samples-------------------------------------------------------- 3 3 3 3 _3 15 A. Shipping - Tankerman, loading CPC, TWA.............................................................................. - Tankerman, disconnecting loading hoses, STEL------------------- Tankerman Helper, loading CPC, TWA -.......................................................... - Tankerman Helper, disconnecting loadinghoses, STEL ----------------- Total Shipping Samples .......................................................................... 2 4 2 _4 12 TOTAL CPC SAMPLES....................................................................-......................................................... 47 C. Ethylene Pichloride (EDC) - All samples are TWA unless otherwise noted. 1. Shipping - Loading tank cars, STEL-------------------------------------------------....................-- - Loading trucks, STEL--------------------------------------------------------------...........-- - Unloading tank cars, STEL.............................................................................. * Connecting barge, STEL--------------------------------------------------------------------------- Disconnecting barge, STEL--------------------------------------------------------------------- Loading barge...........................................................................................................- - Total Shipping Samples 5 5 7 9 9 9 44 SL 43100 1990 I. H. Monitoring Strategy Page 10 2. VCM II - Lead operator ............................................................................................................... 4 - Auxilliary operator, STEL, TWA.....................*................................................4,2 - EDC operator................-................................................................................................ 4 - OHC operator .........................................-......................................................................... 5 - VC process operator........................................-...................................................... 5 - Storage operator ----------------------------------...........................................................- 5 - Maintenance ----------------------------------------------------------------------------- - -.................- _5 Total VCM II 34- 3. Tri II - Lead Operator.............................................-................................................................ 4 - OHC operator.....................................................-...................-..................................... 4 - Furnace/Cooling tower operator...................................................................... 4 - MC/DCE operator------------------------------- 4 - Auxilliary operator, STEL, TWA............................................-.........................4,2 Total Tri II 22 4. Per-Tri - Lead operator...........---------------------------------------------------------------------------------- Still line--------------------------------------- Reactor ------------------------- Auxiliary, STEL, TWA................................... Total Per-Tri 4 4 4 4^2 18 5. EDC/VDCM - Lead EDC/VDCM/TRANSoperator ------------------------------------------------------------------- 4 - B operator, STEL, TWA............................. 4,2 - Auxiliary operator, STEL, TWA...........-...............-..........................................4,2 Total EDC/VDCM 16 6. EC/HC1 - Lead operator--------------------------- 4 - B operator, STEL, TWA.............-..............-...........................-..............................4^2 Total EC/HC1 10 7. WTU - Lead operator --------------------------- 4 - Incinerator operator...........-................................................................................- 4 - CPC operator, STEL, TWA........................................................-...........................4,2 - Bat operator------------------------------------------------------ 4 - Tetra operator----------------------------- 4 - WTU operator -------------------------------------------------------------------------------------------------- 4 - Auxiliary operator,STEL, TWA------------------------------- 4,2 Total WTU 1 32 TOTAL EDC SAMPLES................-...........................................................................-................................176 SL 043101) 1990 I. H. Monitoring Strategy Page 11 D. Chlorinated Hydrocarbons (C^ & C^ compounds) All listed job titles to be sampled twice, 1 on Days, and 1 on either Evenings or Graveyards. All samples to be TWAs. Note: This list does not include job titles covered under the CORE Program. 1. Derivatives. - General - Shift'Supervisor 2. EC/HCl - EC/HCl Operator - Lead Operator 3. EDC/VPC - EDC/VDC Operator - Lead Operator 4. Per/Tri - Auxiliary Operator - Lead Operator - Reactor Operator - Still Operator 5. Shipping at Solvents Loading Rack - Tankerman - Tankerman Helper 6. Tri-Ethane II - Lead Operator - MC-DCE Operator - OHC Operator 7. VCM II - EDC Operator - EDC Lead Operator - OHC Operator - Storage Operator - Vinyl Lead Operator SL 043102 1990 I. H. Monitoring Strategy Page 12 8. WTU - Auxiliary Operator - CPC Operator, while not workin in CPC Unit - Incinerator Operator - Tetra Operator - WTU Operator 9. EDC/VDCM - Tetra operation (1,1,2,2, tetra chloroethane) TOTAL DERIVATIVES SAMPLES (25 X 2) ...........................................-.................................... 50+ D. Hydrogen Sulfide Plant A - Mercury Cell Area Samples - 8 hour, around Sulfide treatment systems -------------------- 8 Brine/Environmental Operator * TWA.......................................................-...............- 6 Brine/Environmental Operator, during NASH addition, etc., - STEL _____8_ TOTAL H2S SAMPLES...........-...................................................-............-......................... 22 E. Mercury - all TWA Samples 1. Mercury Cell Operations - Brine/Environmental Operator ------------------------------------------------------------ Cell/Area Operator---------------- Utility Operator------------------------------------------------------------------------------------ Cell Room Operator.............................................-............................................... - Cell Tender --------------------------------------------------------------------------------------------- Lead Operator-------------------------------- Cell Builder ---------------------------------------------------------------------------------------------- Cell Cut-outHelper--------------- Cell Renewer-------------------------------- Total Operations Samples --------------------------------------------------- 3 3 3 3 5 2 5 5 5 34 2. Mercury Cell Maintenance - Electrician working in Cell Area --........................................................ - Insulator working in Cell Area..........................-...............--............... - Instrument Mechanic working inCell Area ------------------------------------- Machinist working in Cell Area --....................... - Machinist rebuilding pumps..............-............. - Pipefitter rebuilding pumps -------------------------------------------------------------- Welder working in Cell Area..................-------------------------------------------- Yard Crew working Cell Area...........----------------------------------------------2 Total Maintenance---------------------------------------------------------------------- 2 2 2 2 2 2 2 16 TOTAL MERCURY SAMPLES ..........................................................................................-.................... SL *3l03) 50 1990 X. H. Monitoring Strategy Page 13 F. Silica - Crystalline Conduct both respirable and total dust sampling. 1. "A" Sandblast Yard - Area samples at perimeter, downwind.................... - Painter - as "pot watcher" during blasting --........................... Total Samples.....................-..........................................-............-- 2. "C" Sandblast Yard - Area samples at perimeter, downwind -------------------------------------------- Painter, as "pot watcher", during blasting---------------- Total Samples.................................-------------- 8 8 16 8 _J3 16 TOTAL SILICA SAMPLES .................................-...................................................................... G. Synthetic Precipitated Silica (Amorphous) Conduct both respirable and total dust sampling, all TWA. 1. Dryer Building - Dryer Auxilliary Operator ------------------------------------------------------------ Dryer Building Operator--------------------------------------------------------------- 2. Silica Shipping - Packer...............................-...........................-...................................................... - Shipper----------------------------------------------------------------------------------------------- 32 16 16 25 16 TOTAL SPS SAMPLES.................................-.............................-................................................ 73 H. Welding Fume Analyze as total welding fume and the appropriate oxide. Plant C Welding Shop - Area samples - in vicinity of ongoing work------------------------ Welders - TWAs ..................----------------------------------------------------------------- 10/10 10/10 TOTAL WELDING FUME AND OXIDES SAMPLES ....................................................... 40 GRAND TOTAL GENERAL MONITORING................................................................................. SL 04310A) 612+ 1990 I. H. Monitoring Strategy Page 14 III. Noise Monitoring Purpose The Lake Charles Hearing Conservation Program (HCP) was reviewed and updated during 1989. The monitoring program will always concentrate on jobs not previously evaluated and insure the status of job classes not previously included In the Audiometric Testing Program. This monitoring will evaluate jobs currently included in the Audiometric Testing Program. The above conditions will be satisfied by taking requisite number of samples for every job classification in each unit. Program Accountability The Industrial Hygienist will identify job classes not previously monitored, or monitored and not included in the Program (because the TWA was less than 85dBA. He will provide this information to the Plant Safety Representatives. The Plant Safety Representative will, as a team, devise a schedule for conducting the necessary noise dosimetry. They will conduct the sampling, complete the necessary forms, and return data to the Industrial Hygienist for review, and entry to the A/P System. Sampling Distribution & Number A sufficient number of samples will be considered 75% of the number of employees assigned to the job class (or five samples - whichever is less). Job classes which involve shift work will have at least 40% of sampling done on "backshifts". Total number of determinations complex wide will be approximately as follows: Monitored But Not Included in HCP On HCP 210 + HQ -f320 + IV. Special Projects Due to the nature of the process, there may be projects that have not been anticiated in the monitoring strategy; this section is reserved for these special projects. It is Industrial Hygiene's responsibility to identify and schedule such projects as necessary. SL 043105 1990 I. H. Monitoring Strategy Page 15 V. Twelve Hour Shift 1989 was the first year for Lake Charles Plant to operate on a 12-hour shift on a broad basis. The lengthened work shift will impact the monitoring program in several areas as follows: 1. ) Noise - When noise monitored for a 12 hour shift, the dosimeter will be worn for the entire shift. The "twelve hour shift" samples will be converted to equivalent eight hour readings. This will be done using the formula: (T /T )xD - D tt S S A where: (Dose is a linear function) T is the total time Tg is the total sample time Dg is dose calculated by the MK-1 Da is the dose used in the TWA formula. Da replaces D in the following formula to calculate TWA. TWA - 16.61 Log(D/100)+90 where: TWA is the eight hour time weighted average D is actual accumulated dose in percent exposure. The threshold for entering an employee's job classification in the Hearing Conservation Program will be a noise dose of 85 dBA or greater. 2. ) IPEL's For All Other Materials - For the most part exposure monitoring for shift workers is done for substances which exhibit their toxic effects through chronic, low level exposure. Measurement could, from a theoretical standpoint, just as well be measured over a work week or year as it could multiple individual work shifts without regard to whether those shifts are of 8 or 12 hours. Since the time worked (and hence exposed) during a week, month, year or working lifetime is roughly the same under either shift schedule, there is no need to make an adjustment in IPEL's for the 12-hour shift. For acutely toxic materials it may be necessary to make a downward adjustment in IPEL. Half of the existing IPEL will be considered to accommodate the potentially increased dose and reduced recovery time (time from the end of one shift to the beginning of the next). At this writing, no reductions of IPELs have been undertaken. For chronically toxic materials a substance by substance review may reveal the need for reduced IPELs due to short biological half-life but such reductions are not anticipated at this time. Finally, the ACGIH-TLV Committee is addressing TLV considerations for novel work schedules including the 12-hour shift. Decisions and recommendations of the Committee are anticipated for incorporation in the next publication of this document. 0A3lOfe) 1990 I. H, Monitoring Strategy Page 16 Until contraindicated, exposure monitoring will continue on an 8-hour basis for 12-hour shift employees. However, some administrative methods will be used to help ensure this monitoring encompasses the representative and worst case exposure conditions for the shift. 3. Monitoring Equipment - Should it become necessary to monitor continuously for 12 hours, some accommodations may be necessary to ensure the equipment used for sample collection functions for this length of time. This may require some administrative modifications and/or acquisition of equipment. SL 043107 1990 I. H. Monitoring Strategy Page 17 VII. Summary and Approvals of Scheduled Monitoring Activity for the 1990 Program Section Item Number of Samples I. Core Asbestos Vinyl Chloride 262 + 108 + II. General Chlorine CPC (and related) EDC Chlorinated hydrocarbons Hydrogen sulfide Mercury Silica - crystalline Synthetic precip. Silica Welding Fume 122 47 176 50+ 22 50 32 73 40 III. IV. Noise Special Project Noise Dosimetry 320 + 90 + GRAND TOTAL 1990 MONITORING Approvals: 1,392 + R. H. Williams, Manager Employee Health & Industrial Hygiene JjM/ufAwc, J. E. Wyc^fe lanager Environmental Programs 4/j* /9c Date //13/90 ate M. J. Hekmat Industrial Hygienist 0A3108 St