AprXl ^L" s :n r m'T
r.".ww
|
iZ** A* L. Babbe, was- t Bake Ci ty
cc- R.F.licalvenny C.C.Burt
Dear Sir:-
BLAdT FURNACE AKD VLKTILATIOK BAGHOUSE
Mr. Burt with bis letter of April 16th enclosed cost estimate for the new baghouae as follows
Baghouse is.ns and flues
91,000.00 27.000.00 $118,000.00
iir. English has prepared an estimate covering the work that the plant will have to do, this including a third rail for a
5CJ ft. extension of the standard gauge track, 150 ft. of 20" gauge track, turn-tables, loading trestle and two additional dust cars totaling $5715*00. This total Includes 2Q% for contin gencies and would be added to the amount of $116,000, making the
total request $123,715.00.
Messrs. Stryker, English and I have reviewed your letter of April 15th wherein you state there is not sufficient draft in the hoods of machines #1, #2 and #3 to take care of 10,COO cu. ft. of sinter plant ventilation gases, but that the sane could be
h-udled by the i-5 machine. However, Hr. Burt in his letter of April 16th said you were out to the plant the previous day and went over the question of ventilating smoke in detail and that your final recommendation was to discharge the ventilating smoke from the dressing plant to atmosphere through stack and to put the
sinter crushing ventilating gas into the blast furnace flue. Hr. Burt enclosed Drawing P-3o24 revised accordingly.
I think probably you are correct in figuring that we should discharge dross reverb ventilation smoke to atmosphere al though in general I don* t like it. As stated In my letter of April 4th if we included this in the ventilation side of the new baghouse we would have a volume of 225 C.F.H. per bag which would increase to 337*5 C.F.H. per bag when shaking an 60 bag section. At such times undoubtedly our dross reverb draft would be very poor and I believe, as you do. It is more important to insure good draft on the dross reverb than to baghouse . the drossing plant ventilation
gases. This change, therefore, has our approval.
However, I do not understand why you have decided to put
tiie sinter crushing ventilation gas to the blast furnace flue thus
adding 13,000 additional cubic feet to the new baghouse and why you
have rejected the scheme of discharging this to hoods of present
sintering machines which does not add at all to the volume handled
in the present D & L. baghouse. It seems to me by doing as you now
reconmend you are using the limited capacity of the new baghouse
for 10,000 cu. ft. which could just as well be eliminated. Will you
_ j-i ,,
vAii Viave reached this decision.
HER 0000176
For lr. Burt's information on April 19 th we ordered Gllsonite primer and Gilsonite flue cement from the he-nu-it Cor poration and the Missouri Paint and Varnish Company in the quanti ties suggested in his letter of April 16th.
The plans and specifications for the new beghouse h.ve been submitted to four local contractors with request that bids be returned by April 30th. I am holding up submittal of the formal appropriation request until these bids are in so thit they say be compared with cost estimate Mr. Burt forv;arded.
Yours very truly. J D. liacKN2IE.
HER 0000177