Document 6b1Dmke8L555p4J153jeY9OZg

/1 its 6 n 6 o e c vO o UNITED STATES GYPSUM GOMPANY GENERAL APPLICATION DETAILS Preparation and Other Requirements of Roof Decks and Sur faces to Receive All Types of U S G Asbestos Cement Shingles Construction of roof docks and provisions for satis* factory surfaces to receive USG Asbestos Cement Shingles are not included in the individual USG Asbestos Shingle Application Instructions. Therefore, the following general provisions should be carefully checked by the applicator before beginning work. Shingles shall not be applied on roofs having a slope of less than 4 inches to the foot. Minimum Pitch ' American Method Asbestos Cement Shingles--4" in 12". Hexagonal and Dutch Lap Asbestos Cement Shingles--5" in 12". . Nails Nails for applying the shingles directly to roof decks shall be galvanized or copper, barbed. I1/* inches long for new work, and with heads not less than inch in diameter. Nails for applying shingles over wooden shingles shall be galvanized or copper, barbed. 2 inches long, and with heads not less than % inch in di ameter. Nails for fastening down waterproofing felt shall be galvanized, barbed. 1 inch long, and with heads not less than 5/j inch in diameter. The discs or caps shall be not less than l1/* inches in diameter and shall be flat. Bell or cup shaped caps should not be used. Note: Nails for sheet metal work shall correspond to the type of sheet metal used. New Wood Decks Decks should be constructed of matched tongue and groove, well seasoned or treated lumber of uniform thickness. Boards should be dry. smooth, and free from wide cracks or large knot holes, and should be laid close together. Boards should have solid bearings at ends and be securely nailed to each rafter with not less than two face nails, heads to he driven flush with the surface of the boards. Before applying the shingles, the roof surface shall be swept dean. All loose boards shall be se curely nailed in place and all knot holes or other openings or cracks 1/4 inch dr more in width shall be smoothly covered with sheet metal securely nailed in place on one side only. All nails or other projections that might pierce the shingles shall be removed. Shingles shall not be applied when rain is falling, . nor during weather cold enough to prevent the work being done in the proper manner. All material shall be housed or protected from the elements or other sources of damage. Shingles shall be stacked on end on planks off the ground. Over the entire surface to be covered by shingles, lay one thickness of 15-pound Asphalt Water proofing Felt lapping all seams at hip. ridge and valley 12" and all other seams 4". Nail felt sufficiently to hold in place until shingles are applied. Proper pitch for the shingles at the eaves is obtained by applying a cant strip l/^xP/j" Hush and parallel with the eaves. See Detail No. 1. FLASHING--GENERAL All intersections of roofs with vertical surfaces of every land and all openings in roof surfaces should be flashed with sheet metaL L e., copper, zinc, lead or tin. The method should be base and counlerflash- ~ ing--eee detail No. 7, 8 and 9. Base flashing should be not less than 4" high and should extend not less than 4" out on the roof. Counterflashing should turn down over base flashing not less than 4". When attached to masonry walls counterflashing should extend back into raggle joints not loss than 1" and be securely wedged in place. Raggle joint should be completely pointed up with plastic ce- menL Step-flashing should be used where vertical surfaces occur on sloped surfaces. Step-flashing should be formod of separate pieces of shoot metaL properly inserted in raggle groove and lapped 3" but not less than 2". Step-flashing should not be soldered. .' 960 tiOOdOI i detail No. 3. Embed shingles that border on val ley in Asbestos Slaters* Cement When two unequal slopes meet the steeper side will send down a greater quantity of rain water at a greater pace than the other side. Unchecked, the water may back up under the shingles, beyond the edges of the valley flashing. To act as a check, an inverted "V~ crimp should be formed in the valley. See detail No. 4, 5 and 6. When laying the valley it is a good plan to place a wood core under the inverted "V" to pre vent crushing while the roof is being laid. No. 2 Valley Flashing Apply sheet metal valleys to provide an opening not less than 4" wide. The proper width shall be determined as follows: Starting at the top width of ".4 increase the width 1" for every eight feet of length of the valley. Flashing pieces should be full length sheets and of sufficient width to cover the open portion of the valley and extend up under the roof shingles as far as possible without being pierced by the nails holding the shingles. Flashing should be constructed of one piece with no longi tudinal seams in the valley. Cross seams at the ends of the valley units should be locked * and soldered. Edges should be turned back Vz" and held in place by cleats spaced not more than 10" apart and nailed to' the deck with two nails. See VALLEY FLASHING No. 3 OP 00*1 0 9 6 2 No. 4 No. 5 [31 No.6 APPLICATION Chimney Flashing " Step-Dashing, as previously described, should he installed. If the chimney is located on a pitched rool and will receive on the high side the Dow of water from the slope of the roof, a "saddle** or "gus set** or "cricket" should be formed to direct the Dow of the water around the chimney. See detail No. 8. CPOO'J 0 9 6 3 Cap Flashing to lap a min. of 2 Flashing to extend up under shingles and up under cap flashing a minimum of 4 Metal covered saddle oriricket FLASHING FOR CH1MNY~0NSLOPE OF ROOF No. 8 FLASHING UNDER DORMER WINDOW SILL Siding Metal Flashing No. 9 Dormer Window Flashing Where dormer windows rest on the roof, construct a metal pan and insert to extend 4" down the root and 2" up the side of the studs. On new roois. omit the roof boards on the dormer overhang until the main courses of the shingles are applied. On old roois. provide a space oi ", in order to secure the proper clearance for the ap plication of the new shingles Oil the main roof at points where the dormer overhang occurs. See de tail No. 10, 11, 12 and 13. Perspective of" Flashing Pan Shin No. to DETAIL OF METAL PAN FOR DORMERS RESTING ON ROOF [] No.ll around the nails and strike the ollseL This will cut or draw the nails. Remove the old shingle and se cure a new one in place by driving one nail through a hole punched in the center of the shingle. Then slip a small piece of copper over the nail head and bend slightly to hold in place. See detail No. 14. No. 12 METHOD OF REMOVING AND REPLACING BROKEN AMERICAN METHOD SHINGLES No. u USG Hexagonal Shingles With hexagonal shingles, straighten up the storm anchors as shown in detail No. 15. Slip the ripper up under the broken shingle and hook around the nails, then strike the offset with a hammer and the nails will be cut off or drawn. Place a small piece of sheet copper over the storm anchor at "C" and nail it to the rooL Notch new shingle as shown, slip it in place and then bend down the storm anchors. t j9 6 0 tiO O J'J ' REMOVING AND REPLACING BROKEN SHINGLES No. 15 Little or no maintenance is required on asbestos cement shingles. Occasionally shingles become broken and must be replaced. U S G American Method Shingles To remove USG American Method Shingles easily, slip a nail ripper under the broken shingle; hook it USG Dutch Lap Shingles With Dutch Lap Shingles, bend up the storm an chors at "A" and "B". See detail No. 16. Shatter the broken shingles by a hammer blow on the cen ter. then remove the pieces. Insert the ripper under overlaying shingle and remove or cut off nails "C". [S] METHOD OF REMOVING AND REPLACING BROKEN DUTCH LAP SHINGLES No. 16 "D" and **E". Insert a new storm anchor in a new shingle. If it has been found that the old nails can not be withdrawn, notch the new shingle at nail holes as shown. Slide the new shingle into place over storm anchor at "B", raising overlaying shingle 'in nllrrmr msprtmn at **F" of new storm anchor in new shingle, then bend dowiTsfbnn anchors at~"A". "B" and "F." completing the job. RIDGES AND HIPS Ridge and. Hip Roll Construction Apply one l"x 2" furring- strip, edgewise, centered on ridge or hip. The furring strip shall'be high enough to give proper support to the ridge or hip roll but not raise it off the surface of the shingles. Project the strip 1" beyond the ridge or lower ends of the hips* The main body shingles on each side of the ridge or hip should be cut to fit snugly against each side of the furring strip. Cover the ridge or hip with a narrow strip of waterproofing felt, projecting the felt out on each side and under the adjacent shingles. See detail No. 17. ' Application of Ridge or Hip Roll The first section of the ridge or hip roll is 4et at the lowest point and secured with two nails, one near the lower end. and one at the upper or small end. At the latter point, nail through a copper ridge or hip roll clip, nail them at the upper end.and then all following sections of ridge, or hip roll are placed as follows: Set them in position against the ridge or hip roll clip, nail them at the upper end and then bend the copper clip down into position as shown. The lower end of the hip may be filled with Asbestos Slaters* Cement or a piece of shingle cut to fit On ridges, start the application of the ridge or hip roll at the end opposite the direction of prevail ing winds or storms; on dormers, start at the iront .and on hips at the lowest point CPOOH 0 9 6 5 DETAILS OF APPLICATION FOR* BOSTON FUDGE OR HIP No. 19 No. 20 No. 21 Boston Ridge or Hip Apply two l"x2" furring strips, flatwise, one on each side of the ridge or hip. Cut main body shingles to fit against the sides of the strips. Then apply a 6" strip of waterproofing felt and lap the ridge or hip shingles over it Allow a 2' head lap and 7" weather exposure on the shingles. Alternate or "weave" the long edges of the shingles and secure each with two nails. Point up all Joints with Asbestos Slaters' Cement. See detail No. 19 and 20. - Mitred Hip n When this construction is used the hip should be ^ reinforced with extra flashing strip of waterproofing felt, or preferably, sheet metal (copper). Shingles ** must be carefully mitred and applied in a bed of ^ Asbestos Slaters' Cement and carefully pointed ^ up with the same material. See detail No. 21. Cutting and Punching . USG Asbestos Cement shingles may be cut by scor ing with a sharp pointed awl and then breaking m Score shingle with sharp toot Place shingle over straight edge and strike with fist or hatchet METHOD OF CUTTING SHINGLES No. 22 Notching Attachment Punch for face nails No. 23 ASBESTOS SHINGLE CUTTER Adjust /here for thickness of shingles over any square edged surface. See detail No. 22., Holes may be punched with a sharpened nail set or bored with a hand drilL To make straight cuts, score thp shingle with the point of a chisel or hatchet blade. Then place it over a straight-edge and strike the overhanging part several blows with a hatchet or the fist. (A saw may also be used ior cutting but it involves unnecessary labor.) For circular or angular cuts, place the. shingle on a firm, smooth surface and punch holes in it with a pointed nail punch along the lines' to be cut Applicators should use an asbestos shingle cutter (see illustration No. 23) to cut and punch holes in shingles quickly, easily and accurately.--- -- - Old Wood Shingles Before applying USG Asbestos Cement Shingles, all badly warped wood shingles should be removed and replaced with new shingles, inserted to provide a, suitable anchorage for nailing USG Asbestos Cement Shingles. Curled shingles should be split and the comers securely nailed down. See detail No. 24. Valleys should be filled to the level of the surface ~ of the wood shingles with boards oi the -correct thickness before applying new valley construction. See detail No. 25. Gables REROOFING Old Wood Decks All rotted, splintered or weakened roof hoards should be removed and replaced wiih new roof boards. Draw down any roof boards that have warped or curled by renailing. Old shingles should be removed along overhang ing gables and replaced with boards 4 inches~wide of proper thickness to make the top surface level with the surface of the wood shingles. If desired, preformed sheet metal strips may -be used, nailed on 6" centers t/j" from the inner edge. See-'detail No. 26 and 27. .9 6 0 00 I No. 25 18] No. 27 Old Roofs Due to settling oi the building, old rools may be out oi square. It is important when such conditions are encountered that the measurement lines to guide application are at right angle to the eaves line. At the eaves allow only Vz* overhang instead of l", as when applying shingles directly to new roof decks. Bevel Stripping Where old wood shingles are in poor condition and the weather exposure of the new shingle does not coincide with that of the old shingles, apply 9/i"x 4" bevel strips to form even roof surface and to pro* vide suitable nailing surface for the USG Asbestos Cement Shingles. See detail No. 28. Cant Strip Remove existing eavo or cornice moulding and replace it (or apply new moulding) so as to project V4" above the roof boards or old shingles from which the edges have been cut See detail No. 29 and 30. Over Gypsum Tile Application of asbestos cement shingles to roofs of precast gypsum tile. having a slope up to 60, should be made with nails having not less than 2 in. penetration. When the slope of the roof is greater than 60 refer the . problem to the United States Gypsum Company's engineers for special study and recommendations. The roof deck should be thoroughly dry or as nearly so as can reasonably be obtained. Square cut cement coated Naval bronze nails have proved their superiority after a large number oi tests on all types. It is standard practice to use a sheet of water proofing felt between the gypsum roof deck and the asbestos cement shingles. No. 29 No. 30 19] ICATI0N 2TAILS /' NO. 100 HEXAGONAL For instructions regarding preparation of roof deck and application of ... Waterproofing Felt on new or reroofing work, see General Application Details. Hexagonal shingles must he lined up both hori zontally and vertically. It is advisable to start work at the center of the eaves line. Having found the Measure for center ef-Eeve *A - h. Roof board* Thani with i-4-5 method, find ^8 center line of roof Ley ihinjlei/ j5 rLay, fint eave itarter right end left from tin line./ fo |at c~ enter of eave under felt. Cnelk guide line* to be / " .Start second starter shingle parallel to eave line " 1 at center line ever felt.' / ~ ' -.-T Vjteryooflng - t1. . .. Project shingle* : /' ' I'beyond gable / ` ^edgeo ` ' * x: >'a' -i A Project shingle* \~^ beyond-edge of roof METHOD OF STARTING SHINGLES AT EAVES - No. 35 .. , center by measuring, snap a chalk line at right angles to the eaves as shown on Detail No. 35 to mark the center line of the roof. This right angle for the center line can be easily found by the 3-4-5 method as shown on Detail No. 35. Do not measure off a distance on the ridge equal to one-half of the - eaves- length and snap the line between theser two points, because roofs are often out of square. The ' center line would not be at right angles to the eaves and the shingles would not fit together as they should. The first eaves starter shall be nailed to the -sheathing board under the waterproofing felt and at the center of the eaves as shown on Detail No. 35. Work right and left from this shingle. Eaves starters shall extend one (1) inch beyond the eaves Waterproofing Felt \ Snap c.njik line* -T . i^T ___t-^garallel_to_e*v_ _ j/ 1 , .. . ,, l/\ Mam ,;Y\ Bodij Yihmgles Second Starter Singles/ -A . - A 0 X-v '-Eave Starter Sr.nties | METHOD OF APPLYING STARTERS AND MAIN BODY SHINGLES No. 36 . and one (1) inch beyond each gablo end and are always laid with the long dimension parallel to'the eaves line. One second starter shingle is laid at each side of the center line of the rooL breaking joints, with the eaves starter. A copper storm anchor is set be tween each two shingles into the slot: in the cor ners. The shingles are then nailed in place with the lower edge flush with the eaves starter, using two nails to each shingle in the holes provided. It will be found of great assistance in speeding up the work if horizontal chalk lines are snapped on the roof for each course of main body shingles. Lay the head of each course of shingles against this line as shown on Detail No. 36. When using a 16- inch shingle, allow 8 inches between lines. Several vertical chalk lines should be snapped to the right and left of the * center line and parallel to it -- -- --1ch+'k /mr$ on / ---- A-#.W UVt - running through the center of the eaves shingles. =w~" .0VV*TStCeP--J"t T.a.il"w! / af,-,--L--_--_---_- -------{.-ne-s. Set storm anchor In slot Place adjacent shingle _ u/PUce ./^overlapping /;..\ltorm arsdior IfS&Sisi nroou 0969 No. 38 METHOD OF INSTALLING STORM ANCHORS No. 39 No. 40 110] No. 41 LAYING OUT GUIDE LINES ABOUND OORMER No. 37 NO. 200 AMERICAN METHOD TAPERED For instructions regarding preparation of roof deck and application of . Waterproofing Felt on new or reroofing work, see General Application Details --'USG Asbestos Cement Shingles. Hie waterproofing felt along the eaves should be raised and then placed over the starters after they have been applied. * Vatcrproafinj fait. Roof Boards VH Joints Head lap riot less than 2" v- Snap Chalk Guide Unes parallel to eaves -A' Application of Starters Snap a chalk line parallel with the eave, 8" from the edge of the eave. Use portion of starter for first unit to break joints with first course of shingles above. Allow starter to project 1" beyond eave and rake line to form drip edge. Apply succeeding starters similarly spacing them approximately 3/16" apart. Nail securely in nail holes provided. Application of First and Succeeding Courses Apply full size shingle directly over the starter shingle with butt parallel with exposed eave edge of starter, continuing application of full size shingles and breaking joints with underlying starters and spacing shingles approximately 3/16" apart (See detail No. 44). Begin the second course with a half shingle and proceed with full size shingles for the remainder of the roof, exposing each shingle 8" to the weather and securing each shingle to the roof deck with IV4" galvanized or copper needle point nails, through nail holes provided. Eave Starter: Shingle v. Project shindies fat cables and eaves-^** UNIFORM WIDTH SHINGLES '-"UNIFORM EXPOSURE No. 44 Staggered Exposure and Random Width USG American Method Tapered Shingles may be applied in random width or with staggered butt effect, or in combination. If applied in staggered butt effect a.2" minimum headlap must be maintained by one of two methods: A--For uniform width shingles: Snap chalk lines 8" on center, lay top of shingles to line or not more than 1" above or below line, but maintain a linear 16" between the butt of each shingle and corresponding shingle in second course below. B -- For random width or uniform width shingles: Snap chalk lines 7l/j" on center and lay tops of shingles to the line or not more than Vi" above or below line: or use lines 7" on center and keep within 1" above or below the lines. In either case a minimum 2" headlap will be maintained. Both "B" methods will require approximately 7% and 13% more shingles respectively. In laying random width shingles at least a 2" sidelap should he main tained over joints in the underlying course. :V,; .i t ' - l.'-.ll .['WaterproofingFelt . :/ j Roof Boards Head lapnot lest than 2" '. Snap chalk'guide lines T_ ' : parallel to eaves; Waterproofing Felt ' fj Roof Board . y Head. lap riot less than 2 M Joints . Snap Chalk Guide Lines'^ V:; ' parallel to eave* - ^ . G100U 0970 mm Eave Starter Shingle Project shingles I*at eaves and gables----UNIFORM WIDTH SHINGLES - STAGGERED EXPOSURE No. 43 Eave.Starter Shingle Project shingle* Tat Jbio and eaves - RANDOM WIDTH SHINGLES - UNIFORM EXPOSURE [11] No. 45 MTAIL NO. 300 DUTCH LAP METHOD USG Dutch Lap Shingles may be applied with in hole provided and fasten the shingle, with a ~ or Vj lap. - In working from right to leit the eave starters and the shingles are reversed, bringing the naiL Completely overlapping the first shingle, apply a full size shingle with storm anchor inserted through . nail holes adjoining the side edge to the left hand hole provided and insert additional storm anchor instead of to the right hand. See detail No. -46. in opposite hole. Press the shingle down firmly in Eave starters shall be applied to overhang the eaves and gables one (1) inch. Each piece shall be place when clinching storm anchors. Proceed in similar manner to opposite end of roof. laid to lap the preceding piece approximately one* The second course is startod with shingle' cut to third (Vi) or one-quarter O/4) its length, depending ' two-thirds (Vi) or three-quarters (%) original width, upon lap desired. drilling additional hole adjoining head of shingle. Shingles are applied to completely cover the eave starters. The shingles are provided With eight holes. As applied, five of the eight holes are used; three for shingle nails and two for copper storm anchors. See detail No. 46. New holes must be drilled: in cut shingles as required. Insert copper storm anchor and proceed with appli cation in manner before described. The third course is started with one-third (Vi) or one-half (]/i) width shingle. The fourth course is started with two-thirds (Vi) or one-quarter (V4) shingle and continue appli cation alternating as described. Starting at the end of the roof apply a shingle which has been cut to one-third (Vi) or one-quarter _ _ (V4) its original width. Insert a copper storm anchor Butt shingles at ridges, hips and valleys as re quired and finish roof with Asbestos Cement Ridge Roll or Dutch Lap Hip or Ridge Shingles. -mv&- Cut new For V5 Lap nail holes Cut off4*? For '/4 Lap CUT FIRST STARTER SHINGLE l" Projection /'Natl here 4} "T-37 |4r\ Protection FIRST OPERATION Neil j.here t--'Qa--K--1-~ ''///, ", ,, . e CutOff CutOffl for for t V* tap HLap * . CUT FILLER STARTER FOR 1st COURSE Put anchor here Cont.^ Starter Course fc<_t~Nail here-. . I '* * 1 ZL SECOND OPERATION THIRD OPERATION Nnte K*w nail and arv. tvn hole* Ime uc *n lap -- Anchor Cv second ishtnfilr ovic ' i '. Continue First vNatl hare j Course [of Sh/ntf les Cl*eh anenarj ht anchoe Nail here hare % i . L, FOURTH OPERATION-. f*' --11*--' Pi/t storm Cut anchorhere (off Ne Hoi J - .1*' *v. * Git New Off Holes . J . * Naff . ' for Vj Lap For Lap *er*V r'CUT END STARTER TOR2mv COURSE I /-L. also for 4th, ^Put storm .6th. ath.ete, and or here courses. , Apply End Filler as in operation No. 2 and repeat process Note that nail hers I rests on top of shintfle y covrie belo, giving spaemjt-for courses.- i NOtC --*: - These drawing* thnv shingles/; applied with* i '3 U? ** Tsr V4 Up arpUj m same manner . * using aiterr.a*# s^lof nail holes. / , M'alrrproofing Felt j - Nad here Roof Boards fifth OPERATION . For '/a Lap Line up holes in lap like this . i. 4*t ' Lap] .i! 3- SIXTH OPERATION ZD- A Storm Anchor Na*i thru Ltrr-i^ shmgleS . 1 1 * * * Anchor for '-FP'"* .* V shrtijjle ) . - For V3 tap tine up holes tn lap like this Nail- / el si-; Anchor- .i.., s .. .. ' la'firjjf frnm Irft to right, turn shingle around Shine le contains 8 holes-- 5 of`these are used in laymg DUTCH LAP SHINGLES i . 1 -- _ 1 APPLICATION OF MAIN BODY SHINGLES J- APPLICATION DETAILS No. 46 IL 60 U00.lt) if' iTTH'i hm- jirvuwiui Asbestos-cement Siding Shingle*--To apply straight edge shingles, use IISU Shadow.Lock Attachment System. Level a starter strip lor base course of shingles. When lop leg of USU Shadow-Lock channel is placed over starter Strip, it is automatically aligned, (ihauuel is fastened by uniting Is" from top edge through starter strip (or through shingle in succeeding courses) and Weatii- Eiovooo Sheathing into each stud. Use I I ga., 2" gal vanized moling nails with 1 \a" heads. Uorncr pieces arc applied Lv hist inserting them between the exposed legs of the lower channel and the usliestos' siding. Al the top, insert one leg ol the corner piece between the channel and the siding. Applv next channel to the adjacent side of the corner--over both siding and coiner. fL&Vr.. Vv rrr^;`:v- //p^arid Asbestos . 97 '^(. ytf^.r .***/' -.;........- ' Description No. 950 Clapboard Siding A siding material made of a combination of asbestos libers and porlland cement plus a baked-on mineral type coating, not unlike a vitrified enamel in appear ance, in.-iead of the ordinarily porous asbestos-cement surface. Glate,\ Asbestos-Cement Siding is die-cut and made with a wood-grain texture in either a straight edge or a wavy-edge butt, 5/32" thick in units 12" x 27". AL)AlTABI, to both new construction and re-siding. Dimensions Approximate Weight per Sqwari Weather bpeivrt Overlap . Finish Color - ... gV^.Shtfiglos por square . Conventional Construction--No special framing is re quired. It may be applied over wood, gypsum or insula tion sheathing. Resists Moisture and Dirt--The special-coated sur face collects less moisture and dirt than ordinary as- bcslos-eemenl. Ordinary stains do not readily adhere to surface. Glatex siding retains original freshness longer. I Fireproof--The combination oi asbestos fiber and port land cement provides a surface that will not hum and i which helps protect framing against fire hazard. Economical--Glatex siding never requires paint. It No. 600 Wavy Butt Siding Shingle is easily and economically maintained and provides "life-lung'' service. Dirntmiom Approximate Weight per Squore 12' 2V * i/32' 175 Pounds i Cleanoble -- Surface grime can he cleaned from Weather Exposure ' lO'/i Glatex siding by simply washing with soap and water. Overlap 1 l/xw Maximum, 1 Vs* Minimum If Attractive--Indented wood-grain effect enhances beauty of Gi.atex siding. Finish Color Large Units--The 27" lung units mean fewer joints, it* Shingles per sqwore I faster application and tighter walls. tWA- Shingles per bundle t THE GLATEX SMUDGE TEST Wood-grain Texture Satin White SI 17 \ i i % 4 Apply dirty ail or grease Wipes off without penetrating surface Surfoca is restored--no stains remain ffO O d 0978 ASBESTOS SIDING . Thare'a no malntananca with aabaatoa camanl shingles such at 6LATEX. Available in while and Ihraa paalel colora, they naad no paint, even undar Oklahoma's rigorous temparatura aatramaa. GLATEX ahinglaa ara easy to apply over aaiallng wood walla, bland equally wall with wood or maaonry. n o o o o 1I I