Document 6b0Yrp86R5wy47RG1rk0GpJjR
WLCREPTU
*** WORK REQUEST INQUIRY ***
PLAINTIFFS
I EXHIBIT OC-P-135
SELECTION CRITERIA * * * _ _
WORK REQ : REF CHRGE:
AREA:
BLDG/UNIT:
LVL:
RESP: MO : PRIO:
ORIGINATOR
JOB STATUS: M WORK TYPE:
PLANNER:
PLAN STATUS:
(UU/US/PU/PS) OPEN Y (Y/N) CLOSED: Y (Y/N) PURGED: Y (Y/N)
DATE WRITT, FROM: 080195 TO: 110196
DATE WANTED, FROM:
TO:
DATE COMPL, FROM:
TO:
DATE ENTERED, FROM:
TO:
COST: PERIOD: T (C/P/Y/T) AMOUNT:
BLANKET:
(B/J/l/Y) WKCAT:
REQUESTED BY:
PROP NO:
PROCESS ID:
TO D/LOC:
ACCT:
IN: FST:
SEC:
-------------------------------------------------------- *** REPORT FORMAT *** ______________ _ _________ ___ _____
TYPE: L (H:HOURS D:DOLLARS C:CASCADE S:SUMMARY L:LIST B:BKLOG R:RES BKLOG)
PERIOD:
(C:CURRENT MONTH P:PREVIOUS MONTH Y:YEAR TO DATE T:TOTAL TO DATE)
CURR MONTH PREV MONTH Y-T-D T-T-D
S/T HRS 96
1091 6796 8323
O/T HRS 34
155 446 760
TOTAL 130
1246 7242 9083
LABOR $$ 3835
36495 210192 . 262662
MAT'L $$ 936
4536 39682 53335
TOTAL $$ 4771
41031 249874 315997
ENTER: EDIT/SEARCH
PF1:HELP 3 : RETURN 4 : CODES
6 : CLEAR SCRN 7-.WRQ ENTRY
8:MULT CLOSE 9:MULT VERIFY 22:CMS 23:MENU 24:LOGOFF
003433
WLCLIST
*** WORK REQUEST LISTING *
PAGE
1 OF 14
DATE: 11/22/96
RESPCODE=MO,DATEWRIT FR 080195 TO 110196
T
S RE W
WK
DATES
WK REQ P JOB DESCRIPTION
T SP T PR CAT WRITN WANTED CLOSED
<== SORT SELECTION LINE == >
A84839 A84730 A84412 A84155 A83946 A83895 A83842 A83606 A83424 A83336 A83126 A83052 A82802 A82785
J REMOVE ASBESTOS AT OL2 I CUT ASBES.MASTIC ON HEADS J REMOVE ASBESTOS TILE I REMOVE ASBESTOS GASKETS I REMOVE ASBESTOS INSULATION J REMOVE GASKET I ENCAPSULATE (ACM) NEAR CENTAC I BAG TRANSITE BARGE DOCKS J REMOVE ASBESTOS GASKETS J B341 ABESTOS REMOVAL J REMOVE ASBESTOS WRAPPING J 81 BLIND FLANGE J ASBESTOS INSULATION/GASKETS I #15 COMP. ASBESTOS ABATEMENT
1 M0 8 2 SD 101996 112296
1 M0 3 2 SD 101796 113096
C M0 8 1 SC 101196 101196 101196
c M0 3 2 TA 100796 110896 110596
c M0 8 2 RP 100396 101596 101596
c MO 8 1 c MO 4 2
100396 100996 100796 100296 113096 111596
c MO 8 2 US 092796 101996 101196 c MO 8 3 SE 092696 101596 101196
c MO 8 1
092596 092796 092796
c MO 8 3 PM 092396 101196 101096
c MO 8 3 SE 092096 092796 092796
c MO 8 3 SE 091796 092096 091996
c MO 8 2 US 091796 092496 091896
IDR 3 RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 :PAR 10 F/LST 11 HIST 1 2 PRT
003434
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY ***
WORK REQ NO: A84839 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 838000 INDX: 92 1ST ORDER: 00006137 2ND ORD: 07300
PR: 2 OR: 99 WCAT: SD RW CD:
RW RS:
DESC: REMOVE ASBESTOS AT OL2
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 112296 RECNO:
PROP NO:
REQ BY: R.REYES
C&P:
WRITTEN: 101996 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD : M0
STATUS: 1 PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 650
610
JOB DETAILS: PLEASE REMOVE ASBESTOS MASTIC & INSUL.FOR PIPE SUPPORT.
YTD TOTAL HRS: IND: J CL YR: 96
DEL
PHONE 3649
61 YTD O/T:
16 YTD LAB$:
1811 YTD MAT$:
0
DATE ENTR: 102196 LAST ACT: N DATE: 111496
PF3:RETURN
003435
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY ***
WORK REQ NO: A84730 ORIG WR: A80449
PROCESS ID: TEA STILL COLUMN
DIV/LOC: 500510 ACCOUNT: 071100 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 08 WCAT: SD RW CD:
RW RS:
DESC: CUT ASBES.MASTIC ON HEADS
BLD/UNT: ODU AR: CH WK TP: 3 WANTED: 113096 RECNO: 011352 PROP NO:
REQ BY: CONTRERAS C&P:
WRITTEN: 101796 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 500
225
JOB DETAILS: PLEASE CUT PLUGS ON THE TOP & BOTTOM HEAD OF THE TEA STILL. GARY K. KNOWS LOCATION.TO BE PERFORMED PRE-TURNAROUND & ALSO DURING THE T/A.
YTD TOTAL HRS: IND: I CL YR: 96
22 YTD O/T: DATE ENTR: 101796
DEL
PHONE 3626
0 YTD LAB$:
650 YTD MAT$:
282
LAST ACT: N DATE: 110296
PF3:RETURN
003436
WLCDETS
SEADRIFT WORK REQUEST SHOW ONLY
WORK REQ NO: A84412 ORIG WR: 142100
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 094220 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 76 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS TILE
BLD/UNT: HPPE2 AR: H2 WK TP: 8 WANTED: 101196 RECNO:
PROP NO:
REQ BY: FINLEY
C&P:
WRITTEN: 101196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101196
APPROVED BY: E.MYERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 500
500 00
00
15
JOB DETAILS: PLEASE REMOVE THE FLOOR TILE IN FINISHING CONTROL ROOM CONTAINS ASBESTOS.
YTD TOTAL HRS: IND: J CL YR: 96
DEL 569
PHONE 3527
51 YTD O/T:
31 YTD LAB$:
1591 YTD MAT$:
385
DATE ENTR: 101196 LAST ACT: N DATE: 110596
PF3:RETURN
003437
WLCDETS
****** SEADRIFT WORK REQUEST
*** SHOW ONLY ***
WORK REQ NO: A84155 ORIG WR: A83725
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 008510 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT: TA RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: ASU AR: ES WK TP: 3 WANTED: 110896 RECNO:
PROP NO:
REQ BY: M ADKINS
C&P:
WRITTEN: 100796 HWP:
MTAG:
SLIPBL:
SERV: VAPORIZER
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 110596
APPROVED BY: B.B.B.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 260
180
JOB DETAILS: PLEASE FURNISH MANPOWER TO REMOVE ASBESTOS GASKETS ON 02 THROTTLE VALVE REVISIONS WHEN PIPING IS REMOVED. SEE M ADKINS FOR LOCATION AND DETAILS
YTD TOTAL HRS: IND: I CL YR: 96
18 YTD O/T: DATE ENTR: 100796
DEL 02 UNIT
PHONE 5298
0 YTD LAB$:
520 YTD MAT$:
0
LAST ACT: N DATE: 110696
PF3:RETURN
003438
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A83946 ORIG WR: A83598
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 002150 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 12 WCAT: RP RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 101596 RECNO:
PROP NO:
REQ BY: M ADKINS CScP:
WRITTEN: 100396 HWP:
MTAG:
SLIPBL:
SERV: COOLING WATER P DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 10 04 96
DATE COMPLETE: 101596
APPROVED BY: B.B.B.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 400
280
JOB DETAILS: PLEASE HAVE CREW REMOVE ASBESTOS INSULATION AT #3 CW PUMP PER L. MIKOLAS. HE HAS SHOWN THE AREA TO GARY F.
YTD TOTAL HRS: IND: I CL YR: 96
28 YTD O/T: DATE ENTR: 100396
DEL 321
PHONE 5369
0 YTD- LAB$:
808 YTD MAT$:
378
LAST ACT: N DATE: 102596
PF3:RETURN
003439
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A83895 ORIG WR: 292931
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 292700 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 08 WCAT:
RW CD:
RW RS:
DESC: REMOVE GASKET
BLD/UNT: 140-2 AR:
WK TP: 8 WANTED: 100996 RECNO:
PROP NO:
REQ BY: LLSADDLER C&P:
WRITTEN: 100396 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER:
PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 100796
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
JOB DETAILS: PLEASE REMOVE ASBESTOS GAKET FROM SAFETY VALVE FLANGE AT PROCESS SAFETY-VALVE IS FROM N.FIELD TK.2931.
YTD TOTAL HRS: IND: J CL YR: 96
0 YTD O/T: DATE ENTR: 100396
DEL PROCESS SAFETY
PHONE 2328
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 100896
PF3:RETURN
003440
WLCDETS
*** SEADRIFT WORK REQUEST * *** SHOW ONLY ***
WORK REQ NO: A83842 ORIG WR: A81963
PROCESS ID:
DIV/LOC: 5 00510 ACCOUNT: 00814 0 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: M6 WCAT:
RW CD:
RW RS:
DESC: ENCAPSULATE (ACM) NEAR CENTAC
BLD/UNT: ENSYS AR: ES WK TP: 4 WANTED: 113096 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 100296 HWP:
MTAG:
SLIPBL:
SERV: CENTAC AIR COMP DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 111596
APPROVED BY: DWJ(JC)
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 100
80
JOB DETAILS: PLEASE ENCAPSULATE (ACM) NEAR THE CENTAC AIR COMPRESSOR SEE BOSCO FOR MORE INFORMATION. THIS WORK MUST BE DONE PRIOR TO THE TURN AROUND.
YTD TOTAL HRS: IND: I CL YR: 96
8 YTD O/T: DATE ENTR: 100296
DEL
PHONE
0 YTD LAB$:
231 YTD MAT$:
LAST ACT: N DATE: 111696
0
PF3 .-RETURN
003441
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A83606 ORIG WR: A82507
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 220530 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 29 WCAT: US RW CD:
RW RS:
DESC: BAG TRANSITE BARGE DOCKS
BLD/UNT: DOCKS AR: DI WK TP: 8 WANTED: 101996 RECNO:
PROP NO:
REQ BY: R. MAREK
C&P:
WRITTEN: 092796 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101196
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 690
390
JOB DETAILS: PLEASE BAG TRANSITE FROM ROOF OF OLD BUILDING AT BARGE DOCK WASH OUT QUESTIONS SEE ROYAL MAREK OR KEITH VICKERY
YTD TOTAL HRS: IND: I CL YR: 96
39 YTD O/T: DATE ENTR: 092796
DEL
PHONE
0 YTD LAB$:
1126 YTD MAT$:
LAST ACT: N DATE: 101896
PF3:RETURN
316
003442
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A83424 ORIG WR: 152900
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 139900 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 75 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: PPU AR: PI WK TP: 8 WANTED: 101596 RECNO:
PROP NO:
REQ BY: NIX
C&P:
WRITTEN: 092696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG: N RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101196
APPROVED BY: L.WHITE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 120
00
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKETS ON OIL COOLER LOCATED BEHIND THE PAINT SHOP -- PLEASE CALL J.LUCAS AT EXT. 2943 WHEN COMPLETE
YTD TOTAL HRS: IND: J CL YR: 96
0 YTD O/T: DATE ENTR: 092696
DEL
PHONE 2707
0 YTD LAB$:
0 YTD MAT$:
204
LAST ACT: N DATE: 101596
PF3:RETURN
003443
WLCDETS
*** SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A83336 ORIG WR: 155581
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 1484 00 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 83 WCAT:
RW CD:
RW RS:
DESC: B341 ABESTOS REMOVAL
BLD/UNT: LPPE1 AR: LI WK TP: 8 WANTED: 092796 RECNO:
PROP NO:
REQ BY: E CAMPBELL C&P:
WRITTEN: 092596 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 092796
APPROVED BY: C DAVIS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 420
440
JOB DETAILS: PLEASE REMOVE ABESTOS RESIDUE FROM THE CHANNEL IRON AROUND THE 2ND LEVEL OF B 341
YTD TOTAL HRS: IND: J CL YR: 96
DEL
PHONE
44 YTD O/T:
22 YTD LAB$:
1336 YTD MAT$:
DATE ENTR: 092596 LAST ACT: N DATE: 100996
PF3:RETURN
279
003444
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A83126 ORIG WR: 243692
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 231940 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: MO WCAT: PM RW CD:
RW RS:
DESC: REMOVE ASBESTOS WRAPPING
BLD/UNT: EVP AR: EP WK TP: 8 WANTED: 101196 RECNO:
PROP NO:
REQ BY: GALLEMORE C&P:
WRITTEN: 0 923 96 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101096
APPROVED BY: STEVE G
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 210
260
JOB DETAILS: PLEASE REMOVE ASBESTOS WRAPPING OFF OF TUBING LOCATED AT THE HIGH STRENGTH SEWER PUMP STATION ON FIFTH STREET.
YTD TOTAL HRS: IND: J CL YR: 96
26 YTD O/T: DATE ENTR: 092396
DEL
PHONE 3584
0 YTD LAB$:
751 YTD MAT$:
315
LAST ACT: N DATE: 102696
PF3:RETURN
003445
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A83052 ORIG WR: 155500
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148400 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: 8' BLIND FLANGE
BLD/UNT: LP1 AR: LI WK TP: 8 WANTED: 092796 RECNO
PROP NO:
REQ BY: L KUTCHKA C&P:
WRITTEN: 092096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 09 22 96
DATE COMPLETE: 092796
APPROVED BY: T.T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 120
100
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKET ON BLIND FLANGE AT 341 N
YTD TOTAL HRS: IND: J CL YR: 96
10 YTD O/T: DATE ENTR: 092096
DEL
PHONE 2832
0 YTD LAB$:
289 YTD MAT$:
0
LAST ACT: N DATE: 100996
PF3:RETURN
003446
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A82802 ORIG WR: 154412
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148310 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: ASBESTOS INSULATION/GASKETS
BLD/UNT: LP1 AR: LI WK TP: 8 WANTED: 092096 RECNO:
PROP NO:
REQ BY: DONNIE M. C&P:
WRITTEN: 091796 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 09 18 96
DATE COMPLETE: 091996
APPROVED BY: TOM T
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 130
80
JOB DETAILS: REMOVE ASBESTOS INSULATION AND GASKETS FROM PIPING LAYING IN THE PERIMETER OF LP-1, NEED DONE SO PIPING CAN BE REMOVE TO SALVAGE BEFORE VISISTORS ARRIVE.
YTD TOTAL HRS: IND: J CL YR: 96
8 YTD O/T: DATE ENTR: 091796
DEL LP-1 BLOCK-12
PHONE 3506
8 YTD LAB$:
255 YTD MAT$:
0
LAST ACT: N DATE: 092896
PF3:RETURN
003447
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A82785 ORIG WR: A82423
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT: US RW CD:
RW RS:
DESC: #15 COMP. ASBESTOS ABATEMENT
BLD/UNT: OLCOM AR: OL WK TP: 8 WANTED: 092496 RECNO: 003269 PROP NO: 630100130
REQ BY: B GEFFERT C&P:
WRITTEN: 091796 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 091896
APPROVED BY: HODDE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 180
140
JOB DETAILS: REMOVE ASBESTOS GASKETS FROM THE IPC CASE PIPING CONTACT BUBBA 5-508
YTD TOTAL HRS: IND: I CL YR: 96
14 YTD O/T: DATE ENTR: 091796
DEL
PHONE 2774
4 YTD LAB$:
417 YTD MAT$:
0
LAST ACT: N DATE: 092896
PF3:RETURN
003448
WLCLIST
*** WORK REQUEST LISTING ***
DPAAGTEE _
2 OF 14 11/22/96
RESPCODE=MO,DATEWRIT FR 080195 TO 110196
T
S RE W
WK ----------- DATES -----------
WK REQ P JOB DESCRIPTION
T SP T PR CAT WRITN WANTED CLOSED
<== SORT SELECTION LINE ==>
A82690 I REMOVE COVERS & SEAL ASBESTOS C M0 8 2 SD 091696 092396 091996
A82644 I ASBESTOS REMOVAL FOR#10
C M0 8 2
091696 091796 091796
A82287 I INSUL PRE-WRK ODU T/A BU0019
c M0 2 2
091196 101196 101096
A82283 I INSUL PRE-WRK ODU T/A BU0018
c M0 2 2
091196 101196 101096
A82281 I INSUL PRE-WRK ODU T/A BU0017
1 M0 2 2
091196 113096
A82278 I INSUL PRE-WRK ODU T/A BU0020
c M0 2 2
091196 101196 101096
A81926 I DEINSULATE ASBESTOS INSULATION c M0 3 2 SC 090596 092096 091996
A81848 I ASBESTOS REMOVAL SD HP2 A81659 J REMOVE ASBESTOS GASKETS
c M0 8 2 SD 090496 091796 091696 c M0 8 3 SC 083096 090696 090696
A81383 J DEINSULATE DEA PIPE A81230 I REMOVE ASBESTOS GASKETS
c M0 8 1 SC 082796 082796 082896 c M0 8 3 US 082696 091396 090596
A80983 I ASBESTOS REMOVAL
c M0 8 1
082296 082296 082396
A80700 I INSUL PRE-WRK ODU T/A BU0021
1 M0 2 2
081696 113096
A80670 I REMOVE ASBESTOS GASKETS
c M0 3 2 SE 081696 081996 082196
2 IDR 3 RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 PAR 10 F/LST 11 HIST 12 PRT
003449
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A82690 ORIG WR: A79855
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071300 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 11 WCAT: SD RW CD:
RW RS:
DESC: REMOVE COVERS & SEAL ASBESTOS
BLD/UNT: ACE AR: CH WK TP: 8 WANTED: 092396 RECNO:
PROP NO:
REQ BY: J. RAMIREZ C&P:
WRITTEN: 091696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 09 17 96
DATE COMPLETE: 091996
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 110
460
JOB DETAILS: PLEASE REMOVE THE INSULATION COVERS ON THE WEST &. EAST MAKE HEAT
EXCHANGERS AND SEAL THE ASBESTOS. AREA IS ALREADY SEALED BUT IT
HAS CRACKS AND T&I WILL NEED TO INSPECT THESE AREAS. THANKS, JUAN
5-801. GARY ALREADY KNOWS ABOUT THE JOB.
DEL ODU (ACETATE)
PHONE 3583
YTD TOTAL HRS:
46 YTD O/T:
0 YTD LAB$:
1328 YTD MAT$:
113
IND: I CL YR: 96 DATE ENTR: 091696 LAST ACT: N DATE: 100996
PF3:RETURN
003450
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A82644 ORIG WR: A82472
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 12 WCAT:
RW CD:
RW RS:
DESC: ASBESTOS REMOVAL FOR#10
BLD/UNT: OLCOM AR: OL WK TP: 8 WANTED: 091796 RECNO:
PROP NO:
REQ BY: JL,MEJIA
C&P:
WRITTEN: 091696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER:
PLAN CD:
ASIS/ENGR:
EST START: 09 17 96
DATE COMPLETE: 091796
APPROVED BY: HODDE
RC ESTHR 'ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 150
100
JOB DETAILS:
NEED ASBESTOS REMOVAL INSULATORS ON STANDBY WHILE REMOVAL OF
#10 COMP., 12" VALVE IS CHANGED OUT. THERE MAY BE ASBESTOS GASKETS
ON FLANGES. JOB IS TO START AT 12:30 PM TUESDAY 9-17-96.
ANY QUESTIONS SEE OR CALL JOE MEJIA AT EXT-2304 OR PAGER-312.
DEL 500 N
PHONE 2304
YTD TOTAL HRS:
10 YTD O/T:
0 YTD LAB$:
289 YTD MAT$:
14
IND: I CL YR: 96 DATE ENTR: 091796 LAST ACT: N DATE: 092896
PF3 .-RETURN
003451
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A82287 ORIG WR: A76039
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: INSUL PRE-WRK ODU T/A BU0019
BLD/UNT: BUTYL AR: CH WK TP: 2 WANTED: 101196 RECNO:
PROP NO:
REQ BY: E. ORTIZ
C&P:
WRITTEN: 0 91196 HWP:
MTAG:
SLIPBL:
SERV: BU0019
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 450
430 00
00
20
JOB DETAILS: PLEASE INSULATE ALL EXPOSE FLANGES ON #1,2,3 VERTICAL REACTORS FOR DETAILS PAGE 5-747.
YTD TOTAL HRS: IND: I CL YR: 96
DEL
PHONE 3589
45 YTD O/T:
30 YTD LAB$:
1382 YTD MAT$:
4
DATE ENTR: 091196 LAST ACT: N DATE: 101196
PF3:RETURN
003452
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A82283 ORIG WR: A76038
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 VICAT:
RW CD:
RW RS:
DESC: INSUL PRE-WRK ODU T/A BU0 018
BLD/UNT: BUTYL AR: CH WK TP: 2 WANTED: 101196 RECNO:
PROP NO:
REQ BY: E. ORTIZ
C&P:
WRITTEN: 091196 HWP:
MTAG:
SLIPBL:
SERV: BU0018
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 80
60
JOB DETAILS: PLEASE REPAIR ALL LOOSE SECTION OF METAL OF BUCS COL. FOR DETAILS PAGE 5-747
YTD TOTAL HRS: IND: I CL YR: 96
6 YTD O/T: DATE ENTR: 091196
DEL
PHONE 3589
0 YTD LAB$:
173 YTD MAT$:
75
LAST ACT: N DATE: 101196
PF3:RETURN
003453
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A82281 ORIG WR: A76037
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: INSUL PRE-WRK ODU T/A BU0017
BLD/UNT: BUTYL AR: CH WK TP: 2 WANTED: 113096 RECNO:
PROP NO:
REQ BY: E. ORTIZ
C&P:
WRITTEN: 091196 HWP:
MTAG:
SLIPBL:
SERV: BU0017
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 100
50
JOB DETAILS: PLEASE REPAIR INSULATION AS NEEDED FOR DETAILS CONTACT E. ORTIZ PAGER 5-747
YTD TOTAL HRS: IND: I CL YR: 96
5 YTD O/T: DATE ENTR: 091196
DEL
PHONE 3589
0 YTD LAB$:
144 YTD MAT$:
0
LAST ACT: N DATE: 101696
PF3:RETURN
003454
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY ***
WORK REQ NO: A82278 ORIG WR: A76040
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT
RW CD:
RW RS:
DESC: INSUL PRE-WRK ODU T/A BU0020
BLD/UNT: BUTYL AR: CH WK TP: 2 WANTED: 101196 RECNO:
PROP NO:
REQ BY: E. ORTIZ
C&P:
WRITTEN: 091196 HWP:
MTAG:
SLIPBL:
SERV: BU0020
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 120
100
JOB DETAILS: PLEASE REPAIR INSULATION AS NEEDED SEE R ORTIZ FOR DETAILS. PAGE 5-747
YTD TOTAL HRS: IND: I CL YR: 96
10 YTD O/T: DATE ENTR: 091196
DEL
PHONE 3589
0 YTD LAB$:
288 YTD MAT$:
0
LAST ACT: N DATE: 101196
PF3:RETURN
003455
i
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY ***
WORK REQ NO: A81926 ORIG WR: A80449
PROCESS ID: ASBESTOS PIPE
DIV/LOC: 500510 ACCOUNT: 071100 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 08 WCAT: SC RW CD:
RW RS:
DESC: DEINSULATE ASBESTOS INSULATION
BLD/UNT: AMINE AR: CH WK TP: 3 WANTED: 092096 RECNO: 067419 PROP NO:
REQ BY: CONTRERAS C&P:
WRITTEN: 090596 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 091996
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 280
340
JOB DETAILS: PLEASE DEINSULATE SECTIONS OF ASBESTOS INSULATION. T&I WILL
BE INSPECTING THE PIPE IN THESE DEINSULATED AREAS. VIRGINIA
CONTRERAS WILL SHOW YOU THE LOCATION OF THE JOB. THANK YOU.
PAGER 5-586
DEL
PHONE
YTD TOTAL HRS:
34 YTD O/T:
0 YTD LAB$:
982 YTD MAT$:
IND: I CL YR: 96 DATE ENTR: 090596 LAST ACT: N DATE: 092696
PF3:RETURN
24
0034-56
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A81848 ORIG WR: A81070
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 76 WCAT: SD RW CD:
RW RS:
DESC: ASBESTOS REMOVAL SD HP2
BLD/UNT: HPPE2 AR: H2 WK TP: 8 WANTED: 091796 RECNO:
PROP NO:
REQ BY: MUNSCH
C&P:
WRITTEN: 090496 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD : M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 09 04 96
DATE COMPLETE: 091696
APPROVED BY: MYERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 120
220
JOB DETAILS: PROVIDE MANPOWER FOR ASBESTOS REMOVAL DURING SEPT4 SD MIKE MUNSCH 5-713 MIKE CAMPBELL 5-576
YTD TOTAL HRS: IND: I CL YR: 96
22 YTD O/T: DATE ENTR: 090496
DEL
PHONE
0 YTD LAB$:
634 YTD MAT$:
LAST ACT: N DATE: 092696
PF3:RETURN
268
003457
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A81659 ORIG WR: 119587
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 82 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: OLFUR AR: OL WK TP: 8 WANTED: 090696 RECNO:
PROP NO:
REQ BY: MINETREA
C&P:
WRITTEN: 083096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: MO PLAN CD: 30R8 ASIS/ENGR:
EST START: 09 03 96
DATE COMPLETE: 090696
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 100
90
JOB DETAILS: REMOVE ASBESTOS GASKET FROM FURNACE PIPING AT FURNACE WELD SHOP.
YTD TOTAL HRS: IND: J CL YR: 96
9 YTD O/T: DATE ENTR: 083096
DEL
PHONE 2478
0 YTD LAB$:
260 YTD MAT$:
0
LAST ACT: N DATE: 092696
PF3:RETURN
003458
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A81383 ORIG WR: 136540
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071100 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 22 WCAT: SC RW CD:
RW RS:
DESC: DEINSULATE DEA PIPE
BLD/UNT: ODU AR: CH WK TP: 8 WANTED: 082796 RECNO:
PROP NO:
REQ BY: ANN T./J.M C&P:
WRITTEN: 082796 HWP:
MTAG:
SLIPBL:
SERV: DIETHANOLAMINES DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: 278R ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 082896
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
75 00
00
360
JOB DETAILS: PLEASE DEINSULATE DEA PIPE IN NORTHWEST CORNER OF ODU IN THE HIG
H PIPE RACK AS PER VERBAL INSTRUCTIONS FROM BRIAN RALSTON. THE INS
ULATORS HAVE ALREADY BEEN CONTACTED BUT IF THERE ARE ANY QUESTIONS
CONTACT JOE MITSCHERLING AT EXT. 2750 PAGER 5-4 01..
DEL
PHONE 2750
YTD TOTAL HRS:
43 YTD O/T:
8 YTD LAB$:
1165 YTD MAT$:
453
IND: J CL YR: 96 DATE ENTR: 082796 LAST ACT: N DATE: 100396
PF3:RETURN
003459
WLCDETS
* * SEADRIFT WORK REQUEST * if
SHOW ONLY
WORK REQ NO: A81230 ORIG WR: A80957
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 04 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: R/S AR:
WK TP: 8 WANTED: 091396 RECNO:
PROP NO:
REQ BY: D. SPEED
C&P:
WRITTEN: 082696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: R826 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 090596
APPROVED BY: KELLEY
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 170
90
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKETS FROM THE STEAM TURBINE LOCATED AT THE PUMP REPAIR SHOP BLDG.140.JOB IS FOR OLEFINS.GARY K. KNOWS ABOUT THIS JOB.
YTD TOTAL HRS: IND: I CL YR: 96
9 YTD O/T: DATE ENTR: 082696
DEL REPAIR SHOP
PHONE 2528
0 YTD LAB$:
260 YTD MAT$:
31
LAST ACT: N DATE: 092096
PF3:RETURN
003460
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A80983 ORIG WR: A80397
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR:
WCAT:
RW CD:
RW RS:
DESC: ASBESTOS REMOVAL
BLD/UNT: 140-2 AR:
WK TP: 8 WANTED: 082296 RECNO:
PROP NO:
REQ BY: GILBREATH C&P:
WRITTEN: 082296 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: R822 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 082396
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
00
JOB DETAILS: PLEASE SUPPLY MANPOWER FOR REMOVAL OF ASBESTOS GASKET FROM SAFETY VALVE.
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 082296
DEL
PHONE 2328
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 082496
PF3:RETURN
003461
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A80700 ORIG WR: A76041
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: INSUL PRE-WRK ODU T/A BU0021
BLD/UNT: BUTYL AR: CH WK TP: 2 WANTED: 113096 RECNO:
PROP NO:
REQ BY: E.ORTIZ
C&P:
WRITTEN: 081696 HWP:
MTAG:
SLIPBL:
SERV: BU0021
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD:
ASIS/ENGR:
EST START: 10 19 96
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 440
180
JOB DETAILS: PLEASE REPAIR MISC INSULATION ON OUTLET PIPING, VERTICAL RXTRS. FOR DETAILS, E. ORTIZ 5-747. ASBESTOS INCAPSULANT REQUIRED.
YTD TOTAL HRS: IND: I CL YR: 96
18 YTD O/T: DATE ENTR: 081696
DEL
PHONE
0 YTD LAB$:
520 YTD MAT$:
LAST ACT: N DATE: 110296
PF3:RETURN
135
003462
WLCDETS
*** SEADRIFT WORK REQUEST
* * SHOW ONLY
WORK REQ NO: A80670 ORIG WR: A80551
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148250 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: M2 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: LP1F AR: LI WK TP: 3 WANTED: 081996 RECNO:
PROP NO:
REQ BY: T.MIDDAUGH C&P:
WRITTEN: 081696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 082196
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 130
70
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKETS FROM PIPE FLANGES ON SIEVE PREHEATE R .WILL NOTIFY IF AND WHEN NEEDED.THANKS
YTD TOTAL HRS: IND: I CL YR: 96
7 YTD O/T: DATE ENTR: 081696
DEL
PHONE 2828
0 YTD LAB$:
202 YTD MAT$:
77
LAST ACT: N DATE: 090496
PF3:RETURN
003463
WLCLIST
*** WORK REQUEST LISTING ***
DPAAGTEE.
3 OF 14 11/22/96
RESPCODE=MO,DATEWRIT FR 080195 TO 110196
T
S RE W
WK ----------- DATES -----------
WK REQ P JOB DESCRIPTION
T SP T PR CAT WRITN WANTED CLOSED
<== SORT SELECTION LINE ==>
A80333 J VULCANIZABLES UPGRADE J66944 J SAMPLE FOR ASBESTOS AT 507 A79213 J PRECURSOR ASBESTOS REMOVAL A78807 I BLDR 341 ROOF REMOVAL A78658 I PROVIDE INSUL PLANNER AMINES J70698 J ODU CONTROL SYSTEM UPGRADE J61851 J CHECK INSUL.AT ODU SHED
A78420 I REMOVE ASBESTOS PAINT A78247 I REMOVE ASB. MASTIC OX2-RC-17 A77929 *1 REMOVE ASBESTOS AT BLDG.321 A77812 I REMOVE ASBESTOS INSULATION All 693 J SEAL LOOSE ASBESTOS INSULATION A76185 J CHECK OUT INSULATION & REMOVE A76178 I PROVIDE INSUL. PLANNER BUTYL
1 M0
C M0
c M0 c M0 c M0
1 M0
c M0 c M0 c M0
1 M0
c M0
1 M0
1 M0
c M0
83 84 83 83 32 83 83 83 42 84 42 83 83 42
081296 113096 073196 113096 100296 SE 072496 093096 091196 RP 071796 093096 092596 071696 112296 111596 NC 060496 121596 053196 113096 102196 RP 071196 082096 081396 SD 070996 112496 111596 PM 070396 122096 TA 070296 110496 110196 SA 070196 121596 SC 060496 123196 060496 112296 111596
IDR 3 RTN 4 DETL 5 SRT 6 PLN 7 UP 81DN 9 PAR 10 F/LST 11 HIST 12 PRT
003464
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A80333 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006408 2ND ORD: 59000
PR: 3 OR: LC WCAT:
RW CD:
RW RS:
DESC: VULCANIZABLES UPGRADE
BLD/UNT: HPII AR: H2 WK TP: 8 WANTED: 113096 RECNO:
PROP NO:
REQ BY: L CORONADO C&P:
WRITTEN: 081296 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD: 12R8 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1250
1080
JOB DETAILS: GARY, I NEED SAMPLES TAKEN OF MASTIC ON PIPE AND EQUIPMENT AT HPII
VULCANIZABLE FOR UPCOMING WORK. ERNEST HERNANDEZ HAS INFO ON
LOCATIONS OF AREAS OF CONCERN. THANK YOU. NOTIFY ME OF RESULTS.
CONTACT LUPE CORONADO X3649
DEL
PHONE
YTD TOTAL HRS:
108 YTD O/T:
0 YTD LAB$:
3117 YTD MAT$:
536
IND: J CL YR: 96 DATE ENTR: 081296 LAST ACT: N DATE: 101996
PF3:RETURN
003465
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY ***
WORK REQ NO: J66944 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006364 2ND ORD: 73000
PR: 4 OR:
WCAT:
RW CD:
RW RS:
DESC: SAMPLE FOR ASBESTOS AT 507-
BLD/UNT: 507 AR: OL WK TP: 8 WANTED: 113096 RECNO:
PROP NO:
REQ BY: BUD PETERS C&P:
WRITTEN: 073196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: 086V ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 100296
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 680
580
JOB DETAILS: TAKE SAMPLES OF FLOOR TILE AND MASKING IN BL 507 FOR ASBESTOS. IF SAMPLING DETECTS ASBESTOS, REMOVE AS NEEDED.
YTD TOTAL HRS: IND: J CL YR: 96
58 YTD O/T: DATE ENTR: 080296
DEL
PHONE 3450
0 YTD LAB$:
1673 YTD MAT$:
106
LAST ACT: N DATE: 100396
PF3:RETURN
003466
WLCDETS
*** SEADRIFT WORK REQUEST * * *** SHOW ONLY ***
WORK REQ NO: A79213 ORIG WR: 153912
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148250 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: PRECURSOR ASBESTOS REMOVAL
BLD/UNT: LP1 AR: LI WK TP: 8 WANTED: 093096 RECNO:
PROP NO:
REQ BY: BECKY J.
C&P:
WRITTEN: 072496 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: R722 ASIS/ENGR:
5 EST START: 07 24 96
DATE COMPLETE: 091196
APPROVED BY: TOM T
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 250
00
JOB DETAILS: REMOVE ASBESTOS AND GASKETS FROM DEMO PIPING TO SUPPORT B&R PIPEFITTERS.
YTD TOTAL HRS: IND: J CL YR: 96
0 YTD O/T: DATE ENTR: 0724 96
DEL B-443
PHONE 2851
0 YTD LAB$:
0 YTD MAT$ :
LAST ACT: C DATE: 092796
PF3:RETURN
003467
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A78807 ORIG WR: A76206
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148400 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: FB WCAT: RP RW CD:
RW RS:
DESC: BLDR 341 ROOF REMOVAL
BLD/UNT: LP I AR: LI WK TP: 8 WANTED: 093096 RECNO:
PROP NO:
REQ BY: F BERGER
CScP:
WRITTEN: 071796 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: 7R18 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 092596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 450
350
JOB DETAILS: REMOVE SECTION OF ROOF FROM BLDG 341 WHERE FILTER HOUSING WAS LOCATED. THIS SECTION OF ROOFING CONTAINS SOME ASBESTOS MATERIAL.
YTD TOTAL HRS: IND: I CL YR: 96
35 YTD O/T: DATE ENTR: 071796
DEL
PHONE
0 YTD LAB$:
1011 YTD MAT$:
LAST ACT: C DATE: 092796
PF3:RETURN
318
003468
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A78658 ORIG WR: A78381
PROCESS ID: FALL TA AMINES
DIV/LOC: 500510 ACCOUNT: 071100 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: PROVIDE INSUL PLANNER AMINES
BLD/UNT: AMINE AR: CH WK TP: 3 WANTED: 112296 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 071696 HWP:
MTAG:
SLIPBL:
SERV: AM000
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: RB PLAN CD: 1113 ASIS/ENGR:
EST START: 08 05 96
DATE COMPLETE: 111596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 3875
3755
JOB DETAILS: PLEASE PROVIDE AN INSULATOR TO HELP PLAN THE AMINES TURNAROUND. SEE BOSCO FOR DETAILS.
YTD TOTAL HRS: IND: I CL YR: 96
DEL
PHONE 2617
375 YTD O/T:
33 YTD LAB$:
10918 YTD MAT$:
0
DATE ENTR: 071696 LAST ACT: N DATE: 112296
PF3:RETURN
003469
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY
WORK REQ NO: J70698 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006417 2ND ORD: 59100
PR: 3 OR: LC WCAT: NC RW CD:
RW RS:
DESC: ODU CONTROL SYSTEM UPGRADE
BLD/UNT: ODU AR: CH WK TP: 8 WANTED: 121596 RECNO:
PROP NO:
REQ BY: L CORONADO C&P:
WRITTEN: 060496 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD: 0406 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 3420
2990 00
00
40
JOB DETAILS: SAMPLE INSULATION ON TRANSMITTERS AT ODU AND REMOVE ANY ACM NEEDED TO REPLACE INSTRUMENTS. THIS WILL BE DONE BY THE ABATEMENT GROUP . TAKE ALL NECESSARY PRECAUTIONS.
YTD TOTAL HRS: IND: J CL YR: 96
DEL
PHONE 2508
303 YTD O/T:
32 YTD LAB$:
8828 YTD MAT$:
89
DATE ENTR: 060496 LAST ACT: N DATE: 112296
PF3:RETURN
003470
WLCDETS
****** SEADRIFT WORK REQUEST ***
SHOW ONLY ***
WORK REQ NO: J61851 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006435 2ND ORD: 73000
PR: 3 OR: CW WCAT:
RW CD:
RW RS:
DESC: CHECK INSUL.AT ODU SHED
BLD/UNT: ODU AR: CH WK TP: 8 WANTED: 113096 RECNO:
PROP NO:
REQ BY: C WELFEL
C&P:
WRITTEN: 053196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: 3105 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 102196
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 690
610
JOB DETAILS: PLEASE CHECK FOR ABESTOS ON POT IN STORAGE SHED WEST SIDE ODU IN
CENTER OF BLOCK. IF IT CONTAINS ASBESTOS, PLEASE REMOVE IT.
CONTACT BRIAN KRAUSE X2978 PAGER 5-631 IF ANY QUESTIONS. CALVIN
WELFEL 5-183
DEL
PHONE 2467
YTD TOTAL HRS:
61 YTD O/T:
0 YTD LAB$:
1760 YTD MAT$:
165
IND: J CL YR: 96 DATE ENTR: 053196 LAST ACT: N DATE: 102396
PF3:RETURN
003471
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A78420 ORIG WR: A77324
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: M3 WCAT: RP RW CD:
RW RS:
DESC: REMOVE ASBESTOS PAINT
BLD/UNT: HP2 AR: H2 WK TP: 8 WANTED: 082096 RECNO:
PROP NO:
REQ BY: S SANDERS C&P:
WRITTEN: 071196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: R117 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 081396
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1400
2320
JOB DETAILS: REMOVE ASBESTOS PAINT FROM ROOF OF SUB"P"AT HP2
YTD TOTAL HRS: IND: I CL YR: 96
232 YTD O/T: DATE ENTR: 071196
DEL
5-357 PHONE 2448
0 YTD LAB$:
6699 YTD MAT$:
1052
LAST ACT: N DATE: 082196
PF3:RETURN
003472
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A78247 ORIG WR: A77236
PROCESS ID: MG-403
DIV/LOC: 500510 ACCOUNT: 127200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT: SD RW CD:
RW RS:
DESC: REMOVE ASB. MASTIC OX2-RC-17
BLD/UNT:
REC AR: OX WK TP: 4 WANTED: 112496 RECNO: 009860 PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 070996 HWP:
MTAG:
SLIPBL:
SERV: RC-17
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: R107 ASIS/ENGR:
EST START: 10 06 96
DATE COMPLETE: 111596
APPROVED BY: BATES
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 310
220 00
00
20
JOB DETAILS: REMOVE MASTIC (NON-FRIABLE) ASBESTOS FROM THE EAST MAIN SCRUBBER PUMP. SEE BOSCO FOR MORE INFORMATION. (TO BE DONE DURING THE OXIDE T/A)
YTD TOTAL HRS: IND: I CL YR: 96
24 YTD O/T: DATE ENTR: 070996
DEL
PHONE 2617
5 YTD LAB$:
701 YTD MAT$:
73
LAST ACT: N DATE: 111696
PF3:RETURN
003473
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A77929 ORIG WR: A55879
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 003550 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR: 81 WCAT: PM RW CD:
RW RS:
DESC: REMOVE ASBESTOS AT BLDG.321
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 122096 RECNO:
PROP NO:
REQ BY: B.B.
C&P:
WRITTEN: 070396 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD: R736 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 3430
3010
JOB DETAILS: PLEASE REPAIR OR REMOVE ASBESTOS INSULATION ON THE WEST SIDE OF BLDG.321 AS PER CONVERSATION.ALSO REMOVE INSUL. ON INTERIOR AS NEEDED.GARY K.KNOWS LOCATION.
YTD TOTAL HRS: IND: I CL YR: 96
301 YTD O/T: DATE ENTR: 070396
DEL
PHONE 2592
0 YTD LAB$:
8688 YTD MAT$:
505
LAST ACT: N DATE: 092896
PF3:RETURN
003474
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A77812 ORIG WR: A77236
PROCESS ID: MG-403
DIV/LOC: 500510 ACCOUNT: 127200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT: TA RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNT: REC AR: OX WK TP: 4 WANTED: 110496 RECNO: 009860 PROP NO:
REQ BY: B GEFFERT CScP:
WRITTEN: 070296 HWP:
MTAG:
SLIPBL:
SERV: RC-17
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: RB PLAN CD: 0276 ASIS/ENGR:
EST START: 10 06 96
DATE COMPLETE: 110196
APPROVED BY: BATES
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 460
805 00
00
70
JOB DETAILS: REMOVE THE ASBESTOS INSULATION FROM THE EAST MAIN SCRUBBER WATER PUMP. FABRICATE BLANKET INSULATION FOR THE PUMP AND FLANGES. CONTACT BUBBA 5-508
YTD TOTAL HRS: IND: I CL YR: 96
87 YTD O/T: DATE ENTR: 070296
DEL
PHONE 2774
7 YTD LAB$:
2544 YTD MAT$:
236
LAST ACT: N DATE: 112196
PF3:RETURN
003475
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A77693 ORIG WR:
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SA RW CD:
RW RS:
DESC: SEAL LOOSE ASBESTOS INSULATION
BLD/UNT: BUTYL AR: CH WK TP: 8 WANTED: 121596 RECNO:
PROP NO:
REQ BY: VOIGT/AT
C&P:
WRITTEN: 070196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD: 17K6 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1560
1030
JOB DETAILS: SEVERAL FLANGES/ELLS HAVE LOOSE ASBESTOS INSULATION. PLEASE SEAL OR REPLACE. 200# STEAM SUPPLY AT BATTERY LIMITS
THNX, ANN T. 5-401
YTD TOTAL HRS:
103 YTD O/T:
IND: J CL YR: 96 DATE ENTR: 070196
DEL
PHONE 2750
0 YTD LAB$:
2975 YTD MAT$:
306
LAST ACT: N DATE: 110896
PF3:RETURN
003476
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A76185 ORIG WR: 113609
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009210 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 16 WCAT: SC RW CD:
RW RS:
DESC: CHECK OUT INSULATION & REMOVE
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 123196 RECNO:
PROP NO:
REQ BY: R BASALDUA C&P:
WRITTEN: 060496 HWP:
MTAG:
SLIPBL:
SERV: INSULATION
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD: 0406 ASIS/ENGR:
EST START: 06 05 96
DATE COMPLETE:
APPROVED BY: B.B.B.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 430
00
JOB DETAILS: PLEASE CHECK OUT INSULATION IN THE EAST-WEST PIPERACK ON THE 2ND
LEVEL IN OXIDE BLOCK FOR ASBESTOS AND REVOVE OR REPAIR. SEE
RICHARD BASALDUA AT COGEN BLDG. 428 OR PHONE 2031 OR 5358 FOR
BETTER LOCATION OF SUSPECTED ASBESTOS INSULATION. .
THANKS BB
DEL COGEN
PHONE 2592
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
0
IND: J CL YR: 96 DATE ENTR: 060496 LAST ACT: N DATE: 112196
PF3:RETURN
003477
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A76178 ORIG WR: A76022
PROCESS ID: 96 FALLSD
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: PROVIDE INSUL. PLANNER BUTYL
BLD/UNT: BUTYL AR: CH WK TP: 4 WANTED: 112296 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 060496 HWP:
MTAG:
SLIPBL:
SERV: BU0001
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M6 PLAN CD: 0406 ASIS/ENGR:
EST START: 07 01 96
DATE COMPLETE: 111596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 4900 4760
JOB DETAILS: PLEASE PROVIDE AN INSULATOR TO HELP PLAN THE ODU TURNAROUND IN SEPTEMBER. SEE BOSCO FOR MORE INFORMATION.
YTD TOTAL HRS: IND: I CL YR: 96
DEL
PHONE 2617
476 YTD O/T:
38 YTD LAB$:
13835 YTD MAT$:
0
DATE ENTR: 060496 LAST ACT: N DATE: 112296
PF3:RETURN
003478
WLCLIST
*** WORK REQUEST LISTING *
PAGE
4 OF 14
DATE: 11/22/96
RESPCODE=iMO,DATEWRIT FR 080195 TO 110196
T
S RE W
WK
DATES
X WK REQ P JOB DESCRIPTION
T SP T PR CAT WRITN WANTED CLOSED
<== SORT SELECTION LINE ==>
A75231 *J REPAIR COMPRESSOR BLDG ROOF A71222 J ASBESTOS REMOVAL IN OL2 SEP. A70930 *J REPAIR INSUL. AT CONF.CORNER A70929 J PIPE RACK INSULATIO S,OF OX A70926 J PIPE RACK BLOCK 22 S.OF COGEN A70925 J BLOCK 15 W. OF ODU A69070 I SECURE & REMOVE POSS.ASBESTOS A68468 J REMOVE ASBES.INSUL.AT 02 UNIT A67304 *J SEAL FURN AREA ASBESTOS INSUL A66582 J REMOVE ASBES.HOT COMP.AT LP-1 A66581 J REMOVE ASBESTOS AT LP-1 RXN. A66191 I STRIP INSULATION ON STM. LEGS A63709 J SAMPLE ARC CANS FOR ASBESTOS A58387 J INSPECT MECH.RM.OL-2 B-501
C MO 8 3 SC 051796 101196 101196 Y MO 8 4 RP 031196 031197 Y MO 8 4 RP 030696 030697 Y MO 8 4 RP 030696 030697 Y MO 8 4 RP 030696 030697 Y MO 8 4 SC 030696 030697 1 MO 8 4 RP 020596 123196 C MO 4 2 SC 012696 12SA74 110596 Y MO 8 4 SA 011196 011197
1 MO 8 4 SE 010296 113096 1 MO 8 4 SE 010296 113096 1 MO 8 4 SE 122195 123196 C MO 8 3 SE 110795 093096 092596 1 MO 8 4 SC 081695 113096
2 IDR 3 :RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 PAR 10i F/LST 11 HIST 12 PRT
003479
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A75231 ORIG WR: 116400
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 82 WCAT: SC RW CD:
RW RS:
DESC: REPAIR COMPRESSOR BLDG ROOF
BLD/UNT: OLCOM AR: OL WK TP: 8 WANTED: 101196 RECNO:
PROP NO:
REQ BY: SIMMONS
C&P:
WRITTEN: 051796 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101196
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 390
370
JOB DETAILS: REPAIR/REPLACE MISSING PANEL ON TOP OF COMPRESSOR BLDG ROOF. SEE JOHN SIMMONS FOR DETAILS.
YTD TOTAL HRS: IND: J CL YR: 96
37 YTD O/T: DATE ENTR: 051796
DEL
PHONE 2965
0 YTD LAB$:
1068 YTD MAT$:
43
LAST ACT: N DATE: 102596
PF3:RETURN
003480
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A71222 ORIG WR: 119997
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR: 82 WCAT: RP RW CD:
RW RS:
DESC: ASBESTOS REMOVAL IN OL2 SEP.
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 031197 RECNO:
PROP NO:
REQ BY: B WARZECHA C&P:
WRITTEN: 031196 HWP: Y MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: Y PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 03 11 96
DATE COMPLETE:
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 2160
1120
JOB DETAILS: REMOVE ASBESTOS AS NEEDED IN OLEFINS SEPARATIONS AREA.TO COVER THE COST OF REMOVING,REPIARING,SAMPLING,& MAINTAINING ASBESTOS INSUL.IN UNIT.
YTD TOTAL HRS: IND: J CL YR: 95
112 YTD O/T: DATE ENTR: 031196
DEL
PHONE 2536
0 YTD LAB$:
3233 YTD MAT$:
700
LAST ACT: N DATE: 102596
PF3:RETURN
003481
WLCDETS
* SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A70930 ORIG WR: 113609
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009210 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR:
WCAT: RP RW CD:
RW RS:
DESC: REPAIR INSUL. AT CONF.CORNER
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 030697 RECNO:
PROP NO:
REQ BY: BBBROWNING C&P:
WRITTEN: 030696 HWP: Y MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: Y PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 03 06 96
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 4800 3825
00
00
100
JOB DETAILS: REPAIR INSULATION AT CONFUSION CORNER.MAINTINANCE & REPAIRS TO ASBESTOS INSUL.IN PIPERACK.
YTD TOTAL HRS: IND: J CL YR: 95
DEL
PHONE
392 YTD O/T:
25 YTD LAB$:
11366 YTD MAT$:
DATE ENTR: 030696 LAST ACT: C DATE: 111496
PF3:RETURN
436
003482
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY ***
WORK REQ NO: A70929 ORIG WR: 113609
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009210 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR:
WCAT: RP RW CD:
RW RS:
DESC: PIPE RACK INSULATIO S,OF OX
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 030697 RECNO:
PROP NO:
REQ BY: BBBROWNING C&P:
WRITTEN: 030696 HWP: Y MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: Y PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 03 06 96
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 6990
4865
JOB DETAILS: REPAIRS TO PIPE RACK INSULATION SOUTH OF OXIDE.MAINTINANCE & REPAIR OF ASBESTOS INSUL.
YTD TOTAL HRS: IND: J CL YR: 95
DEL
PHONE
486 YTD O/T:
93 YTD LAB$:
14322 YTD MAT$:
DATE ENTR: 030696 LAST ACT: N DATE: 110196
3617
PF3:RETURN
003483
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A70926 ORIG WR: 113609
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009210 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR:
WCAT: RP RW CD:
RW RS:
DESC: PIPE RACK BLOCK 22 S.OF COGEN
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 030697 RECNO:
PROP NO:
REQ BY: BBBROWNING C&P:
WRITTEN: 030696 HWP: Y MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: Y PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 03 06 96
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 2820
880
JOB DETAILS: REPAIRS TO INSULATIONS IN BLOCK 22 S. OF COGEN.MAINTENANCE TO ASBESTOS INSUL.IN PIPE RACK.
YTD TOTAL HRS: IND: J CL YR: 95
88 YTD O/T: DATE ENTR: 030696
DEL
PHONE
0 YTD LAB$:
2540 YTD MAT$:
LAST ACT: N DATE: 092696
PF3:RETURN
0
003484
WLCDETS
*** SEADRIFT WORK REQUEST * *** SHOW ONLY ***
WORK REQ NO: A70925 ORIG WR: 113609
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009210 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR:
WCAT: SC RW CD:
RW RS:
DESC: BLOCK 15 W. OF ODU
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 030697 RECNO:
PROP NO:
REQ BY: BBBROWNING C&P:
WRITTEN: 030696 HWP: Y MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: Y PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 03 06 96
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 2280
490
JOB DETAILS: REPAIRS TO INSULATION IN BLOCK 15(ODU AREA).FOR MAINTENANCE & SAMPLING OF ASBESTOS INSUL.IN PIPERACK.
YTD TOTAL HRS: IND: J CL YR: 96
49 YTD O/T: DATE ENTR: 030696
DEL
PHONE
0 YTD LAB$:
1415 YTD MAT$:
LAST ACT: N DATE: 100996
PF3:RETURN
266
003485
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A69070 ORIG WR: A47976
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR: 82 WCAT: RP RW CD:
RW RS:
DESC: SECURE & REMOVE POSS.ASBESTOS
BLD/UNT: OL-2 AR: OL WK TP: 8 WANTED: 123196 RECNO:
PROP NO:
REQ BY: A.URESTI
C&P:
WRITTEN: 020596 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 2430
2125
JOB DETAILS: SECURE & REMOVE POSSIBLE ASBESTOS INSULATION IN PIPERACK NORTH OF 306
YTD TOTAL HRS: IND: I CL YR: 96
212 YTD O/T: DATE ENTR: 020796
DEL
PHONE 2982
0 YTD LAB$:
6136 YTD MAT$:
1401
LAST ACT: N DATE: 110896
PF3:RETURN
003486
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A68468 ORIG WR: 111625
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 008510 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR:
WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBES.INSUL.AT 02 UNIT
BLD/UNT: E/S AR: ES WK TP: 4 WANTED: 12SA74 RECNO: 000747 PROP NO:
REQ BY: BBBROWNING C&P:
WRITTEN: 012696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 110596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 510
490 00
00
10
JOB DETAILS: REMOVE ASBESTOS INSULATION FROM STEAM PIPING AT THE 02 UNIT.
CONTACT THE OPERATOR OR RICK GOMEZ FOR LOCATION.SOME OF THIS
WORK WILL NEED TO TAKE PLACE WHEN STEAM CAN BE VALVED IN.
UNIT WILL NOTIFY WHEN JOB CAN TAKE PLACE.POSSIBLE S\D.
DEL
PHONE
YTD TOTAL HRS:
50 YTD O/T:
5 YTD LAB$:
1454 YTD MAT$:
IND: J CL YR: 96 DATE ENTR: 012696 LAST ACT: N DATE: 112196
PF3:RETURN
2
003487
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A67304 ORIG WR: 119587
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR: 82 WCAT: SA RW CD:
RW RS:
DESC: SEAL FURN AREA ASBESTOS INSUL
BLD/UNT: OLFUR AR: OL WK TP: 8 WANTED: 011197 RECNO:
PROP NO:
REQ BY: OSPINA
C&P:
WRITTEN: 011196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: Y PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 7900 6820
00
00
230
JOB DETAILS: FURNACE AREA LINES NEED TO HAVE ASBESTOS INSULATION SEALED. CONTACT JAVIER OSPINA FOR DETAILS.SOME REMOVAL ALSO INVOLVED.
YTD TOTAL HRS: IND: J CL YR: 94
705 YTD O/T: DATE ENTR: 011296
DEL
PHONE 2608
0 YTD LAB$:
20275 YTD MAT$:
1253
LAST ACT: N DATE: 091096
PF3:RETURN
003488
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A66582 ORIG WR: 155581
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148400 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBES.HOT COMP.AT LP-1
BLD/UNT: LP1F AR: LI WK TP: 8 WANTED: 113096 RECNO:
PROP NO:
REQ BY: FRANK BEN. C&P:
WRITTEN: 010296 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 01 02 96
DATE COMPLETE:
APPROVED BY: T.T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 3560
380
JOB DETAILS: PLEASE REMOVE OR REPAIR INSULATION LOCATED IN THE HOT COMPOUND AREA WEST OF THE CONTROL ROOM NEXT TO STAIRWAY.GARY K. KNOWS LOCATION.
YTD TOTAL HRS: IND: J CL YR: 95
38 YTD O/T: DATE ENTR: 010296
DEL B-341
PHONE 2832
0 YTD LAB$:
1097 YTD MAT$:
901
LAST ACT: N DATE: 111296
PF3:RETURN
003489
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A66581 ORIG WR: 154412
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148310 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS AT LP-1 RXN.
BLD/UNT: LP1R AR: LI WK TP: 8 WANTED: 113096 RECNO:
PROP NO:
REQ BY: BOEHM
CScP:
WRITTEN: 010296 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 01 02 96
DATE COMPLETE:
APPROVED BY: T.T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 4180
90
JOB DETAILS: REMOVE ASBESTOS FROM JUNCTION BOXES & CONDUIT LINES IN PIPERACK EAST OF THE REACTION CONTROL RM.GARY K.KNOWS LOCATION.
YTD TOTAL HRS: IND: J CL YR: 95
9 YTD O/T: DATE ENTR: 010296
DEL 343
PHONE 2832
0 YTD LAB$:
260 YTD MAT$:
60
LAST ACT: N DATE: 102596
PF3:RETURN
003490
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A66191 ORIG WR: A60261
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009210 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR: 31 WCAT: SE RW CD:
RW RS:
DESC: STRIP INSULATION ON STM. LEGS
BLD/UNT: ENSYS AR: ES WK TP: .8 WANTED: 123196 RECNO:
PROP NO:
REQ BY: C FANELLI C&P:
WRITTEN: 122195 HWP:
MTAG:
SLIPBL:
SERV: COGEN STM SYSTE DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: MO PLAN CD: KAV ASIS/ENGR:
EST START: 12 28 95
DATE COMPLETE:
APPROVED BY: B.B.B.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 5500
4885
JOB DETAILS: PLEASE STRIP INSULATION OFF OF VARIOUS STEAM LEGS THROUGHOUT THE UTILITIES PIPE RACKS. NEW PIPE WILL HAVE TO BE REINSULATED. THANKYOU. SEE C. FANELLI AT 5-802 FOR ADDITIONAL INFO.
YTD TOTAL HRS: IND: I CL YR: 95
488 YTD O/T: DATE ENTR: 122195
DEL
PHONE 3589
0 YTD LAB$:
14101 YTD MAT$:
2062
LAST ACT: N DATE: 103196
PF3:RETURN
003491
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A63709 ORIG WR: 135617
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT SE RW CD:
RW RS:
DESC: SAMPLE ARC CANS FOR ASBESTOS
BLD/UNT: GEU AR: CH WK TP: .8 WANTED: 093096 RECNO:
PROP NO:
REQ BY: KRAUSE/AT C&cP:
WRITTEN: 110795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 092596
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 950
870
JOB DETAILS: PLEASE SAMPLE EACH CAN SECTION ON ARC FOR ASBESTOS. THNX, ANN T. 5-401
YTD TOTAL HRS: IND: J CL YR: 95
80 YTD O/T: DATE ENTR: 110795
DEL
PHONE
0 YTD LAB$:
2309 YTD MAT$:
LAST ACT: N DATE: 092696
PF3:RETURN
440
003492
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A58387 ORIG WR: 120311
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 4 OR: 82 WCAT: SC RW CD:
RW RS:
DESC: INSPECT MECH.RM.OL-2 B-501
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 113096 RECNO:
PROP NO:
REQ BY: BOCHAT
C&P:
WRITTEN: 081695 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: 1 PLANNER: MO PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE:
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 190
80
JOB DETAILS: INSTALL SIGN AND PERFORM VERIFICATION OF ASBESTOS.
LOCATIONS: BLDG 501 CONTROL ROOM BEHIND CONTROL PANELS
BLDG 500 CONTROL ROOM(COMPRESSOR BLDG)
ATTENTION: FRED BERGER
DEL
PHONE 2909
YTD TOTAL HRS:
6 YTD O/T:
0 YTD LAB$:
173 YTD MAT$:
0
IND: J CL YR: 95 DATE ENTR: 081695 LAST ACT: C DATE: 092796
PF3:RETURN
003493
WLCLIST
*** WORK REQUEST LISTING
PAGE DATE
5 OF 14 11/22/96
RESPC0DE=1V10, DATEWRIT FR 080195 TO 110196 T
X WK REQ P JOB DESCRIPTION <= = SORT SELECTION LINE ==>
S RE T SP
W WK
DATES -----------
T PR CAT' WRITN WANTED CLOSED
A58031 J BLDG.341 ASBESTOS WARNING
C M0 8 3 SE 081095 113096 100996
A79433 I REMOVE ASBESTOS GASKET
X M0 8 1 SE 072996 073196 073196
A79077 J REMOVE INSULATION
X M0 8 1
072396 072496 072396
A79074 I STRIP ASBESTOS FROM GSKTS.
X M0 8 3 SE 072396 072496 072396
A78665 I SAMPLE MASTIC HP2-RX2-20
X M0 4 2
071696 072696 072496
J61820 J REMOVE ASBESTOS GASKETS
X M0 8 3 SE 052096 113096 063096
A78393 I REMOVE MASTIC FROM CHILLER
X M0 8 3
071196 072296 071996
A78343 J REMOVE POSSIBLE ASBESTOS
X M0 8 1 EP 071096 071596 071296
A78022 I SAMPLE MASTIC FOR (ACM) OL2
X M0 8 3
070596 071296 071296
A77667 I REMOVE ASBESTOS GASKETS/DIST.
X M0 8 3 US 062996 070896 070596
A77209 I ASBESTOS GASKET REMOVAL HP2
X M0
2 SD 062196 080296 080296
A71917 I CHECK CAULK FOR ASBESTOS
X M0 8 3
032196 072896 072696
A66541 * J REMOVE ASBESTOS FROM CONDS LIN X M0 8 3 SC 010296 073196 073196
A58281 *J FAB AND INSTALL SIGN
X MO 8 3 US 081595 083196 073096
2 IDR 3 :RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 PAR 101 F/LST i: HIST 12 PRT
003494
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: AS8031 ORIG WR: 155581
PROCESS ID:
DIV/LOC: 500 510 ACCOUNT: 14 84 00 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: BLDG.341 ASBESTOS WARNING
BLD/UNT: LP1RX AR: LI WK TP: 8 WANTED: 113096 RECNO:
PROP NO:
REQ BY: B.SAINZ
C&P:
WRITTEN: 081095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: C PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 08 14 95
DATE COMPLETE: 100996
APPROVED BY: T.T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 270
290
JOB DETAILS: PLEASE INSTALL ASBESTOS WARNING SIGNS ON ALL ENTRY DOORS ON BLDG. 341. ALSO REQUEST ASBESTOS VERIFICATION PER FRED BERGER. THIS IS THE OLD G-1750 CONTROL ROOM.
YTD TOTAL HRS: IND: J CL YR: 95
29 YTD O/T: DATE ENTR: 081095
DEL B-341
PHONE 2359
0 YTD LAB$:
836 YTD MAT$:
1083
LAST ACT: N DATE: 110196
PF3:RETURN
003495
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A79433 ORIG WR: A78329
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 303010 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: M2 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKET
BLD/UNT: OLFUR AR: OL WK TP: 8 WANTED: 073196 RECNO:
PROP NO:
REQ BY: R. BRANDT C&P:
WRITTEN: 072996 HWP:
MTAG:
SLIPBL:
SERV:
. DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 7R30 ASIS/ENGR:
EST START: 07 29 96
DATE COMPLETE: 073196
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
00
JOB DETAILS: PLEASE PROVIDE MANPOWER TO REMOVE ASBESTOS BASKET AT SPRAY GAS COOLER #4. SEE TERRY MIDDAUGH FROM BROWN & ROOT IN UNIT FOR DETAILS, OR CALL RUSSELL BRANDT AT PAGER 5-509; EXT. 3778.
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 080296
DEL
PHONE 2828
0 YTD LAB$:
0 YTD MAT$:
204
LAST ACT: N DATE: 092496
PF3:RETURN
003496
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A79077 ORIG WR: 122900
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 76 WCAT:
RW CD:
RW RS:
DESC: REMOVE INSULATION
BLD/UNT: HP-2 AR:
WK TP: 8 WANTED: 072496 RECNO:
PROP NO:
REQ BY: F.DROZD
C&P:
WRITTEN: 072396 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER: M0 PLAN CD: 237R ASIS/ENGR:
EST START: 07 23 96
DATE COMPLETE: 072396
APPROVED BY: EDMYERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
120
JOB DETAILS: PLEASE REMOVE INSULATION ON 1ST STAGE CYLINDER ON VENT GAS MACHINE.
YTD TOTAL HRS: IND: J CL YR: 96
12 YTD O/T: DATE ENTR: 072396
DEL
PHONE 2749
0 YTD LAB$:
346 YTD MAT$:
241
LAST ACT: N DATE: 080196
PF3:RETURN
003497
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A79074 ORIG WR: A78585
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 12 WCAT: SE RW CD:
RW RS:
DESC: STRIP ASBESTOS FROM GSKTS.
BLD/UNT: OLFUR AR: OL WK TP: ,8 WANTED: 072496 RECNO:
PROP NO:
REQ BY: C FANELLI C&P:
WRITTEN: 0723 96 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: R723 ASIS/ENGR:
EST START: 07 23 96
DATE COMPLETE: 072396
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
80
JOB DETAILS: PLEASE STRIP 8" FLANGE OF ASBESTOS GASKETS. SEE C FANELLI AT 5-802 FOR DETAILS. THANKYOU.
YTD TOTAL HRS: IND: I CL YR: 96
8 YTD O/T: DATE ENTR: 072396
DEL
PHONE 2304
0 YTD LAB$:
231 YTD MAT$:
233
LAST ACT: N DATE: 080196
PF3:RETURN
003498
WLCDETS
*** SEADRIFT WORK REQUEST * * * SHOW ONLY +
WORK REQ NO: A78665 ORIG WR: A72220
PROCESS ID: EA-612
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: SAMPLE MASTIC HP2-RX2-20
BLD/UNT: HPPE2 AR: H2 WK TP: 4 WANTED: 072696 RECNO: 012100 PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 0716 96 HWP:
MTAG:
SLIPBL:
SERV: RX2-20
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 167R ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 072496
APPROVED BY: E.MYERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 90
220
JOB DETAILS: PLEASE SAMPLE THE MASTIC ON THE EAST VENT GAS COOLER FOR POSSIBLE ASBESTOS CONTAINING MATERIALS. SEE BOSCO FOR LOCATION AND DETAILS.
YTD TOTAL HRS: IND: I CL YR: 96
22 YTD O/T: DATE ENTR: 071696
DEL
PHONE 2617
0 YTD LAB$:
635 YTD MAT$:
0
LAST ACT: N DATE: 080396
PF3:RETURN
003499
WLCDETS
*** SEADRIFT WORK REQUEST * * * *** SHOW ONLY ***
WORK REQ NO: J61820 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006355 2ND ORD: 73000
PR: 3 OR: CW WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: AIR AR: ES WK TP: 8 WANTED: 113096 RECNO:
PROP NO:
REQ BY: C WELFEL
CScP:
WRITTEN: 052096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 063096
APPROVED BY:
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1615
1515
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKETS FROM SCRAP PIPE BY OLD AIR BUILDING WEST OF OXIDE II. CONTACT DON LEITA (WOP) @ 2914 OR RADIO #12 ON
CONSTRUCTION FREQUENCY. C. WELFEL PAGER 5-183
YTD TOTAL HRS: IND: J CL YR: 96
151 YTD O/T: DATE ENTR: 052096
DEL
PHONE 2467
0 YTD LAB$:
4373 YTD MAT$:
306
LAST ACT: N DATE: 101696
PF3:RETURN
003500
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A78393 ORIG WR: A75149
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: M6 WCAT:
RW CD:
RW RS:
DESC: REMOVE MASTIC FROM CHILLER
BLD/UNT: OLFUR AR: OL WK TP: ,8 WANTED: 0 72296 RECNO:
PROP NO:
REQ BY: R. BOSCO
CScP:
WRITTEN: 071196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 11R7 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 071996
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 210
140
JOB DETAILS: PLEASE REMOVE THE NON-FRIABLE ASBESTOS MASTIC FROM THE GLYCOL CHILLER AT OLEFINS. SEE BOSCO OR RICKY CARTER FOR MORE DETAILS
YTD TOTAL HRS: IND: I CL YR: 96
14 YTD O/T: DATE ENTR: 071196
DEL
PHONE 2617
0 YTD LAB$:
404 YTD MAT$:
129
LAST ACT: N DATE: 091496
PF3:RETURN
003501
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A78343 ORIG WR: 243692
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 231940 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 15 WCAT EP RW CD:
RW RS:
DESC: REMOVE POSSIBLE ASBESTOS
BLD/UNT: EVP AR: EP WK TP: 8 WANTED: 071596 RECNO:
PROP NO:
REQ BY: GALLEMORE C&cP:
WRITTEN: 071096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER
PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 071296
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
120
JOB DETAILS: PLEASE REMOVE POSSIBLE ASBESTOS FROM DEA LEAK AT N.FIELD SO THAT REPAIRS CAN BE MADE AND CLEANUP CAN BEGIN.
YTD TOTAL HRS: IND: J CL YR: 96
DEL
PHONE 3584
12 YTD O/T:
12 YTD LAB$:
383 YTD MATS:
0
DATE ENTR: 071896 LAST ACT: N DATE: 072696
PF3:RETURN
003502
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A78022 ORIG WR: A73044
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 10 WCAT:
RW CD:
RW RS:
DESC: SAMPLE MASTIC FOR (ACM) OL2
BLD/UNT: OLFUR AR: OL WK TP: ,8 WANTED: 071296 RECNO:
PROP NO:
REQ BY: R. 30SC0
C&P:
WRITTEN: 070596 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 5K65 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 071296
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 100
60
JOB DETAILS: PLEASE SAMPLE THE MASTIC ON THE GLYCOL CHILLER FOR POSSIBLE ASBESTOS CONTAINING MATERIALS. SEE BOSCO FOR MORE INFORMATION.
YTD TOTAL HRS: IND: I CL YR: 96
6 YTD O/T: DATE ENTR: 070696
DEL
PHONE 2617
0 YTD LAB$:
173 YTD MAT$:
90
LAST ACT: N DATE: 080696
PF3:RETURN
003503
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A77667 ORIG WR: A74538
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 231940 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR 11 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS/DIST.
BLD/UNT: DIST AR: DI WK TP: 8 WANTED: 070896 RECNO:
PROP NO:
REQ BY: . RAMIREZ C&P:
WRITTEN: 062 996 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 0701 ASIS/ENGR:
EST START: 07 01 96
DATE COMPLETE: 070596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 210
80
JOB DETAILS: PLEASE REMOVE 4-3" ASBESTOS GASKETS OF THE FLANGES LOCATED ON THE NORTH SIDE OF THE TRUCK LOADING RACK AT DISTRIBUTION/NORTH FIELD. WILL SHOW LOCATION OF PIPE SPOOLS WHEN READY. THANKS, JUAN 5-801.
YTD TOTAL HRS: IND: I CL YR: 96
8 YTD O/T: DATE ENTR: 070196
DEL CALL WHEN COMPLETE PHONE 3583
0 YTD LAB$:
231 YTD MAT$:
0
LAST ACT: N DATE: 072396
PF3:RETURN
003504
WLCDETS
*** SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A77209 ORIG WR: A76828
PROCESS ID: HPA3-K-204M
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT: SD RW CD:
RW RS:
DESC: ASBESTOS GASKET REMOVAL HP2
BLD/UNT: HPPE2 AR: H2 WK TP: WANTED: 080296' RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 062196 HWP:
MTAG:
SLIPBL:
SERV: RX2-00
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 0621 ASIS/ENGR:
EST START: 07 16 96
DATE COMPLETE: 080296
APPROVED BY: E.MYERS
RC ESTHR - ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 490
155
JOB DETAILS: PLEASE PROVIDE AN ASBESTOS QUALIFIED PERSON TO REMOVE GASKETS AS NEEDED DURING THE #2 REACTOR TURNAROUND. SEE BOSCO OR J. ESTRADA.
YTD TOTAL HRS: IND: I CL YR: 96
15 YTD O/T: DATE ENTR: 062196
DEL
PHONE 2617
0 YTD LAB$:
447 YTD MAT$:
0
LAST ACT: N DATE: 082496
PF3:RETURN
003505
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A71917 ORIG WR: A70994
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 293240 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: M7 WCAT:
RW CD:
RW RS:
DESC: CHECK CAULK FOR ASBESTOS
BLD/UNT:
NF AR: DI WK TP: 8 WANTED: 072896 RECNO:
PROP NO:
REQ BY: BOB BLACK C&P:
WRITTEN: 032196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: FAB ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 072696
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 770
520
JOB DETAILS: CHECK CAULKING ON SEVERAL TANKS IN NORTH FIELD FOR ASBESTOS. WILL SHOW YOU THE TANKS.REMOVE GASKET MATERIAL AS NECCESSARY FOR BLASTING.
YTD TOTAL HRS: IND: I CL YR: 96
52 YTD O/T: DATE ENTR: 032196
DEL PAGER 534
PHONE 2672
0 YTD LAB$:
1499 YTD MAT$:
679
LAST ACT: N DATE: 072796
PF3:RETURN
003506
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A66541 ORIG WR: 119927
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 82 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS FROM CONDS LIN
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 073196 RECNO:
PROP NO:
REQ BY: WARZECHA
C&P:
WRITTEN: 010296 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 073196
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 730
700
JOB DETAILS: REMOVE ASBESTOS INSULATION FROM CONDENSATE LINE SOUTH OF #1 ARU ACETONE PUMPS SO LINE CAN BE REMOVED.
YTD TOTAL HRS: IND: J CL YR: 96
70 YTD O/T: DATE ENTR: 010296
DEL
PHONE 2536
0 YTD LAB$:
2020 YTD MAT$:
42
LAST ACT: N DATE: 080396
PF3:RETURN
003507
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A58281 ORIG WR: 237811
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 220530 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 89 WCAT US RW CD:
RW RS:
DESC: FAB' AND INSTALL SIGN
BLD/UNT:
82 AR: DI WK TP: 8 WANTED: 083196 RECNO:
PROP NO:
REQ BY: B.CANCHOLA C&P:
WRITTEN: 081595 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 073096
APPROVED BY:
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 310
20
JOB DETAILS: FAB AND INSTALL ASBESTOS PRESENCE SIGN AT MECHANICAL ROOM AT THE B ARGE DOCKS,WEST SIDE SIDE OF BLDG.82.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 081595
DEL
PHONE 2524
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 080396
PF3:RETURN
003508
J I
WLCLIST
*** WORK REQUEST LISTING
RESPCODE=MO,DATEWRIT FR 080195 TO 110196 T
X WK REQ P JOB DESCRIPTION <== SORT SELECTION LINE ==>
S RE T SP
PAGE
.6 OF 14
DATE: 11/22/96
W WK
- DATES
T PR CAT WRITN WANTED CLOSED
A77255 A76785 A76761 A76129 A76128 A76123 A76078 A75561 A74955 A74730 A73323 A72184 A64776 A64774
J G-5 GASKET ROOM REMOVE ASBEST. I REMOVE ASBESTOS GASKETS I STRIP ASBESTOS GSKTS. (DIST) I REMOVE ASBESTOS GASKETS G5 T/A I REMOVE INSUL AS NEEDED G-5 RX J REMOVE ASBESTOS GASKET J REMOVE ASBES.INSUL.ON #1 BRC I ENCAPSULATE ASBESTOS TUBING J #1 MISC COL NOZZLES J GASKETS ON BINS AT SALVAGE J REMOVE TRANSITE AT PUMP HOUSE I REMOVE ASB. GASKETS (3 FLGS) J ESTIMATE FOR ASBESTOS REMOVAL J ESTIMATE FOR ASBESTOS REMOVAL
X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO
83 83 83 82 42 42 83 83 83 83 83 42 83 83
SA 062496 070596 070296 US 061496 062896 062796
061496 062096 061996 060396 062096 061096 060396 061496 061096 PM 060396 060696 060696 NC 053096 060796 060696
052396 060796 060596 SE 051396 060796 060596 SC 050996 061496 060596 RP 041696 062896 062796 SD 032796 061896 061496 SE 112895 061496 061496 SE 112895 061496 061496
2 IDR 3 RTN DETL 5 SRT 6 PLN UP DN 9 PAR 10 F/LST 11 HIST 1 2 PRT
003509
WLCDETS
*** SEADRIFT WORK REQUEST * * * * * * SHOW ONLY * * *
WORK REQ NO: A77255 ORIG WR: 154412
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148310 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 83 WCAT: SA RW CD:
RW RS:
DESC: G-5 GASKET ROOM REMOVE ASBEST.
BLD/UNT: LP1 AR: LI WK TP: 8 WANTED: 070596 RECNO:
PROP NO:
REQ BY: MIKE WARD C&P:
WRITTEN: 062496 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 2406 ASIS/ENGR:
EST START: 06 24 96
DATE COMPLETE: 070296
APPROVED BY: TOM
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 220
240
JOB DETAILS: REMOVE AND DISPOSE OF GASKETS FROM STORAGE ROOM LOCATED ON THE SECOND FLOOR OF THE G-5 REACTOR STRUCTURE.
YTD TOTAL HRS: IND: J CL YR: 96
24 YTD O/T: DATE ENTR: 062496
DEL B-343
PHONE 2307
0 YTD LAB$:
693 YTD MAT$:
0
LAST ACT: N DATE: 071996
PF3:RETURN
003510
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A76785 ORIG WR: A74679
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 293220 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 11 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: DIST AR: CH WK TP: 8 WANTED: 062896 RECNO:
PROP NO:
REQ BY: J. RAMIREZ C&P:
WRITTEN: 061496 HWP: X MTAG: X SLIPBL:
SERV: HEXANOL
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: MD PLAN CD: 1406 ASIS/ENGR:
EST START: 06 14 96
DATE COMPLETE: 062796
APPROVED BY: MORGAN
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
180
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKET OFF THE FLANGE ON THE SOUTH SIDE OF THE SPHERE. AL HARTMAN WILL SHOW WHICH FLANGE NEEDS TO BE WORKED ON. I HAVE ALREADY TALKED TO GARY K. THANKS, JUAN 5-801.
YTD TOTAL HRS: IND: I CL YR: 96
18 YTD O/T: DATE ENTR: 061496
DEL
PHONE 3583
0 YTD LAB$:
520 YTD MAT$:
142
LAST ACT: N DATE: 072396
PF3:RETURN
003511
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY
WORK REQ NO: A76761 ORIG WR: A74538
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 231940 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 11 WCAT:
RW CD:
RW RS:
DESC: STRIP ASBESTOS GSKTS. (DIST)
BLD/UNT: DIST AR: CH WK TP: .8 WANTED: 062096 RECNO:
PROP NO:
REQ BY: J. RAMIREZ C&P:
WRITTEN: 061496 HWP:
MTAG:
SLIPBL:
SERV: ASBESTOS
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 1406 ASIS/ENGR:
EST START: 06 14 96
DATE COMPLETE: 061996
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
120
JOB DETAILS: PLEASE STRIP THE ASBESTOS GASKETS OFF THE FLANGES THAT CAME OFF
THE FILTER JOB AT DISTRIBUTION. PIPE IS LOCATED ON THE NORTH
SIDE OF THE RAILROAD TRACK AT RACK 2. FOR MORE INFORMATION CALL
3583 OR PAGER #5-456. THANKS.
DEL NORTH OF RACK 2
PHONE 3583
YTD TOTAL HRS:
12 YTD O/T:
0 YTD LAB$:
346 YTD MAT$:
0
IND: I CL YR: 96 DATE ENTR: 061496 LAST ACT: N DATE: 062796
PF3:RETURN
003512
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A76129 ORIG WR: A75052
PROCESS ID: G-5 REACTOR
DIV/LOC: 500510 ACCOUNT: 148310 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS G5 T/A
BLD/UNT: LP1 AR: LI WK TP: 8 WANTED: 062096 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 060396 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 0306 ASIS/ENGR:
EST START: 06 03 96
DATE COMPLETE: 061096
APPROVED BY: TOMT
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 270
345
JOB DETAILS: PLEASE REMOVE THE ASBESTOS GASKET FROM THE G-5 WATER PIPING. SEE BOSCO FOR DETAILS.
YTD TOTAL HRS: IND: I CL YR: 96
DEL
PHONE 2617
34 YTD O/T:
24 YTD LAB$:
1070 YTD MAT$:
0
DATE ENTR: 060396 LAST ACT: N DATE: 061596
PF3:RETURN
003513
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A76128 ORIG WR: A75052
PROCESS ID: G-5 REACTOR
DIV/LOC: 500510 ACCOUNT: 148310 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: REMOVE INSUL AS NEEDED G-5 RX
BLD/UNT: LP1 AR: LI WK TP: 4 WANTED: 061496 RECNO:
PROP NO:
REQ BY: R. BOSCO
CSc P:
WRITTEN: 060396 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 0306 ASIS/ENGR:
EST START: 06 03 96
DATE COMPLETE: 061096
APPROVED BY: TOMT
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 240
140
JOB DETAILS: PLEASE REMOVE INSULATION AS NEEDED FOR THE PIPEFITTER. DO NOT
RE-INSULATE AT THIS TIME. IF PERSONNEL PROTECTION IS REQUIRED
ON THIS EQUIPMENT A SHOP ORDER WILL BE SENT LATER. SEE BOSCO FOR
LOCATION.(G-5 OUTAGE WORK.)
DEL
PHONE 2617
YTD TOTAL HRS:
14 YTD O/T:
0 YTD LAB$:
404 YTD MAT$:
0
IND: I CL YR: 96 DATE ENTR: 060396 LAST ACT: N DATE: 061596
PF3:RETURN
003514
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A76123 ORIG WR: 158617
PROCESS ID: G2 S. SEAL OIL COO
DIV/LOC: 500510 ACCOUNT: 148700 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 74 WCAT: PM RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKET
BLD/UNT: LP2 AR: L2 WK TP: 4 WANTED: 060696 RECNO:
PROP NO:
REQ BY: TED
CSc P:
WRITTEN: 0603 96 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 0306 ASIS/ENGR:
EST START: 06 03 96
DATE COMPLETE: 060696
APPROVED BY: SEVIER
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 80
00
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKET ON THE G2 SOUTH SEAL OIL COOLER BETWEEN THE TUBE SHEET AND SHELL. THANKS, TED.
YTD TOTAL HRS: IND: J CL YR: 96
0 YTD O/T: DATE ENTR: 060396
DEL
A PHONE 2009
0 YTD LAB$:
0 YTD MAT$:
49
LAST ACT: N DATE: 071996
PF3:RETURN
003515
WLCDETS
*** SEADRIFT WORK REQUEST * * * *** SHOW ONLY ***
WORK REQ NO: A76078 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006435 2ND ORD: 73000
PR: 3 OR:
WCAT: NC RW CD:
RW RS:
DESC: REMOVE ASBES.INSUL.ON #1 BRC
BLD/UNT: ODU AR:
WK TP: .8 WANTED: 060796 RECNO:
PROP NO:
REQ BY: B PETERS
C&P:
WRITTEN: 053096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: 0306 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 060696
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 190
160
JOB DETAILS: REMOVE ASBESTOS INSULATION ON THE #1 BRC COLUMN AS PER LUPE CORONADO'S INSTRUCTIONS.
YTD TOTAL HRS: IND: J CL YR: 96
16 YTD O/T: DATE ENTR: 060396
DEL
PHONE 3450
0 YTD LAB$:
462 YTD MAT$:
0
LAST ACT: N DATE: 060896
PF3:RETURN
003516
WLCDETS
*** SEADRIFT WORK REQUEST * * * * SHOW ONLY
WORK REQ NO: A75561 ORIG WR: A73605
PROCESS ID: FB2-C-5124
DIV/LOC: 500510 ACCOUNT: 148150 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: M6 WCAT:
RW CD:
RW RS:
DESC: ENCAPSULATE ASBESTOS TUBING
BLD/UNT:
LP1 AR: LI WK TP: 8 WANTED: 060796 RECNO: 040911 PROP NO:
REQ BY: R. BOSCO C&P:
WRITTEN: 0 52 3 96 HWP: MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 05 03 96
DATE COMPLETE: 060596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 270
240
JOB DETAILS: PLEASE ENCAPSULATE THE TUBING ON AND AROUND THE HEXENE DEGASSING COLUMN. SEE BOSCO FOR DETAILS AND LOCATION. ( SEND TO THE ASBESTOS DEPARTMENT)
YTD TOTAL HRS: IND: I CL YR: 96
24 YTD O/T: DATE ENTR: 052396
DEL
PHONE 2617
0 YTD LAB$:
693 YTD MAT$:
108
LAST ACT: N DATE: 070996
PF3:RETURN
003517
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A74955 ORIG WR: 135625
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SE RW CD:
RW RS:
DESC: #1 MISC COL NOZZLES
BLD/UNT: GEU AR: CH WK TP: .8 WANTED: 060796 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 0513 96 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 060596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 340
250
JOB DETAILS: REMOVE ASBESTOS INSULATION AROUND NOZZLES AT BOTTOM OF #1 MISC COL
FOR INSPECTION FOR CORROSION. MIKE BOLDT WILL PROVIDE DETAILS.
THNX, ANN T. 5-401
MIKE BOLDT 2754 5-295
DEL
PHONE
YTD TOTAL HRS:
25 YTD O/T:
0 YTD LAB$:
721 YTD MAT$ :
IND: J CL YR: 96 DATE ENTR: 051396 LAST ACT: N DATE: 062296
PF3:RETURN
003518
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A74730 ORIG WR: 142017
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 094210 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: MM WCAT: SC RW CD:
RW RS:
DESC: GASKETS ON BINS AT SALVAGE
BLD/UNT: MMD AR: MM WK TP: .8 WANTED: 061496 RECNO:
PROP NO:
REQ BY: S.WIEST
C&P:
WRITTEN: 050996 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 060596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 310
200
JOB DETAILS: STORAGE BINS LOCATED IN THE SALVAGE YARD NEED TO HAVE GASKET MATERIAL CHECKED TO SEE IF IT IS ASBESTOS.CALL SAM WIEST FOR LOCATION OF MATERIAL. EXT 2290, PAGER 5-644
YTD TOTAL HRS: IND: J CL YR: 96
20 YTD O/T: DATE ENTR: 050996
DEL
PHONE
0 YTD LAB$:
577 YTD MAT$:
LAST ACT: N DATE: 062096
PF3:RETURN
285
003519
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A73323 ORIG WR: 237812
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 220530 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 89 WCAT: RP RW CD:
RW RS:
DESC: REMOVE TRANSITE AT PUMP HOUSE
BLD/UNT: PMPHS AR: DI WK TP: 8 WANTED: 062896 RECNO:
PROP NO:
REQ BY: N HANKE
C&P:
WRITTEN: 041696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 062796
APPROVED BY: MORGAN
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 580
1200
JOB DETAILS: REMOVE THE TRANSITE FROM THE INSIDE SOUTH EAST CORNER OF THE PUMP HOUSE AT THE BARGE DOCK. CONTACT DON MORGAN OR NORMAN HANKE BEFORE STARTING.
YTD TOTAL HRS: IND: J CL YR: 96
120 YTD O/T: DATE ENTR: 041696
DEL BARGE DOCK
PHONE 5622
0 YTD LAB$:
3464 YTD MAT$:
685
LAST ACT: N DATE: 072396
PF3:RETURN
003520
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A72184 ORIG WR: A71705
PROCESS ID: G-241
DIV/LOC: 500 510 ACCOUNT: 03 7220 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 31 WCAT: SD RW CD:
RW RS:
DESC: REMOVE ASB. GASKETS (3 FLGS)
BLD/UNT: HPPE2 AR: H2 WK TP: 4 WANTED: 061896 RECNO:
PROP NO:
REQ BY: LUCAS 726 C&P:
WRITTEN: 032796 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER:
PLAN CD:
ASIS/ENGR:
EST START: 05 22 96
DATE COMPLETE: 061496
APPROVED BY: E.MYERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
120
JOB DETAILS: PLEASE REMOVE 3 FLGS. OF ASB. GASKETS. THE VALVE WILL BE REMOVED IN THE AM OF 5-22-96. LOCATION IN IN THE S/W CORNER, ON #1 HYPER FLOOR. SEE JIM FOR LOCATION AND EXACT TIME SERVICES NEEDED!
YTD TOTAL HRS: IND: I CL YR: 96
12 YTD O/T: DATE ENTR: 033096
DEL 566
PHONE 2943
0 YTD LAB$:
346 YTD MAT$:
0
LAST ACT: N DATE: 061596
PF3:RETURN
003521
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A64776 ORIG WR: 135136
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SE RW CD:
RW RS:
DESC: ESTIMATE FOR ASBESTOS REMOVAL
BLD/UNT: BUTYL AR: CH WK TP: 8 WANTED: 061496 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 1128 95 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 061496
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1120
430
JOB DETAILS: TO COVER THE COST OF ESTIMATING COST FOR ASBESTOS REMOVAL IN BUTYL
FOR '96: 1.#1 BRC COLUMN 2. OTHER ASBESTOS IN BUTYLS THAT MAY BE
IN PIPERACKS, GROUND LEVEL OR SMALL VESSELS. DO NOT INCLUDE RXTRS
OR ANY OTHER LARGE VESSELS. SEPARATE THESE TWO ESTIMATES PLEASE.
THNX, ANN T. 5-401
DEL
PHONE
YTD TOTAL HRS:
43 YTD O/T:
0 YTD LAB$:
1240 YTD MAT$:
750
IND: J CL YR: 95 DATE ENTR: 112895 LAST ACT: N DATE: 070596
PF3:RETURN
003522
WLCDETS
*** SEADRIFT WORK REQUEST * * *** SHOW ONLY ***
WORK REQ NO: A64774 ORIG WR: 136558
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071100 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SE RW CD:
RW RS:
DESC: ESTIMATE FOR ASBESTOS REMOVAL
BLD/UNT: AMINE AR: CH WK TP: 8 WANTED: 061496 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 112895 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: MO PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 061496
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1120
550 00
00
20
JOB DETAILS: TO COVER THE COST OF ESTIMATING COST FOR ASBESTOS REMOVAL IN AMINE
FOR '96: l.MAIN STRUCTURE UPPER LEVEL. 2.MAIN STRUCTURE GROUND
LEVEL. 3. AMINES TANK FARM
PLEASE SEPARATE THESE INTO 3 ESTIMATES AS LISTED ABOVE.
THNX, ANN T. 5-401
DEL
PHONE
YTD TOTAL HRS:
57 YTD O/T:
0 YTD LAB$:
1639 YTD MAT$:
575
IND: J CL YR: 95 DATE ENTR: 112895 LAST ACT: N DATE: 070396
PF3:RETURN
003523
i
WLCLIST
*** WORK REQUEST LISTING ***
PAGE
7 OF 14
DATE: 11/22/96
RESPCODE=MO > DATEWRIT FR 080195 TO 110196
T
S RE W
WK
DATES
X WK REQ P JOB DESCRIPTION
T SP T PR CAT WRITN WANTED CLOSED
fp < = = SORT SELECTION LINE ==>
J70695 A75651 A75410 A75189 A74860 A74857 A74846 A74510 A74362 A71816 J61827 A73899 A73819 A73735
J SAMPLE -REMOVE INSUL.AT HP-2 I REMOVE ASBES.GASKETS #14 COMP. J REMOVE ASBESTOS GASKETS I CHECK :FOR ASBESTOS I REMOVE ASB GSKETS OLEFINS I REMOVE ASB ON VAC TOWER I HC-5 CYCLE WATER PIPE ASBESTAS J E-LINE HTRS CONDS LINE ASBESTS J SAMPLE FOR ASBESTOS ENTRY J SAMPLE BLDG 327 ROOF J REMOVE ASBESTOS GASKETS J ASBESTOS INSULATION I REMOVE ASB GASKETS @ 561 J INCAPSULATE ASBESTOS INSULATIO
X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X MO X MO X MO X MO X MO
81 81 81 83 83 83 82 83 83 83 83 81 83 83
SC 042496 051096 050696 SD 052596 052596 052896 SC 052196 053196 052496
051696 053096 052496 SC 051096 051396 051496 SD 051096 051096 051496 SE 051096 051096 051096 SC 050696 060796 053196 PM 050296 051496 051496 SC 032096 050396 050696 SC 031596 032996 040596
042596 053096 043096 SC 042496 042696 043096
sc 042396 042696 043096
2 IDR 3 RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 PAR 10 F/LST 11 HIST 1 2 PRT
003524
WLCDETS
*** SEADRIFT WORK REQUEST * * * * * * SHOW ONLY * * *
WORK REQ NO: J70695 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006408 2ND ORD: 73000
PR: 1 OR: CW WCAT SC RW CD:
RW RS:
DESC: SAMPLE-REMOVE INSUL.AT HP-2
BLD/UNT: HPII AR: H2 WK TP: 8 WANTED: 051096 RECNO:
PROP NO:
REQ BY: C. WELFEL C&P:
WRITTEN: 042496 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 050696
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 300
640
JOB DETAILS: PLEASE SAMPLE DUCT WORK AT HPPEII FOR ASBESTOS AND REMOVE IF NECESSARY.CONTACT L.CORONADO OR J.WEST FOR LOCATION.
YTD TOTAL HRS: IND: J CL YR: 96
64 YTD O/T: DATE ENTR: 042696
DEL
PHONE 2467
0 YTD LAB$:
1848 YTD MAT$:
0
LAST ACT: N DATE: 052996
PF3:RETURN
003525
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A75651 ORIG WR: A75615
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR:
WCAT: SD RW CD:
RW RS:
DESC: REMOVE ASBES.GASKETS #14 COMP.
BLD/UNT: OLCOM AR: OL WK TP: 8 WANTED: 052596 RECNO:
PROP NO:
REQ BY: J.REYNA
C&P:
WRITTEN: 0 52 5 96 HWP:
MTAG:
SLIPBL:
SERV:
. DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER:
PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 052896
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
00
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKETS FROM THE #14 COMPRESSOR WHEN THE EQUIPMENT IS LIFTED FOR SHIPPING TO BE STEAM CLEANED. THANK YOU.
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 052796
DEL
PHONE 2965
0 YTD LAB$:
0 YTD MAT$:
204
LAST ACT: N DATE: 061496
PF3:RETURN
003526
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A75410 ORIG WR: 119987
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 82 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 053196 RECNO:
PROP NO:
REQ BY: WARZECHA
C&P:
WRITTEN: 052196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD : M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 052496
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 2.0 0
120
JOB DETAILS: REMOVE ASBESTOS GASKETS FROM EKL VAPORIZER. NEED THIS DONE BY 5/22 SO T&I CAN INSPECT VAPORIZER.
YTD TOTAL HRS: IND: J CL YR: 96
12 YTD O/T: DATE ENTR: 052196
DEL
PHONE 2536
0 YTD LAB$:
346 YTD MAT$:
C
LAST ACT: N DATE: 060396
PF3:RETURN
003527
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A75189 ORIG WR: A72727
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 327480 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: M3 WCAT:
RW CD:
RW RS:
DESC: CHECK FOR ASBESTOS
BLD/UNT: B-2 AR:
WK TP: .8 WANTED: 053096 RECNO:
PROP NO:
REQ BY: S SANDERS C&P:
WRITTEN: 051696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 052496
APPROVED BY:
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
00
JOB DETAILS: CHECK MATERIAL THAT IS COMING OFF CEILING FOR ASBESTOS IN B-2 IH LAB NE PART OF BUILDING
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 051696
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 060896
PF3:RETURN
105
003528
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A74860 ORIG WR: A74421
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 12 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASB GSKETS OLEFINS
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 051396 RECNO:
PROP NO:
REQ BY: M ADKINS
C&P:
WRITTEN: 051096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 05 13 96
DATE COMPLETE: 051496
APPROVED BY:
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
100
JOB DETAILS: PLEASE REMOVE GASKETS ON PIPE THAT WAS REMOVED FROM RACK SO IT
CAN BE HAULED TO SALVAGE. UNIT WANTS PIPE REMOVED FROM UNIT.
PIPE IS LOCATED SOUTH SIDE.
THANKS
DEL
PHONE
YTD TOTAL HRS:
10 YTD O/T:
0 YTD LAB$:
289 YTD MAT$:
236
IND: I CL YR: 96 DATE ENTR: 051096 LAST ACT: N DATE: 060696
PF3:RETURN
003529
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A74857 ORIG WR: A73042
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 12 WCAT SD RW CD:
RW RS:
DESC: REMOVE ASB ON VAC TOWER
BLD/UNT: OLFUR AR: OL WK TP: .8 WANTED: 051096 RECNO:
PROP NO:
REQ BY: M ADKINS
C&P:
WRITTEN: 051096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 051496
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
100
JOB DETAILS: WORK WAS DONE ALREADY. THIS IS TO COVER THE COST.
YTD TOTAL HRS: IND: I CL YR: 96
10 YTD O/T: DATE ENTR: 051096
DEL 501
PHONE 5298
0 YTD LAB$:
289 YTD MAT$:
0
LAST ACT: N DATE: 060196
PF3:RETURN
003530
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A74846 ORIG WR: A74185
PROCESS ID: HC-5 PIPING
DIV/LOC: 500510 ACCOUNT: 148400 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: HC-5 CYCLE WATER PIPE ASBESTAS
BLD/UNT: LP1 AR: LI WK TP: ,8 WANTED: 051096 RECNO:
PROP NO:
REQ BY: BINO
CiP:
WRITTEN: 051096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 05 10 96
DATE COMPLETE: 051096
APPROVED BY: TOM T
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
50
JOB DETAILS: REMOVE ASBESTOS GASKETS FROM PIPING REMOVED FROM HC-5, SO BINO CAN DISPOSE OF PIPING THIS AFTERNOON.
YTD TOTAL HRS: IND: I CL YR: 96
5 YTD O/T: DATE ENTR: 0.51096
DEL B-353
PHONE 2832
0 YTD LAB$:
144 YTD MAT$:
78
LAST ACT: N DATE: 060196
PF3:RETURN
003531
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A74510 ORIG WR: 119987
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 82 WCAT: SC RW CD:
RW RS:
DESC: E-LINE HTRS CONDS LINE ASBESTS
BLD/UNT: OLSEP AR: OL WK TP: .8 WANTED: 060796 RECNO:
PROP NO:
REQ BY: WARZECHA
C&P:
WRITTEN: 050696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 053196
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 270
140
JOB DETAILS: PLEASE STRIP ASBESTOS INSULATION UP TO FIRST FLANGE GOING EAST FROM LEAKING ELBOW ON THE CONDENSATE LINE COMING FROM THE E-LINE HEATERS. SEE BREND FOR QUESTIONS ON LOCATION.
YTD TOTAL HRS: IND: J CL YR: 96
14 YTD O/T: DATE ENTR: 050796
DEL
PHONE 2536
0 YTD LAB$:
404 YTD MAT$:
0
LAST ACT: N DATE: 060896
PF3:RETURN
003532
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A74362 ORIG WR: 135605
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: PM RW CD:
RW RS:
DESC: SAMPLE FOR ASBESTOS ENTRY
BLD/UNT: GEU AR: CH WK TP: 8 WANTED: 051496 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 050296 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 051496
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 150
220
JOB DETAILS: WILL REQUIRE SCAFFOLD INSIDE UPPER ISO COL TO REACH. SCAFFOLD WILL
BE PUT IN 5 03 AM. ENTRY IS VERY TIGHT & CONGESTED INSIDE.
T&cl REQUIRES INSULATION CUTS FOR INSPECTION. NEED TO KNOW IF THIS
IS'ASBESTOS (VESSEL FLOOR UNDERSIDE) THNX, ANN T. 5-401
DEL
PHONE
YTD TOTAL HRS:
22 YTD O/T:
0 YTD LAB$:
635 YTD MATS:
0
IND: J CL YR: 96 DATE ENTR: 050296 LAST ACT: N DATE: 051596
PF3:RETURN
003533
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A71816 ORIG WR: 337100
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 333010 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 44 WCAT SC RW CD:
RW RS:
DESC: SAMPLE BLDG 327 ROOF
BLD/UNT: BL327 AR: GF WK TP:.8 WANTED: 050396 RECNO:
PROP NO:
REQ BY: R. MAREK
C&P:
WRITTEN: 032096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 050696
APPROVED BY: RNT
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 450
410
JOB DETAILS: SAMPLE BUILDING 327 ROOF FOR ASBESTOS
YTD TOTAL HRS: IND: J CL YR: 96
41 YTD O/T: DATE ENTR: 032096
DEL
PHONE
0 YTD LAB$:
1183 YTD MAT$:
LAST ACT: N DATE: 051496
1080
PF3:RETURN
003534
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY ***
WORK REQ NO: J61827 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006407 2ND ORD: 7300C
PR: 3 OR: CW WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: HPPE2 AR: H2 WK TP: .8 WANTED: 032996 RECNO:
PROP NO:
REQ BY: C WELFEL
C&P:
WRITTEN: 031596 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 040596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 140
120
JOB DETAILS: PLEASE REMOVE 8 ASBESTOS GASKETS IN HPPE-2 BY BIN PROJECT. . CONTACT DON LEITA AT X-2914 OR RADIO # 12 (CONSTRUCTION RADIO)
YTD TOTAL HRS: IND: J CL YR: 96
12 YTD O/T: DATE ENTR: 031596
DEL
PHONE 2467
0 YTD LAB$:
345 YTD MAT$:
0
LAST ACT: N DATE: 040696
PF3:RETURN
003535
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A73899 ORIG WR: 119987
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX
1ST ORDER:
2ND ORD:
PR: 1 OR: 82 WCAT:
RW CD:
RW RS:
DESC: ASBESTOS INSULATION
BLD/UNT: OLSEP AR:
WK TP: .8 WANTED: 053096 RECNO:
PROP NO:
REQ BY: J.DELGADO CScP:
WRITTEN: 042596 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 043096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 130
80
JOB DETAILS: CLEAN UP ASBESTOS INSULATION ON SIDE WALK.
YTD TOTAL HRS: IND: J CL YR: 96
8 YTD O/T: DATE ENTR: 042596
DEL
PHONE 2965
8 YTD LAB$:
255 YTD MAT$:
0
LAST ACT: N DATE: 050396
PF3:RETURN
003536
WLCDETS
* * * SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A73819 ORIG WR: A71983
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 09 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASB GASKETS @ 561
BLD/UNT: HPPE2 AR: H2 WK TP: ,8 WANTED: 042696 RECNO:
PROP NO:
REQ BY: LUCAS 726 C&P:
WRITTEN: 042496 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 043096
APPROVED BY: E.MYERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
100
JOB DETAILS: PLEASE REMOVE ASB GASKETS ON PIPE FLGS. AT 561 (S/W CORNER). WE NEED TO SALVAGE AND REUSE THE 4" CK. VALVE. SEE JIM FOR LOCATION
YTD TOTAL HRS: IND: I CL YR: 96
10 YTD O/T: DATE ENTR: 042496
DEL 561
PHONE 2943
0 YTD LAB$:
289 YTD MAT$:
0
LAST ACT: N DATE: 050396
PF3:RETURN
003537
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A73735 ORIG WR: 136540
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071100 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SC RW CD:
RW RS:
DESC: INCAPSULATE ASBESTOS INSULATIO
BLD/UNT: ODU AR: CH WK TP: 8 WANTED: 042696 RECNO:
PROP NO:
REQ BY: ANN T/J.M. C&P:
WRITTEN: 042396 HWP:
MTAG:
SLIPBL:
SERV: STEAM
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 043096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
280
JOB DETAILS: PLEASE INCAPSULATE 3/4" STEAM PIPE FOR REMOVAL.JOB HAS ALREADY BEE
N SHOWN TO INSULATING CREW.
E
YTD TOTAL HRS: IND: J CL YR: 96
28 YTD O/T: DATE ENTR: 042396
DEL
PHONE 2750
0 YTD LAB$:
808 YTD MAT$:
0
LAST ACT: N DATE: 060196
PF3:RETURN
003538
WLCLIST
*** WORK REQUEST LISTING * * *
PAGE
8 OF 14
DATE: 11/22/96
RESPCODE=MO,DATEWRIT FR 080195 TO 110196
T WK REQ P JOB DESCRIPTION FP <== SORT SELECTION LINE ==>
S RE T SP
w WK
DATES
T PR CAT WRITN WANTED CLOSED
A72809 A72445 A72130 A72128 A71839 A70976 A64061 A72303 A72282 A71811 A71538 A71508 A70163 A69603
I RMV ASB GASKET MAT1L- 02 UNIT J REMOVE ASBESTOS INSULATION I ENCAPSULATE ACM AT N.T.F. I SAMPLE MASTIC AND INSULATION I SAMPLE LINES FOR (ACM) OXIDE *1 SAMPLE FOR ASBESTOS N/F *J REMOVE ASBES. GASKETS AT OL-1 I REMOVE ASBESTO GASKETS G1750 J REMOVE ASBESTOS I SAMPLE INSULATION AT 02 UNIT I G-1750 NITROGEN HEATER I ASBESTOS REMOVAL BLDG 13 J ENCAPSULATE ASB INSUL ON FLNGS J ASBESTOS MASTIC
X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO X MO
42 81 83 83 42 83 83 81 81 83 81 81 83 83
TA 040996 041796 041496 RP 040296 040896 040896
032796 042696 042996 032796 043096 042496 032196 041996 041796 030696 042996 041496 SC 111395 032996 040996 SE 032996 032996 033096 RP 032996 032996 033096 032096 040496 032796 SE 031596 031596 032096 SA 031496 031496 032096 SE 022396 032996 033096 SA 021396 031596 030596
IDR 3 :RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 :PAR 10 F/LST 11 HIST 12 PRT
003539
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A72809 ORIG WR: A68890
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 008510 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT: TA RW CD:
RW RS:
DESC: RMV ASB GASKET MAT'L- 02 UNIT
BLD/UNT: ASU AR: ES WK TP:,4 WANTED: 041796 RECNO:
PROP NO:
REQ BY: CONTRERAS CScP:
WRITTEN: 040996 HWP:
MTAG:
SLIPBL:
SERV: COOLING WTR PMP DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: JC PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 041496
APPROVED BY: DWJ(JC)
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 40
210
JOB DETAILS: REMOVE ASBESTOS GASKET MATERIAL FROM 16"-150# CHECK VALVE AND FLANGES ON COOLING WATER PUMP AT 02 UNIT.
YTD TOTAL HRS: IND: I CL YR: 96
21 YTD O/T: DATE ENTR: 040996
JOE CONTRERAS 5-221
DEL 02 UNIT
PHONE 3009
0 YTD LAB$:
606 YTD MAT$:
131
LAST ACT: N DATE: 050396
PF3:RETURN
003540
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A72445 ORIG WR: 292916
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 291740 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 89 WCAT: RP RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNT:
NF AR: DI WK TP: 8 WANTED: 040896 RECNO:
PROP NO:
REQ BY: BITTERLY
C&P:
WRITTEN: 04 02 96 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 040896
APPROVED BY: MORGAN
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
175
JOB DETAILS: REMOVE INSULATION FROM THE DEA LINE UNDER RACK 2. CONCACT DAVID BITTERLY FOR EXACT LOCATION
YTD TOTAL HRS: IND: J CL YR: 96
17 YTD O/T: DATE ENTR: 040296
DEL NF
PHONE 2296
0 YTD LAB$:
505 YTD MAT$:
0
LAST ACT: N DATE: 041396
PF3:RETURN
003541
J
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A72130 ORIG WR: A71590
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 293330 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR:
WCAT:
RW CD:
RW RS:
DESC: ENCAPSULATE ACM AT N.T.F.
BLD/UNT: NTF AR:
WK TP: 8 WANTED: 042696 RECNO:
PROP NO:
REQ BY: R. CARTER C&P:
WRITTEN: 032796 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: MO PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 042996
APPROVED BY:
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 210
90
JOB DETAILS: PLEASE SEAL\ENCAPSULATE ACM ON 2" LINE WHERE INSULATION WILL BE TIED IN AT N.T.F. ON ACETIC ACID LINE SEE RICKY OR JOE FOR LOCATION THANKS!!! 2473\5-209
YTD TOTAL HRS: IND: I CL YR: 96
9 YTD O/T: DATE ENTR: 032796
DEL
PHONE
0 YTD LAB$:
260 YTD MAT$:
LAST ACT: N DATE: 052496
PF3:RETURN
499
003542
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A72128 ORIG WR: A71871
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR
WCAT :
RW CD:
RW RS:
DESC: SAMPLE MASTIC AND INSULATION
BLD/UNT: SALV AR:
WK TP:.8 WANTED: 043096 RECNO:
PROP NO:
REQ BY: R CARTER C&cP:
WRITTEN: 032796 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 042496
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 390
00
JOB DETAILS: PLEASE SAMPLE MASTIC AND INSULATION AND IF NEEDED REMOVE
FROM COMP. BOTTLES OLEFINS 2 EQUIPMENT SEE JOE OR RICKY
FOR LOCATION
5-209\5-173\2473
DEL
PHONE
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
IND: I CL YR: 96 DATE ENTR: 032796 LAST ACT: N DATE: 071796
PF3:RETURN
665
003543
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A71839 ORIG WR: A63873
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 127200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: SAMPLE LINES FOR (ACM) OXIDE
BLD/UNT: REA AR: OX WK TP:.4 WANTED: 041996 RECNO:
PROP NO:
REQ BY: R. BOSCO
CScP:
WRITTEN: 032196 HWP:
MTAG:
SLIPBL:
SERV: R-19
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 041796
APPROVED BY: BATES
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
50
JOB DETAILS: PLEASE SAMPLE AND MARK THE LINES ON THE Bl, B2 & B3 TETRALIN SYS. FOR POSSIBLE ASBESTOS CONTAINING MATERIALS.
YTD TOTAL HRS: IND: I CL YR: 96
5 YTD O/T: DATE ENTR: 032196
DEL
PHONE 2617
0 YTD LAB$:
144 YTD MAT$:
3184
LAST ACT: N DATE: 052396
PF3:RETURN
003544
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY ***
WORK REQ NO: A70976 ORIG WR: A67830
PROCESS ID: NONE
DIV/LOC: 500510 ACCOUNT: 291740 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 08 WCAT:
RW CD:
RW RS:
DESC: SAMPLE FOR ASBESTOS N/F
BLD/UNT: DIST. AR:
WK TP: 8 WANTED: 042996 RECNO: 064449 PROP NO:
REQ BY: V.SPRAGUE C&P:
WRITTEN: 030696 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 041496
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1850
2090
JOB DETAILS: PLEASE SAMPLE THE PIPING PER SIMONS DIRECTIONS FOR ASBESTOS
IF IT IS ASBESTOS KEEP THIS S/O OPEN TO REMOVE AREAS AT THE SAME
LOCATIONS AS SAMPLES ARE TAKEN. WE WILL MOVE BACK THE DUE DATE IF
YOU HAVE TO CUT. THANKS VIVIAN X-3479 5-514
DEL
PHONE
YTD TOTAL HRS:
209 YTD O/T:
6 YTD LAB$:
6050 YTD MAT$:
1654
IND: I CL YR: 96 DATE ENTR: 030796 LAST ACT: N DATE: 041696
PF3:RETURN
003545
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY *+*
WORK REQ NO: A64061 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 880000 INDX: 80 1ST ORDER: 00004830 2ND ORD: 00101
PR: 3 OR: MM WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBES. GASKETS AT OL-1
BLD/UNT: MMD AR: MM WK TP:,8 WANTED: 032996 RECNO:
PROP NO:
REQ BY: S WIEST
CScP:
WRITTEN: 1113 95 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 040996
APPROVED BY:
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1730 1300
JOB DETAILS: REMOVE ASBESTOS GASKETS ON 12 HEATERS LOCATED ON THE SOUTH SIDE OF # 1 GAS SEE SAM WIEST FOR LOCATION IF NECESSARY.
YTD TOTAL HRS: IND: J CL YR: 95
96 YTD O/T: DATE ENTR: 111395
DEL
PHONE
0 YTD LAB$:
2772 YTD MAT$:
LAST ACT: N DATE: 041096
PF3:RETURN
165
003546
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A72303 ORIG WR: A72064
PROCESS ID: STEAM PIPE
DIV/LOC: 500510 ACCOUNT: 148370 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTO GASKETS G1750
BLD/UNT: LP1 AR: LI WK TP: .8 WANTED: 032996 RECNO:
PROP NO:
REQ BY: D. MAREK
C&P:
WRITTEN: 032996 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 03 29 96
DATE COMPLETE: 033096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 120
125
JOB DETAILS: REMOVE ASBESTO GASKETS FRON STEAM PIPING
YTD TOTAL HRS: IND: I CL YR: 96
12 YTD O/T: DATE ENTR: 032996
DEL 34IN
PHONE 2396
0 YTD LAB$:
361 YTD MAT$:
131
LAST ACT: N DATE: 060696
PF3:RETURN
003547
i
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A72282 ORIG WR:
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 355080 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR:
WCAT: RP RW CD:
RW RS:
DESC: REMOVE ASBESTOS
BLD/UNT: BLD2 AR:
WK TP: 8 WANTED: 032996 RECNO:
PROP NO:
REQ BY: S.FIGUEROA C&P:
WRITTEN: 032996 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 033096
APPROVED BY: ADD
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 90
120
JOB DETAILS: REMOVE ASBESTOS FROM STEAM FOR REPAIR WORK AND REINSULATE AFTER WORK IS DONE.
YTD TOTAL HRS: IND: J CL YR: 96
12 YTD O/T: DATE ENTR: 032996
DEL
PHONE 2348
0 YTD LAB$:
346 YTD MAT$ :
305
LAST ACT: N DATE: 052196
PF3:RETURN
003548
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A71811 ORIG WR: A69994
PROCESS ID:
DIV/LOC: 5 00 510 ACCOUNT: 0 08510 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 10 WCAT:
RW CD:
RW RS:
DESC: SAMPLE INSULATION AT 02 UNIT
BLD/UNT: ASU AR: ESWK TP: .8 WANTED: 040496 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P :
WRITTEN: 0320 96 HWP:
MTAG:
SLIPBL:
SERV: 02-027
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 032796
APPROVED BY: B.B.B.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 80
40
JOB DETAILS: PLEASE SAMPLE THE INSULATION MATERIALS ON THE N2 COMPRESSOR FOR POSSIBLE (ACM) THANK YOU. SEE BOSCO FOR DETAILS AND LOCATIONS.
YTD TOTAL HRS: IND: I CL YR: 96
4 YTD O/T: DATE ENTR: 032096
DEL
PHONE 2617
0 YTD LAB$:
115 YTD MAT$:
163
LAST ACT: N DATE: 052996
PF3:RETURN
003549
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A71538 ORIG WR: A71530
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148370 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: G-1750 NITROGEN HEATER
BLD/UNT:
L1R AR: LI WK TP: 8 WANTED: 031596 RECNO:
PROP NO:
REQ BY: V. SHRADER C&P:
WRITTEN: 031596 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 032096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
90
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKETS FROM TUBE SHEET, HEAD, AND HEATER SHELL
YTD TOTAL HRS: IND: I CL YR: 96
9 YTD O/T: DATE ENTR: 031596
DEL
PHONE
9 YTD LAB$:
287 YTD MAT$:
LAST ACT: N DATE: 040296
PF3:RETURN
279
003550
WLCDETS
*** SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A71508 ORIG WR: A64790
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 333010 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 44 WCAT SA RW CD:
RW RS:
DESC: ASBESTOS REMOVAL BLDG 13
BLD/UNT: BLD13 AR: GF WK TP: 8 WANTED: 031496 RECNO:
PROP NO:
REQ BY: R. MAREK
C&P:
WRITTEN: 031496 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 032096
APPROVED BY: RNT
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 380
390
JOB DETAILS: PLEASE CLEAN ASBESTOS AROUND BLDG 13
YTD TOTAL HRS: IND: I CL YR: 96
DEL
PHONE
39 YTD O/T:
30 YTD LAB$:
1216 YTD MAT$:
DATE ENTR: 031496 LAST ACT: N DATE: 041296
PF3:RETURN
667
003551
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A70163 ORIG WR: 135115
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SE RW CD:
RW RS:
DESC: ENCAPSULATE ASB INSUL ON FLNGS
BLD/UNT: BUTYL AR: CH WK TP: 8 WANTED: 032996 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 022396 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 033096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 310
170
JOB DETAILS: SEVERAL FLANGES/ELL HAVE LOOSE ASBESTOS INSULATION. PLEASE SEAL OR REPLACE. LOCATED ON 200# STEAM SUPPLY BATTERY LIMIT. SEE RED VOIGT FOR EXACT LOCATION 5-733. THNX, ANN T. 5-401
YTD TOTAL HRS: IND: J CL YR: 96
17 YTD O/T: DATE ENTR: 022396
DEL
PHONE
0 YTD LAB$:
491 YTD MAT$:
LAST ACT: N DATE: 040296
204
PF3:RETURN
003552
WLCDETS
* * * SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A69603 ORIG WR: 147610
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 127300 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 85 WCAT: SA RW CD:
RW RS:
DESC: ASBESTOS MASTIC
BLD/UNT: REC AR: OX WK TP: 8 WANTED: 031596 RECNO:
PROP NO:
REQ BY: MARTINEZ
CSc P:
WRITTEN: 021396 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 030596
APPROVED BY: BATES
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 240
00
JOB DETAILS: RVGC SUCTION PIPING HAS RIPPED INSULATION, PLEASE REMOVE OR REPAIR INSULATION, SEE MARTY FOR LOCATION. 2253/5345.
YTD TOTAL HRS: IND: J CL YR: 96
0 YTD O/T: DATE ENTR: 021396
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 031696
PF3:RETURN
110
003553
WLCLIST '
*** WORK REQUEST LISTING
PAGE
9 OF 14
DATE: 11/22/96
RESPCODE= MO,DATEWRIT FR 080195 TO 110196 <1~n
S RE W
WK
DATES
X WK REQ P JOB DESCRIPTION
T SP T PR CAT WRITN WANTED CLOSED
FP <== SORT SELECTION LINE ==>
A68341 A58377 A57941 A69451 A69341 A68878 A68655 A68646 A65718 A57954 A68450 A68350 A67723 AS 7 6 2 5
*J G-1750 SOUR OIL POT/LINE INSUL I ENCAPSULATE ASBESTOS MATERIAL J INSPECT B-100 MECH.ROOM HP-1 I REMOVE ASBESTOS #3 EXTRUDER J SCRAPE GLUE OFF TOP TANK 601 I REMOVE ASBESTOS INSULATION I SEAL INSULATION OL-2 (SEP.) J REMOVE ASBESTOS INSULATION I ASBESTOS INSUL. AT BOILER 22 J CHECK XYLENE RM.AT B-100 HP-1 J REMOVE INSULATION C02 TURBINE I REMOVE ASBES.INSUL.AT OL-2 I REMOVE ASBESTOS GASKET J REMOVE ARC CHUTES
X M0 X M0 X M0 X M0 X M0 X M0 X M0 X MO X MO X MO X MO X MO X MO X MO
82 83 83 81 81 81 81 82 42 83 83 83 83 83
SE 012596 031796 031596 081695 053196 040196 080995 032296 031896 021096 021096 021696
RP 020896 020896 022096 020296 020296 021196 013096 013096 021196
SE 013096 021696 022096 121395 022996 022896 080995 022396 021096
US 012996 012996 012996 011196 013196 012996
011696 013196 012596 EP 011696 013196 012596
2 IDR 3 RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 PAR 10 F/LST 11 HIST :L2 PRT
003554
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A68341 ORIG WR: 154514
PROCESS ID: G-1750 INSUL.
DIV/LOC: 500510 ACCOUNT: 148340 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: G-1750 SOUR OIL POT/LINE INSUL
BLD/UNT: LP1 AR: LI WK TP: . 8 WANTED: 031796 RECNO:
PROP NO:
REQ BY: DONNIE M. C&P:
WRITTEN: 012596 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 01 25 96
DATE COMPLETE: 031596
APPROVED BY: TOM T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 680
80
JOB DETAILS: REMOVE INSULATION PRIOR TO S/D, SOME OF THE INSULATION IS OR LOOKS
LIKE ASBESTOS.REINSULATE LINE BEFORE SCAFFOLD IS REMOVED.HAVE
SCAFFOLD BUILT AS NECESSARY.
SEE DONNIE MAREK FOR LOCATION OF INSULATION.
DEL B-343
PHONE 2396
YTD TOTAL HRS:
8 YTD O/T:
0 YTD LAB$:
231 YTD MAT$:
576
IND: J CL YR: 96 DATE ENTR: 012596 LAST ACT: N DATE: 033096
PF3:RETURN
003555
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A58377 ORIG WR: A57290
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009210 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: M6 WCAT:
RW CD:
RW RS:
DESC: ENCAPSULATE ASBESTOS MATERIAL
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 053196 RECNO:
PROP NO:
REQ BY: R. BOSCO
CScP:
WRITTEN: 0 816 95 HWP:
MTAG:
SLIPBL:
SERV: STEAM LINES
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 09 18 95
DATE COMPLETE: 040196
APPROVED BY: B.B.B.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 950
920 00
00
95
JOB DETAILS: PLEASE ENCAPSULATE OR REMOVE ASBESTOS MATERIAL LOCATED IN THE WEST PIPE RACK. SEE BOSCO FOR LOCATIONS, SOME SAFETY PRECAUTION WILL BE NEEDED BEFORE WORK CAN BEING. CALL ME AT 2617 OR 5-608 THANK YOU :
YTD TOTAL HRS: IND: I CL YR: 95
101 YTD O/T: DATE ENTR: 081695
DEL
PHONE
0 YTD LAB$:
2892 YTD MAT$:
LAST ACT: C DATE: 052496
563
PF3:RETURN
003556
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A57941 ORIG WR: 367000
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 355090 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR
WCAT:
RW CD:
RW RS:
DESC: INSPECT B-100 MECH.ROOM HP-1
BLD/UNT:
100 AR: HI WK TP: 8 WANTED: 032296 RECNO:
PROP NO:
REQ BY: W GIPSON
C&P:
WRITTEN: 080995 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 031896
APPROVED BY: WGG
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 240
120
JOB DETAILS: INSTALL SIGN FOR THE PRESENCE OF ASBESTOS IN ROOM 110. ALSO, PERFORM VERIFICATION OF ASBESTOS REMOVAL FROM ROOM 110. ATTN: FRED BERGER
YTD TOTAL HRS: IND: J CL YR: 95
12 YTD O/T: DATE ENTR: 080995
DEL
PHONE
0 YTD LAB$:
346 YTD MAT$:
LAST ACT: N DATE: 040296
PF3:RETURN
279
003557
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A69451 ORIG WR: A66723
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148400 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR:
WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS #3 EXTRUDER
BLD/UNT: LPPE1 AR: LI WK TP: 8 WANTED: 021096 RECNO:
PROP NO:
REQ BY: J.BURNS
C&P:
WRITTEN: 021096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER:
PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 021696
APPROVED BY: FRO G.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
00
JOB DETAILS: PLEASE REMOVE POSSIBLE ASBESTOS FROM STM.PIPING NEXT TO THE #3 EXTRUDER.SEE OPERATIONS FOR LOCATION.ALSO INSTALL TEMPORARY INSUL.FOR PERSONAL PROTECTION.SEE FRO GONZALES FOR APPROVAL.
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 021296
DEL
PHONE 2276
0 YTD LAB$:
0 YTD MAT$:
203
LAST ACT: N DATE: 031296
PF3:RETURN
003558
i
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A69341 ORIG WR: 290601
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 297020 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 89 WCAT: RP RW CD:
RW RS:
DESC: SCRAPE GLUE OFF TOP TANK 601
BLD/UNT: DOCSK AR: DI WK TP: 8 WANTED: 020896 RECNO:
PROP NO:
REQ BY: N HANKE
C&P:
WRITTEN: 020896 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 022096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 950
00
JOB DETAILS: TO COVER COST OF REMOVING GLUE FROM TOP OF TANK 601. THIS GLUE HA S 1 % ASBESTOS IN IT AND WILL REQUIRE QUALIFIED PERSONAL TO REMOVE IT
YTD TOTAL HRS: IND: J CL YR: 96
0 YTD O/T: DATE ENTR: 020896
DEL
PHONE 5622
0 YTD LAB$:
0 YTD MAT$:
1221
LAST ACT: N DATE: 031596
PF3 -.RETURN
003559
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A68878 ORIG WR: A68341
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148340 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR:
WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNT: LPPE1 AR:
WK TP: .8 WANTED: 0202 96 RECNO:
PROP NO:
REQ BY: D.MAREK
C&P:
WRITTEN: 020296 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 021196
APPROVED BY:
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 490
00
JOB DETAILS: PLEASE REMOVE POSSIBLE ASBESTOS FROM SOUR OIL POT LINE AT THE G-1750 REACTOR.SEE DONNIE MAREK FOR LOCATION.REPAIRS FOR FREEZE PROTECTION.
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 020296
DEL
PHONE 2832
0 YTD LAB$:
0 YTD MAT$:
522
LAST ACT: N DATE: 032896
PF3:RETURN
003560
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A68655 ORIG WR: A47976
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR:
WCAT:
RW CD:
RW RS:
DESC: SEAL INSULATION OL-2 (SEP.)
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 013096 RECNO:
PROP NO:
REQ BY: A.URESTE
C&P:
WRITTEN: 013096 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 021196
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 670
00
JOB DETAILS: PLEASE ENCAPSULATE POSSIBLE ASBESTOS INSUL.IN OL-2 SEPERATIONS AREA.THANK YOU.
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 013096
DEL
PHONE 2982
0 YTD LAB$:
0 YTD MAT$:
305
LAST ACT: N DATE: 021796
PF3:RETURN
003561
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A68646 ORIG WR:
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 22 WCAT: SE RW CD: OT RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNT: GEU AR: CH WK TP: -8 WANTED: 021696 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 013096 HWP:
MTAG:
SLIPBL:
SERV:
. DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 022096
APPROVED BY:
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 290
00 00
00
30
JOB DETAILS: PLEASE REMOVE ASBESTOS INSULATION TO ASSIST IN LOCATING LEAK ON
LP CONDENSATE HEADER. NEED TO HAVE REPAIRS MADE NEXT WEEK & NEED
TO HAVE DE-INSULATED SO MATERIALS CAN BE ORDERED.
THNX, ANN T. 5-401
DEL
PHONE
YTD TOTAL HRS:
3 YTD O/T:
0 YTD LAB$:
75 YTD MAT$ :
226
IND: J CL YR: 96 DATE ENTR: 013096 LAST ACT: N DATE: 040396
PF3:RETURN
003562
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A65718 ORIG WR: A64754
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 004320 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: ASBESTOS INSUL. AT BOILER 22
BLD/UNT: ENSYS AR: ES WK TP: .4 WANTED: 022996 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 1213 95 HWP:
MTAG:
SLIPBL:
SERV: #22-008
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 02 19 96
DATE COMPLETE: 022896
APPROVED BY: B.B.B.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 780
170
JOB DETAILS: PLEASE REMOVE THE ASBESTOS CONTAINING MATERIALS FROM THE HOT WATER PIPING. SEE BOSCO FOR LOCATIONS. ALSO USE THIS CHARGE FOR ANY ENCAPSULATION DONE TURNING THE FEB. T/A.
YTD TOTAL HRS: IND: I CL YR: 95
12 YTD O/T: DATE ENTR: 121395
DEL
PHONE 2617
0 YTD LAB$:
346 YTD MAT$:
182
LAST ACT: N DATE: 051196
PF3:RETURN
003563
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A57954 ORIG WR: 367000
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 355090 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR
WCAT:
RW CD:
RW RS:
DESC: CHECK XYLENE RM.AT B-100 HP-1
BLD/UNT:
100 AR: HI WK TP: 8 WANTED: 022396 RECNO:
PROP NO:
REQ BY: W GIPSON
C&P:
WRITTEN: 080 9 95 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 021096
APPROVED BY: WGG
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 370
00
JOB DETAILS: CHECK FOR THE PRESENCE OF ASBESTOS IN XYLENE TESTING ROOM ON THE HOT WATER LINE.REMOVE INSUL.& CUT PIPE AS PER JIMMY NIX 020596.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 080995
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 021796
PF3:RETURN
258
003564
WLCDETS
*** SEADRIFT WORK REQUEST * *** SHOW ONLY ***
WORK REQ NO: A68450 ORIG WR: 119919
PROCESS ID: E-008
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 82 WCAT: US RW CD:
RW RS:
DESC: REMOVE INSULATION C02 TURBINE
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 012996 RECNO: 004199 PROP NO: 610800046
REQ BY: WILLIAMS
C&P:
WRITTEN: 012996 HWP:
MTAG:
SLIPBL:
SERV: 200# STEAM
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 01 26 96
DATE COMPLETE: 012996
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
00
JOB DETAILS: REMOVE INSULATION FROM C02 STILLS' REFLUX STEAM TURBINE SO IT CAN BE PULLED AND SENT TO REPAIR SHOP. MAY BE ASBESTOS.
YTD TOTAL HRS: IND: J CL YR: 96
0 YTD O/T: DATE ENTR: 012696
DEL
PHONE 2965
0 YTD LAB$:
0 YTD MAT$:
197
LAST ACT: N DATE: 021396
PF3:RETURN
003565
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A68350 ORIG WR: A67877
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR:
WCAT
RW CD:
RW RS:
DESC: REMOVE ASBES.INSUL.AT OL-2
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 013196 RECNO:
PROP NO:
REQ BY: A.VASQUEZ C&P:
WRITTEN: 011196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 012996
APPROVED BY:
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 390
00
JOB DETAILS: PLEASE REMOVE ASBESTOS FROM E-LINE HEATER PIPING.R.CARTER KNOWS LOCATION.PAGE 5-983 FOR ANY QUESTIONS.
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 012596
DEL
PHONE 5983
0 YTD LAB$:
0 YTD MAT$:
42
LAST ACT: N DATE: 022996
PF3:RETURN
003566
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A67723 ORIG WR: A67017
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: M7 WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKET
BLD/UNT: 165 AR:
WK TP: 8 WANTED: 013196 RECNO:
PROP NO:
REQ BY: G.LANE
C&P:
WRITTEN: 0116 96 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 012596
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 180
00
JOB DETAILS: REMOVE ASBESTOS GASKET FROM VENT STACK. THANKS FOR THE HELP GARY.
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 011796
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 022996
PF3:RETURN
41
003567
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A67625 ORIG WR: 108700
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 007350 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 03 WCAT: EP RW CD:
RW RS:
DESC: REMOVE ARC CHUTES
BLD/UNT: 163 AR: ES WK TP: .8 WANTED: 013196 RECNO:
PROP NO:
REQ BY: G BELK
C&P:
WRITTEN: 0116 96 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD : M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 012596
APPROVED BY:
RC ESTHR IS 180
ACTHR 00
RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
JOB DETAILS: PLEASE DISPOSE OF ASBESTOS LADEN ARC CHUTES WHICH
ARE LOCATED ON A PALLET ON THE NORTH END OF THE
CARBIDE ELECTRIC SHOP
THANKS GERROLD
DEL
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD
IND: J CL YR: 96 DATE ENTR: 011696 LAST ACT: N DATE: 022996
PHONE MAT$:
2606 96
PF3:RETURN
003568
1
WLCLIST
*** WORK REQUEST LISTING ***
PAGE
10 OF 14
DATE: 11/22/96
RESPCODE=MO,DATEWRIT FR 080195 TO 110196
WK REQ FP
T P JOB DESCRIPTION
<= = SORT SELECTION LINE == >
S RE T SP
W WK
DATES
T PR CAT WRITN WANTED CLOSED
A67537 A67311 A67302 A66634 J70692 A63715 A60303 A57733 A65594 A65359 A65247 J70691 A64786 J61914
J SEAL OR REMOVE ASBESTOS INSUL I REMOVE INSULATION F/REPAIRS J REMOVE ASBESTOS AT OL-2 TRAY I REMOVE ASBESTOS GASKETS J REMOVE GASKETS OL 2 TANK J ASBESTOS SAMPLING ACE PIPING J REMOVE ASBESTOS AT LP-1 RXN. J ASBESTOS INSPECTION BLDG.2 J REMOVE ASBESTOS GASKET. I REMOVE ASBESTOS GASKET I BARREL ZONES J REMOVE ASBESTOS SEALANT I REMOVE ASBESTOS WRAPPING J ASBESTOS REMOVAL
X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0
83 83 81 82 84 83 83
83 81 83 83 83 82 83
SE 011596 012296 012296 SC 011196 013196 012996 US 012296 012296 012996 SE 010396 010396 010596
121395 013196 012596 SE 110795 013196 012496 SE 091495 123195 010396 CT 080795 011596 011396 US 121195 121195 T21395" SE 120795 121395 121395 RP 120695 121895 121395
113095 122295 122295 112895 113095 120695 112795 122495 122295
IDR 3 .RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 :PAR 10 F/LST 11 HIST 1 2 PRT
003569
i
WLCDETS
*** SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A67537 ORIG WR:
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SE RW CD:
RW RS:
DESC: SEAL OR REMOVE ASBESTOS INSUL
BLD/UNT: GEU AR: CH WK TP:,8 WANTED: 012296 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 011596 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 012296
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
00
JOB DETAILS: ASBESTOS INSULATION NEEDS TO BE EITHER REMOVED OR ENCAPSULATED. LOCATED ON 2ND LEVEL AT GEU ON NORTH END ON EAST SIDE.
THNX, ANN T.
YTD TOTAL HRS:
0 YTD O/T:
IND: J CL YR: 95 DATE ENTR: 011596
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 022996
237
PF3:RETURN
003570
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A67311 ORIG WR: A66557
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 342320 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 31 WCAT: SC RW CD:
RW RS:
DESC: REMOVE INSULATION F/REPAIRS
BLD/UNT: MMD AR: MM WK TP: .8 WANTED: 013196 RECNO:
PROP NO:
REQ BY: A.VASQUEZ C&P:
WRITTEN: 011196 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 012996
APPROVED BY: GOHLKE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 490
00
JOB DETAILS: PRIOR TO REMOVING INSULATION PLEASE HAVE GARY KLASSEN CHECK
INSULATION FOR ASBESTOS, SAMPLE IF NECESSARY. THANKS ANDREW
5-983 THIS JOB IS ABOVE THE OFFICES AT STORES. CONTACT ANDREW
WHEN ALL THE ABOVE IS COMPLETE SO REPAIRS CAN BE COMPLETED.
DEL
PHONE 5983
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
153
IND: I CL YR: 96 DATE ENTR: 011296 LAST ACT: N DATE: 022396
PF3:RETURN
003571
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A67302 ORIG WR: 119997
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 82 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS AT OL-2 TRAY
BLD/UNT: OLSEP AR: OL WK TP: .8 WANTED: 012296 RECNO:
PROP NO:
REQ BY: A.URESTE
C&P:
WRITTEN: 012296 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD : M0
STATUS: X PLANNER: M'0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 012996
APPROVED BY:
RC ESTHR IS 640
ACTHR 00
RC ESTHR
ACTHR
RC ESTHR
ACTHR
RC ESTHR
ACTHR
JOB DETAILS: REMOVE ASBESTOS LOCATED NORTH OF BLDG 503 IN PIPERACK ON CABLETRAY.
YTD TOTAL HRS: IND: J CL YR: 96
0 YTD O/T: DATE ENTR: 011296
DEL
PHONE 2965
0 YTD LAB$:
0 YTD MAT$:
18S
LAST ACT: N DATE: 022996
PF3:RETURN
003572
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A66634 ORIG WR: A64731
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 09 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: GEU AR: CH WK TP: .8 WANTED: 0103 96 RECNO:
PROP NO:
REQ BY: OSCAR LEAL C&P:
WRITTEN: 0103 96 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 01 03 96
DATE COMPLETE: 010596
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 140
00
JOB DETAILS: ATTENTION GARY CLASSEN: PLEASE STRIP ASBESTOS GASKETS FOR OSCAR LEAL TO ALLOW PUMP INSTALLATION. CALL J. RAMIREZ AT 5-801 FOR FURTHER INFO. THANKYOU.
YTD TOTAL HRS: IND: I CL YR: 96
0 YTD O/T: DATE ENTR: 010396
DEL
PHONE 3589
0 YTD LAB$:
0 YTD MAT$:
189
LAST ACT: N DATE: 022996
PF3:RETURN
003573
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: J70692 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 838000 INDX: 92 1ST ORDER: 00006118 2ND ORD: 05900
PR: 4 OR:
WCAT:
RW CD:
RW RS:
DESC: REMOVE GASKETS OL 2 TANK
BLD/UNT:
AR: WK TP: .8 WANTED: 013196 RECNO:
PROP NO:
REQ BY: CORONADO
C&P:
WRITTEN: 121395 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START:: 00 00 00
DATE COMPLETE: 012596
APPROVED BY:
RC ESTHR IS 160
ACTHR 00
RC ESTHR
ACTHR
RC ESTHR
ACTHR
RC ESTHR
ACTHR
JOB DETAILS: REMOVE ASBESTOS GASKETS FROM DIRTY OIL TANK PIPING.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 121395
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 012696
PF3:RETURN
0
003574
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A63715 ORIG WR: 138514
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071300 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SE RW CD:
RW RS:
DESC: ASBESTOS SAMPLING ACE PIPING
3LD/UNT: ACE AR: CH WK TP: 8 WANTED: 013196 RECNO: 064377 PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 110795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 012496
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
70
JOB DETAILS: CHARGE LINE TO/FROM TANKS 3713/3715 MAY HAVE ASBESTOS IN SEVERAL
AREAS. SIMON HAS MARKED LOCATION ON DRAWINGS.WE NEED SAMPLING DONE
TO VERIFY BEFORE WE MAKE ANY DECISION ON HOW WE WILL APPROACH THIS
SEE ANN FOR MARKED DRAWINGS. THNX, ANN T. 5-401
DEL
PHONE
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
40
IND: J CL YR: 95 DATE ENTR: 110795 LAST ACT: N DATE: 022996
PF3:RETURN
003575
WLCDETS
SEADRIF7 WORK REQUEST
SHOW ONLY
WORK REQ NO: A60303 ORIG WR: 153912
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148250 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS AT LP-1 RXN.
BLD/UNT: LP1R AR: LI WK TP: 8 WANTED: 123195 RECNO:
PROP NO :
REQ BY: BOEHM
CiP:
WRITTEN: 091495 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: MO PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 010396
APPROVED BY: T.T.
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1510
945
JOB DETAILS: REMOVE ASBESTOS FROM JUNCTION BOXES & CONDUIT LINES IN PIPERACK EAST OF THE REACTION CONTROL RM.GARY K.KNOWS LOCATION.
YTD TOTAL HRS: IND: J CL YR: 95
94 YTD O/T: DATE ENTR: 091495
DEL 343
PHONE 2832
0 YTD LAB$:
2651 YTD MAT$:
221
LAST ACT: N DATE: 010496
PF3:RETURN
003576
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A57733 ORIG WR: 366873
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 355080 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: TE WCAT: CT RW CD:
RW RS:
DESC: ASBESTOS' INSPECTION BLDG.2
BLD/UNT: BLD2 AR: LA WK TP: .8 WANTED: 011596 RECNO:
PROP NO:
REQ BY: T ESCOBEDO C&P:
WRITTEN: 080795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 011396
APPROVED BY: ADD
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 420
210
JOB DETAILS: ATTN FRED BERGER
PLEASE POST ASBESTOS SIGN ON DOOR TO ROOM 105 AND ON DOOR TO PENT
HOUSE PER OSHA REGULATIONS.
ALSO PERFORM THE VERIFICATION STEP.
DEL
PHONE 2544
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
178
IND: J CL YR: 95 DATE ENTR: 080795 LAST ACT: N DATE: 012596
PF3:RETURN
003577
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A65594 ORIG WR: 125713
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 039020 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 16 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKET.
BLD/UNT: ENSYS AR: ES WK TP: 3 WANTED: 121195 RECNO:
PROP NO:
REQ BY: W. CARLOC". C&P :
WRITTEN: 121195 HWP:
MTAG:
SLIPBL:
SERV: C2CH4 LINE
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 12 11 95
DATE COMPLETE: 121395
APPROVED BY: B.B.B.
RC ESTHR IS 160
ACTHR 25
RC ESTHR
ACTHR
RC ESTHR
ACTHR
RC ESTHR
ACTHR
JOB DETAILS: PLEASE REMOVE A ASBESTOS GASKET FROM A 6" FLANGE FOR ROBERT GOSSETT AT CONFUSSION CORNER. IT IS IN THE PIPE RACK. WILL REQUIRE OVERTIME TO DO IT TODAY WHILE OXIDE IS DOWN.
THANKS BB YTD TOTAL HRS: IND: J CL YR: 9r
0 YTD O/T: DATE ENTR: 121195
DEL COGEN
PHONE 2592
0 YTD LAB$:
0 YTD MAT$:
263
LAST ACT: N DATE: 013096
PF3:RETURN
003578
WLCDETS
*** SEADRIFT WORK REQUEST * * * *** SHOW ONLY ***
WORK REQ NO: A65359 ORIG WR: A65126
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148750 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 31 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKET
BLD/UNT: LP2 AR: L2 WK TP:.8 WANTED: 121395 RECNO:
PROP NO:
REQ BY: CONTRERAS C&P:
WRITTEN: 120795 HWP:
MTAG:
SLIPBL:
SERV: BARREL ZONES
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 121395
APPROVED BY: DWJ(JC)
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 300
00
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKETS FROM TWO MIXER / EXTRUDER BARREL
ZONES REMOVED FROM PI MIXER / EXTRUDER IN LP2. BARREL ZONES ARE
LOCATED ON PAD SOUTHEAST OF PROCESS SAFETY SHOP. CALL OR PAGE
WHEN COMPLETE.
JOE CONTRERAS 5-221
DEL CALL OR PAGE
PHONE 3009
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
0
IND: I CL YR: 95 DATE ENTR: 120795 LAST ACT: N DATE: 122895
PF3:RETURN
003579
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A65247 ORIG WR: A65126
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148750 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 09 WCAT: RP RW CD:
RW RS:
DESC: BARREL ZONES
BLD/UNT: LP2 AR:
WK TP:'8 WANTED: 121895 RECNO:
PROP NO:
REQ BY: A.RIVERA
C&P:
WRITTEN: 120695 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 121395
APPROVED BY: TS{AR}
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
40
JOB DETAILS: FLEASS REMOVE ASBESTOS GASKET FROM BARREL ZONES,LOCATE SOUTH CF JUILDING 140 ON CONCRETE PAD.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 120695
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 121595
PF3:RETURN
0
003580
J
WLCDETS
3EADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: J70691 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 838000 INDX: 92 1ST ORDER: 00006110 2ND ORD: 07300
PR: 3 OR:
WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS SEALANT
BLD/UNT: HP2 AR:
WK TP: 8 WANTED: 122295 RECNO:
PROP NO:
REQ BY: CORONADO
C&P:
WRITTEN: 113095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER:
PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 122295
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 650
265
JOB DETAILS: TO REMOVE ASBESTOS SEALANT ABOVE PELLET SEPARATOR ROOM.
YTD TOTAL HRS: IND: J CL YR:
0 YTD O/T: DATE ENTR: 113095
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 011996
PF3:RETURN
2
003581
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A64786 ORIG WR: A63123
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR:
WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS WRAPPING
BLD/UNT: OL2 AR: OL WK TP: .8 WANTED: 113095 RECNO:
PROP NO:
REQ BY: R.FLORES
C&P:
WRITTEN: 112895 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M'O PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 120595
APPROVED BY: URESTI
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 410
180
JOB DETAILS: PLEASE REMOVE ASBESTOS WRAPPING FROM INST.TUBING IN SEPERATIONS AND REPLACE WITH NEW WRAPPING FOR FREEZE PROTECTION.
YTD TOTAL HRS: IND: I CL YR: 95
C YTD O/T: DATE ENTR: 112895
DEL
PHONE 2982
0 YTD LAB$:
0 YTD MAT$:
2
LAST ACT: N DATE: 011296
PF3:RETURN
003582
WLCDETS
* * * SEADRIFT WORK REQUEST * * * *** SHOW ONLY ***
WORK REQ NO: J61914 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006408 2ND ORD: 73000
PR: 3 OR 99 WCAT:
RW CD:
RW RS:
DESC: ASBESTOS REMOVAL
BLD/UNT: HP2 AR:
WK TP: ,8 WANTED: 1224 95 RECNO:
PROP NO:
REQ BY: P BETHANY C&P:
WRITTEN: 112 795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: MC PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 122295
APPROVED BY:
RC ESTHR ACTKR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 1620
14 55
JOB DETAILS: REMOVE FLOOR TILE WITH ASBESTOS FROM INTEC 400 ROOM IN BLDG. 561.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O.T: DATE ENTR: 112795
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 011296
PF3:RETURN
18
003583
WLCLIST
*** WORK REQUEST LIST ING
PAGE
11 OF 14
DATE: 11/22/96
RESPCODE=MO ,DATEWRIT FR 080195 TO 110196 T
X WK REQ p JOB DESCRIPTION FP <== SORT SELECTION LINE ==>
S RE T SP
W WK
DATES ------------
T PR CAT WRITN WANTED CLOSED
A62789 A64682 A64472 A64374 A64208 A63711 A63704 A63676 A63483 A63294 A62987 A62846 A62708 A62689
I STRIP TUBING/PIPING AS NEEDED i REMOVE ASBESTOS INSULATION #9 u REMOVE ASBESTOS GASKETS
j DE-INSULATE LINE' j ASBES.REMOVAL ON CSAC AT ODU J ASBESTOS SERVICES PER LIST i ENCAPSULATE ACM,NEAR VSNTSAC j REMOVE ASBESTOS INSUL-STM TRCN j REMOVE ASBESTOS BLDG 1 i REMOVE ASBESTOS GASKETS (GEU) j INSULATION SAMPLES i REMOVE INSUL.IN CABLE PIT i CHECK FOR ASBESTOS ISOMER COL. I MANPOWER FOR CRIBBING
X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X MO X MO X MO X MO X MO
83 82 81 81 42 83 42 81 83 83 83
3 83 42
SE 102495 122895 121895 SD 112295 113095 112895 US 112195 112195 112295 US 112095 112095 112195 SD 111595 111695 112295 SE 110795 112195 111395
110795 111395 111395
SE 110695 111105 110995 SC 110395 113095 111595
110195 110895 110995 SE 102695 112795 111395
102495 112795 112895 102395 111095 110995 TA 102395 112095 111395
2 IDR 3 RT'N 4 DETL 5 SRT 5 PLN 7 UP 8 DN 9 PAR 10' F/LST 11 HIST 12 PRT
003584
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A62789 ORIG WR: A62110
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009210 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 31 WCAT: SE RW CD:
RW RS:
DESC: STRIP TUBING/PIPING AS NEEDED
BLD/UNT: ENSYS AR: ES WK TP:.8 WANTED: 122895 RECNO:
PROP NO:
REQ BY: C FANELLI C&P:
WRITTEN: 102495 HWP:
MTAG:
SLIPBL:
SERV: FREEZE PROTECTI DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: MO PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 121895
APPROVED BY: B.B.B.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 850
580
JOB DETAILS: PLEASE STRIP TUBING AND HARD PIPING AT VARIOUS LOCATIONS FOR TRACING PURPOSES AND DISSASSEMBLY. SOME TUBING HAS ASBESTOS WRAP. JOB IS LOCATED AT #1 STEAM PLANT.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 102495
DEL
PHONE 3589
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: C DATE: 121895
PF3:RETURN
003585
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A64682 ORIG WR: A64315
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 82 WCAT: SD RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION #9
BLD/UNT: OLCOM AR: OL WK TP: 8 WANTED: 113095 RECNO:
PROP NO:
REQ BY: REYNA
C&P:
WRITTEN: 112295 HWP:
MTAG:
SLIPBL:
SERV: PROPANE
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 11 27 95
DATE COMPLETE: 112895
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
260
JOB DETAILS: REMOVE ASBESTOS INSULATION FROM #9 COMPRESSOR 50# SUCTION HEADER TO 2ND STG SUCTION BOTTLE.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 112795
DEL
PHONE 2272
0 YTD LAB$:
0 YTD MAT$:
77
LAST ACT: N DATE: 011696
PF3:RETURN
003586
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A64472 ORIG WR: 119997
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 82 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: OLSEP AR: OL WK TP:- 8 WANTED: 112195 RECNO:
PROP NO:
REQ BY: WEST
C&P:
WRITTEN: 112195 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: MO PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 112295
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 100
60
JOB DETAILS: REMOVE ASBESTOS GASKETS FROM PSV'S AT T&I SHOP.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 112195
DEL
PHONE 2982
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 120195
PF3:RETURN
003587
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A64374 ORIG WR: 123025
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 34 WCAT: US RW CD:
RW RS:
DESC: DE-INSULATE LINE
BLD/UNT: HPPE2 AR: H2 WK TP: 8 WANTED: 112095 RECNO:
PROP NO:
REQ BY: BRUNNER
C&P:
WRITTEN: 112095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 112195
APPROVED BY: E.MEYER
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 210
40
JOB DETAILS: PLEASE PROVIDE INSULATERS TO DE-INSULATE #2 REACTOR POST PRODUCT VALVE COOLING WATER PUMP. UNIT NOT SURE OF INSULATION TYPE. NEED THIS DONE AS SOON AS POSSIBLE. THANK YOU.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 112095
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 120595
0
PF3:RETURN
003588
i
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A64208 ORIG WR: 138514
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071300 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 22 WCAT: SD RW CD:
RW RS:
DESC: ASBES.REMOVAL ON CSAC AT ODU
BLD/UNT: ACE AR: CH WK TP: 4 WANTED: 111695 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 111595 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 112295
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 220
105
JOB DETAILS: NEED ASBESTOS REMOVAL ON CSAC COLUMN. WILL HAVE SCAFFOLD READY.
ERNEST HAS LOOKED AT THIS JOB. RUDY CAN HELP HIM WITH THIS.
THIS IS FOR A ONE DAY OUTAGE.
THNX, ANN T. 5-401
DEL
PHONE
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$ :
IND: J CL YR: 95 DATE ENTR: 111595 LAST ACT: N DATE: 113095
PF3:RETURN
003589
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A63711 ORIG WR: 135115
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071200 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SE RW CD:
RW RS:
DESC: ASBESTOS SERVICES PER LIST'
BLD/UNT: ODU AR: CH WK TP: 8 WANTED: 112195 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 110795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 111395
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
200
JOB DETAILS: PER LIST BY RUDY, WE HAVE SEVERAL INSULATION JOBS THAT EITHER HAVE
ASBESTOS OR WE SUSPECT IS ASBESTOS. STOP BY & SEE ANN OR RUDY FOR
LIST AND DETAILS.
THNX, ANN T. 5-401
YTD TOTAL HRS:
0 YTD O/T:
DEL 0 YTD LAB$:
PHONE 0 YTD MAT$ :
IND: J CL YR: 95 DATE ENTR: 110795 LAST ACT: N DATE: 011296
PF3:RETURN
003590
J
WLCDETS
SEADRIFT WORK REQUEST * * + * * * SHOW ONLY
WORK REQ NO: A63704 ORIG WR: A61793
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR:
WCAT:
RW CD:
RW RS:
DESC: ENCAPSULATE ACM,NEAR VENTSAC
BLD/UNT: HPPE2 AR: H2 WK TP: 4 WANTED: 111395 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 110795 HWP:
MTAG:
SLIPBL:
SERV: HP2-2-11
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: RB PLAN CD: RAM ASIS/ENGR:
EST START: 11 10 95
DATE COMPLETE: 111395
APPROVED BY: E.MYERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 380
300
JOB DETAILS: PLEASE ENCAPSULATE ANY ASBESTOS CONTAINING MATERIAL AROUND THE #2 VENT STACK. THE AREA OF CONCERN IS ON THE INLET PELLETER. SEE BOSCO FOR LOCATION IF NEEDED. THANK YOU
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 110795
DEL
PHONE 2617
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 120695
PF3:RETURN
003591
WLCDETS
* * * SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A63676 ORIG WR: 138815
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071420 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 22 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSUL-STM TRCN
BLD/UNT: SURF AR: CH WK TP: 8 WANTED: 111105 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 110695 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 11 07 95
DATE COMPLETE: 110995
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 240
80
JOB DETAILS: NEED ASBESTOS INSULATION REMOVED FROM STEAM TRACING/TUBING AT SURF UNIT. SEE BILL WADE OR BOBBY BAREFIELD FOR LOCATION. THNX, ANN T. 5-401
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 110795
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 011296
3
PF3:RETURN
003592
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A63483 ORIG WR: 337112
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 333010 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 44 WCAT SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS BLDG 1
BLD/UNT: BLDG1 AR: GF WK TP:, 8 WANTED: 113095 RECNO:
PROP NO:
REQ BY: R. MAREK
C&P:
WRITTEN: 1103 95 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 111595
APPROVED BY: RNT
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
165
JOB DETAILS: PLEASE REMOVE ASBESTOS INSULATION FROM LINE IN STORAGE ROOM BLDG 1
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 110395
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 112995
PF3:RETURN
0
003593
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A63294 ORIG WR: A62417
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 220010 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 31 WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS :geu)
BLD/UNT: GEU AR: CH WK TP:. 8 WANTED: 110895 RECNO:
PROP NO:
REQ BY: J. RAMIREZ CScP:
WRITTEN: 110195 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 110995
APPROVED BY: ANN T.
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 240
320
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKETS OFF THE SPOOL AND VALVE ON THE SOUTH SIDE OF GEU BLOCK. JUAN (5-801) WILL SHOW WHERE SPOOL AND VALVE ARE LOCATED. THANKS.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 110195
DEL SOUTH SIDE (GEU)
PHONE 3583
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 111795
PF3:RETURN
003594
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A62987 ORIG WR: 135625
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 22 WCAT: SE RW CD:
RW RS:
DESC: INSULATION SAMPLES
BLD/UNT: GEU AR: CH WK TP: 8 WANTED: 112795 RECNO:
PROP NO:
REQ BY: KRAUSE/AT C&P:
WRITTEN: 102695 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 111395
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 170
200
JOB DETAILS: PER VERBAL ANN/GARY: TO COVER THE COST OF INSULATION SAMPLES TAKEN
AT GEU ON ALCOHOL COLUMN EACH CAN SECTION. VIVIAN HAS WRITTEN WOR
FOR SAMPLING DONE ON ISOMER COLUMN.
THNX, ANN T. 5-401
DEL
PHONE
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
0
IND: J CL YR: 95 DATE ENTR: 102695 LAST ACT: N DATE: 111795
PF3:RETURN
003595
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A62846 ORIG WR: A61779
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 094760 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: Ml WCAT:
RW CD:
RW RS:
DESC: REMOVE INSUL.IN CABLE PIT
BLD/UNT:
ES AR: ES WK TP: WANTED: 112795 RECNO:
PROP NO:
REQ BY: HOWELL
C&P:
WRITTEN: 102495 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 112895
APPROVED BY: JANAK
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 400
220
JOB DETAILS: REMOVE INSULATION ON CABLE IN CABLE PITS ON EXISTING CABLE CONTACT ROBERT HOWELL FOR MORE INFORMATION.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 102495
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 121395
PF3:RETURN
003596
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A62708 ORIG WR: A61296
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR:
WCAT:
RW CD:
RW RS:
DESC: CHECK FOR ASBESTOS ISOMER COL.
BLD/UNT: GEU AR: CH WK TP:.8 WANTED: 111095 RECNO:
PROP NO:
REQ BY: SPRAGUE
C&P:
WRITTEN: 102395 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 110995
APPROVED BY: DCB
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 180
140
JOB DETAILS: PLEASE CHECK FOR ASBESTOS ON ISOMER COLUMN PIPING. THANKS VIVIAN
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 102395
DEL
PHONE 3479
0 YTD LAB$:
0 YTD MAT?:
0
LAST ACT: N DATE: 112895
PF3:RETURN
003597
WLCDETS
*** SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A62689 ORIG WR: A62579
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148750 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT: TA RW CD:
RW RS:
DESC: MANPOWER FOR CRIBBING
BLD/UNT: LP-2 AR: L2 WK TP: 4 WANTED: 112095 RECNO:
PROP NO:
REQ BY: S SANDERS C&P:
WRITTEN: 102395 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER M0 PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 111395
APPROVED BY: DWJ
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 680
570
JOB DETAILS: PLEASE FURNISH MANPOWER TO CRIB UP ABOUT 4' HIGH X 7' TO EAST SIDE OF LP2 PI MIXER GEARBOX. ALSO NEED TO EXTEND CRIBBING TO NORTH OF GEARBOX ABOUT 14' X 4' HIGH ALSO. FOR INFOR CALL MIKE ADKINS
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 102395
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 111495
0
PF3:RETURN
003598
WLCLIST
* * WORK REQUEST LISTING * *
PAGE
12 OF 14
DATE: 11/22/96
RESPCODE=MO,DATEWRIT FR 080195 TO 110196
T
S RE W
WK
DATES
WK REQ P JOB DESCRIPTION
T SP T PR CAT WRITN WANTED CLOSED
FP < = = SORT SELECTION LINE ==>
A61847 A61390 A63062 A63055 A63019 A62717 A62684 A62627 A62526 A62406 A62397 A61901 A61868 A61327
J REMOVE ASBESTOS INSULATION J conds :DRAIN LINE ASBESTOS REMO I REMOVE (ACM) GASKETS FOR LP2 J REMOVE ASBESTOS FROM #4 PC J REMOVE ASBESTOS GASKET #6 COM I STRIP ASBESTOS GSKT. (PFO) J REMOVE INS. &. MASTIC J REMOVE ASBESTOS INSULATION #4 J SILO 205 REPAIR I ASBESTOS GASKET COVERAGE J REMOVE INSULATION I ENCAPSULATE SUSPECT ASBESTOS J PLEASE PROVIDE ASBESTOS REMOVA I REMOVE FILTER DUST
X M0 X M0 X M0 X M0 X M0 X M0 X M0 X M0 X MO X MO X MO X MO X MO X MO
83 83 42 83 81 83 83 81 81 42 81 81 81 42
SC 101095 112095 110995 SC 100295 111795 110795
102795 103095 103095 SC 102795 110395 103095
102695 102695 103095 102395 103095 102595 RA 102395 110695 103095 102095 102095 102395 SE 101995 103195 102795 101795 102095 102095 SC 101795 102495 102395 SD 101095 101095 101395
RP 101095 101095 101195
092995 100395 100395
IDR 3 RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 PAR 10 F/LST 11 HIST 1 2 PRT
003599
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A61847 ORIG WR: 113609
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009210 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 16 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNT: COGEN AR: ES WK TP: 8 WANTED: 112095 RECNO:
PROP NO:
REQ BY: CARLOCK
C&P:
WRITTEN: 101095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 10 12 95
DATE COMPLETE: 110995
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 260
780
JOB DETAILS: REMOVE ASBESTOS INSULATION AT CONFUSION CORNER PIPE RACK SO STEAM TRACING CAN BE RUN. CONTACT ROBERT GOSSETT FOR DETAILS. (2963)
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 101095
DEL
PHONE 2592
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 111895
PF3:RETURN
003600
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A61390 ORIG WR: 119997
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 82 WCAT: SC RW CD:
RW RS:
DESC: CONDS DRAIN LINE ASBESTOS REMO
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 111795 RECNO:
PROP NO:
REQ BY: WARZECHA
C&P:
WRITTEN: 100295 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 110795
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 560
600
JOB DETAILS: REMOVE ASBESTOS FROM CONDENSATE LINE WEST OF EKL TANK AND REINSULATE. CONTACT OPERATOR FOR LOCATION.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 100295
DEL
PHONE 2442
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 111795
PF3:RETURN
003601
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A63062 ORIG WR: A48584
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148750 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: M6 WCAT:
RW CD:
RW RS:
DESC: REMOVE (ACM) GASKETS FOR LP2
BLD/UNT: LP2 AR: L2 WK TP:.4 WANTED: 103095 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 102795 HWP:
MTAG:
SLIPBL:
SERV: PI-024
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 10 29 95
DATE COMPLETE: 103095
APPROVED BY: DWJ
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 460
145
JOB DETAILS: PLEASE PROVIDE MANPOWER COVERAGE FOR ASBESTOS GASKET REMOVAL AS NEEDED. ALSO INSULATION REMOVAL IF REQUIRED BY MAINTENANCE PERSON NEL. THANK YOU (TURNAROUND WORK) SEE BOSCO FOR DETAILS.
YTD TOTAL HRS: IND: .1 CL YR: 95
0 YTD O/T: DATE ENTR: 102795
DEL
PHONE 2617
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 112995
PF3 -.RETURN
003602
J
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A63055 ORIG WR: 116414
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 82 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS FROM #4 PC
BLD/UNT: OLCOM AR: OL WK TP: 8 WANTED: 110395 RECNO:
PROP NO:
REQ BY: YAKLIN
C&P:
WRITTEN: 102795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 103095
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 190
00
JOB DETAILS: REMOVE ASBESTOS GASKETS FROM #4 COMPRESSOR 1R POWER CYLINDER. CYLINDER IS IN BLDG 500 BAY.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 102795
DEL
PHONE 2965
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 120195
PF3:RETURN
003603
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A63019 ORIG WR: 116446
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 82 WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKET #6 COM
BLD/UNT: OLCOM AR: OL WK TP: 8 WANTED: 102695 RECNO:
PROP NO:
REQ BY: YAKLIN
C&P:
WRITTEN: 102695 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 103095
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
140
JOB DETAILS: REMOVE ASBESTOS GASKET FROM #6 COMPRESSOR POWER CYLINDER HEAD.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 102695
DEL
PHONE 2965
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 120195
PF3:RETURN
003604
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A62717 ORIG WR: A62445
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 039290 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 09 WCAT:
RW CD:
RW RS:
DESC: STRIP ASBESTOS GSKT. (PFO)
BLD/UNT: OLPFO AR: OL WK TP: 8 WANTED: 103095 RECNO:
PROP NO:
REQ BY: J. RAMIREZ C&P:
WRITTEN: 102395 HWP:
MTAG:
SLIPBL:
SERV: OXIDE TAILS
DWG ATTCH:
SPECS:
FAC CHG: Y RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 10 24 95
DATE COMPLETE: 102595
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
120
JOB DETAILS: PLEASE STRIP ASBESTOS GASKETS OFF THE 3" SPOOL AND THE GATE VALVE. JUAN WILL SHOW WHERE THE SPOOL AND VALVE IS LOCATED. THANKS JUAN 5-801.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 102395
DEL PFO UNIT
PHONE 3583
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 110395
PF3:RETURN
003605
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A62684 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 838000 INDX: 92 1ST ORDER: 00006120 2ND ORD: 05700
PR: 3 OR: TM WCAT: RA RW CD:
RW RS:
DESC: REMOVE INS. & MASTIC
BLD/UNT: BL543 AR: GS WK TP: 8 WANTED: 110695 RECNO:
PROP NO:
REQ BY: T. MUNIZ
C&P:
WRITTEN: 102395 HWP: Y MTAG: N SLIPBL: N
SERV: DRINKING WATER DWG ATTCH: N SPECS:
FAC CHG: N RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 103095
APPROVED BY: EISENMA
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 320
155
JOB DETAILS: REMOVE ASBESTOS AND MASTIC ON DRINKING WATER LINES INTO KITCHEN TO FACILITATE BOTTLE PROJECT REARRANGEMENT OF BLOW MOLDING MACHINE. CONTACT T. MUNIZ FOR FIELD INSTRUCTIONS.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 102395
DEL
PHONE 2566
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 110495
PF3:RETURN
003606
WLCDETS
** SEADRIFT WORK REQUEST * * * * SHOW ONLY
WORK REQ NO: A62627 ORIG WR: 116414
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 82 WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION #4
BLD/UNT: OLCOM AR: OL WK TP: 8 WANTED: 102095 RECNO:
PROP NO:
REQ BY: YAKLIN
C&P:
WRITTEN: 102095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 102395
APPROVED BY: URESTE
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 210
60
JOB DETAILS: REMOVE ASBESTOS INSULATION FROM #4 COMP POWER CYLINDER
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 102095
DEL
PHONE 2965
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 110495
PF3:RETURN
003607
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A62526 ORIG WR: 154421
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148310 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: SILO 205 REPAIR
BLD/UNT: LP1R AR: LI WK TP: 8 WANTED: 103195 RECNO:
PROP NO:
REQ BY: D. BOHEM
C&P:
WRITTEN: 101995 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 102795
APPROVED BY: T.T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 440
400
JOB DETAILS: PLEASE CHECK SILO 205 ON CONE SECTION FOR ASBESTOS IN SEAM CAULKIN G
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 101995
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 111895
PF3:RETURN
0
003608
WLCDETS
* * SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A62406 ORIG WR: A57593
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR:
WCAT:
RW CD:
RW RS:
DESC: ASBESTOS GASKET COVERAGE
BLD/UNT: HP-2 AR:
WK TP: 4 WANTED: 102095 RECNO:
PROP NO:
REQ BY: BOSCO
C&P:
WRITTEN: 101795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 102095
APPROVED BY: E.MYERS
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 400
220
JOB DETAILS: TO COVER THE COST OF ASBESTOS GASKET REMOVAL DURING THE HP-2 TURNAROUNDS.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 101795
DEL
PHONE 2617
0 YTD LAB$ :
0 YTD MAT$:
0
LAST ACT: N DATE: 110395
PF3:RETURN
003609
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A62397 ORIG WR: 122971
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 34 WCAT: SC RW CD:
RW RS:
DESC: REMOVE INSULATION
BLD/UNT: HPPE2 AR: H2 WK TP: 8 WANTED: 102495 RECNO:
PROP NO:
REQ BY: SELBY
C&P:
WRITTEN: 101795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 102395
APPROVED BY: E.MYERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 180
90
JOB DETAILS: PLEASE REMOVE INSULATION ON THE REACTION WATER PUMP.REPLACE WHEN P UMP IS CHANGED OUT.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 101795
DEL 566
PHONE 3527
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 112995
PF3:RETURN
003610
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A61901 ORIG WR: A61872
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 22 WCAT: SD RW CD:
RW RS:
DESC: ENCAPSULATE SUSPECT ASBESTOS
BLD/UNT: GEU AR: CH WK TP: 8 WANTED: 101095 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 101095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101395
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 180
120
JOB DETAILS: PLEASE ENCAPSULATE SUSPECTED ASBESTOS INSULATION ON ARC COL. THNX, ANN T. 5-401
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 101095
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 112995
PF3:RETURN
0
003611
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A61868 ORIG WR: 152946
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 139900 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 75 WCAT: RP RW CD:
RW RS:
DESC: PLEASE PROVIDE ASBESTOS REMOVA
BLD/UNT: PPU AR: PI WK TP: 8 WANTED: 101095 RECNO:
PROP NO:
REQ BY: JIM NIX
C&P:
WRITTEN: 101095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101195
APPROVED BY: CHOV
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 180
100
JOB DETAILS: PLEASE PROVIDE AN ASBESTOS REMOVAL PERSON TO REMOVE A COUPLE OF ASBESTOS GASKETS AT THE PI PELLETER JIM NIX 3090 5-727
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 101095
DEL 101
PHONE 2983
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 110395
PF3:RETURN
003612
WLCDETS
* * * SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A61327 ORIG WR: A44638
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 333010 INDX
1ST ORDER:
2ND ORD:
PR: 2 OR:
WCAT:
RW CD:
RW RS:
DESC: REMOVE FILTER DUST
BLD/UNT: 163 S AR:
WK TP: 4 WANTED: 100395 RECNO:
PROP NO:
REQ BY: P TOMPKINS C&P:
WRITTEN: 092995 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER MO PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 100395
APPROVED BY: SUMMERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 300
120
JOB DETAILS: PLEASE REMOVE DUST FROM BULB CRUSHER AREA MONDAY. OCT. 0295.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 092995
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 110395
PF3:RETURN
0
003613
WLCLIST
*** WORK REQUEST LISTING ***
PAGE
13 OF 14
DATE: 11/22/96
RESPCODE=MO,DATEWRIT FR 080195 TO 110196
T
S RE W
WK
DATES
X WK REQ P JOB DESCRIPTION
T SP T PR CAT WRITN WANTED CLOSED
FP <== SORT SELECTION LINE ==>
A61260 I REMOVE ASBESTOS GASKET,ON FLG X M0 8 2 US 092895 100795 101195
A61160 I REMOVE ASBESTOS GASKET
X MO 4 2 RP 092795 101895 100395
J62897 J ASBESTOS TESTING
X MO 8 3
092595 102095 101895
A60774 J TEST INSULATION
X MO 8 3 SC 092195 100695 100395
J62890 J ASBESTOS GASKET REMOVAL
X MO
2 NC 091295 103095 101895
A60100 I MNPWR TO BLOCK UP
X MO 4 2 TA 091295 100695 100395
A59723 J ROOFING CORE SAMPLES & REMOVAL X MO 8 3
090695 110695 110195
A59720 J ROOFING CORE SAMPLES & REMOVAL X MO 8 3
090695 110695 101895
A59404 I STRIP ASBESTOS GASKETS {2}
X MO 8 3 SE 083195 090595 090795
A58434 J REMOVE INSULATION/GASKETS
X MO 8 3 RP 081795 093095 090795
A59308 I REMOVE ASBESTOS GASKETS
X MO 8 1 TA 083095 083095 083195
A58740 J REMOVE ASBESTOS FLANGE
X MO 8 1
082295 082295 083095
A58594 J INSPECT TILE AT ENSYS FOR ASB X MO 8 3
082195 083195 083195
A58549 I REMOVE ASBESTOS/DRYER BOTTOM
X MO 8 2 SC 081895 082195 082495
2 IDR 3 RTN 4 DETL 5 SRT 6 PLN 7 UP 8 ]DN 9 :PAR 10 F/LST 11 HIST :12 PRT
003614
WLCDETS
*** SEADRIFT WORK REQUEST **' + ** SHOW ONLY
WORK REQ NO: A61260 ORIG WR: A61166
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 09 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKET,ON FLG
BLD/UNT: OLFUR AR: OL WK TP: 8 WANTED: 100795 RECNO:
PROP NO:
REQ BY: A.VASQUEZ C&P:
WRITTEN: 092895 HWP:
MTAG:
SLIPBL:
SERV: CH4
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 09 29 95
DATE COMPLETE: 101195
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 320
490
JOB DETAILS: WE ARE REMOVING A SPOOL FOR REVISIONS ON THIS DATES 09-29-95 FRI.
AND ON 10-02-95 MONDAY, 10-04-95 WEDNESDAY AND 10-07-95 FRIDAY
WE ARE ASSUMING THEY ARE ASBESTOS,WE WILL NOTIFIED OTHER WISE.
FLANGES WILL BE ON THE PIPE RACK AT #2 GAS FURNACES THANKS ANDREW
5-983
DEL
PHONE 3581
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
0
IND: I CL YR: 95 DATE ENTR: 092995 LAST ACT: N DATE: 101895
PF3:RETURN
003615
J
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A61160 ORIG WR: A56776
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 094100 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 26 WCAT RP RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKET
BLD/UNT: W/S AR: SH WK TP: 4 WANTED: 101895 RECNO:
PROP NO:
REQ BY: HENDERSON CStP:
WRITTEN: 092795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 100395
APPROVED BY: HERRON
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 180
60
JOB DETAILS: PLEASE HAVE B &. R ASBESTOS CREW REMOVE GASKET OFF SKIMMER FLG LOCATED AT WELD SHOP S-SIDE ON 9-28-95 A.M.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 092795
DEL 163-S
PHONE 2493
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 101895
PF3:RETURN
003616
WLCDETS
*** SEADRIFT WORK REQUEST * *** SHOW ONLY ***
WORK REQ NO: J62897 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 838000 INDX: 92 1ST ORDER: 00006114 2ND ORD: 07300
PR: 3 OR: 99 WCAT:
RW CD:
RW RS:
DESC: ASBESTOS TESTING
BLD/UNT: HPII AR:
WK TP: 8 WANTED: 102095 RECNO:
PROP NO:
REQ BY: P BETHANY C&P:
WRITTEN: 092595 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: KAV ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101895
APPROVED BY: BETHANY
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 250
200
JOB DETAILS: PLEASE TEST THE FLOOR TILE IN THE PELLET SORTER ROOM AT HP-II FOR ASBESTOS. CONTACT ME FOR ADDITIONAL INFO @ PAGER 5-511.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 092595
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 110395
PF3:RETURN
0
003617
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY
WORK REQ NO: A60774 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 880000 INDX: 80 1ST ORDER: 00004830 2ND ORD: 00101
PR: 3 OR: MM WCAT: SC RW CD:
RW RS:
DESC: TEST INSULATION
BLD/UNT: MMD AR: MM WK TP: 8 WANTED: 100695 RECNO:
PROP NO:
REQ BY: S.WIEST
C&P:
WRITTEN: 092195 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 100395
APPROVED BY: S.WIEST
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 170
500
JOB DETAILS: HEAT EXCHANGERS LOCATED ON THE SOUTH SIDE OF #1 GAS NEED TO BE TESTED FOR ASBESTOS CONTENT. SEE SAM WIEST FOR LOCATION EXT. 2290 OR PAGER 5-644
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 092195
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 111795
PF3:RETURN
0
3878
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: J62890 ORIG WR:
PROCESS ID:
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006310 2ND ORD: 73000
PR: 2 OR: PB WCAT: NC RW CD:
RW RS:
DESC: ASBESTOS GASKET REMOVAL
BLD/UNT:
AR: WK TP: WANTED: 103095 RECNO:
PROP NO:
REQ BY: P BETHANY C&P:
WRITTEN: 091295 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD : M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START:: 00 00 00
DATE COMPLETE: 101895
APPROVED BY: BETHANY
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 610
40
JOB DETAILS: REMOVE ASBESTOS GASKETS DURING THE HP-1 SHUTDOWN.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 091295
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: C DATE: 102395
PF3:RETURN
0
9
003619
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A60100 ` ORIG WR: A59787
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148400 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT: TA RW CD:
RW RS:
DESC: MNPWR TO BLOCK UP
BLD/UNT: LP1F AR: LI WK TP: 4 WANTED: 100695 RECNO:
PROP NO:
REQ BY: S.SANDERS C&P:
WRITTEN: 091295 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 100395
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 870
1200
JOB DETAILS: PLEASE FURNISH 2 MEN TO WORK WITH UCC RIGGERS TO SHORE UP FOR REMOVAL OF HC5 GEAR BOX AND MOTOR.WILL ALSO NEED TO SHORE UP FOR REINSTALLATION OF SAME (ON OR ABOUT OCTOBER 4TH).
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 091295
DEL
PHONE 5298
0 YTD LAB$ :
0 YTD MAT$ :
0
LAST ACT: N DATE: 101895
PF3:RETURN
003620
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A59723 ORIG WR: 141117
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 094100 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR:
WCAT:
RW CD:
RW RS:
DESC: ROOFING CORE SAMPLES & REMOVAL
BLD/UNT: HP1 AR: HI WK TP: 8 WANTED: 110695 RECNO:
PROP NO:
REQ BY: J LEFTWICH C&P:
WRITTEN: 090695 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH: Y SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: M0 ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 110195
APPROVED BY: JJL
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 380
630
JOB DETAILS: TAKE ROOFING CORE SAMPLES AND ANALYZE FOR BLDG. 101. PREPARE COST
ESTIMATE FOR ROOFING MEMBRANE REMOVALS, ABANDON PIPING & MISC. ST
RUCTURAL REMOVALS & DISPOSAL FOR BUILDING 101. SEE JIM LEFTWICH EX
TENSION 2821 FOR COMPLETE INSTRUCTIONS AND DWGS.BEFORE STARING JOB
DEL D.R.BROWN/C.WELFEL PHONE 3610
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
0
IND: J CL YR: 95 DATE ENTR: 090795 LAST ACT: N DATE: 112895
PF3:RETURN
003621
WLCDETS
*** SEADRIFT WORK REQUEST *** SHOW ONLY ***
WORK REQ NO: A59720 ORIG WR:
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148400 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR:
WCAT:
RW CD:
RW RS:
DESC: ROOFING CORE SAMPLES & REMOVAL
BLD/UNT: LP1 AR:
WK TP: 8 WANTED: 110695 RECNO:
PROP NO:
REQ BY: J LEFTWICH C&P:
WRITTEN: 090695 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH: Y SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 101895
APPROVED BY: JJL
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 660
510
JOB DETAILS: TAKE ROOFING CORE SAMPLES AND ANALYZE FOR BLDG. 341. PREPARE COST
ESTIMATE FOR ROOFING MEMBRANE REMOVALS, ABANDON PIPING & MISC. ST
RUCTURAL REMOVALS & DISPOSAL FOR BUILDING 341. SEE JIM LEFTWICH EX
TENSION 2821 FOR COMPLETE INSTRUCTIONS AND DWGS.BEFORE STARING JOB
DEL D.R.BROWN/C.WELFEL PHONE 3610
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
0
IND: J CL YR: 95 DATE ENTR: 090795 LAST ACT: N DATE: 110195
PF3:RETURN
003622
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A59404 ORIG WR: A54852
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 009760 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 31 WCAT: SE RW CD:
RW RS:
DESC: STRIP ASBESTOS GASKETS {2}
BLD/UNT: LP-1 AR:
WK TP: 8 WANTED: 090595 RECNO:
PROP NO:
REQ BY: C FANELLI C&P:
WRITTEN: 083195 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 090795
APPROVED BY:
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 120
80
JOB DETAILS: PLEASE STRIP ALL ASBESTOS GASKETS OFF OF ABANDONED PIPE LOCATED ON EAST SIDE OF LP-1. ASK FANELLI FOR ADDITIONAL INFO AT 5-802.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 083195
DEL
PHONE 3649
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 101095
PF3:RETURN
003623
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A58434 ORIG WR: 237812
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 220530 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR:
WCAT: RP RW CD:
RW RS:
DESC: REMOVE INSULATION/GASKETS
BLD/UNT:
BD AR:
WK TP: 8 WANTED: 093095 RECNO:
PROP NO:
REQ BY: JAN SIMON C&P:
WRITTEN: 081795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 090795
APPROVED BY: JAN
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 480
420
JOB DETAILS: REMOVE THE INSULATION MATERIAL AND REMAINING GASKETS FROM THE TWO SURPLUS TANKS AT MARINE TERMINAL.UNIT UFT GUYS WILL REMOVE FLANGES FROM THE TANK. SEE JAN OR NORMAN IF YOU HAVE ANY QUESTIONS.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 081795
DEL
PHONE
0 YTD LAB$:
0 YTD MAT$:
LAST ACT: N DATE: 102495
0
PF3:RETURN
003624
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A59308 ORIG WR: A58948
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 22 WCAT: TA RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: GEU AR: CH WK TP: 8 WANTED: 083095 RECNO:
PROP NO:
REQ BY: ANN T.
C&P:
WRITTEN: 083095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 083195
APPROVED BY: ANN T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 150
160
JOB DETAILS: TO COVER THE COST OF REMOVING ASBESTOS GASKETS. THERE ARE 2 JOBS
WORKING: 1. WELD REPAIRS ON SMALL TANK, & 2. REPLACE 7 VALVES IN
TK FARM.
THNX, ANN T. 5-401
DEL
PHONE
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
0
IND: I CL YR: 95 DATE ENTR: 083095 LAST ACT: N DATE: 091395
PF3 .-RETURN
003625
WLCDETS
*** SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A58740 ORIG WR: 104460
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 004320 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR:
WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS FLANGE
BLD/UNT: B-420 AR: ES WK TP: 8 WANTED: 082295 RECNO:
PROP NO:
REQ BY: R.GOSSETT C&P:
WRITTEN: 082295 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 083095
APPROVED BY: SIMMS
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 110
90
JOB DETAILS: PLEASE REMOVE SUSPECTED ASBESTOS FROM PIPING AT #22 BOILER. SEE R. GOSSETT FOR LOCATION.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 082295
DEL
PHONE 2562
0 YTD LAB$:
0 YTD MAT?:
0
LAST ACT: N DATE: 083195
PF3:RETURN
003626
J
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A58594 ORIG WR: 104412
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 004320 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR:
WCAT:
RW CD:
RW RS:
DESC: INSPECT TILE AT ENSYS FOR ASB
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 083195 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 082195 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: 29 PLAN CD: RAM ASIS/ENGR:
EST START: 08 28 95
DATE COMPLETE: 083195
APPROVED BY: RED SIM
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 670
780 PL
10
00
JOB DETAILS: PLEASE, SAMPLE FLOOR TILES & GLUE WERE THE OLD CONTROL ROOM WAS
THE TILES OR GLUE MAY CONTAIN ASBESTOS MATERIALS. THIS JOB IS
LOCATED ON THE WEST SIDE OF ENERGY SYSTEMS. SEE BOSCO FOR MORE
INFORMATION IF NEEDED. PAGER 5-608 OR 2617 THANK YOU
DEL
PHONE
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
IND: J CL YR: 95 DATE ENTR: 082195 LAST ACT: N DATE: 100495
0
PF3:RETURN
003627
WLCDETS
*** SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A58549 ORIG WR: A56859
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 31 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS/DRYER BOTTOM
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 082195 RECNO:
PROP NO:
REQ BY: A.VASQUEZ C&P:
WRITTEN: 081895 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 082495
APPROVED BY: URESTI
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 250
240
JOB DETAILS: PLEASE REMOVE ASBESTOS FROM THE BOTTOM OF #5 FURNACE DRYER.
PRIOR TO SANDBLASTING PLEASE CONTACT ANDY URESTI 5-113
WHEN COMPLETE. ARRANGEMENTS FOR HAULING CAN BE MADE THEN.
THANKS ANDREW VASQUEZ 5-983
DEL
PHONE
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
IND: I CL YR: 95 DATE ENTR: 081895 LAST ACT: N DATE: 091395
PF3:RETURN
0
003628
WLCLIST
*** WORK REQUEST LISTING *** --------------------------------------------
PAGE DATE:
14 OF 14 11/22/96
RESPCODE=MO,DATEWRIT FR 080195 TO 110196
T
S RE W
WK
DATES ------------
WK REQ P JOB DESCRIPTION
T SP T PR CAT WRITN WANTED CLOSED
FP <== SORT SELECTION LINE ==>
A58469 A58216 A58053 A58051 A57791 A57680 A57475 A57460 A57459 A57414 A56955
J REMOVE ASBESTOS GASKETS J DE-INSULATE ABESTOSES J REMOVE ASBESTOS INSUL-TK3800 I REMOVE AREAS OF ASBESTOS I RMV ASBESTOS GASKETS-JOY A/CMP I CONTRACT TO REMOVE OLD GASKET I REMOVE ASBESTOS GASKEST THURS. J REMOVE ASBESTOS GASKETS J ASBESTOS REMOVAL-LP-1 JB'S I REMOVE ASBESTOS GASKEST 304 J REMOVE ASBESTOS INSULATION
X M0 X M0 X M0 X M0 X M0 X M0 X MO X MO X MO X MO X MO
82 83 83 81 31 32 81 83 83 32 83
081795 081895 082495 SA 081495 082195 082495 SE 081095 082195 082495
081095 081095 081595 TA 080795 080895 081495
080495 081195 081495 SC 080295 080395 081095 SC 080195 080995 081095 SE 080195 093095 083195 OS 080195 080195 081095
080195 072595 080495
2 IDR 3 RTN 4 DETL 5 SRT 6 PLN 7 UP 8 DN 9 PAR 10 F/LST 11 HIST 12 PRT
003629
WLCDETS
*** SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A58469 ORIG WR: 119553
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 82 WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: OLFUR AR: OL WK TP: 8 WANTED: 081895 RECNO:
PROP NO:
REQ BY: YAKLIN
C&P:
WRITTEN: 081795 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: MO PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 082495
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 100
160
JOB DETAILS: REMOVE ASBESTOS GASKETS FROM #2 HOT WATER PUMP AND PIPING SO REBUILT PUMP CAN BE INSTALLED.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 081795
DEL
PHONE 2965
0 YTD LAB$ :
0 YTD MAT$:
0
LAST ACT: N DATE: 083195
PF3:RETURN
003630
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A58216 ORIG WR: 147700
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 127300 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 21 WCAT: SA RW CD:
RW RS:
DESC: DE-INSULATE ABESTOSES
BLD/UNT: OXIDE AR: CH WK TP: 8 WANTED: 082195 RECNO:
PROP NO:
REQ BY: DF MOBLEY C&P:
WRITTEN: 081495 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 082495
APPROVED BY: TRIPP
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 260
380
JOB DETAILS: PLEASE DE-INSULATE ABESTOSES LINE CONTACT DARREN FOR LOCATION THANKS DARREN
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 081495
DEL 120S
PHONE 2250
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 091495
PF3:RETURN
003631
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A58053 ORIG WR: 293800
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 293220 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 89 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSUL-TK3800
BLD/UNT:
NF AR: CH WK TP: 8 WANTED: 082195 RECNO:
PROP NO:
REQ BY: S. CURRY
C&P:
WRITTEN: 081095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 082495
APPROVED BY:
RC ESTHR ACTHR
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 400
400
JOB DETAILS: PLEASE REMOVE THE ASBESTOS INSULATION FROM THE PIPING COMING FROM
TANK 3800. START WITH THE PIPING GOING THRU THE DIKE WALL SO T&I
CAN INSPECT IT AND WE CAN BEGIN WRAPPING. THANKS, STEVE CURRY
X2712.
DEL
PHONE
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
0
IND: J CL YR: 95 DATE ENTR: 081095 LAST ACT: N DATE: 082995
PF3:RETURN
003632
WLCDETS
* * SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A58051 ORIG WR: A56241
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR:
WCAT:
RW CD:
RW RS:
DESC: REMOVE AREAS OF ASBESTOS
BLD/UNT: HP2 AR:
WK TP: 8 WANTED: 081095 RECNO:
PROP NO:
REQ BY: V.SPRAGUE C&P:
WRITTEN: 081095 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: 29 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 081595
APPROVED BY: E.MYERS
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
455
JOB DETAILS: PLEASE PROVIDE MANPOWER TO REMOVE ASBESTOS THANKS VIVIAN
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 081095
DEL
PHONE 3479
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 081895
PF3 -.RETURN
003633
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A57791 ORIG WR: A56960
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 008510 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 10 WCAT: TA RW CD:
RW RS:
DESC: RMV ASBESTOS GASKETS-JOY A/CMP
BLD/UNT: BL-17 AR: ES WK TP: 3 WANTED: 080895 RECNO:
PROP NO:
REQ BY: CONTRERAS C&P:
WRITTEN: 080795 HWP:
MTAG:
SLIPBL:
SERV: AIR COMPRESSOR DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: 29 PLAN CD: RAM ASIS/ENGR:
EST START: 08 07 95
DATE COMPLETE: 081495
APPROVED BY: DWJ(JC)
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
00
JOB DETAILS: REMOVE ASBESTOS GASKETS FROM FLANGES ON JOY AIR COMPRESSOR AT 02 UNIT.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 080795
JOE CONTRERAS 5-221
DEL BL17, 02 UNIT
PHONE 3009
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 082995
PF3:RETURN
003634
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A57680 ORIG WR: A54181
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 094100 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: 10 WCAT:
RW CD:
RW RS:
DESC: CONTRACT TO REMOVE OLD GASKET
BLD/UNT:
HP1 AR: HI WK TP: 3 WANTED: 081195 RECNO:
PROP NO:
REQ BY: R. BOSCO
C&P:
WRITTEN: 080495 HWP:
MTAG:
SLIPBL:
SERV: HP1-03
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: 29 PLAN CD: RAM ASIS/ENGR:
EST START: 08 08 95
DATE COMPLETE: 081495
APPROVED BY: MCCUTCH
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 300
400 PL
20
00
JOB DETAILS: PLEASE PROVIDE ASBESTOS PERSONNEL TO REMOVE OLD GASKET MATERIAL,
DURING THE HP1 TURNAROUND. FOR MORE INFORMATION CONTACT BOSCO AT
2617 OR 5-608. THERE WILL BE APPOX. 26 VALVES THAT WILL BE DONE.
THANK YOU GARY.
YTD TOTAL HRS:
0 YTD O/T:
DEL 0 YTD LAB$:
PHONE 0 YTD MAT$:
0
IND: I CL YR: 95 DATE ENTR: 080495 LAST ACT: N DATE: 081695
PF3:RETURN
003635
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A57475 ORIG WR: A57471
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 008170 INDX:
1ST ORDER:
2ND ORD:
PR: 1 OR: 16 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKEST THURS.
BLD/UNT: ENSYS AR: ES WK TP: 8 WANTED: 080395 RECNO:
PROP NO:
REQ BY: RED SIMMS C&P:
WRITTEN: 080295 HWP:
MTAG:
SLIPBL:
SERV: AIR PIPING
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: 29 PLAN CD: RAM ASIS/ENGR:
EST START: 08 03 95
DATE COMPLETE: 081095
APPROVED BY: B.B.B.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
80
JOB DETAILS: PLEASE HAVE ONE INSULATOR TO REMOVE ASBESTOS GASKETS OFF 4"
FLANGES BEFORE WE SEND PIPE TO WELD SHOP THRUSDAY MORNING.
PLEASE HAVE INSULATOR AT BLDG 121 SOUTH (AIN BLDG.) AT 8:00 AM
SO WE CAN GET THE PIPE TO THE SHOP. ROBERT GOSSETT WILL BE THERE.
THANKS BB
DEL AIR BLDG. 121 SOUTH PHONE 2592
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB$:
0 YTD MAT$:
0
IND: I CL YR: 95 DATE ENTR: 080295 LAST ACT: N DATE: 081195
PF3:RETURN
003636
i
WLCDETS
SEADRIFT WORK REQUEST ***
SHOW ONLY
WORK REQ NO: A57460 ORIG WR:
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 82 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNT: OLFUR AR: OL WK TP: 8 WANTED: 080995 RECNO:
PROP NO:
REQ BY: OSPINA
C&P:
WRITTEN: 080195 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: 29 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 081095
'
APPROVED BY: URESTE
RC ESTHR IS 160
ACTHR 100
RC ESTHR
ACTHR
RC ESTHR
ACTHR
RC ESTHR
ACTHR
JOB DETAILS: REMOVE ASBESTOS INSULATION (GASKETS) FROM PIPING AT A&B WASH PAD.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 080195
DEL
PHONE 2608
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 081195
PF3:RETURN
003637
J
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A57459 ORIG WR: 155512
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 148400 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 83 WCAT: SE RW CD:
RW RS:
DESC: ASBESTOS REMOVAL-LP-1 JB'S
BLD/UNT: LP1 AR: LI WK TP: 8 WANTED: 093095 RECNO:
PROP NO:
REQ BY: TOM T.
C&P:
WRITTEN: 080195 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: M0 PLAN CD: RAM ASIS/ENGR:
EST START: 08 01 95
DATE COMPLETE: 083195
APPROVED BY: TOM T.
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 3750
1620
JOB DETAILS: REMOVE ASBESTOS FROM J-BOXES IN FIELD AT HOT COMPOUNDING, B-341 AREA.
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 080195
DEL B-341
PHONE 2832
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 090695
PF3:RETURN
003638
WLCDETS
*** SEADRIFT WORK REQUEST *** *** SHOW ONLY ***
WORK REQ NO: A57414 ORIG WR: A56075
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 071300 INDX:
1ST ORDER:
2ND ORD:
PR: 2 OR: M5 WCAT: OS RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKEST 304
BLD/UNT: 304 AR: SH WK TP: 3 WANTED: 080195 RECNO:
PROP NO:
REQ BY: K.HOLLAND C&P:
WRITTEN: 080195 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER:
PLAN CD:
ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 081095
APPROVED BY: HOLLAND
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 200
100
JOB DETAILS: PLEASE REMOVE ASBESTOS GASKETS OF DUMP TANK COOLER FROM ODU LOCATED AT 304 WASH PAD.
YTD TOTAL HRS: IND: I CL YR: 95
0 YTD O/T: DATE ENTR: 080195
DEL
PHONE 3575
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 091295
PF3:RETURN
003639
WLCDETS
SEADRIFT WORK REQUEST
SHOW ONLY
WORK REQ NO: A56955 ORIG WR: 116432
PROCESS ID:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: 3 OR: 82 WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNT: OLSEP AR: OL WK TP: 8 WANTED: 072595 RECNO:
PROP NO:
REQ BY: HODDE
C&P:
WRITTEN: 080195 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: M0
STATUS: X PLANNER: 29 PLAN CD: RAM ASIS/ENGR:
EST START: 00 00 00
DATE COMPLETE: 080495
APPROVED BY: URESTE
RC ESTHR ACTHR RC ESTHR
ACTHR RC ESTHR ACTHR RC ESTHR ACTHR
IS 160
320
JOB DETAILS: REMOVE ASBESTOS INSULATION FROM #12 COMP MOTOR OIL COOLER
YTD TOTAL HRS: IND: J CL YR: 95
0 YTD O/T: DATE ENTR: 072495
DEL
PHONE 2982
0 YTD LAB$:
0 YTD MAT$:
0
LAST ACT: N DATE: 080995
PF3:RETURN
003640
12/05/94
*** WORK REQUEST LISTING ***
RESPCODE=MO,DATEWRIT FR 010189 TO 010191
PAGE 4
I D WK REQ R
T P JOB DESCRIPTION
S RE T SP
-------------TOTAL TO DATE-------------
S/T
O/T
TOTAL
H14727
J PICKUP ASBESTOS INSUALTION
X MO
101
0 101
H14739
J REMOVE INSULATION FROM CND.HDR X MO
0
2
2
H15153
I REMOVE INSULATION
X MO
10
0
10
H16117
J REMOVE INSULATION ON VALVE
X MO
75
0
75
H16147
J REMOVE ASBESTOS ON C2H2 STILL X MO
4
0
4
H16404
J STRIP ASB. ON STEAM LINE
X MO
4
0
4
H16416
J SCRAP ASB. GAST AT 304
X MO 6 0
6
H16508
J STRIP ASB. #13 COMP STM LINE
X MO
82
21
103
H16544
I REMOVE GASKET FROM CYL
X MO
34
6
40
H17112
J REMOVE ASBESTOS INSULATION
X MO
17
0
17
H18369
J STRIP INSULATION
X MO 4 0
4
H19591
J REMOVE ASBESTOS GASKET
X MO 4 0
4
H19863
I REMOVE GASKETS
X MO 6 5 11
H20623
J MAKE LISTING OF ALL ASBESTOS
X MO
63
0
63
H20645
J REMOVE ASBESTOS INS. OFF COLUM X MO
36
0
36
H20812
J REMOVE ASBESTOS GASKETS
X MO
18
0
18
H20822
J REMOVE ASBESTOS INSULATION
X MO
18
0
18
H20839
J COVER EXPOSED INSULATION
X MO
7
0
7
H21018
J REMOVE ASBESTOS
X MO 8 0
8
H21177
I REMOVE ASBESTOS GASKETS
X MO
24
0
24
H21405
J REMOVE INSULATION
X MO
2 12
14
H21507
J REMOVE INSULATION (ASBESTOS)
X MO
46
0
46
H21518
J REMOVE INSULATION
X MO 33 10
43
H21544
I REMOVE GASKET (ASBESTOS)
X MO
6
0
6
H21632
J REMOVE ASBESTOS INSULATION
X MO
0 10
10
H21648
J REMOVE ASBESTOS
X MO 2 0
2
H21738
J IDENTIFY INSULATION ON TANKS
X MO
6
0
6
H21741
J
X MO
29
0
29
H21865
I STRIP ASBESTOS GASKETS
X MO 0 0
0
H21899
I STRIP GASKETS ON OX 1 & 2
X MO
13
0
13
H21945
I STRIP ASBESTOS GASKETS
X MO
24
0
24
H22079
J REMOVE INSULATION FROM ACETIC X MO
80
41
121
H22183
I REMOVE INSULATION
X MO
34
4
38
H22200
J REMOVE GASKET FROM VALVE
X MO
2
0
2
H22302
I STIP ASBESTOS NO. 2
X MO 21 18
39
H22799
J SAMPLE #1 GAS C2H4 COL
X MO
28
0
28
H23244
J REMOVE ASBESTOS
X MO
30
0
30
H23490
I REMOVE ASBESTOS GASKETS
X MO 6 0
6
H23792 * J REMOVE ASBESTOS SIDING
X MO
223
0 223
H23983
J CLEAN GASKETS ON TKS. 904,903 X MO
2
0
2
H24201 * J BULK PRIMARY BINS
X MO 8 6 14
H25368
J REMOVE ASBESTOS GASKETS
X MO 6 0
6
H25369
J REMOVE ASBESTOS GASKETS
X MO
12
0
12
H25435
I ASBESTOS GASKET REMOVAL
X MO 4 0
4
H26917
J SCRAPE ASBESTOS GASKET
X MO
11
0
11
H27001
J REMOVE ASBESTOS INSUL. ON S/G X MO
8 34
42
H27031
J CK VALVE VD UNIT
X MO 4 0
4
H27068
J ASBESTOS REMOVAL FLARE TOWER
X MO
6
0
6
H27088 H28056
J REMOVE ASBESTOS GASKETS I REMOVE ASBESTOS GAXKETS
X MO 6 0 X MO 8 0
6 8
H28059
I REMOVE INSULATION
X MO 8 0
8
H28204
J REMOVE ASBESTOS GASKETS
X MO 0 1
1
005505
NAME 5NUMBER: PAGER :
*** WORK REQUEST ***
WORK REQ NO: 00H14727 ORIG WR: 00203000
APPROVED BY: WTH
DIV/LOC: 500310 ACCOUNT: 220040 INDX:
1ST ORDER:
2ND ORD:
PR: A OR: C3 WCAT: SE RW CD:
RW RS:
DESC: PICKUP ASBESTOS INSUALTION
ELD/UNIT:N.FLD AR: CM WK TP: 8 WANTED: 090589 RECNQ:
PROPNO:
REQ BY: BITTERLY
C&P:
WRITTEN: 090589 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS'-
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 091989
RC ESTHR IS 160
ACTHR RC ESTHR 1010
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH-
JOE DETAIL: PICK UP ASBESTOS INSULATION IN PIPE RACK AND ROADWAY ENTRANCE TO NORTH FIELD.
DELIVER TO:
PHONE
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB$:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 091189 LAST ACT: N DATE: 100489
0
005506
NAME'.NUMBER:PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H14739 ORIG WR: 00203000
APPROVED BY: R.GECK
DIV/LOC: 500510 ACCOUNT: 220040 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: C3 WCAT: SE RW CD:
RW RS:
DESC: REMOVE INSULATION FROM CND.HDR
BLD/UNIT:
NF AR:
WK TP: 8 WANTED: 101889 RECNO:
PROPNO:
REQ BY: BITTERLY
C&P:
WRITTEN: 101789 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 103089
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 160
20
JOB DETAIL: REMOVE THE INSULATION FROM A SECTION OF RACK 2 CONDENSATE HEADER. SAMPLES HAVE BEEN PULLED BUT HAVE NOT RECEIVED RESULTS. WILL TREAT THIS AS ASBESTOS.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 102489 LAST ACT: N DATE: 110389
.
0
005507
NAME
NUMBER:
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H15153 ORIG WR: 00H04U0
APPROVED BY: WTH
DIV/LOC: 500310 ACCOUNT: 023500 INDX:
1ST ORDER:
2ND ORD:
PR: D OR: 10 WCAT: SC RW CD:
RW RS:
DESC: REMOVE INSULATION
BLD/UNIT: 501N AR:
WK TP: 8 WANTED : 083189 RECNQ:
PRQPNO:
REQ BY: STEVENS
C&P:
WRITTEN: 081189 HWP:
MTAG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START: 000000
DATE COMPLETE: 092589
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
IS 180
100
JOE DETAIL: REMOVE INSULATION ON 6" ACETYLENE LINE LINE IN #2 GAS PIPE RACK ACROSS STREET LINE IS OPEN ENDED
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: I CL YR: 89 DATE ENTR: 081189 LAST ACT: N DATE: 092989
005508
NAME:
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H16U7 ORIG WR: 00119587
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: A OR: JB WCAT: US RW CD:
RW RS:
DESC: REMOVE INSULATION ON VALVE
BLD/UNIT:
AR:
WK TP: 8 WANTED : 080889 RECNO:
PROPNO:
REQ BY: BAUER
C&P:
WRITTEN: 080789 HWP:
SERV:
DWG ATTCH:
SPECS:
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
DATE COMPLETE: 082389
MTAG:
SLIPEL:
FAC CHG:
RESP CD: MO
EST START: 000000
RC ESTHR IS 160
ACTHR RC ESTHR 750
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHF
JOB DETAIL: REMOVE ASBESTOS INSULATION FROM STEAM VALVES ON #12 FURNACE TO REMOVE 0 PLATES
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB#:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 080989 LAST ACT: N DATE: 082489
._0
005509
NAME:
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H16147 ORIG WR: 00119907
APPROVED BY:
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: A OR: 82 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS ON C2H2 STILL
ELD/UNIT: OL-2 AR:
WK TP: 3 WANTED: 062289 RECNQ:
PROPNO:
REQ BY: ELMO
CeP:
WRITTEN: 062289 HWP:
MTAG:
SLIPBL:
SERV: STATUS'- X PLANNER
DWG ATTCH: PLAN CD
SPECS: AS IS/ENGR:
FAC CHG:
RESP CD: MO
EST START:: 000000
DATE COMPLETE: 063089
RC ESTHR IS 160
ACTHR RC ESTHR 40
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
JOE DETAIL: PLEASE RMOVE ASBESTOS ON C2H2 STILL D/P LINE <4M X 2' LINE)
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB*: ........
0 YTD MAT*
IND: J CL YR: 89 DATE ENTR: 062389 LAST ACT: N DATE: 070189
0
005510
NAME'
_______________________ NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H16404 ORIG WR: 00119910
APPROVED BY: DAN
DIV/LOC: 500S10 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 WCAT: SC RW CD:
RW RS:
DESC: STRIP ASB. ON STEAM LINE
BLD/UNIT:OL-SE AR: OL WK TP: 4 WANTED: 062289 RECNQ:
PROPNO:
REQ BY: DE HOYOS
C&P:
WRITTEN: 062189 HWP: Y MTAG:
SLIPBL:
SERV: STEAM 75# STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START: 000000
DATE COMPLETE: 063089
RC ESTHR ACTHR RC ESTHR
IS 160
40
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHF
JOB DETAIL:
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
_ 0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 062389 LAST ACT: N DATE: 070189
005511
NAME:NUMBER:PAGER:
*** WORK REQUEST ***
WORK REG NO: 00H16416 ORIG UR: 00128310
APPROVED BY: UTH
DIV/LOC: 500510 ACCOUNT: 039290 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 WCAT: SC RW CD:
RW RS:
DESC: SCRAP ASB. GAST AT 304
BLD/UNIT: 304 AR:
WK TP: 4 WANTED: 063089 RECNO:
PROPNO:
REQ BY: DEHOYOS
C&P:
WRITTEN: 063089 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 080289
RC ESTHR
ACTHR RC ESTHR
IS 160
60
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
JOB DETAIL'-
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*
0 YTD MAT*
IND: J CL YR: 89 DATE ENTR: 070589 LAST ACT: N DATE 080389
0
005512
NAME:NUMBER:PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H16508 ORIG WR: 00116433
APPROVED BY:
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 WCAT: SD RW CD:
RW RS:
DESC: STRIP ASB. #13 COMP STM LINE
BLD/UNIT: OL-2 AR:
WK TP: 4 WANTED: 062289 RECNO:
PROPNO:
REQ BY: E GARCIA
C&P:
WRITTEN: 052389 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 062689
RC ESTHR IS 160
ACTHR RC ESTHR 1035
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH`
JOE DETAIL: PLEASE STRIP ASBESTOS FROM #13 COMPRESSOR STEAM & CONDENSATE
PIPING DURING 6-19-89 SHUTDOWN. CHECK WITH ERNEST GARCIA
FOR LOCATION AND SCHEDULING. WRAP WITH TEMPORARY INSULATION UNTIL
PERMANENT CAN BE INSTALLED. EXT 2439/5-609
S/D...............
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB*:
0 YTD MAT*:
.
0
IND: J CL YR: 89 DATE ENTR: 052489 LAST ACT: N DATE: 062889
005513
NAME :
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H16544 ORIG WR: 00G86335
APPROVED BY:
DIV/LOC: S00S10 ACCOUNT: 025100 INDX:
1ST ORDER
2ND ORD:
PR: B OR: 18 WCAT : SC RW CD :
RW RS:
DESC: REMOVE GASKET FROM CYL
ELD/UNIT:42GAS AR:
WK TP: 4 WANTED: 052389 RECNO:
PROPNO:
REQ BY: HARTMAN
C&P:
WRITTEN : 052389 HWP:
SERV:
DWG ATTCH:
SPECS:
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
MTAG:
SLIPBL:
FAC CHG:
RESP CD MO
EST START: 000000
DATE COMPLETE: 053089
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHF
IS 160
400
JOE DETAIL: REMOVE ASBESTOS GASKET FROM CYL. ASB...............
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: I CL YR: 89 DATE ENTR: 052489 LAST ACT: N DATE: 060189
0
005514
NAME:NUMBER:PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H17U2 ORIG WR: 00119587
APPROVED BY: ACHIERN
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: NB WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNIT'.FURN. AR: OL WK TP: 3 WANTED: 061489 RECNO:
PROPNO:
REQ BY: BEDEE
C&P:
WRITTEN: 061289 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 063089
RC ESTHR IS 160
ACTHR RC ESTHR 170
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH:
JOB DETAIL: REMOVE INSULATION FROM NO. 12 FURNACE / NO. 17 FURNACE ASBESTOS................................
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB$:
0 YTD MAT*
IND: J CL YR: 89 DATE ENTR: 061689 LAST ACT: N DATE 070189
0
005515
NAME:
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00Hia369 ORIG WR: 00272600
APPROVED BY: R.GECK
DIV/LOC: 500310 ACCOUNT: 260940 INDX:
1ST ORDER:
2ND ORD=
PR: B OR: C3 WCAT: SE RW CD:
RW RS:
DESC: STRIP INSULATION
BLD/UNIT:RK2-A AR: CH WK TP: 8 WANTED: 012990 RECNO:
PROPNO:
REQ BY: AUTRY
C8cP:
WRITTEN: 012990 HWP:
MT AG:
SLIPBL:
SERV:
DWG ATTCH:
STATUS: X PLANNER
PLAN CD
DATE COMPLETE: 013190
SPECS: ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START : 000000
RC ESTHR IS 160
ACTHR RC ESTHR 40
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
JOB DETAIL: STRIP ASBESTOS INSULATION ON RACK 2-A SPOT 2.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*
IND: J CL YR: 90 DATE ENTR: 013090 LAST ACT: N DATE 020390
0
005516
NAME
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H19591 ORIG WR: 00135607
APPROVED BY: KNEBEL
D1V/L0C: 500510 ACCOUNT: 071250 INDX:
1ST ORDER:
2ND ORD:
PR: D OR:
WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKET
BLD/UNIT:163-S AR: SH WK TP: 8 WANTED: 111089 RECNO:
PROPNO:
REQ BY: KNEBEL
C&P:
WRITTEN: 110889 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 112089
RC ESTHR IS 160
ACTHR RC ESTHR 40
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
JOB DETAIL: REMOVE WHAT APPEARS TO BE ASBESTOS GASKET FROM A-MOT VALVE LOCATED AT INST. SHOP NORTH DOOR.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB*:
0 YTD MAT*
IND: J CL YR: 89 DATE ENTR: 111089 LAST ACT: N DATE 112189
0
005517
NAME:
NUMBER: *** WORK REQUEST ***
PAGER:
WORK REQ NO: 00H19863 ORIG WR: 00H27556
APPROVED BY: WTH
DIV/LOC: 500S10 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: C OR: 05 WCAT: SC RW CD:
RW RS:
DESC: REMOVE GASKETS
BLD/UNIT:163-S AR: SH WK TP: 8 WANTED: 103089 RECNO:
PROPNO:
REQ BY: WISE
C&P:
WRITTEN: 103089 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 110689
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHF
IS 160
115
JOB DETAIL: REMOVE ASBESTOS GASKETS FROM VALVE BODY.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
_ 0 YTD MAT*:
IND: I CL YR: 89 DATE ENTR: 103189 LAST ACT: N DATE: 110789
005518
NAME:NUMBER:PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H20623 ORIG WR: 00153411
APPROVED BY: UTH
DIV/LOC: 500510 ACCOUNT: 148150 INDX:
1ST ORDER:
2ND ORD:
PR: D OR: CE WCAT: SA RW CD:
RW RS:
DESC: MAKE LISTING OF ALL ASBESTOS
BLD/UNIT:LP1RX AR: PL WK TP: 8 WANTED: 021790 RECNO:
PROPNO:
REQ BY: C.ENGELS
C&P:
WRITTEN: 011590 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH*.
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 022190
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 400
630
JOB DETAIL: MAKE LISTING OF ALL THE ASBESTOS INSULATION IN THE LP1 REACTION AREA. INCLUDING PURIFICATION CATALYST, G-5 AND G-17 AREAS.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 90 DATE ENTR: 011790 LAST ACT: N DATE: 022890
.
0
005519
NAME
NUMBER: *** WORK REQUEST ***
PAGER:
WORK REQ NO: 00H20643 ORIG WR: 00153411
APPROVED BY: D.CANO
DIV/LOC: 500510 ACCOUNT: 148150 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: CE WCAT: SA RW CD:
RU RS:
DESC: REMOVE ASBESTOS INS. OFF COLUM
BLD/UNIT:LP1RX AR: PL WK TP: 8 WANTED: 031090 RECNO:
PROPNO:
REQ BY: C.ENGELS
C&P:
WRITTEN: 011190 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 031490
RC ESTHR IS 160
ACTHR RC ESTHR 365
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
JOB DETAIL: REMOVE THE ASBESTOS INSULATION FORM THE ISOPENTANE COLUMN.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 90 DATE ENTR: 011890 LAST ACT: N DATE: 032290
.
0
005520
NAME
NUMBER
PAGER
*** WORK REQUEST ***
WORK REQ NO: 00H20812 ORIG WR: 00289914
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 290000 INDX:
1ST ORDER:
2ND ORD:
PR: A OR:
WCAT: RP RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNIT: D1ST AR: CH WK TP: 8 WANTED: 073189 RECNO:
PROPNQ:
REQ BY: PORTER
C&P:
WRITTEN: 073189 HWP:
MTAG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: AS IS/ENGR:
FAC CHG:
RESP CD: MO
EST START : 000000
DATE COMPLETE: 082389
RC ESTHR IS 160
ACTHR RC ESTHR 180
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHF
JOB DETAIL: PLEASE REMOVE ASBESTOS GASKETS ON PIPE PLANES ON THE DISCHARGE MOTOR VALVE ON THE STRENGTH SEWER PUMPS
DELIVER TO:
PHONE :
YTD TOTAL HRS
0 YTD Q/T:
0 YTD LAB*
0 YTD MAT*
IND: J CL YR 89 DATE ENTR: 080889 LAST ACT: N DATE 082489
0
005521
NAME:NUMBER:PAGER
*** WORK REQUEST ***
WORK REQ NO: 00H20822 ORIG WR: 00246511
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 237440 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: JP WCAT: Rp RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNIT: DIST AR: CH WK TP: 4 WANTED-' 081089 RECNQ
PROPNO:
REQ BY'- PORTER
C&P:
WRITTEN: 080989 HWP:
M T A G '
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 082389
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 160
180
JOB DETAIL: STRIP ASBESTOS INSULATION FOR LINE REPAIR
DELIVER TO:
PHONE :
VTD TOTAL HRS:
0 YTD D/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 081689 LAST ACT: N DATE: 110389
005522
NAME:NUMBER:FAGER:
*** WORK REQUEST **#
WORK REQ NO: 00H20839 ORIG WR: 00262517
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 221940 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: JP WCAT*. SA RW CD:
RW RS:
DESC: COVER EXPOSED INSULATION
BLD/UNIT: DIST AR: CH WK TP: 8 WANTED: 082589 RECNO:
PROPNO:
REQ BY: PORTER
C&P:
WRITTEN: 081889 HWP:
SERV:
DWG ATTCH:
SPECS:
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
DATE COMPLETE: 091989
MTAG:
SLIPBL:
FAC CHG:
RESP CD: MO
EST START: 000000
RC ESTHR IS 160
ACTHR RC ESTHR 70
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
JOB DETAIL: COVER THE EXPOSED ASBESTOS INSULATION ON THE STEAM HEADER LOCATED ON THE WEST END OF LOADING RACK 3.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 083189 LAST ACT: N DATE: 092089
005523
NAME
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H21018 ORIG WR: 00138339
APPROVED BY: WTH
DIV/LOC: 300310 ACCOUNT: 071300 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 22 WCAT:
RW CD:
RW RS:
DESC: REMOVE ASBESTOS
BLD/UNIT:ACETA AR: CH WK TP: 8 WANTED: 081089 RECNO:
PROPNO:
REQ BY: BROWNING
C&P:
WRITTEN: 080889 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 082389
RC ESTHR IS 160
ACTHR RC ESTHR 80
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
JOE DETAIL: PLEASE REMOVE APPROX 6' OF ASBESTOS INSULATION FROM TANK 3625 CIRCULATING LINE IN BUTYLS T.SK FARM AT ODU LINE IS GROUND LEVEL AND A 2" LINE NEED TO REMOVE ASBESTOS SO UE CAN REPLACE A LINE
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 081089 LAST ACT: N DATE: 082489
005524
NAME:
NUMBER *** WORK REQUEST ***
PAGER:
WORK REQ NO: 00H21177 ORIG WR: OOH35766
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 071100 INDX:
1ST ORDER:
2ND ORD:
PR: D OR: 22 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNIT: AMINE AR: CH WK TP: 8 WANTED: 111789 RECNO:
PROPNO*.
REQ BY: WILLIAMS
C&P:
WRITTEN: 111589 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 112989
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 160
240
JOB DETAIL'- PLEASE REMOVE ASBESTOS GASKETS FROM VALVES ON PALLET AT 360 WEST.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: I CL YR: 89 DATE ENTR: 111689 LAST ACT: N DATE: 113089
005525
NAME
NUMBER
PAGER'.
*** WORK REQUEST ***
WORK REQ NO: 00H2140S ORIG WR: 00119921
APPROVED BY: WTH
DIV/LOC: 500310 ACCOUNT: 023300 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 WCAT: US RW CD:
RW RS:
DESC: REMOVE INSULATION
BLD/UNIT: OL-2 AR: OL WK TP: 4 WANTED: 070689 RECNO:
PROPNO:
REQ BY: NEILL
C&P:
WRITTEN: 070689 HWP:
MTAG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS'. ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START : 000000
DATE COMPLETE: 080289
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR AC TH
IS 160
140
JOB DETAIL: PLEASE REMOVE INSULATION FROM 41C2A2 STILL KETTLE REPLACE AFTER LEAKS ARE PLUGGED
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 070789 LAST ACT'. N DATE: 080389
.- 0
005526
NAME!
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H21307 ORIG WR: 00128300
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 039290 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 WCAT: SC RW CD:
RW RS:
DESC: REMOVE INSULATION (ASBESTOS)
BLD/UNIT :1GAS AR: OL WK TP: 8 WANTED : 081889 RECNO:
PROPNO:
REQ BY: DEHOYOS
C&P:
WRITTEN: 081889 HWP:
MT AG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 083089
RC ESTHR IS 160
ACTHR RC ESTHR 460
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHf
JOB DETAIL: REMOVE ASBESTOS FROM SCRAP INSTRUMENT TUBIGN LOCATED AT 201 WEST (NEXT TO ROAD SIDE)
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*
0 YTD MAT*
IND: J CL YR: 89 DATE ENTR: 082389 LAST ACT: N DATE 090789
0
005527
NAME:
NUMBER:
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H21318 ORIG WR: 00119928
APPROVED BY: WTH
DIV/LOC- 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 WCAT : US RW CD
RW RS:
DESC: REMOVE INSULATION
BLD/UNIT:B-501 AR: OL WK TP: 8 WANTED: 090189 RECNO:
PROPNO :
REQ BY: DELGADO
CS<P:
WRITTEN : 082289 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
STATUS: X PLANNER
PLAN CD
DATE COMPLETE: 091989
SPECS: ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START: 000000
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 160
435
JOB DETAIL: REMOVE ASBESTOS INSULATION FROM OUT OF SERVICE STEAM LINES.
SEE ME FOR DETAILS.
JERRY D. 2965
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 082889 LAST ACT: N DATE: 092089
0
005528
NAME:NUMBER:PAGER:.
*** WORK REQUEST ***
WORK REQ NO: 00H21S44 ORIG WR: 00H170U
APPROVED BY: UTH
DIV/LOC: 500510 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 WCAT: SC RW CD:
RW RS:
DESC: REMOVE GASKET (ASBESTOS)
BLD/UNIT:42GAS AR: OL WK TP: 4 WANTED: 083089 RECNQ:
PROPNO:
REQ BY: HODGES
C&P:
WRITTEN: 083089 HWP:
(IT AG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START: 000000
DATE COMPLETE: 091989
RC ESTHR IS 160
ACTHR RC ESTHR 60
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHF
JOB DETAIL: REMOVE GASKETS ON FILTER CASING FOR PREVENTIVE MAINTENANCE.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*
0 YTD MAT*:
IND: I CL YR: 89 DATE ENTR: 090189 LAST ACT: N DATE 092089
005529
NAME:NUMBER:PAGER
*** WORK REQUEST ***
WORK REQ NO: 00H21632 ORIG WR: 00119923
APPROVED BY: WTH
DIV/LOC: 500310 ACCOUNT: 025300 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSULATION
BLD/UNIT: OL-2 AR: OL WK TP: 8 WANTED: 080889 RECNO:
PROPNO:
REQ BY: GARCIA
C&P:
WRITTEN: 080789 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 082389
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 160
105
JOB DETAIL: PLEASE REMOVE ASBESTOS INSULATION AND GASKETS FROM C2 KETTLE PIPING WILL BE READY FOR MAINT 080889
DELIVER TO:
PHONE :
VTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 081089 LAST ACT: N DATE: 082489
0
005530
NAME:
NUMBER:
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H21648 ORIG WR: 00119S87
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: JB WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS
ELD/UNIT:OL-I1 AR: OL WK TP: 8 WANTED: 091589 RECNO:
PROPNO:
REQ EY: BAUER
C&P:
WRITTEN: 083189 HWP:
MTAG:
SLIPBL:
SERU:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 091989
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
IS 160
20
JOE DETAIL: REMOVE ASBESTOS FROM 1/2" STEAM LINE IN SOUTH CORNER OF BUILDING 400 - FURNACE SHOP.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD O/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 090589 LAST ACT: N DATE 092989
005531
NAME:NUMBER:PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H21738 ORIG WR: 00237852
APPROVED BY: R.GECK
DIV/LOC: 500510 ACCOUNT: 220530 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: DH WCAT: SC RW CD:
RW RS:
DESC: IDENTIFY INSULATION ON TANKS
BLD/UNIT:DOCKS AR: CH WK TP: 8 WANTED: 032790 RECNQ:
PROPNO:
REQ BY: HANKE
C&P:
WRITTEN: 032090 HWP: Y MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 041090
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
IS 160
60
JOB DETAIL: IDENTIFY TYPE OF INSULATION THAT IS ON THE HOT WATER TANKS.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB*
0 YTD MAT*:
IND: J CL YR: 90 DATE ENTR: 032890 LAST ACT: N DATE 052590
0
005532
NAME:NUMBER:PAGER:
*** WORK REQUEST **
WORK REQ NO: 00H21741 ORIG WR:
APPROVED BY: R.GECK
DIV/LOC: 500511 ACCOUNT: 930000 INDX: 93 1ST ORDER: 00006017 2ND ORD: 04000
PR: B OR: NH WCAT: SC RW CD:
RW RS:
DESC:
BLD/UNIT:W.FLD AR: CH WK TP: 9 WANTED: 061190 RECNO:
PROPNO:
REQ BY: HANKE
C&P:
WRITTEN: 050390 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 053090
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 350
290
JOE DETAIL'- CHECK INSULATION ON ABANDONED PIPE TO BE REMOVED TO SEE IF IT IS ASBESTOS. SEE N.E. HANKE FOR LINE ID.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*
IND: J CL YR: 90 DATE ENTR: 050890 LAST ACT: N DATE: 060290
005533
NAME :
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H21865 ORIG WR: 00A02115
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: A OR: M2 WCAT: SD RW CD:
RW RS:
DESC: STRIP ASBESTOS GASKETS
BLD/UNIT:HP-II AR: PL WK TP: 3 WANTED: 081789 RECNO:
PROPNO:
REQ BY: R.C.ROSS
C&P:
WRITTEN: 081789 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 083089
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHf
IS 160
00
JOB DETAIL: PLEASE PROVIDE MANPOWER TO STRIP ASBESTOS GASKETS AS NEEDED. SHUTDOWN......................... ......
DELIVER TO:
PHONE :
VTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: I CL YR: 89 DATE ENTR: 082389 LAST ACT: N DATE: 083189
0
005534
NAME
NUMBER:
PAGER:
*** WORK REQUEST #**
WORK REQ NO: 00H21899 ORIG WR: 0OG79970
APPROVED BY: WTH
DIV/LOC: SOOSIO ACCOUNT: 127200 INDX:
1ST ORDER:
2ND ORD:
PR: D OR: M2 WCAT: SC RW CD:
RW RS:
DESC: STRIP GASKETS ON OX 1 & 2
BLD/UNIT:OX-II AR: CH WK TP: 8 WANTED: 082989 RECNO:
PROPNO:
REQ BY: MIDDAUGH
C&P:
WRITTEN: 082989 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 091989
RC ESTHR IS 160
ACTHR RC ESTHR 130
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHr
JOB DETAIL: PLEASE SUPPLY MANPOWER TO STRIP ASBESTOS GASKETS ON OXIDE PIPING TEAROUT.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: I CL YR: 89 DATE ENTR: 083089 LAST ACT: N DATE: 092089
005535
NAME
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H21945 DRIG WR: 00H04121
APPROVED BY: WTH
DIV/LOC: 500S10 ACCOUNT: 148340 INDX:
1ST ORDER:
2ND ORD:
PR: B OR:.M2 WCAT: SD RW CD:
RW RS:
DESC: STRIP ASBESTOS GASKETS
ELD/UNIT:LPR-1 AR: PL WK TP: 8 WANTED: 091189 RECNO:
PROPNO:
REQ BY: R.C.ROSS
C&P:
WRITTEN: 091189 HWP:
SERV:
DWG ATTCH:
SPECS:
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
DATE COMPLETE: 091989
MTAG:
SLIPBL:
FAC CHG:
RESP CD: MO
EST START: 000000
RC ESTHR IS 160
ACTHR RC ESTHR 240
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
JOE DETAIL: STRIP ASBESTOS GASKETS AS NEEDED G-1750
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB*:
0 YTD MAT*:
IND: I CL YR: 89 DATE ENTR: 091289 LAST ACT: N DATE: 092189
005536
NAME:
NUMBER:
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 0OH22079 ORIG WR: 00237841
APPROVED BY: WTH
DIV/LOC: 500310 ACCOUNT: 220530 INDX:
1ST ORDER:
2ND ORD:
PR: B OR:
WCAT: RP RW CD:
RW RS:
DESC: REMOVE INSULATION FROM ACETIC
BLD/UNIT:BARGE AR: CH WK TP: 8 WANTED: 080789 RECNO:
PROPNO:
REQ BY: LOWMAN
C&P:
WRITTEN: 080389 HWP:
MTAG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START:: 000000
DATE COMPLETE: 082389
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHf
IS 00 1215 RS 160
00
JOB DETAIL: PLEASE REMOVE INSULATION FROM AROUND ACETIC ACID UNLOADING POT ON THE SOUTH EAST CORNER OF THE BARGE DOCKFRONT
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*
IND: J CL YR: 89 DATE ENTR: 080889 LAST ACT: N DATE: 100589
005537
NAME 5NUMBER:PAGER:.
*** WORK REQUEST ***
WORK REQ NO: 00H22183 ORIG WR: 00H22181
APPROVED BY: BEATTY
DIV/LOC: 500S10 ACCOUNT: 008170 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 16 WCAT:
RW CD: RA RW RS:
DESC: REMOVE INSULATION
BLD/UNIT:ENSYS AR: OL WK TP: 8 WANTED: 010490 RECNO:
PROPNO:
REQ BY: D.SIMONS
C&P:
WRITTEN: 010490 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 011690
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 160
385
JOB DETAIL: REMOVE INSULATION ON EXHAUST HEADER ON #7 A/C AT BLDG. 121
DELIVER TO:
PHONE :
VTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
INC: I CL YR: 90 DATE ENTR: 010890 LAST ACT: N DATE: 011890
0
005538
NAME :
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H22200 ORIG WR: 00110299
APPROVED BY: GBEATTY
DIV/LOC: 500510 ACCOUNT: 008170 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 16 WCAT:
RW CD:
RW RS:
DESC: REMOVE GASKET FROM VALVE
BLD/UNIT:ENSYS AR: OL WK TP: 8 WANTED: 040590 RECNO:
PROPNO:
REQ BY: D.SIMONS
C&P:
WRITTEN: 040590 HWP:
MT AG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START: 000000
DATE COMPLETE: 041090
RC ESTHR IS 160
ACTHR RC ESTHR 20
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHf
JOE DETAIL: REMOVE ASBESTOS GASKET FROM VALVE.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 90 DATE ENTR: 040690 LAST ACT: N DATE: 041190
005539
NAME:
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H22302 ORIG WR: 00H22400
APPROVED BY: WTH
DIV/LOC: 500310 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: A OR: 35 WCAT: US RW CD:
RW RS:
DESC: STIP ASBESTOS NO. 2
ELD/UNIT:HPR-2 AR: PL WK TP: 8 WANTED: 122889 RECNO:
PROPNO:
REQ BY: THOMPSON
C&P:
WRITTEN: 122889 HWP:
MT AG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 013090
RC ESTHR IS 160
ACTHR RC ESTHR 395
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
JOE DETAIL: NO ENTRY IN THIS SECTION OF ORIGINAL WORK REQUEST
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB*:
0 YTD MAT*:
IND: I CL YR: 90 DATE ENTR: 012390 LAST ACT: N DATE 013190
0
005540
NAME:NUMBER:PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H22799 ORIG WR: 00130811
APPROVED BY: J.MOORE
DIV/LOC: 500510 ACCOUNT: 039520 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: NB WCAT: US RW CD:
RW RS:
DESC: SAMPLE #1 GAS C2H4 COL
BLD/UNIT: OL-I AR: OL WK TP: 8 WANTED: 100290 RECNQ:
PROPNO:
REQ BY: BEDEE
C&P:
WRITTEN: 100290 HWP:
MTAG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START: 000000
DATE COMPLETE: 100990
RC ESTHR IS 160
ACTHR RC ESTHR 280
ACTHR RC ESTHR
ACTHR RC ESTHR
A C T H:
JOE DETAIL: SAMPLE INSULATION ON #1 GAS ETHYLENE COLUMN AND PIPING FOR ASBES TOS.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 90 DATE ENTR: 100390 LAST ACT: N DATE: 102790
-
0
005541
NAME!NUMBER:PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H23244 ORIG WR: 00324100
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 327260 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: M7 WCAT: SE RW CD:
RW RS:
DESC: REMOVE ASBESTOS
BLD/UNIT: 165 AR: SH WK TP: 8 WANTED: 122889 RECNO:
PROPNO:
REQ BY: J.MOLINA
C&P:
WRITTEN: 122789 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE? 010390
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
A C T H:
IS 160
300
JOB DETAIL: REMOVE ASBESTOS AT 165.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
IND: J CL YR: 89
0 YTD 0/T:
0 YTD LAB*:
DATE ENTR: 122889 LAST ACT: N DATE
0 YTD MAT*: 010590
005542
NAME:NUMBER:PAGER:
*** WORK REQUEST #**
WORK REQ NO: 00H23490 ORIG WR: 00H74852
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 037220 INDX:
1ST ORDER:
2ND ORD:
PR: A OR: BB WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNIT:HP--II AR: PL WK TP: 8 WANTED: 101290 RECNO:
PROPNO:
REQ BY: BLAKE
C&P:
WRITTEN: 101290 HWP:
MTAG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: ASIS/ENGRi
FAC CHG:
RESP CD: MO
EST START: 000000
DATE COMPLETE: 101990
RC ESTHR ACTHR RC ESTHR
IS 160
60
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHF
JOE DETAIL:
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: I CL YR: 90 DATE ENTR: 101990 LAST ACT: N DATE 102490
005543
NAME:NUMBER:PAGER:
*** WORK REQUEST ***
WORK REQ NO: OOH23792 ORIG WR: 00272619
APPROVED BY: R.GECK
DIV/LOC: 500510 ACCOUNT: 260940 INDX:
1ST ORDER:
2ND ORD:
PR: B OR:
WCAT: SC RW CD:
RW RS:
DESC: REMOVE ASBESTOS SIDING
ELD/UNIT:WFLD. AR: CH WK TP: 8 WANTED: 053090 RECNO:
PROPNO:
REQ BY: LOWMAN
C&P:
WRITTEN: 010990 HWP: Y MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 052190
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 2190
2230
JOE DETAIL: REMOVE THE TRANSITE SIDING ON THE GLYCOL LOADING RACK SHELTER ON RACK #1, AND ON THE OPERATORS' SHELTER ON THE GROUND NEAR THE LOW PIPE RACK. PLEASE CO-ORDINATE WITH THE CARPENTER'S SHOP SO THAT RE-SIDING WILL OCCUR IMMEDIATELY AFTER OLD SIDING IS REMOVED.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
_
0 YTD MAT*:
IND: J CL YR: 90 DATE ENTR: 011090 LAST ACT: N DATE: 061690
._
0
005544
NAME:
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H23983 ORIG WR: 00290904
APPROVED BY: R.GECK
DIV/LOC: 500510 ACCOUNT: 292700 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: S5 WCAT:
RW CD:
RW RS:
DESC: CLEAN GASKETS ON TKS. 904,903
ELD/UNIT:WFLD. AR: CH WK TP: 8 WANTED: 041690 RECNO:
PROPNO:
REQ BY: J.MCADAMS
C&P:
WRITTEN: 041690 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG ?
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START : 000000
DATE COMPLETE: 043090
RC ESTHR IS 160
ACTHR RC ESTHR 20
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
JOE DETAIL: PLEASE CLEAN GASKETS ON MANWAYS TANK 904 & 903.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND :: J CL YR: 90 DATE ENTR: 041790 LAST ACT: N DATE: 050190
005545
NAME:
NUMBER:
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H24201 ORIG WR: 00141013
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 094100 INDX:
1ST ORDER:
END ORD:
PR: D OR: DS WCAT: RP Rw CD:
RW RS:
DESC: BULK PRIMARY BINS
BLD/UNIT:HPF-1 AR: PL WK TP: 8 WANTED : 033190 REGNO:
PROPNO :
REQ BY: D.SHAIN
C&P:
WRITTEN: 113089 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 051190
RC ESTHR IS 1800
ACTHR RC ESTHR
80 TD
00
ACTHR RC ESTHR 60
ACTHR RC ESTHR
ACTH
JOB DETAIL: FURNISH SCAFFOLDING, EQUIPMENT,LABOR, SUPERVISION & SAFETY INSPEC
TION TO:DEMOLISH GYPSUM/ASBESTOS/BUILT-UP ROOF DECKING AROUND BASE
OF BINS PER ATTACHED SKETCHES. USES DOUBLE-WRAP POLY BAGS FOR ASB
ESTOS. S/B BIN BASE RING. STIFFENERS, STRUCTURAL STEEL BEAM AND
GUSSETS TO FACILITATE INSPECTION.RECOAT BL
DELIVER TO: ASTED AREAS PCM 201.
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
..
0
IND: J CL YR: 89 DATE ENTR: 121289 LAST ACT: N DATE: 070490
005546
NAME
_______________________ NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H25368 ORIG WR: 00119500
APPROVED BY: UTH
DIV/LOC: 500510 ACCOUNT: 025200 1NDX:
1ST ORDER:
2ND ORD:
FR: B OR: JB WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNIT:OLFUR AR: OL WK TP: S WANTED: 090690 RECNO:
PROPNO:
REQ BY: J.BAUER
C&P:
WRITTEN: 090590 HWP: Y MTAG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS*ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START: 000000
DATE COMPLETE: 091290
RC ESTHR IS 160
ACTHR RC ESTHR 60
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHF
JOB DETAIL: REMOVE ASBESTOS GASKETS
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 90 DATE ENTR090690 LAST ACT: N DATE: 091490
005547
NAME
_______________________ NUMBER *** WORK REQUEST ***
PAGER:
WORK REQ NO: 00H25369 ORIG WR: 00119587
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: JB WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNIT:OLFUR AR: OL WK TP: 8 WANTED: 092190 RECNO:
PROPNO:
REQ BY: J.BAUER
C&P:
WRITTEN: 091890 HWP: Y MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 092490
RC ESTHR IS 160
ACTHR RC ESTHR
120
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH-
JOE DETAIL: REMOVE ASBESTOS GASKETS
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB*
0 YTD MAT*:
IND: J CL YR: 90 DATE ENTR: 091990 LAST ACT: N DATE 092790
005548
NAME:
NUMBER :
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H25435 ORIG WR: 00H24067
APPROVED BY: TESCH
DIV/LOC: SOOSIO ACCOUNT: 008170 INDX:
1ST ORDER:
2ND ORD:
PR: A OR: 08 WCAT: EP RW CD:
RW RS:
DESC: ASBESTOS GASKET REMOVAL
BLD/UNIT: 147 AR: SH WK TP: 8 WANTED: 092989 RECNO:
PROPNO:
REQ BY: FOLHAR
C&P:
WRITTEN: 101089 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 103089
RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
IS 160
40
JOB DETAIL: PLEASE REMOVE ASBESTOS GSKET FROM OUTLET FLANGE OF SAFETY VALVE.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD Q/T:
0 YTD LAB*:
0 YTD MAT*:
IND: I CL YR: 89 DATE ENTR: 101089 LAST ACT: N DATE: 103189
0
005549
NAME '
NUMBER:
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H26917 ORIG WR: 00116400
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 025100 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 UCAT: US RU CD:
RU RS:
DESC: SCRAPE ASBESTOS GASKET
BLD/UNIT:B-500 AR: OL WK TP: 4 WANTED: 113089 RECNO:
PROPNO:
REQ BY: NEILL
C&P:
WRITTEN: 112889 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 112989
RC ESTHR IS 160
ACTHR RC ESTHR 110
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
JOB DETAIL: NO ENTRY
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 112989 LAST ACT: N DATE: 120589
005550
NAME:
NUMBER:
FAGER:
*** WORK REQUEST ***
WORK REQ NO: OOH27001 ORIG WR: 00119900
APPROVED BY: JMOORE
DIV/LOC: 500S10 ACCOUNT: 025500 INDX:
1ST ORDER:
2ND ORD:
PR: A OR: 18 WCAT: US RW CD:
RW RS:
DESC: REMOVE ASBESTOS INSUL. ON S/G
ELD/UNIT : #2GAS AR: OL WK TP: 8 WANTED : 121389 RECNQ:
PRQPNQ:
REQ BY: HODGES
C&P :
WRITTEN: 121389 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG '
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 122089
RC ESTHR IS 160
ACTHR RC ESTHR
80 PA
00
ACTHR RC ESTHR 340
ACTHR RC ESTHR
AC THf
JOB DETAIL: REMOVE ASBESOTS INSULATION ON SIGHT GLASS.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 121489 LAST ACT: N DATE: 122189
005551
NAME'.NUMBER'.PAGER'-
*** WORK REQUEST ***
WORK REQ NO; 00H27031 ORIG WR: 00119500
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT'. 025200 INDX:
1ST ORDER;
2ND ORD:
PR'. C OR; 18 WCAT'- US RW CD:
RW RS:
DESC: CK VALVE VD UNIT
BLD/UNIT: #2GAS AR: OL WK TP; 8 WANTED: 122989 RECNO:
PROPNO'-
REQ BY'. HODGES
C&P:
WRITTEN'. 122989 HWP:
MTAG:
SLIPBL-'
SERV: STATUS'. X PLANNER
DWG ATTCH: PLAN CD
SPECS'. ASIS/ENGR:
FAC CHG:
RESP CD! MO
EST START: 000000
DATE COMPLETE: 010390
RC ESTHR IS 160
ACTHR RC ESTHR 40
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
JOB DETAIL: SCRAPE ASBESTOS GASKET 3" CK VALVE
DELIVER TO;
PHONE '.
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*
0 YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 122989 LAST ACT: N DATE 010590
005552
NAME:NUMBER:PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H27068 ORIG WR: 00130970
APPROVED BY: JMOORE
DIV/LOC: 500310 ACCOUNT: 039520 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 18 WCAT: US RW CD:
RW RS:
DESC: ASBESTOS REMOVAL FLARE TOWER
BLD/UNIT:ttlGAS AR: OL WK TP: 8 WANTED: 011090 RECNO:
PROPNO:
REQ BY: HODGES
C?<P:
WRITTEN: 010990 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS'- X PLANNER DATE COMPLETE: 011690
PLAN CD
ASIS/ENGR:
EST START: 000000
RC ESTHR IS 160
ACTHR RC ESTHR 60
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
JOE DETAIL: REMOVE ASBESTOS INSULATION FROM PIPE ft FLARE TOWER.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*
0 YTD MAT*
IND: J CL YR: 90 DATE ENTR: 011090 LAST ACT: N DATE 011890
0
005553
NAME :
NUMBER:
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H27088 ORIG WR: 00119537
APPROVED BY:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: J8 WCAT: US RW CD:
RU RS:
DESC: REMOVE ASBESTOS GASKETS
BLD/UNIT:OLFUR AR: OL WK TP: 8 WANTED: 030890 RECNO:
PROPNO:
REQ BY: J.BAUER
C&P:
WRITTEN: 030890 HWP: Y MTAG: N SLIPBL: Y
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: ASIS/ENGR:
FAC CHG:
RESP CDi MO
EST START: 000000
DATE COMPLETE: 031490
RC ESTHR IS 160
ACTHR RC ESTHR 60
ACTHR RC ESTHR
ACTHR RC ESTHR
AC TH
JOB DETAIL: REMOVE ASBESTOS GASKET FROM PIPE.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
0 YTD 0/T:
0 YTD LAB*:
0 YTD MAT*:
IND: J CL YR: 90 DATE ENTR: 031090 LAST ACT: N DATE: 031590
005554
NAME'-
NUMBER
PAGER:
*** WORK REQUEST ***
WORK REQ NO: 00H2S056 ORIG WR: 00H39722
APPROVED BY: WTH
DIV/LOC: 500510 ACCOUNT: 220040 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: M2 WCAT: RP RW CD:
RW RS:
DESC: REMOVE ASBESTOS GAXKETS
BLD/UNIT: NF AR:
WK TP: 8 WANTED: 122889 RECNO:
PROPNO'-
REQ BY: MIDDAUGH
C&P:
WRITTEN: 122889 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS'. X PLANNER
PLAN CD
ASIS/ENGR:
EST START : 000000
DATE COMPLETE: 010390
RC ESTHR IS 160
ACTHR RC ESTHR 80
ACTHR RC ESTHR
ACTHR RC ESTHR
ACTH
JOB DETAIL: PLEASE REMOVE ASBESTOS GASKETS ON 3" DRINKING WATER LINE
DELIVER TO:
PHONE :
YTD TOTAL HRS: IND: I CL YR: 89
0 YTD 0/T: DATE ENTR: 122889
0 YTD LAB*:
0 YTD MAT*:
LAST ACT: N DATE: 010590
0
005555
NAME:NUMBER:PAGER:
*#* WORK REQUEST #**
WORK REQ NO: 00H28059 ORIG UR: 00H25582
APPROVED BY: DAN
DIV/LOC: 500510 ACCOUNT: 004310 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: 29 WCAT: SC RW CD:
RW RS:
DESC: REMOVE INSULATION
ELD/UNIT:ENSYS AR: OL WK TP: 4 WANTED: 011290 RECNO:
PROPNO:
REQ BY: HAIRELL
C&P:
WRITTEN: 011090 HWP:
MTAG:
SLIPBL:
SERV: STATUS: X PLANNER
DWG ATTCH: PLAN CD
SPECS: ASIS/ENGR:
FAC CHG:
RESP CD: MO
EST START : 000000
DATE COMPLETE: 011690
RC ESTHR IS 160
ACTHR RC ESTHR 80
ACTHR RC ESTHR
ACTHR RC ESTHR
A C T Hc
JOB DETAIL: REMOVE INSULATION
DELIVER TO:
PHONE :
YTD TOTAL HRS: IND: I CL YR: 90
0 YTD 0/T: DATE ENTR: 011090
0 YTD LAB*:
0 YTD MAT*
LAST ACT: N DATE: 011890
005556
NAME
NUMBER
PAGER'-
*** WORK REQUEST ***
WORK REQ NO: OOH28204 ORIG WR: 00119528
APPROVED BY:
DIV/LOC: 500510 ACCOUNT: 025200 INDX:
1ST ORDER:
2ND ORD:
PR: B OR: KB WCAT: US RU CD:
RW RS:
DESC: REMOVE ASBESTOS CASKETS
BLD/UNIT:
AR: OL WK TP: 8 WANTED: 092589 RECNO:
PROPNO:
REQ BY: J.BAUER
CS.P:
WRITTEN: 092589 HWP:
MTAG:
SLIPBL:
SERV:
DWG ATTCH:
SPECS:
FAC CHG:
RESP CD: MO
STATUS: X PLANNER
PLAN CD
ASIS/ENGR:
EST START: 000000
DATE COMPLETE: 100389
RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHR RC ESTHR ACTHF
IS 160
15
JOB DETAIL'- REMOVE ASBESTOS GASKETS #8 FURNACE.
DELIVER TO:
PHONE :
YTD TOTAL HRS:
YTD 0/T:
0 YTD LAB*:
YTD MAT*:
IND: J CL YR: 89 DATE ENTR: 092789 LAST ACT: N DATE: 100689
005557