Document 6Rv0BVyqaYDLqE83DJE2pOVVd

ETHYL CORPORATION PETROLEUM CHEMICALS GROUP BATON ROUGE PLANT PLEASE ADDRESS REPLY TO; BOX 341 BATON ROUGE, LA, 70621 TO: Permanent Representatives of the Vinyl Chloride Safety Association The time for the next Vinyl Chloride Safety Association meeting is near. The attached agenda reflects the membership response to the questionnaire sent earlier and should provide a very interesting, informative and valuable meeting. You will note that there are three (3) slots on the program for presentation of an industry-wide response to questionnaires. These question naires are attached. Please complete as soon as possible and send to the address listed on the bottom of each questionnaire or bring the information to the New Orleans meeting. There is concern that all who plan to attend have not made reservations and may have difficulty making last minute arrangements. The meeting will be held in New Orleans, Louisiana, October 20 and 21 at the Marriott Hotel. You should plan to arrive Wednesday, October 19. Make reservations directly with the hotel. Write or call: New Orleans Marriott 555 Canal Street New Orleans, Louisiana 70140 (504) 581-1000 To reduce the early morning registration rush, a preregistration time will be available from 6:00 p.m. - 7:00 p.m., October 19, 1983. As permanent representative, please distribute copies of the agenda to all who plan to attend the meeting from your company. I look forward to seeing you in New Orleans. HG0:isd 9/7/83 H. G. Olson, Secretary Vinyl Chloride Safety Association OCC 4544 VINYL CHLORIDE SAFETY ASSOCIATION MEETING October 20-21, 1983 New Orleans, Louisiana October 20, 1983 Tine Subject Discussion Leader 8:00-8:30 a .m. Registration and Coffee 8:30-10:00 a.m. OLD CASE HISTORIES Thompson Chemical Explosion 1964 (Group discussion on practices with sight glasses) J. T. Barr -- Air Products Hooker Burlington Plant Fire 1968 J. A. King Occidental Chemical Goodyear Plaquemlne Plant Fire 1972 (Results of Corrective Action Taken to Prevents Recurrence) C. D. Langlois BFGoodrich Chemical Over-Pressurization of a PVC . Reactor P. Rangnes -- Norsk Hydro Oxichlorination Explosion B. Reynolds -- PPG BFGoodrich Altona Sphere Release (Update of revisions made with VCM storage) H. Waltemate BFGoodrich Chemical 10:30-10:45 a.m. Coffee Break 10:45-12:00 p.m. CURRENT CASE HISTORIES . Formosa Plastics' Baton Rouge VCM Tank Car Loading Fire July 30, 1983 W. Hager Formosa Plastics Bursting of a Resin Hopper Truck J. Wallace Esso Chemical Rupture of a VCM line Esso Chemical J. Wallace - VCM Loading Pump Housing Failure L. White PPG Conoco*s 1982 VCM Tank Car Derailment and Clean-up in Texas D. Ashby Conoco Other Current Case Histories Group OCC 4545 2- - October 20, 1983 (Cont'd) Time Subject Discussion Leader 12:00-1:30 p.m. Lunch Vinyl Institute Roy T. Gottesman Vinyl Institute 1:30-3:00 p.m. HEALTH Angio Sarcoma Update J. T. Barr Air Products Similarities of Plants with Multiple J. T. Barr - Cases of Angio Sarcoma(Group Air Products discussion) M. N. Johnson - BFGoodrich Chemical PVC Dust J. T. Vaughan ICI 3:00-3:15 p.m. Coffee Break 3:15-4:30 p.m. SAFETY EQUIPMENT Area Monitoring System, Leak . M. Nevill - Detectors and Personnel Monitoring Dow Chemical Equipment Valve Position Indicator Switches (Response toquestionnaire) J. H. McCulley Conoco OCC 4546 October 21, 1983 Time Subject Discussion leader 8:00-8:30 a.m Business Meeting -Election of Officers -Selection of 1984 Meeting Site -Vinyl Institute and Interaction with VCSA 8:30-9:30 a.m SAFETY PROGRAMS Safety Performance Assessment J. T. Vaughan ICI Plant Evacuation - Planning and Training T. M. Jones BFGoodrich Chemical 9:30-10:00 a.m PROCESS SAFETY Controlling Runaway Reactions and Emergency Power (Results of questionnaire) M. J. Bate Esso Chemical A. Peterson Georgia-Pacific 10:00-10:15 a. m. Coffee Break 10:15-12:00 p. . ENVIRONMENTAL - REGULATORY Handling VCM Waste from Small Pilot J. Wallace - Plants (Results of questionnaire) Esso Chemical Update on EPA-0SHA Court Action (Group discussion) W. C. Holbrook -- BFGoodrich Chemical Regulatory Update W. C. Holbrook BFGoodrich Chemical 12:00-2:00 p.m LUNCH Livingston, Louisiana Sept. 28, 1983 Captain W. T. Poe - Derailment Involving Seven Tank Louisiana State Cars of VCM Police 3509q/kp 9/1/83 Adjourn OCC 4547 VINYL CHLORIDE SAFETY ASSOCIATION 1983 MEETING Run-Away Reaction Control Questionaire 1. Guidelines for response: a) Please enter the point at which initial action is taken for each of the following occurrences during a run-away. (N/A implies that no action is taken far this occurence.) (i) (ii) (iii) Reaction reachesC above set temperature. Reaction reaches______psig above set pressure. Others __________________ __________ b) Is the response to the above situations automatic? (Y/N) 2. Causes? a) Please identify the three major causes (in order) of run-away batches: Charge error ____ Mechanical failure ____ Instrument failure ____ Agitation loss ____ Loss of cooling . ____ ' Formulation ____ Others: 3. Control techniques: a) Please indicate the order in which the following techniques are applied during a run-away (assuming previous steps were unsuccessful): Increase reactor cooling Add liquid-phase inhibitor Add vapour-phase inhibitor Dump a portion of the batch Vent to recovery system Vent to atmosphere Others: ____ ____ ____ ____ ____ ____ ___/2 occ 4548 -2- \ 3. Control Techniques: (Continued) b) If an inhibitor is used: i) ii) iii) Does it control the reaction or Kill it? How many discrete inhibitor injection systems are available? How is the inhibitor injected? Gravity Pump N2 pressure .Other (specify) c) Does the point at Which the reaction runs away affect the control technique? If so, how? d) Are you completely satisfied with your inhibitor system, or would you like to see improvement? e) What areas would you like to see improved? 1) Reliability 2) Operability 3) Toxicity 4) Product usability 5) Other reasons and comments ' ________ ________ ________ 4. Power supply: a) How often is plant power interrupted, on average, per year resulting in loss of agitation? ________(times/yr) b) If an extended power failure is experienced, how is agitation restored in order to disperse an inhibitor? (If used): i) ii) iii) iv) Back-up power supply Short, fast venting (ie burping) Other: ________________________________ Reactor size ________ ________ ________ /3 OCC 4549 -3- 4. Power supply: (Continued) c) If a back-up power supply is available for agitation: i) What type is it? (ie. steam, electrical, other) ii) What percentage of normal agitation speed does it supply? d) Are you completely satisfied with your back-up agitation system, or would you like to see improvement? What improvement would you like to see? ________(%) ________ 5. Frequency of use: a) How many batches per year result in run-aways Where some action is required? b) What percentage of the above number of batches result in environmental emissions of VCM? ________ _______(%) Please send response by October 14, 1983 to: Mr. M.J. Bate Esso Chemical Canada Technology Plastics Technology Centre 480 South Christina Street Sarnia, Ontario Canada N7T 2P1 Or bring response to meeting in New Orleans. M.J. Bate/jcd 0063J/jrw OCC 4550 VINYL CHLORIDE SAFETY ASSOCIATION 1983 MEETING -Small Pilot Reactor Environmental Questionalre This study is aimed to evaluating sound, safe practices far residual monomer disposal from small pilot reactors, i.e., those up to 50 U.S. gallons (0.19 cu.m) Which are not covered by the U.S. EPA National Omission Standard. 1. Do you have pilot reactors less than 50 gallons? _______ 2. Are these coupled into the plant VCM recovery system? _______ 3. If not coupled to plant, is this because of A. Remote location B. Safety concerns C. Other reasons 4. A. B. C. D. Do you vent to atmosphere. If so, how high a stack. Do you take any measures to disperse the mranrer during venting. Have you any details of ground level concentrations during venting. 5. Do you treat the vented monomer by A. Ldquification by compression. B. Liquification by cooling. C. Carbon absorption. D. Liquid absorption. E. Flaring. F. Incineration and scrubbing. G. Catalytic destruction. H. Ary other method. 6. If absorbing do you A. Desorb and recover the monomer in situ. B. Move the absorbent to a treatment site. C. Treat the absorbent in another way. m f/2 OCC 4551 2- 7. Please comment on the safety, effectiveness and/or problems with your procedure. 8. Are there any local regulations covering this type of experimental equipment and/or emissions. 9. Plant location. Please return completed guestionaires by October 14th to: Mr. J.R. Wallace Esso Chemical Canada Plastics Technology Centre 480 South Christina Street Sarnia, Ontario Canada N7T 2P1 Or bring response to meeting in New Orleans. J.R. Vfallace/jcd 0063J/jrw OCC 4552 VALVE POSITION SWITCH SURVEY FORM Note: Please fill out a separate survey form for each type of indicator. Type of Indicator: _______ Electromagnetic Limit Switch _____ Inductive Proximity Switch (e.g. metal sensing) _______ Capacitance Proximity Switch (e.g. anymaterial) _______ Hall Effect Proximity Switch (e.g. magneticsensing) _______ Photoelectric Position Switch (e.g. infrared) _____ Potentiometer Displacement Sensor , ______ Optical Encode Displacement Sensor ______ Other (explain): Manufacturer(s): Model Number(s) (if known): Number of switches of this type: 1-5 _______ 6-20 _______ 21+ Typical number of operating cycles of these switches: per day _______per week _______per month _______per year Reliability of Position Switch (mean time between failure): _______Months _______Years Cause of Failure (e.g. bent indicator arm, slipped magnet., water in switch, shifting of switch by vibration, mechanical damage by personnel, other). Please list by frequency of occurrence: Maintenance Performed (e.g. alignment, replacement, wiring): Unusual Ambient Conditions (if applicable): Vibration Other: _______High/Low Temperatures Comments on Performance (e.g. good, poor): _____________ Please return completed questionnaire as soon as possible to: John H. McCulley, Jr., Conoco, Inc., Drawer 1267 Ponca City, OK 74603 - Or bring response to the meeting in New Orleans. Accn OCC 4553