Document 6Rjdmg3Z7E7RMkRL19gRQ3EQ6
rr
Goodrich Chemical Company
Inter-Organization Correspondence
To H. T. Evans
From
J. W. Gressler
Location Pedricktown
Location
Pedricktown
Department
Department
SAFETY INSPECTION - BUREAU OF ENGINEERING AND SAFETY, Subject N. J. DEPARTMENT OF LABOR AND INDUSTRY
Date
January 11, 1971
This morning the Pedricktown Plant was inspected by Mr, Leon Johnson and Mr. Fred Antheil from the New Jersey Department of Labor and Industry. Noise level samples were/taken in two areas, Building 521 (Boiler House) and Building 513 (Pearl-Paste Polymerization). Mr. Antheil conducted the tests. He .used a General Radio Sound-Level Meter, Type 1565A, on the A scale. Listed below are the results:
Building 521 (Boiler House ,
Area Sampled
Reading dBA
1. At operator's desk 2. At lab testing table 3. At boiler feed pumps 4. Inside of phone booth 5. Inside of restroom (door open) 6. Inside of restroom (doorclosed) 7. Front of east boiler
87 89 90 73 80 75 87
Building 513 (Pearl-Paste Polymerization)
Area Sampled
' Reading dBA
1. Center, first floor 2. Control panel at southdoor, first floor 3. At paste spray ring water collection tank, west
wall, first floor 4. Pearl side, first floor,west side 5. While bottom Yarway valve was opening on the
first floor
86 85
87 86
98
This inspection was limited to sound-level readings.
JWG/rp
cc:
A. R. Webber D. L. Dowe11 W. E, McCormick W. L. Cato File
J. W. Gressler
is: a K
a 3
61 ^
Harold Evans Akron
Pedriektown Plant Dept, 0020 - Bldg. 5-H
1/8/71
As I discussed with you on the 'phone last week, we are shipping Immediately the x-ray equipment to your Plant to do hand x-rays be ginning January 20. Mrs. Bender* our x-ray technician* will arrive the evening before and you are reserving a room for her at Howard Johnsons for the 19th and 20th.
We are also sending to you* twenty blood and urine containers for personnel handling lead. We would like to have repeat specimens on Messrs. Neff* Draybold* and Pfeffer as soon as possible.
As I told you on the 'phone, you will need a small centrifuge to pre pare the blood serum for liver function tests. We suggest Model #S-16220 listed In the Sargent-Welch catalogue* at a price of $172. The procedure is for your nurse to draw the blood, then centrifuge it and send to us only the serum. She will need to draw a minimum of 10 ml.* inasmuch as we need at least 3 ml. of serum. We will send to you small tubes for the serum and these should be returned to us, packed in dry Ice, by airmail parcel post. Sometime within the next week we will ship to you the container and the tubes for the transmittal of the serum to us.
I would like to have you advise me approximately a week In advance of the date of your shipment of the serum to us so that we may properly alert our laboratory to expect them.
W. E. McCormick
mj
26180001
BFG46715
) )
Report of Visit to the Pedricktown Plant November 19 & 20, 1970
This visit to the Pedricktown Plant was made primarily to evaluate atmospheric vinyl chloride concentrations in PSG reactors daring cleaning operations. Noise evaluations were also performed throughout the Plant, The exhaust efficiency of laboratory hoods was appraised.
I. Recommendations t
A. Personnel working at the bagger and bag compressor in the Drier Building should be placed on the Plant's Hearing Conservation .Program. This will include preassignment and periodic audiometric examination of personnel and enforced wearing of ear protection on the job. Provisions of The B. F. Goodrich Company's Medical Bulletin No. 34 should be followed in all essential detail.
B. Make certain that all personnel working with raw sewer water and sewage are adequately protected in accordance with The B. F. Goodrich Company's Medical Bulletin No. 41.
11. Results and Discussion:
A. Vinyl Chloride in PSG Reactors
As part of a continuing program for evaluating atmospheric vinyl chloride concentrations in polymerizers, air samples were obtained in two PSG reactors prior to and during manned entry for cleaning.
Samples were collected in Vacutainer tubes and analyzed by Mr. E. G. DeCapita and Mr. D. P, O'Keefe on the Plant's F & M 700 chromatograph. A separate report has been prepared and distributed by Mr. DeCapita covering the analysis of the samples (12-14-70).
This preliminary evaluation of PSG atmospheres indicates no major or acute hazard exists to personnel from atmospheric vinyl chloride exposure during the defining operation.
The recommended maximum vinyl chloride concentration of 200 ppm was considerably above the majority of all concentrations measured in the reactors. One sample from Reactor 83, collected near the manhole 30 minutes after opening, showed a vinyl chloride concentration of 222 ppmj a second sample from this reactor collected at the same location 15 minutes after entering showed a concentration of 755 ppm* Little credence is given to the last concentration value of 755 ppm. Vinyl chloride concentration at this sampling site under the prevailing physical conditions would normally be expected to decrease rather than increase. The apparent discrepancy is attributed to sampling or analytical error.
BFG46716
26181001
-2-
A third sample showing a high concentration of vinyl chloride (755 ppm) was obtained after a second run in Reactor 83 on the following day. This sample was collected at the lower outlet of the reactor
immediately after opening of the reactor. There is no reason to doubt the validity of this result. Though it is somewhat high, it does not represent a personnel exposure condition during the cleaning operation.
The remaining thirteen samples from PSG reactors were all less than 200 ppm vinyl chloride (range 188-8 ppm). This concentration range of vinyl chloride presents no inhalation health hazard to personnel who must enter the reactors for cleaning purposes.
Further work is planned in the vinyl chloride evaluation program ^throughout the Chemical Company and additional measurements of PSG reactor atmospheres will be scheduled.
B. Noise
Three noise hazardous areas within the Plant were designated the May Plant visit report. One additional area has been identified as noise hazardous during the present visit) this the bagger and bag compressor area in the Drier Building.
In is
In the Mass Poly Building, there is excessive noise within the office during the pneumatic conveying of product. Conversation and telephone usage is difficult. The condition can be corrected by covering the conveying trench in the floor of the office. It is suggested that this be done.
During the time of this visit the paste side of the Drier Building was down and only the resin side was operating. Additional noise measurements should be performed throughout the building when all normal equipment is operating.
The Latex Building was also down. A noise survey should be performed of this facility when it is operating.
26181002
The second floor of the Drier Building is potentially a noise hazardous area, but it is normally unoccupied.
The remaining high noise areas shown in the Table (Second floor. Suspension and Paste Poly Building) Bagger station. Compounding Building) were identified in the May report.
C. Laboratory Hoods
Fume hoods in the quality control laboratory are of a bypass design to conserve conditioned air in the laboratory. There was concern among laboratory personnel as to the exhaust efficiency of these hoods. Face velocity at the hoods is an ineffective measure of
BFG46717
3
exhaust capability of these hoods since outside air is circulated through the hood to make up total exhaust flow. A velocity traverse was made from the roof of the building on the exhaust opening from ona of the hoods. This opening measured 10.5" X 10.5" (0.77 ft.and the average exhaust velocity (9 point traverse) was 990 ft. min." . This is equivalent to a volume flow of 762 ft. rain."^ from the hood.
The open face of the hood in the laboratory is 28" X 35" (6.8 t.^). With a volume flow from the roof exhaust of 762 ft. /min., there would be an equivalent face velocity at the hood opening of 112 ft./min. This is a satisfactory value for handling all but the most toxic materials (TLVis5 ppm).
mm 1-5-71
R. W. Hodrell
V,
26181003
TABLE I
Padricktown Plane Noise Levels
Location
Suspension A Paste Poly Building First Floor Second Floor
Mass Poly Building Production Area Office, during conveying of product intermittent peaks to
Compounding Building Bagger Station (North) Near Mills (South of Cuber^Enclosure)
Drier Building First Floor, overall average near operator's desk bagger & bag compressor area (paste side) Second Floor, near Rotex screener near centrifuge
Noise, dbA
89-90 91-92
88-90 86-88
96
91-92 89-90
85-86 83
103 90
90-91