Document 6Rg9eErRmVNaa98ObnZv0ddBR

SOLV/EDC & CMP PLANT NOTIFICATION OF PROCESS CHANGE CHECKLIST Type: LEVEL 1 (minor) ^ LEVEL 2 (moderate) LEVEL 3 (major) Originator: CLARENCE BICKHAM Date of Origination: 04/29/97_________ Plant: Methanes Actual Date of Change: 4-30-97________________ Area: THERM_______________ Equipment: R-1300 Permanent Yes Temporary 0 Yes From: 4-30-97 To: 6-23-97 Description and Location of Change (Scope): CHANGE AP (1941) FROM 445 TO 440__________________________ Technical Basis for Change: TO LOWER CONTROL TEMPERATURE BASED ON PREVIOUS RUN CONDITIONS DUE TO FAILURE OF THE CONTROL THERMOCOUPLES Impact on: OSafety Loss Prevention Environment Health Quality 0Production Other: Type of Change: ^Alarm Shutdown Point Instrument ^Process Computer Control Addition/Removal of Equip. Piping Modification Equip./Material Modification Chemical Job Procedure No. ^Process Set Point Change Piping Spec. Other: | Pre-modification Checklist: Applicable Follow-up Applicable Applicable JApplicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable ^Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable ^Applicable JApplicable Written job scope and sketch of proposed change; POD# Project economics; attached. Consult piping and equipment specifications; Spec. # Comply with Engineering Practices. Consult Technology Center or comply with Tech. Ctr. guidelines. Equipment access/congestion considered. Consult Environmental function Environmental project checklist complete. Chemicals listed in the (TSCA) inventory before use. Perform Reactive Chemicals testing or review. Consult Safety function for compliance with S&LP and Block requirements Consult Process Safety for impact on PHA(F&EI, CEI, & Fire protection). State Fire Marshall notified. Consult Industrial Hygiene function Consult maintenance/Reliability Eng. Consult Instrument function. Consult Electrical function. Consult Analyzer function Consult/Inform Computer/Programming Support. Consult Area Engineer. Consult Operations. Consult Area Technologist Consult Inventory Management Consult Process Engineering. Evaluate and modify relief system. Work Order written. (List them) Consult Constmction/Small Projects Consult Site Logistics Consult Quality (Customer Notification ?) Other (Name them} Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes . ' 1 Date Page 1 of 4 RR 4/96 DOW CONFIDENTIAL INFORMA TION Document 1 DO A 075947 CONFIDENTIAL Date: 04/29/97 Date: 04/29/97 Date: 04/29/97 Post-modification Checklist: (BEFORE START-UP) Applicable Follow-up Signature Applicable Applicable Applicable Applicable Applicable Applicable ^Applicable Applicable Applicable Applicable Applicable Applicable Applicable jApplicable Applicable Applicable Applicable Applicable Perform prestartup audit: major equipment addition/mod. Lvl 3;attach. PSM files updated(such as piping circuits). Project list updated. Documented in Operating Discipline Library Completed Job Procedures reviewed by: Operations Safety Envir._________________________ ________ Emergency Procedures Training Aids (IPT, etc.) Controlled copies of Critical Oper. Procedures updated Safety/Environmental (cleaning, vessel entry, red tag) - Update plant Roundsheets, forms Plant equipment files updated. P&ID's, process flow sheets, and plot plans updated.,Personnel trained on the change. Method: Critical instrument checklist updated. Updated HAZCOM Manual & equip. List. Pressure vessels, PVRV's, & PRD registered. Instrument loops checked and documented. Field switches, equipment, & MCC starters checked & labeled. Log sheets/controlled forms updated. GPI flow diagram & history/EDAS updated. GEMTS, PPM, & MSMS updated. Mod V program change checklist completed. Equipment RTO Checklist completed. Follow-up action plan completed prior to Final Approval(attached). Yes Yes Yes Yes Yes Yes Yes Yes Yes ^ Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes DYes Yes Yes TTtd- Date APPROVAL: Final Approver: r/ / Date: <//?;//? \ Page 2 of 4 RR 4/96 DO W CONFIDENTIAL INFORMA TION Document 1 DO A 025948 CONFIDENTIAL Methanes MOC Training Signoff Sheet MOC TITLE: DATE: k the box next to the appropriate individual that the communication/training is intended to reach. <nEngmef5ig Staff '1 Signature 7TMr / izaie Taylor, D. Haney, J. Kelley, K. Storm, C. Hunt, L.C. Rolke, R.W. Stallcup, J.S. White, W.S. Young, Barry. 434501 091506 239424 / 249497 088600 097946 240558 434499 433620 Ml n/ Breaux, R. Beieler, B. Bickham, C.J. Cook, F. Cavalier, N. Grant, W.C. Gravouilla, D.C. Jackson, R. Metrejean, D.J. Harrison, W. 433793 281334 432411 431977 241889 432637 434255 hit 4\f^A 433457 241773 /V- 096480 Day Personnel Master # V signature lT>ate 1 Michel, A. Cook, J. Dugas, D. Brown, MS. Rizzo, G. Johnson, J. Donatto, B. n Carrier, B.P. Witt, J. Vavasseur, T. Landry, C.P. 432203 433658 432407 433928 432580 432541 434031 085908 241996 434160 434292 Bishop, C.E. Bourg, J. Davis, C. Ekey, J. Jack, O.J. Looney, R. Wolfe, D. Millender, R. Signature / 432026 /7 094487/ 433015/ 202669 \ 094373 276854 246186 OH- h- *17 v 432751 Von V. H3t 9- t33 `idhl-7 W Rate,, *rl> ` 4i m wn shiti r_, Site Logistics " Clebert, J. Mathis, J. Simonson, F. Armond, N.L. Doucet, K Master#' :`^Si^'^"'"rT3Ste"T 432385 432997 432477 098664 432056 Page 4 of 4 RR 4/96 DOW CONFIDENTIAL INFORMA TION Document I DO A 025949 CONFIDENTS Aioc^ fit* 0 Attlfn) ~L? *v i CL (p >(Jr cA. -- y Az>Gn) -i <^-- - 7 i^z*`-'<. cU* C 7^At &/? 7 /l &/23/?7 ,4*y?(cJr^ y/y (? 2"" t-v /<- (jrA y (l t by \ DO A 025950 CONFTOFNTIAL Review & Initial : SUBJECT CHLORINATED METHANE PRODUCTS COMMUNIQUE' = QmL Z9, ,m'i_ DATE FROMi: (l$lL, /fail6 (2c This form is used to insure the attached information is communicated to the appropriate plant personnel. INITIATOR: Place a check mark by the group(s) needing to review. (PLOYEE: Please initial and date when you have reviewed and understood the material. Day Staff PERSONS NEEDINO TO REVIEW ; Coaches X SOS's X OS's Loaders Init. Date Cookj^L i2tS Breaux nit- Hate. Init. ishop ___ Dugas r/y Beieler f^/Z, Bourg Day Oper. Bickham CookF. jrC^ Davis Ci Ekey Date Init. Date Armand Doucet Instruments Cavalier Init. Date \ Grant Gravouilla Jackson ^ Harrison Jack ooney Wolfe ffl/t/ Init. Date Neyland_______ Shanklin--____ Metrejean .. sh Vlillender DO A 0?5951 CONFIDENTIAL Cook, James Fr m: Sent: To: Subject: Cook, James Tuesday, April 29,1997 2:48 PM Beieler, B; Bickham, Clarence; Bishop, Cecil; Bourg, Jason; Breaux, Richard; Cavalier, Neal; Cook, Frederick; Davis, Clarence; Donatto, Brian; Dugas, Donnie; Ekey, John; Grant, William; Gravouilla, Dale; Harrison, Donald; Jack, Oliver; Jackson, Russell; Johnson, Jimmy; Looney, R; Metrejean, Darren; Michel, Adam; Millender, Ronald; Wolfe, Dennis; Clebert, Julie; Haney, Jim; Hunt, Laurie; Kelley, Kevin; Rizzo, Gary; Rolke, Richard; Storm, Colleen; Taylor, Don; Young, Barry R-1300 Temperature Control The outlet temperature has been manually selected as the control point ((AK(175) = 5)) on R-1300. This is due to the probable failure of the east Thermowell. The west one has already failed and been placed in manual. In order to control the reactor at the proper temperature, AP(1941) had to be lowered. This is AK(101) low limit temperature setpoint which normally controls a point somewhere in the bed. The value was 445 and it was lowered to 440. Some tuning was done to help with the swing that started on the outlet was selected. With the 3 outlet Al's being used for temperature control, we may be susceptible to a rainstorm now. The average bed temperature will probably come on as we lower the control setpoint or the bed temperature Al's begin to fail. Only the 3 outlet temperature Al's can shut you down on low temperature. Work is under way to fabricate a thermowell at this time. Please sign the Communique Book once you have read this. Thanks, JRC Jt.t- > \ Page 1 DO A 075952 CONFIDENTIAL