Document 6Rg9eErRmVNaa98ObnZv0ddBR
SOLV/EDC & CMP PLANT NOTIFICATION OF PROCESS CHANGE CHECKLIST
Type: LEVEL 1 (minor) ^ LEVEL 2 (moderate) LEVEL 3 (major)
Originator: CLARENCE BICKHAM
Date of Origination: 04/29/97_________ Plant: Methanes
Actual Date of Change: 4-30-97________________ Area: THERM_______________ Equipment: R-1300
Permanent Yes Temporary 0 Yes From: 4-30-97 To:
6-23-97
Description and Location of Change (Scope): CHANGE AP (1941) FROM 445 TO 440__________________________
Technical Basis for Change: TO LOWER CONTROL TEMPERATURE BASED ON PREVIOUS RUN CONDITIONS DUE TO FAILURE OF THE CONTROL THERMOCOUPLES
Impact on: OSafety Loss Prevention Environment Health Quality 0Production Other:
Type of Change:
^Alarm Shutdown Point Instrument
^Process Computer Control Addition/Removal of Equip. Piping Modification
Equip./Material Modification Chemical Job Procedure No.
^Process Set Point Change Piping Spec. Other:
| Pre-modification Checklist: Applicable
Follow-up
Applicable Applicable JApplicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable ^Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable
^Applicable JApplicable
Written job scope and sketch of proposed change; POD# Project economics; attached. Consult piping and equipment specifications; Spec. # Comply with Engineering Practices. Consult Technology Center or comply with Tech. Ctr. guidelines. Equipment access/congestion considered. Consult Environmental function Environmental project checklist complete. Chemicals listed in the (TSCA) inventory before use. Perform Reactive Chemicals testing or review. Consult Safety function for compliance with S&LP and Block requirements Consult Process Safety for impact on PHA(F&EI, CEI, & Fire protection). State Fire Marshall notified. Consult Industrial Hygiene function Consult maintenance/Reliability Eng. Consult Instrument function. Consult Electrical function. Consult Analyzer function Consult/Inform Computer/Programming Support.
Consult Area Engineer. Consult Operations. Consult Area Technologist Consult Inventory Management Consult Process Engineering. Evaluate and modify relief system. Work Order written. (List them) Consult Constmction/Small Projects Consult Site Logistics Consult Quality (Customer Notification ?) Other (Name them}
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
. '
1 Date
Page 1 of 4 RR 4/96
DOW CONFIDENTIAL INFORMA TION
Document 1
DO A 075947 CONFIDENTIAL
Date: 04/29/97 Date: 04/29/97 Date: 04/29/97
Post-modification Checklist: (BEFORE START-UP) Applicable
Follow-up Signature
Applicable Applicable Applicable Applicable
Applicable Applicable ^Applicable Applicable Applicable Applicable Applicable Applicable Applicable jApplicable Applicable Applicable Applicable Applicable
Perform prestartup audit: major equipment addition/mod. Lvl 3;attach. PSM files updated(such as piping circuits). Project list updated. Documented in Operating Discipline Library
Completed Job Procedures reviewed by: Operations Safety Envir._________________________ ________ Emergency Procedures Training Aids (IPT, etc.) Controlled copies of Critical Oper. Procedures updated Safety/Environmental (cleaning, vessel entry, red tag) - Update plant Roundsheets, forms Plant equipment files updated. P&ID's, process flow sheets, and plot plans updated.,Personnel trained on the change. Method: Critical instrument checklist updated. Updated HAZCOM Manual & equip. List. Pressure vessels, PVRV's, & PRD registered. Instrument loops checked and documented. Field switches, equipment, & MCC starters checked & labeled. Log sheets/controlled forms updated. GPI flow diagram & history/EDAS updated. GEMTS, PPM, & MSMS updated. Mod V program change checklist completed. Equipment RTO Checklist completed. Follow-up action plan completed prior to Final Approval(attached).
Yes Yes Yes Yes
Yes Yes
Yes Yes Yes ^ Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Yes
DYes Yes Yes
TTtd-
Date
APPROVAL: Final Approver:
r/ /
Date: <//?;//?
\
Page 2 of 4 RR 4/96
DO W CONFIDENTIAL INFORMA TION
Document 1
DO A 025948 CONFIDENTIAL
Methanes MOC Training Signoff Sheet
MOC TITLE:
DATE:
k the box next to the appropriate individual that the communication/training is intended to reach.
<nEngmef5ig Staff
'1 Signature 7TMr / izaie
Taylor, D. Haney, J. Kelley, K. Storm, C. Hunt, L.C. Rolke, R.W. Stallcup, J.S. White, W.S.
Young, Barry.
434501 091506
239424 /
249497 088600 097946 240558 434499 433620
Ml n/
Breaux, R.
Beieler, B.
Bickham, C.J.
Cook, F.
Cavalier, N.
Grant, W.C. Gravouilla, D.C.
Jackson, R.
Metrejean, D.J. Harrison, W.
433793
281334
432411
431977
241889
432637
434255 hit 4\f^A
433457 241773
/V-
096480
Day Personnel Master # V signature lT>ate 1
Michel, A. Cook, J.
Dugas, D. Brown, MS. Rizzo, G. Johnson, J. Donatto, B.
n Carrier, B.P.
Witt, J.
Vavasseur, T. Landry, C.P.
432203 433658 432407 433928 432580 432541 434031 085908 241996 434160 434292
Bishop, C.E. Bourg, J. Davis, C. Ekey, J. Jack, O.J. Looney, R. Wolfe, D. Millender, R.
Signature /
432026 /7 094487/
433015/ 202669
\
094373
276854
246186 OH- h- *17 v 432751 Von
V.
H3t 9-
t33
`idhl-7
W
Rate,, *rl> `
4i m wn shiti
r_,
Site Logistics "
Clebert, J. Mathis, J. Simonson, F. Armond, N.L. Doucet, K
Master#' :`^Si^'^"'"rT3Ste"T 432385 432997 432477 098664 432056
Page 4 of 4 RR 4/96
DOW CONFIDENTIAL INFORMA TION
Document I
DO A 025949 CONFIDENTS
Aioc^
fit*
0
Attlfn)
~L?
*v i
CL
(p >(Jr
cA. -- y
Az>Gn)
-i <^--
-
7 i^z*`-'<.
cU* C 7^At
&/? 7
/l &/23/?7
,4*y?(cJr^ y/y (? 2""
t-v /<-
(jrA y (l t
by
\
DO A 025950 CONFTOFNTIAL
Review & Initial
:
SUBJECT
CHLORINATED METHANE PRODUCTS COMMUNIQUE'
= QmL Z9, ,m'i_ DATE
FROMi: (l$lL, /fail6
(2c
This form is used to insure the attached information is communicated to the appropriate plant personnel. INITIATOR: Place a check mark by the group(s) needing to review.
(PLOYEE: Please initial and date when you have reviewed and understood the material.
Day Staff
PERSONS NEEDINO TO REVIEW ;
Coaches
X
SOS's
X
OS's
Loaders
Init. Date
Cookj^L i2tS Breaux
nit- Hate.
Init.
ishop ___
Dugas
r/y Beieler f^/Z,
Bourg
Day Oper.
Bickham CookF. jrC^
Davis Ci Ekey
Date
Init. Date
Armand
Doucet
Instruments
Cavalier
Init. Date
\
Grant
Gravouilla
Jackson ^
Harrison Jack
ooney
Wolfe ffl/t/
Init. Date
Neyland_______ Shanklin--____
Metrejean .. sh Vlillender
DO A 0?5951 CONFIDENTIAL
Cook, James
Fr m:
Sent:
To:
Subject:
Cook, James Tuesday, April 29,1997 2:48 PM Beieler, B; Bickham, Clarence; Bishop, Cecil; Bourg, Jason; Breaux, Richard; Cavalier, Neal; Cook, Frederick; Davis, Clarence; Donatto, Brian; Dugas, Donnie; Ekey, John; Grant, William; Gravouilla, Dale; Harrison, Donald; Jack, Oliver; Jackson, Russell; Johnson, Jimmy; Looney, R; Metrejean, Darren; Michel, Adam; Millender, Ronald; Wolfe, Dennis; Clebert, Julie; Haney, Jim; Hunt, Laurie; Kelley, Kevin; Rizzo, Gary; Rolke, Richard; Storm, Colleen; Taylor, Don; Young, Barry R-1300 Temperature Control
The outlet temperature has been manually selected as the control point ((AK(175) = 5)) on R-1300. This is due to the probable failure of the east Thermowell. The west one has already failed and been placed in manual. In order to control the reactor at the proper temperature, AP(1941) had to be lowered. This is AK(101) low limit temperature setpoint which normally controls a point somewhere in the bed. The value was 445 and it was lowered to 440. Some tuning was done to help with the swing that started on the outlet was selected. With the 3 outlet Al's being used for temperature control, we may be susceptible to a rainstorm now. The average bed temperature will probably come on as we lower the control setpoint or the bed temperature Al's begin to fail. Only the 3 outlet temperature Al's can shut you down on low temperature. Work is under way to fabricate a thermowell at this time. Please sign the Communique Book once you have read this.
Thanks, JRC
Jt.t- >
\
Page 1
DO A 075952 CONFIDENTIAL