Document 6RM89QnDd9DRGBvkBmpJnNbm1
Monsanto
FROM ANNISTON, ALABAMA
date
subject
December 28, 1965 LABORATORY OBJECTIVES FOR 1966
REFERENCE
TO L. C. Fuhrmeister
CC:
Target Date
Responsi ble
A. Safety 1. No serious injuries. 2. Reduce minor injury frequency to 2.5. 3. Nine of monthly safety meetings conducted by an analyst or technician with an average attendance of 87% or
1-1t67 1-1-67 12-15-66
(Dept,) (Dept. ) (Dolin)
better.
B. Function
'
i
1. Improve and bring analytical instrumentation up to date,
-.
l'
including on stream analyzers,
a. Obtain infrared spectrophotometer for methyl PCT,
l`
Aroclor, parathions, and waste stream analysis.
3-15-66
b. Obtain Infotronics digital integrator for quanti
2-15-66
tative GLC analysis.
c. Develop on stream GLC instrumentation for chlorine
7-15-66
cell gas analysis.
d. Replace following obsolete routine equipment;
10-1-66
1) pH meter
2) colorimeter
3) aerograph GLC
e. Obtain additional instruments for methods
7-1-66
development,
f. Establish formal work request program for non
1-20-66
routine samples and special work.
(Dolin & TSD Supt.) (Dolin & TSD Supt.) (Chemists & TSD Engr.) (Dolin)
(Dolin)
(Dolin)
DSW 551807
STLCOPCB4090224
LABORATORY OBJECTIVES FOR 1966
page 2
B. Function (continued)
2. Develop and improve analytical procedures.
a. Review arid revise, as necessary, 80% of analytical 25%-4-l-66
. ' 50%-8-l-66
methods not reviewed in 1965.
807.-12-1-66
b. Devise new analytical methods as necessary to
1-1-67
meet customer requirements or for process control.
(Chemists & Section Leaders)
(Dolin & Chemists)
c. Devise new, more informative methods of analysis for critical intermediates and raw materials such as
(Chemists & Dolin)
1) thio acid - 4-1-66
2) chlorine - 7-1-66
3) (?25 " 9-1-66
4) Benzene - 3-15-66
d. Develop techniques to separate, identify, and study 9-1-66
(Chemists)
properties of isomers and isomer groups in liquid
Aroclors.
3. Review and up-date chemical materials specifications.
a. Review and re-issue all specifications issued prior to Jan. 1, 1965.
107.-2-1-66 50%-5-l-66 100%-9-l-66
(Liddle & Dolin)
b. Issue tentative specifications as required by product development.
1-1-67
(Liddle & Dolin)
c. Monitor changing intermediate and raw material specifications.
Start 3-1-66
(Liddle & Dolin)
C. Personnel
1. Employ testing program as a criterion of qualification for new employees.
5-1-66
(Personnel & Dolin)
2. Develop testing program to measure proficiency and
training status of present employees.
=
2-15-66
(Dolin & Section Leaders)
3. Hold four quarterly training meetings for laboratory
12-15-66 (Dolin)
personnel.
DSW 551808
STLCOPCB4090225
LABORATORY OBJECTIVES FOR 1966 C. Personnel (continued)
page 3
4. Develop chemists in more sophisticated techniques, such as IR spectra interpretation,, (See attached trip
12-1-66
(Chemists & Dolin)
schedule.)
5. Continue development of chemists in management skills so that either of the two chemists is capable of
Continuing (Dolin Miller Liddle)
acting as chief chemist.
I
6. Carry out continuing program to train section leaders
in supervisory skills.
Start 1-1-66
(Dolin Arnett Kemp)
7. Continue formal training of analysts to achieve in creased productivity and versatility.
D. Facilities and Plans
Review 3-1-66 6-1-66 9-1-66
(Section Leaders)
1. Bring five year plan for laboratory physical facilities 3-1-66
(Dolin)
up-to-date.
2. Develop five year plan for personnel needs, equipment, and procedures.
5-1-66
(Chemists & Dolin)
3. Submit plans, obtain approval, and do the following; a. Move chief chemist's and secretary's offices out
6-1-66
(Dol in & TSD Supt.)
of present work area.
b. Separate laboratory space for methods development group.
6-1-66
(Dolin & TSD Supt.)
c. Additional space and rearrangement of present control laboratory space for increased efficiency.
6-1-66
(Dol in & TSD Supt.)
d. Set up technical library to serve plant. e. Obtain set International Critical Tables.
9-15-66 10-1-66
(Dolin & TSD Supt.) (Dolin)
f. Revise filing system.
5-1-66
(Dolin Parris)
DSW 551809
STLCOPCB4090226
LABORATORY OBJECTIVES FOR 1966
page 4
D. Facilities and Plans (continued)
3. Submit plans, obtain approval, and do the following:
(continued)
g. Establish physical constant program for all plant
3>15~66 (Liddle)
products.
E. Organization
1. Review organization of laboratories and submit plan to
2-15-66 (Dolin)
obtain optimum effectiveness of chemists and technicians,
2, Supervise operation of technical library,
'9-15-66 (Dolin)
OED/dp Att. 1
0, E, Dolin
DSW 551810
STLCOPCB4090227
Laboratory Trip Schedule for 1966 1. One chemist to attend one week seminar at Fisk Institute on IR. 2. One chemist to attend Perkin-Elmer course on IR operation. 3. Chief Chemist and One chemist to attend Pittsburgh analytical symposium on
Analytical Chemistry. 4. Chief Chemist and one section leader to visit Central Research and WGK plant. 5. One section leader to attend course on developing leadership skills.
DSW 551811