STOCKPILING
CUTS BOILER REPAIRS TO MINIMUM
WITH STICKLE FEED WATER HEATER
# To assure trouble-free boiler operation, thii Texas oil refinery needed a dependable hourly supply of up to 50,000 pounds of preheoted feed water, free of destructive oxygen and scole-forming subitonces. Selected for the job was the No. 6 Stickle Deaerating Feed Water Heater and Purifier, shown above.
Stickle heaters prevent corrosion of boilers, piping, steam'Iines and turbines by removing destructive oxygen and COj. Special type trays force water to 'flow irregularly in a thin film, depositing solids and releasing non* condensoble gases. Trays cannot overflow--are easily romoved for occasional cleaning. Open coils bring feed water into direct contact with steam --immediately transmit heat from steam to water--cutting fuel costs 10-15%. Condonsed steam is not wasted. It provides one-sixth of boiler feed supply. Stickle feed water hooters are built in a varloty of sixes. Capacities! 3,000 to 300,000 pounds per hour. Every installation Is guaranteed.
Write for free 16-pago Bu/lofin 117.
STICKLE STEAM SPECIALTIES COMPANY
2265 VALLEY AVENUE . INDIANAPOLIS 18, INDIANA
Stickle rv|| Equipment
\ ~|.J" tuts the cost of steam
Diffmstwl end Boiler Return
Systems Open Fleet Steem
Traps Ragulallogand Re-
dating Votvsi Open Ceil
Feed Water Heaters end Pari-
Hen
e Oil and Steam
Separators Temperatare
Controllers
314
as nearly level oa possible end
ly compacted before placing nett-1
5. Side slopes of pile, space'pS
ting, should be kept to a maiiitj
25% so scraper can .descend'^
the pile surface.
6. If space limitations require'!, of maximum height with n\uh
slope, then a crawler tractor with^ doter should be used to clean
and seal side slopes.
%-
7. Top of pile should have imum width of 50 ft for maneg^
8. Approach ramps are most sug lory if they do not exceed 10%,
practical top limit o( 25%.
9. Pile should be built as closa*^
sible to point of coni loading *5"
loading to minimise haul.
Reclaiming cool with a ecri
most efficiently accomplished by
ing the load directly Into o drive
hopper, hut can be done in areas'
by a bulldozer or o clamshell cni
some kind.
^
Most efficient method of :la
scrapers with coal to be stockpile the overhead hopper, as this gives''
imum pay leads. If this isn't pod coal ahould be deposited by crass
conveyors In a relatively open an
scrapers ean self-load.
If more than one type of coil,
be stockpiled in the same area, diflj
types can be segregated by either W ing sidby-alde piles, or stockpiling
horiiontal layers. Reclaiming horin layers is done in conventional mu
while side-by-side piles may b
claimed by downhill loading. "j Auxiliary Dozer. General open
proctice on large piles uses a cni
tractor with anglo dozer along * 2-englno unit. The big machine!!
safety's sake, should go no closed
one or two it of the edge of'tbtConsequently, the angle dozer Uni
dress the edges, clean up arotM^.
drive-over hoppers, and knock
high piles of loose coal to aersper loading. Some installation)
their coal demand is such that six k
production of the 2-engine scrape*;
handle either stockpiling or
During the remainder of the . 2-engine driver is used as a buD4?
operator, cleaning up and
around the pile edges. Two*enoine principle became
with postwar development of duty torque converter and sem-*]
niatic transmission. Since first H 1946, the siime power train of *
torque converter und semi-aui
transmission has been used in
and trucks, with neatly 200 of the
POWER J4NUA*1