Document 6RB8zwoYj6MYjZ66kXw3zQJ24

C0&1 and ! LIBRARY POWER PLANT ENGINEERING ALL Power Engineers Steam, Electricity and All Other Power Engineering Services COMPLETE CONTENTS fThe Greens Bayou Station of Houston Lighting and Power Co........................... 54 By Louh Elliott Diesel Plant Saves $10,000 in First 4 Months' Operation........................... 59 Central Control Rooms--Design & Operation.............................................................. 62 By A- F. Barge! *The Cyclone Furnace--Latest Thing in Coal Burning............................................... 64 ' By f. x. Gilg 'Refining and Production of Fuel Oils............................................................................ 71 ' By Paul F, Schmidt ;poWer Generation News Reel........................................................................................... 72 Don't Underestimate Cables and Potheads....................................... ........................ 74 By K- H. Acfcmann Tfirst 5000-kw Packaged Turbine Generator Simplifies installation................. 80 By A A. Woodward and k. k. Kaloy Usage Diagram Shows Steam Turbine's Part in Pulp Production.......... 82 [Can "The Glamor Girl"--the Spreader Stoker--Fire Large Boilers?.................... 84 By J. S. Bennett and F. C. Motsorot pLarge Electronic D-C Motor Drives inIndustry........................................................... 86 IBasic Power Plant Figuring................................................................................................ 88 By William H. Engolman r.The Honor of Dignified Willy........................................................................................... 92 By John koven .New Steam Generating Plant Serves Columbia Steel's New Cold-Reduction Mill........................................................................................................... 102 .Steam Sampling Methods.................................................................................................... 104 [Babcock & Wilcox Installs New Laboratory..................................................................106 liquid level Control Increases Compressor Capacity and Improves Plant Operation ............................................................................................ 108 How Waste Heat Recovery Saves Btu's For Schramm .......................................... 110 Full Wave Reversing Educational Thy-Mo-Trol Drive Announced by G. E...............................................................................................................110 Regular Departments Notes On This Issue.................... . . 5 Engineers' Preview...................... . . 7 Helpful Bulletins ......................... .. 35 New Equipment News............... . . 42 Construction News...................... . . 50 Letters to the Editors.................... . . . fitk Operator Liked it Boiler Horsepower ' Filter Paper " The Grounded Neutral in the Ea*f 53 Questions and Answers................. 96 How Often Should Standby Dieiel* Be Run? Want* Electromagnet to Romove Steel Shot From Boiler Header* ________ Why Do Thrust Bearing* Wear Out? New Engineering Books ............... . 96 Coming Events.................................. .108 News from the Field........................ .114 Obituaries ....................................... .120 Catalog Library.............................. .122 APRIL 1950 T^PLAINTIFF^I If . EXHIBIT I .11 jVH-s- j First 5000 -kw Packaged Turbine Generator Simplifies Installation By A. A. WOODWARD Assistant Superintendent Steam Production Public Service Company of Colorado and R. R. KALEY Steam Service Engineer Westingnouse Eiectric Corporation Denver, Colorado FIRST 5000-KW Westinghouse markably during the past several packaged power plant to be in years. Output of . the system had stalled" in the United States wasdoubled during the last five-year brought into commercial service in period. In 1948 the maximum hour 1948 by the Public Service Co. of demand reached was 9500 kw. Colorado at Grand Junction, Colo Need for Poekaged Unit rado. This type of steam-turbine generator unit was chosen, partly because of a favorable delivery date, but mainly because it fitted so con veniently into the available space in the existing turbine room. Until the installation of the 5000 kw packaged generating unit, the area was served by the following facilities showing the need for addi tional generating capacity. (1) A 3300-kw hydro plant at Pali Demand for electric energy in sade. Colorado, the full capacity of Grand Junction. Colorado, and the which is available only during the surrounding area had increased re spring and fall months. During the summer period output is . because of irrigation nee. during the winter months. : erauon is limited by icing . (2) A 1400-kw hydro p. ins the Redlands Irrigation which a varying amount above its own pumping nee to the Public Service Co. rado. (3) A 3500-kw steam pia: in the City of Grand June: plant has provided the firming up the variable available from the hydro r Fig. I. Eight piers support the 5C00-i turbine generator instead of the more complicated foundations neeoed for seoarate mounting Fig. %. Auxiliaries such as this two-stage condensate mounted on the condenser, simplifying instaiiatic SO AVER S-E'iERA' ; 1^1(rr*'-'r>rn-r-f >f0stU *hc 350<>-kw urn: at Grand ..*punolionnn0-1thw`verfe<>snutroo-jiec..t....inth,.v*.e.a....r-i2Patu_i_ob__ni_i?_c yj*n Co- Additional firm power ^tf'*lCeeded quickly to insure an suPPb' ?! power at load peaks, ifljp* desirable that the new unit p the existing generating stajt ^^th a minimum amount or re dement of existing facilities. t >roackaged power unit appeared { ^Ve these advantages. 1 Requires Only Simple Supports | -pjncipal departure from conven< *j steam turbine design em i j in the packaged unit is in K r^-jpoorting structure. Eight com- ^ ** lively small piers, such as shown ' i'support the entire turbine fAJator unit with the single ex<*ron of the circulating pump. ^*5j]ess excavation and foundation jTwas found necessary with this "2hod of installation, since ex floor elevations did not have l* maintained. This type of unit * also eminently suited for con^Lijig to the minimum headroom ^quirements of the Grand Junction Counting the auxiliaries on the -denser provides an extremely ^pact unit weighing in all only 85 These auxiliaries consist of: I ^ air coolers, oil cooler, dual two * rfige air ejector with inter and jfler condensers, vertical two-stage jjodensate pump (Fig. 2) and a ^.pressure, feedwater heater. The gjfhuie, generator, and direct-con^jcted exciter are mounted directly the upper condenser deck. Axial jgi lateral expansion is controlled w the use of flexible steel members * shown in Fig. 1. A flexible dia phragm is provided between the tur tle exhaust flange and the con denser shell. Although it was possible to ship the condenser, turbine and generator completely assembled as a unit, con ditions at Grand Junction were such u to necessitate shipment of the wain parts separately. However, re assembly of the unit was much ampler and faster than is the case with a conventional unit. After the condenser was in position on the supporting piers, the turbine, gen erator, and exciter were located by using the same dowels that were used for the original assembly in the manufacturer's shops. No change was required to obtain the correct coupling alignment. Detoils of 5000-kw Poekoged Unit The package turbine generator set, supplied complete by Westinghouse Electric Corp., consists of the following elements: The turbine, which is the condens ing impulse type, is designed to operate at 400 psig throttle pressure, *50 F total temperature, exhausting >t 1],2 in. Hg absolute. The genera tor is rated at 5000 kw, 0.8 pf, 6250 fcva, 4150 v, 3 phase, 60 cycles. A Fig. 3. Turbine, generator, and exciter are also mounted on the condenser, making a complete package that con be shipped as a single unit radial-flow type surface condenser having 6.000 sq ft of surface is used. It is equipped with one 6300-gpm centrifugal circulating pump: one 128-gpm vertical 2-stage condensate pump and one 2-stage, twin element steam jet air ejector unit; one lowpressure bleed heater. The direct-connected 33 kw. 125 v. a-c enclosed exciter is provided with a two-piece removable housing. Cooling air is obtained from the main-generator air cooling system and is returned to the coolers through filters. The exciter brushes can be changed easily and without special tools while the unit is carry ing load. This is a desirable feature from an operating standpoint. The assembled unit is shown in Fig. 3. The unit has been serving the needs of the system in a very satis factory manner since its initial oper ation. For the past 12 months the unit has been in quite continuous operation, totalling 8035 hrs. System conditions, which dictate the maxi mum use of hydro generation and transmission "take," result in a lowload factor for steam-plant opera tion. Total generation of the above unit for the annual period amounted to 24.999.000 kw hr with a maximum hourly output of 5800 kw. Where New Unit Gets Its Steam _Steam supply for the new pack aged generating unit is provided by a new steam generating unit capable of producing 60.000 lb of steam per hour at 450 psi. Older boilers gen erating at 150 psi had previously supplied the 3500-kw unit and three old, smaller units. The new boiler is now used for both the new' and old generating units. When the 5000-kw' packaged unit operates, the old units are shut down. When the packaged unit is shut down, the 3500-kw unit and the three small units are oper ated from the new boiler, which con tinues to operate at 450 psi. by reduc ing the pressure to 150 psi through desuperheating arrangements. New steam generating equipment consists of one Type F. H. Babcock & Wilcox boiler and superheater, with initial capacity of 60.000 lb steam per hour and future capacity of 85.000 lb steam per hour. The boiler is designed for 450 psig drum pres sure. It has four circular horizontal burners for pulverized coal or oil firing. It is of the dry-bottom ash removal type, and is equipped with a B it W air heater, and two type E-21 B & W pulverizers. Forced-draft and induced-draft fans were furnished by the Amer ican Blower Corp., and are arranged for V-belt drive. Capacity of the forced draft fan is 75,000 lb per hr of 80 F air at 950 rpm: induceddraft fan will handle 93.000 lb per hr of 420 F flue gas at 1170 rpm. A Multiclone dust collector is in stalled between the gas outlet of the boiler and the inlet of the air heater. Ashes are removed from the boiler and dust collector w'ith United Conveyor Corp. conveyor equip ment. The boiler feedwater is heated and deaerated by a Worthington 80,000 lb per hr, horizontal, single-element type deaerating heater. From this, 2 Allis-Chalmers type MM, 4-stage centrifugal boiler feed pumps, driven by 85 hp type ZS Terry turbines supply the feedwater to the boiler. Each pump is designed to deliver 100 gpm at 1320 ft total head. Condenser circulating water cool ing is provided by a two-section 5500 gpm Marley, Model 18, B 1 induced-draft, double-flow cooling tower. t Apr!!, I95C--POWER GENERATION--Chicago, III. 81 i f