To : Vinyl Shift Supervisors From : M. P. Blackwell Date : May 18, 1982 Subject : SHIFT PERFORMANCE FOR APRIL, 1982.
Listed below is each shift's performance for each standard during the month of April, 1982.
Charges Per Shift M Pounds Dried Per Shift
AB 12.33(1) 12.7 550.0(1) 572.8
C 12.25 492.3
D 12.5^^ 491.8(1)
Moisture Resamples (Missed)
10
27
1
Coarse Batches Slurries Above 1000 ppm (Blends) Blowdown Samples Above 10 ppm
0 1 11
00 27 39
0 3 2
Absenteeism, %
2.2 9.7 0.0
0.7
Bagging Rates, Lbs./Manhour
4904
4528
4910
5189
Bag Weights VCM Releases Safety Performance
0 00 0 00 1 00
0 0 0
(1) Charging and drying rates affected by Fluid Bed eryer shutdown. (2) D. W. Clark sick leave - 9.7%.