Document 6Bx9Rdpk4MoBGJpqdpYXZek4g
(conoco)
Interoffice Communication
To
From
D#te subjct
M. L. Ashby P. D. Despres January 12, 1984 REISSUE OF THERMAL RELIEF VALVE DISCHARGE CONTAINMENT DESIGN
The original issue of the final design for RV discharge containment on January 11, 1984 contained two erroneous specifications Worklist item
number 8 and note 1 in Figures 2 and 4 specified the removal of a segment of tubing between the nitrogen supply and the sample bomb eductors. This specification has been removed; the nitrogen is the motive fluid for the
eductor, which is used to clear the sample lines when taking vinyl chloride samples. Please discard the old final issue and replace it with the attached.
Process Engineer
br cc: RAC-JWW**MLA(4)-MCM-JRH(4)-RB-PLF-DLD-SRA-PE
PFF-MGH-JCL
(conoco)
Interoffice Communication
to M. L. Ashby
From p. D. Despres
oate January 11, 1984
subject
Thermal Relief Valve Discharge Containment Design No. 1983-400-1283-PDD FINAL Design
Sixteen relief valves protecting process piping and equipment in vinyl chloride service in the tank farm area now discharge directly to the at mosphere (see attached Figures 1 and 3). Overpressure in these systems is due almost exclusively to thermal expansion of liquid vinyl chloride in blocked-in sections of piping or equipment. The attached final design provides for containment of the discharges of these sixteen relief valves by piping their discharge lines into the closed loop sampling system vent line which ties directly into the tank farm vent line to the incinerator. This containment system will eliminate the possibility of a vinyl chloride discharge to the atmosphere from these sixteen RVs.
The tank farm vent line will not have to be shutdown for tie-ins to be made; an existing 1" thread-o-let and V thread-o-let on the vent header will be the points of connection.
This project should be completed with funding from Miscellaneous Projects Under $15,000. By copy of this final design to J. R. Holcomb, a cost estimate is requested. Please contact me if there are any questions or comments.
Process Engineer
kf
cc: RAC-JWW-MLA(4)-MCM-JRH(4)-RB-PLF-DLD-SRA-PE PFF-MGH-JCL
Sr. Process Engineer
Discussion
Relief valve discharges in the tank farm area are very rare. Overpressure by the process equipment, such as pumps, is not possible in this section of the plant. Relief valve discharges have occurred in the past, however, and have been found to be caused by thermal exDansion of the vinyl chloride in an enclosed, liquid filled system. A system must be completely liquid filled or contain a non-condensible gas before thermal expansion can develop sufficient pressure for an RV discharge at 285 psi. The statistical pro bability of these conditions occurring is low and indicates the rarity of thermal RV discharges.
Figures 1 and 3 indicate the 2 areas in the tank farm where the 16 RVs are located. The valves themselves are listed in the attached Table 1 with their service descriptions and specifications. There will be two tie-in points to the vent line to the incinerator. The 9 valves indicated in Figure 1 will tie-in to the existing \h" vent line now servicing the closed loop sampling system in the P-401 and T-401 area. The 7 RVs indicated in Figure 3 will be tied in to the existing V thread-o-let on the 3" railcar vent header in the pipe rack at the southwest corner of the T-411C dike. Thermal releases characteristically discharge very small quantities of vinyl chloride, so upsetting the incinerator will not be a problem with a direct tie-in to the vent header. The largest system will discharge less than 1 lb. of vinyl chloride due to thermal expansion at 30C. Ten RVs on the vent recovery system now discharge directly to the incinerator vent line and have not caused a problem in the past.
These 16 RVs are not fire-sized; they were designed to relieve liquid overpressure in the pipelines. The discharge lines will all be 1" pipe, matching the relief valve discharge connections. Pressure drop through the 1" pipe is not a consideration for thermal discharges due to the small amount of VCM released. Likewise, the small pipe will provide an appropriate restriction to help limit flow and reseat the RV in the event that an RV sticks open.
The RVs on F-401 and F-402 (RV-413 and RV-414, respectively) will be re located from the top head of the filter to the side to aid in clearing and changing the filters. A bypass line will be installed around the RVs to be used for clearing the dryers of vinyl chloride for openinq. The vent line that presently ties back into the closed loop sampling vent from the N2 supply line will be removed and the filters will be vented to the incinerator through the RV bypass (see Figures 2 and 4).
00 QOO'2 O'*"
~Tk&L-E I. VCM K&uer Vau/gs TO
dc/4TfttN B~P
KV AlO.
"D/acH s&r Lsa/G Prjsssuxs. Stzts.
Location - ^a/zvtca
A<A i r- 40/ , F-AOl (See. Ptaae. d)
3Zi
Z&S" I
P-40( dt^charje, -/z> F-4-Ol
3 3eZ
Z.SS zss'
i i
P- ACt ^UJziicryu Cu<&P-4-01 c/ijc/i^e,; F-40 1 Oudl&t
32.<? 330
e.6528^*
i 1
T-4Ci Zieac/er P-4-OZ sucAoyc Line.
331
zas~ t
34-3
2 85- 1
4/3 (,40
no 28 S'
l t
A zea Z: T-4-t
T~ 40/ header' P~dCl dfsch&rqe do
F-4CI F-4tC3
C. j P'4U
Piques 2- )
ret-cu*^
3n 3zz. 323 3 2.4 3z.r 3 Zfc 414
285" /
285* / Z 85" / Z85" / 2g5* i Z8S- i no _J_
Linder T-4-ttG F~4rl { discj^ircj^ F-4oz. crudied -do F-4CZ oudted do
header rs^Lcsr- Icadtwjj
d3ryr[
F - 4cZ oudia t header P~d-L{ SLcdtiGK header F-4-OZ.
PV>T> l^Z&s
CUH 000002094
fCM- 1^3-400-l'ZS3-Plr&
Environmental Inpact Statement
This project will eliminate discharges of vinyl chloride to the atmosphere from sixteen relief valves in the tank farm area that protect pipelines and equipment from liquid thermal expansion. The discharge lines from the RVs will be routed to the VCM vent incinerator.
Energy Impact Statement
This project will have no effect on plant enerqy consumption. The Process Design Energy Checklist was not applicable and was not completed for this design.
Safety and Health Impact Statement
This project will eliminate potential vinyl chloride exposure from RV discharges from sixteen RVs in vinyl chloride service in the tank farm area. The Process Design Safety Checklist has been completed and was included in the Review Design.
WORK LIST
Refer to Figure 1 for Items 1 through 4.
1. Relocate RV-413 to the IV' connection on the side of F-401 (see Figure 2). Run line 1"-HE-1-N-A2-1 from RV-413 on F-401 and RV-328 to the 1" tee in the IV' vent line for the closed loop sampling system. A section of the existing 3/4" closed loop sampling vent line will be removed and the remaining section tied back into line 1"-HE-1 (see Note 3, Figure 1). Tie in RVs -330, -327, -343 to line 1"-HE-1. In clude a 1" block valve and pipe union at each RV. At F-401, include a IV1 x 3/4" concentric reducer and a 3/4" block valve between the filter and RV-413, and a 1" pipe union and 1" block valve downstream of the RV (refer to Figure 2). Include a bypass around RV-413 with a 3/4" block valve, concentric 1" x 3/4" reducer and a 1" pipe union. Include a 3/4" bleeder in the line and backweld all threaded connections.
2. Run line l"-HE-2-N-A2-l from RV-321 and tie in to line 1"-HE-1. Install a pipe union and 1" block valve at the RV tie-in and backweld the threaded connections. Car seal open the valve.
3. Run line l"-HE-3-N-A2-l from RV-329 and RV-331 and tie in to line 1"-HE-1. Install a pipe union and 1" block valve at each RV tie-in and backweld the threaded connections. Car seal open the valves.
4. Run line l"-HE-4-N-A2-l from RV-640 on F-403 to line 1"-HE-1. Install a pipe union and 1" block valve at the RV and backweld all threaded connections. Car seal open the valve. Include a 3/4" bleed valve in the line by RV-640. Remove the existing 3/8" priming line from the P-415 discharge and run a V' priming line from P-415 to line l"-HE-4. Include a block valve in the line.
5. Tie in the 3/4" closed loop sampling system vent line to line 1"-HE-1N-A2-1.
Refer to the attached Figure 3 for Items 6 through 10.
6. Run line l"-HE-5-N-A2-l from RV-319 on the rework line under T-411C to the V1 thread-o-let on the 3" v6nt line from T-411C at the SW corner of the tank dike. Install a pipe union and 1" block valve at the RV tie-in and backweld all threaded fittings. Car seal the valve open. Include 13/4" bleed valve by the RV and a 1 x V' concentric reducer at the thread-o-let.
7. Run line l"-HE-6-N-A2-l from RV-322 on the P-411 discharge header and RV-326 on the suction header and tie in to line l"-HE-5. Install unions and 1" block valves at the RV tie-ins and backweld all threaded connections. Car seal the valves open. Include a 3/4" bleed valve by RV-322.
CUH 0 0000^096
8. Run line l"-HE-7-N-A2-l from RV-414 and RV-325 on F-402 and F-402 outlet line and tie in to line l"-HE-5. Include a 1" pipe union and block valve on RV-325. Relocate RV-414 to the 1" vent line on the side of F-402 (refer to Figure 4). Include a 1 x 3/4" concen tric reducer and block valve upstream of the RV and a 1" pipe union and block valve downstream. Car seal open the valves. Include a 1" bypass valve around the RV. Backweld all threaded connections.
9. Run line l"-HE-8-N-A2-l from RVs -323 and -324 and tie in to line l"-HE-5. Include 1" pipe unions and block valves at the RV tie-ins and backweld the threaded connections. Car seal open the valves.
10. Tie in the 3/4" closed loop samoling system vent line to line 1"-HE5-N-A2-1.
00 ooo ?.o9
(COnOCrA
Engineering Center
ponca cy., cOklahoma
Specification Sheet
SPECIFICATION SHEET
PROJECT NO. f-ir1-'40O~tz&3 -ft?P
A F E NO.__________________________________ REO. NO._____ ___________________
i
PROCESS PIPING SCHEDULE
date
/*> APPnnv
---
MADE BY -
__________________
PLANT.
Lino Designation
/-nC~3~`4-/)2- i
! "-iiE -
(
- ah/iz-1
/- 1 ' ~'hE - t // /; --/
/-Hr- j 1
Service
Fran
To
P-^/4 ***, *3<3, 1 J4-3 RY-3Z)
gV-3Zc;,33t
ZV- C40
RV~3(<?
r-ne-t
i'-HE-/ !%" L^Sif.p xo*> tAHft,'*/-'} lr-\/T
%* \/c#A Clma
f?\f-3'Z'Zx32(a i-tfe-s*
HV-4U,3Z<r r-tfE-sr
<`/-3Z3,3Z4
Flow^*'1
V Rate L Lb/Hr
(Hot BPSD}
Normal At T and P LB/CF vise
F PSIG (SP GP) CP
Press Drop
PSIG/ 100'
V /9S V /(
a V Vu
V V-
/--
/--
f? c o. S .Of <:./
t< -
-
-
*1 i
H " i
Is
- <
n I
u i " '
Vel
ft/sec -- -- --
--
-- -- -- --
Fluid
Vt.\J K- f-'/y.'-'j '; U if n < f * M * , * *i it t/
CUIH 0 0 0 0 0 2 0 9 8
`
j(0 MciK|kV\C.Hv"T <?w r v/3(ve sticks <Dp(2P\ t
i ..
tF i&i UIS- . K e u e P \Z q i^ T *S C M rtg E , CcMTfltNMEKTT S y S T M
-7
Figure. I . F-40\ VCM Fil-tbr. PV pjp/Na
^6M*D
_T"-- ExiSTffit<$
A/*/
o /slore
^ W*^i4 Usr
--(*f-
(JrOlON
co Loa<^ Oe&a/ (ZeMCr/, /^U>C/|T
f"D"D
o i/^/s-f
r1,
KloTeS: /, "There, is art u-rtctsed /l/z, ^^h>-Occi~ eyjstowc^ .
-Des-^jsJo, i?& -400 -164-9XT& CUM 000002100
Ft<hUR& 3, fegCP VAufE^ttH#(S$ CQN-r/jfNMEtiT ~TC s-4b`2~
----- E/.'2nM<^ " MW
K-V
--fff--
Umiom
^ V' = ,?kLlsT O Kicrn=-
,,.CO Cai^ Lcck. OpeO
wKi'-
T>i1fcfJo-.l^e-4*0-ie^-ppT? CWH 000002101
Fie,aeE. 4% F~4C2 VCM Fi^tsk FV P/r>//\l6i
Le&bm'd -------- x.ist/m<$
--
O VJORK Usr
--I'l-- co
L./MIOM
G4 Ooo; Oa=haJ &MdV. /RELOCATE
PV~D
t/siz*
Tv^ivNo, I^S-400 -1&4-RU'D CWH 00002102
* i
To: M. L. Ashby
nteroftice .ommunicatlon
From:
Date:
Subject:
V. M. Fisher & S. C. Racca August 24, 1984
TANK FARM VENT BLOWER (BL-412 A&B) MODIFICATIONS DESIGN NO. 204-400-884-VMF/SCR
VIS1A
The attached class "A" design provides for modifying the Tank Farm Vent Blowers BL-412 A&B and spare to handle higher wet vent header pressures. Also included are revisions to the existing instrumentation and piping. The modifications will protect the blowers from surging and will decrease the probability of bypassing the tank farm vent to atmosphere.
This design should be implemented before the "Incinerator Bypass Reduction - High Vent Pressure" project (see "Incinerator Bypass Reduction", V. M. Fisher to M. L. Ashby, March 15, 1984) is fully operational. After this project is started up the maximum wet vent header pressure at PT-902 (the pressure transmitter for the Wet Vent Header Pressure Bypass Controller, PRC-902) will be increased from 90 inches WC to 110 inches W.C.
The eductor now installed in place of the spare blower will be removed and stored in the warehouse. Based on nitrogen and electrical prices, operating the eductor rather than the blowers would cost $33,000 extra per year. In the future, the eductor will be installed temporarily if both spare blowers are down for maintenance.
The blower modifications is the better and less costly alternative, using existing equipment, to handling the higher wet vent header pressures. Currently, PED is evaluating long term alternatives to compressing the tank farm vents.
Currently, one fully modified blower package (with a 20 hp motor), one new check valve, and all instrumentation with the exception of the specified pressure gauges on the blower discharges have been installed. Also the spare blower has been modified.and is stored in the warehouse. Work list items which remain are modifying and installing the other blower package, installing the other check valve, two pressure gauges, and cooling water outlet piping for the recycle cooler, and setting RV-533 at 4 inches W.C. and TSH-491 at 200 F.
000002103 CUH
/
Virg41 M. Fisher Process Engineer
Stephen C. Racca Process Engineer
br cc: RAC-PEM-RB-MLA(4)-MCM-JRH(4)-SRA-PLF-DLD-PE-PFF
CViV' 000<>vOS iOA
TABLE OF CONTENTS TANK FARM VENT BLOWER MODIFICATIONS
VCM PLANT
Design Basis Process Description Impact Statements Energy Checklist Safety Checklist Operating Procedure Work List Specification Sheets Figures
I
DESIGN BASIS TANK FARM VENT BLOWER MODIFICATIONS
VCM PLANT
The "Incinerator Bypass Reduction" design (Design No. 194-900983-VMF to M. L. Ashby from V. M. Fisher, March 15, 1984) when completely operational will increase the vent header pressure from 90 to 110 inches W.C. Raising the maximum allowable wet and dry vent header pressures will reduce the possibility of bypassing the incinerator to atmosphere. Considering line and equipment losses at a wet vent rate of 47,080 SCFH and a tank farm vent rate of 200 SCFM the maximum back pressure on the Tank Farm Vent Blowers BL-412A/B will be 131 inches W.C. To handle the wet vent header's increased pressure the blowers must be modified.
Burner ring assembly modifications, included in the Liquid Seal Flame Arrestor Project, eliminated the wet vent header burner ring and combined the wet and dry vents in the dry vent burner. The dry vent burner was sized to handle 64,000 SCFH with a 12 inch W.C. pressure drop. By combining the wet and dry vents, the pressure drop through the dry vent burner increased to approximately 36 inches W.C. raising the vent header pressures at design flow the same amount. To compensate for the increased pressure drop through the dry vent burner, the setpoint for the dry and wet vent header pressure controllers (PRC-901 and PRC-902, respectively) had to be increased from the original setting of 65 inches W.C. to prevent bypassing the incinerator at design flows.
The blowers were originally designed for an inlet vent rate of 200 SCFM and a wet vent header pressure of 65 inches W.C. By design, the existing blowers' maximum pressure rise is 72 inches W.C. When the header pressure rises above the blower discharge pressure, decreasing blower throughput, surging becomes a problem. Surging may cause bearing failure resulting in rubbing and severe damage to the blower internals. Currently, this is a repeated maintenance problem for BL-412A/B.
To eliminate the surge problem resulting from the increased wet vent header pressure, BL-412A/B and spare will be modified to
increase the discharge pressure. The existing Paxton Blowers
can be converted from a model CB-95 to a model CB 96 for 300
to 500 SCFM at 140 to 126 inches W.C. pressure rise. The modi
fications will include: changing the belt guards, belts, the
motor pulleys (changing from two-groove to three-groove and in
creasing the diameter from 5.6 in. to 8.0 in.), the blower
pulleys (changing igm two-groove to three-groove and increasing
the diameter frnmQj.
in. to 5.3 in.), and the impellers, machining
the casing covers, increasing the oil reservoirs capacity, and
increasing the motors from 7.5 hp to 2 0 hp. The modified blowers
will operate at 5300 RPM, an increase from 4700 RPM. The price for
CUH 000002106
modifying two blowers is Modifying the spare will is changing the impeller the casing cover.
$4,050 each (FOB Santa Monica, CA) . cost less since all that is required and the blower pulley, and machining
The modified blower will be operated at a minimum flow of 300 SCFM (~15% above the surge point of 250 SCFM). Based on actual data, the existing recycle loop system would have an estimated pressure drop of 177 inches W.C. at 300 SCFM (Recycle Cooler = 44 inches W.C., check valve = 43 inches W.C., piping = 35 inches W.C., and PCV-491 at 90 (or 100%) open 55 inches W.C) which exceeds the blower's discharge pressure. To reduce this pressure drop new check valves, having a pressure drop of approximately 2 inches W.C. at 300 SCFM will be installed. (The check valves prevent blower damage due to backward rotation.)
Recycle Cooler H-412, a water cooled monel, multi-tube exchanger, is provided in the recycle line to prevent overheating the blower. A recent cleaning of the cooler increased the cooling water flow rate from 2.5 gpm to 7.5 gpm. An evaluation of actual data indicates that this cooler will be adequate to maintain the in creased recycle flow below 120F at the outlet of H-412.
The minimum flow through the blower will be maintained 15% over surge by using the blower motor amperage to control recycle control valve ICV-412. The blower performance curve exhibits a rapid loss in pressure head with flows over 300 SCFM. To keep the discharge pressure high even at maximum vent rates, amperage control rather than a constant flow recycle loop will be used to maintain the flow through the blower. The new controller IRC-412 will control at 12.5 amps to maintain a minimum of 300 SCFM flow through the blower. To warn of an impending surge condition a low amp alarm IAL-412 will be activated at 12 amps. A high amp alarm IAH-412, activated at 22.9 amps will warn of an impending blower motor tripout. Each blower will be equipped with a low amp shutdown to prevent surge damage. The shutdowns, ISDL-412 A or B, will be activated at 11.5 amps. All alarms will be located in the main control room and when activated will have an audible buzzer and annunciator panel light.
Control Valve PCV-491A will have a 3-way solenoid installed on the pnuematic signal line to the valve's diaphragm actuator. The solenoid will close PCV-491A to isolate the tank farm blower system from the wet vent header whenever the operating blower shuts down. Should the eductor be in use, hand switch HS-412 will energize the solenoid to allow normal operation of PCV-491A.
A high pressure alarm PAH-481 will be tied into transmitter PT-481 which senses the pressure in S-412. When the pressure reaches 2 inches W.C. an audible buzzer and an annunciator light will be activated in the main control room. To monitor the pressure in S-412 a recorder, PR-481, will also be installed in the main control room.
CUH 00000210/