Document 6Bvx7JG4EDvx9wZQxvm8KwVDm

DownloadRandom document
AR226-2629 17 AR226-262 9 Dordrecht Works C-8 Sam Summary-Revision 1 Groundwater Sampling Results Revision 1 Note: Revision 1 of the Dordrecht Works March 2003 sampl event summary was prepared based on new well const information received in June 2003. This new informat changed the observations presented on the "Second Aq in this document. iordrecht bampi 192003 The m Scope of Work Summary - 24 samples were collected on March 10-12., 20Q3, including: -18 site monitoring wells (most previously samp mid 1990^). Two water bearing zones; freatic first aquifers. No samples were collected from ^second" aquifer. -1 site tapwater (local ^city" water) - 1 from "Spaarbekk" or "Drinkwaterbekken" r - 2 from groundwater treatment system (combin influent and effluent) - 2 from site wastewater treatment plant (sweetw Dordrecht SamDiina The ''Vv.^.y''' Results (In ug/L) ^ wy / Sample ID MW-315 MW-N16-2 MW-N23-T MW-N28-1 GW Treatment 103 | Date | 3/10/2003 3/10^2003 3/10/2003 3/10/2003 1 3/11/2003 : Waste Treatment 82 GW Treatment 401 3/11/2003 3/11/2003 Waste Treatment 80 3/11/2003 Spaarbekk 3/11/2003 | tap Water MVV-119 MW-303 MW-05A 3/11/2003 3/11/2003 ; 3/11/2003 | 3/11/2003 T MW-N26-1 3/11/2003 MW-N25-1 MW-308 MW-W02-A MW-314 'MW-TT8''"~'""'''~''1'''"" " .^^^^.........^ ,,,........,,..,.,,..,..,,....., 3/11/2003 3/11/2003 I 3/11/2003 i 3/11/2003 ; 3/1172003 3/1172003 MW-N19-1 MW-311 MW-316 MW-317 3/12/2003 3/1272063 371272003 3/12/2003 C-8(ug/L) 71.3 ^ ^ 14.4 9-18 3,890 7.91 4,850 0.439 0.0736 158 7,430 ^ 16.1 3.99 131 14.7 50.2 ^ ^ ^ 0.762 354 1530 2896 The m June Analytical ResulVMMI June Sampling Result, MF-11= 295 * Well is situated near southern end of site near edge of "Drinkwaterbekken" reservoir. : Sampling 2003 The m | SF = che el i HA - El Ue Ji 1s iS i ; = - ! = g rror PPE Fjrst Aquifer OverallC-8 Con(ept|t '^w Results Discussion 9 Elevated levels found in Waste Treatment 82-Sweetwater (3 isg/L) and Waste Treatment 80-Saltwater (4850 ug/L). - Based on flow of approximately 500,000 gal/day, this repr discharge of approximately 7,300 Ibs/year. Highest groundwater measurement 7430 ug/L in MW-303, completed in shallowest water bearing zone, "freatic layer" ("Ophooglaag"), Slightly higher than Aug. 1995 measurem 1700 ug/L. Other shallow wells near this site location MW-3 (1530 ug/L) and MW-317 (2890 ug/L). Range for shallow water bearing zone is 34.9 ug/L (central 7430 ug/L, north site, near river. Dordrecht Sampling 2003 'i'^-."-::" The m Results Discussion Concentrations in first aquifer "Eerste" range from .139 to ug/L. Overall, 2003 measured concentrations are higher than mid sampling events. Spaarbekk Reservior .439 ug/L. Water used by site for non cooling. Also used for water sports/recreation. Groundwater treatment system influent, GW Treatment 10 9.18 ug/L and effluent, GW Treatment 401, was 7.91 ug/L. Site "Tap Water" was .0736 ug/L. Source is "city water". 303 UN The Site Conceptual Model Summary Areas of impact and groundwater flow directi Dordrecht sampling 2003 ^ ' - The ^ey Site Conceptual Model Primary source area (I.e., C8 and chlorocarbons) is freatic (s aquifer underlying FP process area. This area of impact is co by a sheet-pile cut-off wall and a Groundwater Pump & Trea Treatment is air stripper (no affect on C-8). First aquifer is also pumped to maintain inward groundwate gradient. Second aquifer receives "Pumped Infiltration" to establish h pressures (upward gradient) and prevent first aquifer from fl vertically downward to second. cht Sampling 2003 ^ :, - : ^; L "^n. The m LL / @ \ itl [Ld Ly . i 2 ERE = eeJ) : ~ b=25 J 5] z a< 4 5 [<] 8) H K2Y S Lr . ia ||| OB | E Tae 3 3 Fo |oh dL] i TE A AiIFae NNaFT 0 ba Guts : cha BN| ll hi A| ot Y ae ARE)Y y = | =2h OERA LF lL = =e] ; ol; [Q)o IS 1ru} a hy [37) J -- ut aa) -- =| & messWR 1)Dg ee