iordrecht bampi 192003
The m
Scope of Work Summary
- 24 samples were collected on March 10-12., 20Q3,
including:
-18 site monitoring wells (most previously samp
mid 1990^). Two water bearing zones; freatic first aquifers. No samples were collected from ^second" aquifer.
-1 site tapwater (local ^city" water)
- 1 from "Spaarbekk" or "Drinkwaterbekken" r
- 2 from groundwater treatment system (combin influent and effluent)
- 2 from site wastewater treatment plant (sweetw
Dordrecht SamDiina
The
''Vv.^.y'''
Results (In ug/L)
^
wy
/
Sample ID MW-315 MW-N16-2 MW-N23-T
MW-N28-1 GW Treatment 103
|
Date
|
3/10/2003
3/10^2003
3/10/2003
3/10/2003 1
3/11/2003 :
Waste Treatment 82 GW Treatment 401
3/11/2003 3/11/2003
Waste Treatment 80
3/11/2003
Spaarbekk
3/11/2003 |
tap Water
MVV-119
MW-303 MW-05A
3/11/2003
3/11/2003 ; 3/11/2003 | 3/11/2003 T
MW-N26-1
3/11/2003
MW-N25-1 MW-308 MW-W02-A MW-314
'MW-TT8''"~'""'''~''1'''"" "
.^^^^.........^ ,,,........,,..,.,,..,..,,.....,
3/11/2003 3/11/2003 I 3/11/2003 i 3/11/2003 ; 3/1172003 3/1172003
MW-N19-1 MW-311 MW-316 MW-317
3/12/2003 3/1272063 371272003
3/12/2003
C-8(ug/L)
71.3 ^ ^
14.4 9-18 3,890 7.91 4,850 0.439 0.0736 158 7,430
^
16.1
3.99
131
14.7 50.2
^
^ ^ 0.762
354 1530 2896
The m
June Analytical ResulVMMI
June Sampling Result, MF-11= 295
* Well is situated near southern end of site near edge of "Drinkwaterbekken" reservoir.
: Sampling 2003
The m
|
SF
= che el i HA
- El Ue Ji 1s iS i ; = -
!
= g rror PPE
Fjrst Aquifer
OverallC-8 Con(ept|t
'^w
Results Discussion
9 Elevated levels found in Waste Treatment 82-Sweetwater (3 isg/L) and Waste Treatment 80-Saltwater (4850 ug/L).
- Based on flow of approximately 500,000 gal/day, this repr discharge of approximately 7,300 Ibs/year.
Highest groundwater measurement 7430 ug/L in MW-303,
completed in shallowest water bearing zone, "freatic layer" ("Ophooglaag"), Slightly higher than Aug. 1995 measurem
1700 ug/L. Other shallow wells near this site location MW-3 (1530 ug/L) and MW-317 (2890 ug/L).
Range for shallow water bearing zone is 34.9 ug/L (central 7430 ug/L, north site, near river.
Dordrecht Sampling 2003
'i'^-."-::" The m
Results Discussion
Concentrations in first aquifer "Eerste" range from .139 to ug/L.
Overall, 2003 measured concentrations are higher than mid sampling events.
Spaarbekk Reservior .439 ug/L. Water used by site for non cooling. Also used for water sports/recreation.
Groundwater treatment system influent, GW Treatment 10 9.18 ug/L and effluent, GW Treatment 401, was 7.91 ug/L.
Site "Tap Water" was .0736 ug/L. Source is "city water".
303
UN The
Site Conceptual Model Summary
Areas of impact and groundwater flow directi
Dordrecht sampling 2003 ^
'
-
The
^ey
Site Conceptual Model
Primary source area (I.e., C8 and chlorocarbons) is freatic (s aquifer underlying FP process area. This area of impact is co by a sheet-pile cut-off wall and a Groundwater Pump & Trea Treatment is air stripper (no affect on C-8).
First aquifer is also pumped to maintain inward groundwate gradient. Second aquifer receives "Pumped Infiltration" to establish h pressures (upward gradient) and prevent first aquifer from fl vertically downward to second.
cht Sampling 2003 ^
:,
-
: ^; L "^n. The m
LL /
@
\ itl [Ld
Ly .
i
2 ERE = eeJ)
:
~ b=25
J
5]
z
a<
4
5
[<]
8)
H K2Y
S Lr
. ia
|||
OB |
E Tae
3
3 Fo |oh
dL]
i TE
A
AiIFae NNaFT
0
ba Guts
:
cha
BN|
ll
hi A|
ot Y ae ARE)Y
y
= | =2h OERA LF
lL
= =e]
;
ol;
[Q)o IS 1ru} a
hy
[37)
J
-- ut
aa) --
=| & messWR 1)Dg
ee