bine-generator unit may be installed when needed. As a part of the same program, the natural
In the boiler plane are. three Elliott 375,000-lb-perhr deaerating feedwater heaters. These units were installed- at various dines during the expansion of
the boiler plant, the latest orie.going in last year.,
gasoline plant on the outlet of the station was com
pletely rebuilt. It is now an ultramodern gasoline
and petroleum by-products plant, capable of turning
out under peak load flows of over 150,000 gal per
day of gasoline, butane, propane, and ethane. At the
same time, the dehydration plant on the outlet of
the gasoline plant was enlarged so that all gas going
into the distribution lines is thoroughly dry.
I It has been necessary to build a complete com
munity to house part of the men who run the plant,
as there is no large town within 20 miles of Hastings.
So with the plant itself has grown up a community
of about 67 houses, complete with its own water,
gas, electric, ice, and sewage systems. Normal oper
ations at Hastings regularly require about 175 men.
During the recent construction work a camp housed
more than 200 employees.
The final result of all this expansion program is a
station almost completely rebuilt since 1940, with
No. 1 plant discharging into the older pipe line
system at 400 psi pressure and No. 2 plant dis
charging into the new high-pressure line system at
1300 psi. In spite of this increase the new plant has
fewer buildings than the old plant and from all
angles is more modem and efficient.