Document 6BVYx4N5O5824aX9NJmv4jya3
SAFE FILE....
THYL C ORP O RAT *'
Manufacturing and Traffic Department
April 19, 1948
r\\Y&
o'!
. v.
76^:
PLtASC AOOACSS RtP(.Y
TOi-BOX 341
^
BATON ROUGE LN-A.
File EMS
Stone & Webster Engineering Corporation 49 Federal Street Boston 7, Massachusetts
Gentlemen:
8147
PLAINTIFF'S EXHIBIT
ETCO-534
REVISIONS TO NO. 3 ETHYL CHLORIDE PLANT ETHYL CHLORIDE AREA
PLANT EXPANSION - BATON ROUGE
In the conferences held in New York during December, 1947, it was arbitrarily decided that Ethyl would handle the engineering and construction required to make the No. 5 Ethyl Chloride Plant suitable for operation on Esso Standard*s new light ends ethylene stream. Now that the job has been more thoroughly studied, we have decided that it would be more ad vantageous for Stone and Webster to handle all phases of this work (engineering, purchasing, and construction) in view of the similarity of this job with certain phases of the No. 4 Ethyl ^Chloride Plant. In particular, most of the pressure vessels required for the No. 3 plant revision are exact dupli cates (with possible exception of nozzle orientation) of vessels required for the No. 4 plant.
In order to expedite this project to take advantage of the early availability of the light ends stream, approval is being given to place duplicate orders with the successful bidder on the corresponding vessel in the No. 4 plant. The placement of orders should not be held up pending the study of nozzle orientation.
We are attaching to- this letter specifications for the major items of equipment (towers, drums, exohangers, and pumps) which are now known to be required. Subsequent investi gation may indicate that additional items are required, so the list should not be considered as fixed. Specifications on piping, instruments, etc. have not been handled at the time of this writing, but will be forwarded later. It is possible that the piping revisions could be made in the field to dispense with piping detail drawings.
SAFE FILE
f
MA.NUFArruRiNa Department
Stone & Webster Engr. Corp.
Page 2
April 19, 1948
We should appreciate your accepting this added project and proceeding -with its construction*
EPB* ebs
Yours Tery truly,
B. B. Turner Assistant Resident Manager
\
Per
Engineering Superintendent
CC: Mr. W* J. Henry Dr* H. E. O'Connell Mr. J. B. Rhorer Mr. J. H. Schaeffer Mr. B B* Turner Mr. F J. Maslyk (2)-S & W, Baton Rouge
i