Document 6BV2oEZq7BbLp1OnNV2KwyJM6
PLAINTIFF'S EXHIBIT
CertainTeed
Date July 14, 1980
Subject INDUSTRIAL HYGIENE SURVEY-RIVERSIDE
April 21-25, 1980
To Naaman Rhoades
Janis Woodson
CT-6S4
Locatlor^n^nal^ooe^^^ Riverside, 260 Location and mail code VF Corp. #4
cc: F. Timpe - 2125/2B J. McGinley - 2125/2B W. Blakeslee - 2126/BB L. Megargee - Riverside, 260 0. H. Kittilstad - VF 1125/4
Please find attached a completed log of personal/area air sample and audio dosimetry results.
V
Of the air samples taken, one 115 minute sample taken on the Crusher Operator, T. Silva, was 2.76 f/cc (Sample 088) which is above the current OSHA 8-hour Time Weighted Average (TWA) exposure of 2.0 f/cc. The TWA for this employee was 1.39 f/cc.
L. Megargee resampled this position on 6/26 and 6/27/80 with results being 0.15 f/cc, 0.11 f/cc and 1.29 f/cc.
All other air samples taken were within the OSHA standard with only 3 samples being above 1.0 f/cc (samples were taken on the #3 Tester Operator and the Crush Operator - Samples 041, 042 and 089).
It is recommended that the areas with samples exceeding 1.0 f/cc be monitored regularly in order to be assured that the employee's exposure remains below the 2.0 f/cc level. If a level exceeding 2.0 f/cc is found, respirators are required until an acceptable level is again achieved.
The results of the audiodosimetry noise survey indicated 11 job positions with a daily dose percentage above 100% (90 dBA dosimetry).
Those positions are:
Machine Tender Line #1 Lathe Operator Line #1 Tester Operator Line #3 Lathe Operator Line #3 Tester Operator Line #3 Beller Line #3 Handler Rework Saw SI Boring Mill Operator Coupling Tester Crusher
Sample 101 Sample 109 Sample 110 Sample 111 Sample 113 Sample 114 Sample 116 Sample 119 Samples. 120 and 122 Sample 127 Samples; 132 and 133
It is recommended that hearing protection be required at these positions until proper and permanent noise controls can be instituted.
A complete survey report is forthcoming detailing sample analysis and observations.
JW/ejb
Attachment
CTD027314
rttHth
SAINT-GOBAIN CORPORATION
Thomas E. Case, CIH
OQK
f/a. -- ~flb&r,> p&T
Q'b^'h
flovurtffe * TM'nJ^
D-O^Z = 0<6? y
y?o
0-0%
Salnt-Gobaln Cofporatlon . 750 E. Swedesford Road PO Box 860 Motley Fofge, PA 19482-0101 Telephone 215-341-7707
CertaWeed Corporation. Norton Company
CTD027315
Industrial Hygiene Survey Riverside, A/C Pipe Plant 4/21-25/ 1980
TABLE ____ PERSONAL DUST EXPOSURES
Pa9e 1
No. 80 ,
POSITION LOCATION (Date)
NAME/AREA
Manufacturing Department
001/1, Mixer Operator
J. James
00/
mh SC ` QQlC,
t,ot
004 P,
4/24/80
wt*
-eas
-ec6>
per Machine Tender
001^ / 4/21/80
F. Windsor
jtes Machine Tender
oo 1A (
A. Horton
mT
4/23/80
8|,
2nd Shift.
.pfcr i
yrf' Press Operator
'co^' 4/21/80
D. Marron
0>e Press Operator W. Ashen 4/23/80 2nd Shift
s*<
Mandrel Handler J. Clauson
<*>*' 4/21/80
ANALYSIS
riME
FOR h. I.h-A,
MIN.
UtK
RESULT f/cc
l
TWA f/cc
i<-` LAz 0
RESULT
mer m
1
3:25a3:40a
3:40a3:55a
3:55a1:45a
1:45a:45p
75
1^
15 :
no
120
0.16
i. fc<?r
0.18
V7 4^'* 0.15
0.21
ioo.3S'5'6 0.29
1 0 minute break* 6", 12" 4 14" 150
taging 4 cleaning area.
: elt and Cylinder change 1/2 hour lunch.
Made 2 dumps
:45p:00p
15
lS-V#4 0.36
Staging
.V
Ubvr
1
: OOp :54p
1 1:40a :56p
54
t
1
0.22
7 2.56% 196/^
0.13
11 minute dump. 15 minute staging, 28 minute cleanup
8" 150 A 10" 200 pipe -
:15p:35p
:35p:35p
lo140 ,
1.8r7 Q.21
^D Sfi.SEW
60 0.75
--
6" 150/200 pipe
& v.
&ber
-75^ 1 0 7:35p8:50p
-
210^'^ 11:27a-
2:57p
0,0.--'1^3 0.09
-
VOID Pump problems 8" 150 4 10" 200 pipe.
Elfcor.
*&*_
4:15p 6:35p
6:35d7:35p
14^ *5.5*4 120.20
60 ?.0&
42.84^ 0.19 0.23
7:35p 8:50p
> 0.16
11:42a 196
2:58p
_3,oM
Lo-nsi
0.10
--
6" 150/200 pipe 8" 150/200 pipe
Mandrel Handler D. Braun
^/^eo./'A JndrShift
\
1:20p5:25p
12^ bi-SlV
0.16
75 '
Tt40p8=sqp.
6" 150/200 pipe
^VOJJJ-Pump Problems--^-^'
y VOID - Pum^problems
CTD027316
Industrial Hygiene Survey Riverside A/C Pipe Plant April 21-25* 1980
TABLE PERSONAL DUST EXPOSURES
Page 2.
No. 80
POSITION LOCATION (Gate)
NAME/AREA
ANALYSIS
|kjfL^
FOR
Manufacturing Department (Continued...)
TIME
MIN.
RESULT f/cc
TWA f/cc
RESULT
1
stvf
Mandrel Handler
4/25/80
podAi
Stripper 4/21/80
Stripper
J. Clauson^^.
A. Chavez | 1
iG. Soncrant
Mtier ^HJeY
f/fber
fro
j
i
o'ofcl
4/23/80
2nd Shift
ow 0\l
Tray Loader 4/21/80
J. Butts
i___
pftJer
1:35p1:53p
18
/1.83*5 0.22
-
14" 150 pipe
11:45a 2:53p
188
0.005 3.0 Wy
B" 150 & 10" 200 pipe
4:25p6:30p
6:30p7:45p
7:45p3:00p
125 t*u 75
15 (u
18. mot 0.08
0.007
0.07
S3 23 f 0} 0.31
5" 150/200 pipe Steamy
3Q minute break
2:30p- 60 1:30p
2 .04
^1.061 <G.
8" 150 & 200 pipe _
I2T **'
Tray Loader Truck Driver 4/21/80
L. Goodman
ffTber
11:50p
183
2:53p J-0<&
0.007
8" 150 & 200 pipe -
J326^ Oilt 1
Tray Loader
02^ 01^'
4/23/80
oae' 0ftt'
2nd Shift
0. Ledford
Fjlier
4:30p 6:30p
6:30p 7:45p
$.061 120
75 ?. '3
0.029 7.
6" 150/200 pipe
0.052 (a
7:45p- 65 8:50p .7 13
^1.061 &.0
POT
Relief Operator 4/21/80 Relief Operator
1C. Aeschlim^n 1
rE. Renfro
Fi^6r F^er
om" * 4/23/80 0^'
11:35a 2:50p
195 0.07 2 . Oft 43 JfrVO^:
8" 150 & 10" 200
~ro- 2YO/`9 4:15p- ' 140/.^ 0.17 6:35p
6:35p- 60 a-> 7:35p
l^ZC1 0.089
0.14
6" 150/200 pipe
Relieved Press Operator and Stripper
P3Z0'^'
2nd Shift
7:35p8:52p
75 (1^.
0.13
Relieved Mandrel Handler 4 Press Operator
Finishing Department
azf V'
Line 1 Truck
Driver
4/24/80
D. Glavin \ i
Line 3 Lathe Operator 4/23/80
D. PastlldS/
F4ber
F^ter
V
8:55a- 185
212:00N
,o8
0.021
j Z'
0.022
6" 150 Pioe
12:00N 3:15p
195
0.023
7:52a 10:58a
'V.0% 186
I9WOCW i
0.033
0.041
14" 150 pipe
CTD027317
Iriaustrtal Hygiene Survey Riverside A/C Pipe Plant 4/(21-25/80
TABLE PERSONAL OUST EXPOSURE^
Page 3.
No. POSITION LOCATION
60 (Date)
NAME/AREA
ANALYSIS
FOR fiveW
Finishing Department
j JA
riME MIN.
Continued... Line 3 Lathe ox Operator
D. Pasillas
SP\ J4VSt^\
JJASer
/
0:58a 112 ! 2:50p 1
i 2:50p- 150..1T20p " ,
RESULT f/cc
TWA f/cc
'"'I1
lypiLJo _0___ ^
RESULT
0.053 /8.4H
14" 150 pipe
VOID --Pump problems -
eitA.
Line 3 Lathe
J. Peterson
Fiber
:47a 1:00a
193
o?3.77 sr,: r 0.039
14" 150 pipe
Assistant 4/23/80
V'
Line 3 Tester
J, Campbell
Fiber
l 1:00a no l 2:50p
z.or
iinwH 0.063
0.066
i 2:50p 3:20p
150 2.*
7 ^Sa 195 il :00a
0.093
fees, oiCJ'31,45
14" 150 pipe
o6,,
1o''
Operator
4/23/80
11:00a no
12:50p 1.0*
?o .QuzS
1,13
1.19
12:50p 150 3:20p .oM
HOl.bliZS' 0.89
Line 3 Beller
0. Parr
4/23/00
Fiber
6:05a- 171 10:56a 2 0
10:56a- 109 12:45p -k. . o
0.Q97 35. V 0.11
14" 150 pipe 0.102
U" ' -
12:45p- ""155 3:20p
-
Stir' crt> P
Kr pt-1*?'
LTne 3 Beller
4/23/80
J. Dobbs
^9tTA o^A
Line 3 Handler
A. Amaro
^psT
4/23/80
i
-flSf C^Ti:
l
> Line 3 Inspecto L. Gil
4/23/80
^
Fiber Fiber \
7:53a- . 184 10:57a
10:57a- no I2:47p 2.fZ
/3T 057/2
0.23
~
zg.izom 0.18
0.17
14" 150 pipe
12:47p 153 3:20p l.' 3
0.13
8:00a10:57a
MO-fro? 177 0.22
I^Z-
10:57a 12:45p
108 i^-z-
U-K{% 0.20
0.22
12:45p - 155
3:20p \f\l
loSi3UZ3 0.24
14" 150 pipe
Fiber J
7:50a - 185 10:55a
0.038
14" 150 pipe
CTD027318
(
Industrial Hygiene Survey Riverside A/C Ptpe Plant 4/21-25/80
TABLE ____ PERSONAL DUST EXPOSURES
Page 4.
No. 1 80 '
POSITION LOCATION (Date)
NAME/AREA
ANALYSIS
MW
FOR
Line 3 Inspector
/ lA L. OH
-H^er
|
4/23/80 0^"'
1 1
0o5>& ' Small Rework
Saw Operator
5* 4/22/80
M. Allen b'
1 i
t>4 WC|
0
pt^
0^'
osf
ciibi
Large Rework
Saw Operator 4/23/80
Ka,
Large Rework Saw Ooerator 4/24/80 .
' M. Alle i
H. All en
Fjwr
^MtSer'
TIME
MIN.
RESULT
W/Ks
10;55a- no
12:45p
\-1-^ 0.054
TWA f/cc
0.05
RESULT 14" 150 pipe
12:45p* 3:20
155 ?
0.062
7:20a9:15a
9:15a11:50a
115 0.06
1 \a.ttQyz
155 0.095
Ufa
0.084
8" 150 Rework to 1/2 lengths
11:50a 1:45p
115
"A.
Void Sample Used Twice--
:45p 3:20p
95 nz-
0.09
8:10a 115 10:05a \
0.28
10:05a 12:15p
130 5.061
(S'*- *.6,
9:35a- 40 10:15a 1^
0.05
r 0.16
On Sweeper
60 min.-lar^e saw 14" 150 51 min. Small saw 8" 150
1/2 hour sweeper, 30 min small saw, 15 min. large saw
30 min. large saw 14" 150 10 min. small saw
Fittings Departm ent
96^ . #1 Boring Mill ^'
i
A. Buehrostro
364^ ovt 6.
4/22/80
365'
| !
068''*
1
be?' #1 Boring Mill .M. Plaza
068^
Helper
oi*A,
jlW 4/22/80
OT-SBi \
jwf
*c.
i
\
V
f\^r
8:05a10:20a
135
<c '' 75*
0.05
10" 150 couplings
10:20a 11:51a
91
7 A'
0.08
11:51a 129
i
2:00p
-? ,o*J
0.052
0.061 Down 1 hr. for repair
1
1 2:00p- 145
Down 40 min. `for repair
2:45p
0.068
7-0^ Ja. 35^3?
F jiier [
Wr^O*
^L
\
| 1
viy
10:20a
92
11:52a 7^
11:52a 115
1:46p Z-I3>
1:46p 4:26p
159
z.'">
0.17
o.CSS3, .r
HoMCll 7^
0.10
0.15
0.17
^Voi.(t^^aimf> 1 e__ufredtvdC5U
10" 150 Couplings (Dry) Working on plastic coupli machine
10H 150 Couplings (Dry)
CTD027319
L jstrlal Hygiene Survey liverside A/C Pipe Plant 1/21-25/80
TABLE ____ PERSONAL OUST EXPOSURES
Page 5.
No. POSITION
NAME/AREA
ANALYSIS
TIME
MIN.
RESULT
TWA
80 LOCATION (Date) A. Buenro^ro #1 Boring Mill
FOR yPlK
l
M-OqJ* "O
Fiber
0:25a-
15
f/cc , f/cc
REMARKS
/ JV ff-. JUb
-10 i
10" 150 Couplings (Wet)
10:40
Operator
| /&3
4/24/80
Big Mill Operator
y*
4/22/80
jK, 0V>C'
>
E. Garcia
yK oil A;
Coupling Cut Off Saw Operator
J>rf
4/22/80
o$tbt
OTps
8. Taylor
sx<
Coupling Tester Operator
T. Putnam
080"' oV-b i
4/22/80
joei 0^'
joef o^'
Fiber
Fiber
Fiber
i
8:11a10:22a
131 %.~n^3
l,o
0.25
10:22a 11:55a
93 7-
W.yoKld 0.34
11:55a 2:05p
130 1
2:05p 4:25p
140
lyi'tlVil 0.42 0.36
0.68
7^
12" Couplings
1,0
8:20a' IT;57a
217
11:52a 2:20p
U 143
/,i.s '2Sar 0.17
0.058
0.13
10" 150 Couplings
2:/0p . / 12j/ yfay
/ /
8:30a10:00a
90 1-^
0.20
/ / /
Vpfb Pump Problems.
12" 150 Couplings -Bry side of Coupling Tester
10:00a 11:57a
117 ^ 0.086
0.13
11:57a 2:10p
133
0.071 *2.0r<>X~>
10:00-11:30, Net side of coupling tester, 11:3012 Noon Machine Down
12:30-4:30, Employee Handler Line 1.
2:1 Op 4:20p
130
0.19
Fittings Maker 4/24/80
t. Hamilton
Fiber
8:45a 12 N
195
0.45
< 8" Tap couplings
& Large FM Lathe
$.
086 0^C-
Operator 4/22/80
1
M. Garcia d
Fiber (
H
8:15a11:55a
0.025
11:55* J4<r 2:15p 2.011
2:15 4:27 )
Z.oH
0.034
0.03
/</, Y02Nfc>S
0.036
12" 150 1/2 length FM's
v i_
CTD027320
liC..-tr1al Hygiene Survey
Riverside A/C Pipe Plant 4/21-25/80
TABLE ____ PERSONAL DUST EXPOSURES
Page 6.
CTO027321
Industrial Hygiene Survey Riverside A/q PLpe Plant April 21-25, 1980
No.
___ S2_
POSITION LOCATION, (Date)
j.
NAME/AREA i
/ M A-
Fiber Wareho (se AREA
4/25/80
vsT Bag Opener
out*-'
4/25/80
AREA
'X
Pit near wet tin screw 4/25/80
AREA
M
0^'
In is 1/2 wa,
between pit nd flow through
AREA
yxf
Machine Tende -
Control pane'
4/25/80
AREA
x
X'
Time Clock 4/25/80
i
i
AREA
TABLE ENVIRONMENTAL DUST RESULTS
ANALYSIS
TIME
FOR^ . ^
MIN.
otyn
RESULT f/cc
TWA f/cc
RESULT
8:47a9:47a
60
t-U
0.11 f/cc /
/o-O
5ump 4' from floor in fiber warehouse Isle.
fMfer
Fijidf
8:45a9:45a
60
8:40a9:40a
60
!%
0.11 f/cc
t5bno<
0.41 f/cc
nzSbfaHZ
Jumping 8:45a, pump settle near bag opener control
5ump 5* 6" from-floor in sle way at pit. Sprinkleis >n running 16" 150.
Fi>gr
11:50a 1:30p
100
IM
0.43 f/cc
12^.1b&oZ --
Pump hanging 5* from floor approximately 30* from pit and 30' from flow
FJESer
9:50a11:50a
60
0.23 f/cc
Pump sitting 6' from floor
-- on roll up chart cabinet
Fj/er
10:25a- 255
2:40p
i-n
0.002 f/cc
--
o.Ivlins'
Pump sitting on time clock near FM Lathe at entrance to finishing 4' ft. from floor.
-
\
CTD027322
Indust^ 1 Hygiene Survey Riverside A/C Pipe Plane April 21-25, 1980
No. 80
100
101 102
103
104
POSITION LOCATION (DATE)
Mixer Operator 4/24/80
Machine Tender 4/23/80 2nd Shift
Machine Tender 4/25/80
Control Operator 4/23/80 2nd shift
Mandrel Handler 4/23/80 2nd shift
AUDIODOSIMETRY RESULTS
NAME J. Janes
TIME
Mir.,
3:25a-2:54p 389
RESULT s
Eight He ur 85 dSA 30 wr
Doslmet er
REMARKS
21- Running 6" 150 pipe.
7;
A, Horton
:15p-A:50p 275
-
105 gunning 6" 150 pipe
F. Windsor A. Askew D. Brown
:20a-2:30p 370
62 *7 -
Running 6" 150 pipe.
t :15p-8:50p 275
-
44 f' *
Running 6" 150 pipe
:20p-8:50p 270
-
71 Running 6" 150 pipe
105 Stripper Operator G. Soncrant 4/23/80 2nd shift
106 Tray Loader
J. Ledford
4/23/80 2nd Shift
107 Relief Operator
E. Renfro
4/23/80 2nd Shift
108 Relief Operator 4/25/80
A. Aeschllman
4:25p-8:00p 215
-
4:30p-8:50p 260
-
4:15p-8:50p 275
-
8t 20a-2;30p 370
-
78 Running 6" 150 pipe
\
2
4'
Running 6" 150 pipe
94 /' -
Running 6" 150 pipe
58 Running 6" 150 pipe
109 Line #1 Lathe Operator D. Pasillas 4/25/80
110 Line #1 Tester Operatoi J. Campbell
4/25/80
111 Line #3 Lathe Operator D. Pasillas
4/23/80
112 Line #3 Lathe Assistant J. Peterson
4/23/80
8:15a-3:15p 420
-
8:15a-3:15p 420
-
7:52a-3:20p 448
-
7:47a-3:20p 453
-
113 Line #3 Tester Operate r J. Campbell 4/23/80
114 Line 03 Beller ,, 4/23/80
T). Park
7;45a-3:20p 455
-
8:05a-3:20p 435
-
192 Running 6" 150 pipe
187 Running 6" 150 pipe
181 Running 14" 150 pipe ?\ 96 Running 14" 150 pipe
^129 . Running 14" 150 pipe
109 Running 14" 150 pipe
115 Line #3 Beller 4/23/80
J. Dobbs
7:53a-3:20p 447
-
97 Running 14" 150 pipe
116 Line #3 Handler 4/23/80
117 Vine 03 Inspector 4/23/80
R. Amaro L. Gil
8:00a-3:20p 440
-
7:50a-3:20p 450
-
124 Running 14" 150 pipe 77 Running 14" 150 pipe
CTD027323
Industrial Hygiene Survey Riverside A/C Pipe Plant
April 21-25, 1980
AUDIODOSIMETRY RESULTS
POSITION NO. LOCATION 80 (DATE)
NAME
TIME
Min.
RESUt rs
Eight H )ur
Dosime ter
REMARKS
118 Small Rework Saw Operator 4/22/80
M. Allen
119 Large & jfmll Rework M. Allen Saw Operator 4/22/80
9:15a-3:20p 365 8:10a-12:15p 245
120 Boring Mill #1 Operat( r A. Buenrostro
3:14a-4:25p 491
4/22/80
121 Boring Mill #1
Helper 4/22/80
M. Plaza
8:13a-4:25p 490
- 75 Running 8U 150 pipe <*7. 1
102- Large Saw Running 14" 150
A ')
(75 min) Small saw running 8" 150 (80 min)
112- Running 10" 150 couplings
(Dry) Machine down 2 hours :o '
66- Running 10" 150 coupling
(Dry) Machine down 2 hours.
122 Boring Mill #1 Operator 4/24/80
A. Buenrostro
9:00a-4:20p 440
-
113 Running 10" 150 couplings (wet)
123 Boring Mill #1
A. Buenrostro
10:25a-3:45p 320
-
51 Running 8" 150 couplings (wet
Operator 4/25/80
Y-
124 Big Mill Operator 4/22/80
E. Garcia
8:lla-4:25p 494
-
93 Running 12" 150 couplings
. 125
Big Mill Operator 4/24/80
E. Garcia
B:30a-3:15p 405
-
62 Running 12" 150 couplings
126 Coupling cut off Operator 4/22/80
B. Taylor
127 Coupling Tester
T. Putnam
Operator 4/22/80
>:20a-4:27p 427
-
37 Running 10" 150 couplings
V
9:15a-4:20p 425
-
122 Running 12" 150 couplings
(4 hours) Line 01 Handler (4hr
128 Coupling Tester Operator 4/24/80
129 Coupling Tester Operator 4/24/80
130 Pitting Maker 4/24/80
131 FM Lathe Operator 4/22/80
132 Crusher Operator 4/22/80
133 Crusher Operator 4/24/80
134 Boiler Operator 4/25/80
T. Putnam P. Martinez C. Hamilton M. Garcia
T. Silva T. Silva D. DeAngells
135 Maintenance Oiler/ mechanic 4/24/80
Eltz
8:10a-4:20p 490 8:10a-4:20p 490 8:45a-4:20p 455 9:20a-4:27p 427 9:14a-4:20p 426 8:50a-4:20p 450 9:25a-2:30p 305
-
-
3:20a- 4:20p 480
-
65 Running 12" 150 couplings
61 -> li
35
Running 12" 150 Couplings 8" Top couplings
90 Running 12" 150 1/2 length
153
137
74 /' {
37