Document 6BNVbNyk8dnjEq0ayM1zdbkj1
Disc.: EH-1
July 27, 1988
In past years, we have issued Industrial Hygiene Bulletins covering safety, health, and environmental matters. There has been some confusion regarding those bulletins, as often they have been treated as information al, rather than as a reflection of company policy and/or approaches to industrial hygiene matters.
Henceforth, such information will be released in the form of Industrial Hygiene Directives, which should be considered mandatory.
Attached is an Industrial Hygiene Directive deal ing with asbestos demolition/removal procedures.
Att.
Homer M. Cole Director Industrial Hygiene and Toxicology
ft-100-65
005032
APPENDIX A
WORK PRACTICES AND ENGINEERING CONTROLS FOR ASBESTOS REMOVAL/DEMOLITION ACTIVITIES
Practices and Engineering Controls for Small-Scale Short-Duration Asbest^ Renovation aad Maintenance Activities
Definition ofSmall-Scale. Short.Duration Activities
Fur the purposes of hi* appendix. smallscale. shun-duration renovation and maintenance activities art tasks such as. but not limited to:
Removal of ssbestos-conuining insulation on pipes:
Removal of small quantities of asbestoscontaining insulation on beams oe above ceilings:
Replacement of an asbestos-containing gasket on a valve:
Installation or removal of a small section of drywall:
Installation of electrical conduits through or proKtmate to asbestos-containing materials.
Evidence in the record {see the Summary and Explanation section of the preamble for paragraph (g) Methods of Compliance, for specific citations} suggests that the use of certain engineering and work practice controls is capable of reducing employee exposures to asbestos to levels below the final standard's action level (0.5 f/cc). Several controls and work practices, used either singly or in combination, can be employed effectively to reduce sabestos exposures during small maintenance and renovation operations These include:
Wet methods: Removal methods ;
--Use of Clown bags --Removal of entire asbestos insulated
pipes or structures --Use of mini-enclosures
Enclosure of asbestos materials: and Maintenance programs. This appendix describes these controls and work practices in detail.
Preporotion of the Areo Before Renovation or Maintenance Activities
The first step in preparing to perform a mxN-scale. short-duration axbestus renovation or maintenance task, regardless of the sbatement method that will be used, is the removal from the work area of all objects tbit are movable to protect them from asbestosxonUmir.etion Objects that cannot he removed mult be covered completely with a 6-mil fh/ck poJyethilene plait;c *bcehng before the task begins Ifobieeuhave already been conummmed. they should be thor*tighl> cleaned with High Efficiency Particuixte Air (1IEPAJ filtered vacuum or be wet wiped before they are removed from the work area or completely.encased tn the piaciic.
IVct SlcihoJs
Whenever feasible, and regardless of the abatement method to be used (e.g.. removal, enclosure, use of glove bags], wet methods must be used during small-scale, short duration maintenance and renovation activities that involve disturbing asbestoscontaining materials Handling asbestos materials wet is one of the most reliebie methods of ensuring that asbestos fibers do nut become airborne, and this practice should therefore be used whenever feasible. As discussed in the Summary and Explanation aection of the preamble for paragraph (g). Methods of Compliance, wet methods can be used in (he great majority of workplace situations Only in cases where asbestos work must be performed on live electrical equipment, on live steam lines, or in other areas where water will seriously damage materials or equipment may dry- removal be performed. Amended water or another wetting agent should be applied by.means of an airless sprayer to minimize the extent to which the asbestos-conteixung material it disturbed.
Asbestos-containing materials should be wetted from the initiation of the maintenance
C/ove Bag Installation. Clove bags are approximately 40-mch-wide times 64-inchlong begs fitted with arms through which the work can be performed Isee figure &-l|A)). When properly installed and used, they permit workers to remain completely isolated from the asbestos material removed or replaced inside the bag Clove bags can thus provide a flexibUe. easily installed, and quickly dismantled temporary amall work ' area enclosure that is ideal for small-scale asbestos renovation or maintenance jobs.
or renovation operation and wetting agents should be used continually throughout the work periud to ensure that any dry asbestoscontaining material exposed in the course of the work ta wet and remains wet until final disposal. '
Removal ofSmallAmount ofAsbestosContaining Materials
Several methods can be used to remove sir.a11 amounts of asbcstos-contamuig materials during small-scale, short-duration renovation or maintenance tasks. These include the use of glove bags, the removal of an entire esbestos-coveted pipe or structure, and the construction of mini-enclosures. The proerdures that employers must use for each of these operations If they wish to avail themselves of the final rule's exemptions ere described tn the following section*.
Clave Bogs
As discussed in the Summery end Explanation section of the preamble for paragraph Is). Methods of Compliance, evidence in the record indicate that the use of glove bags to enclose the work area during mall-scale, short-duration maintenance or renovation activities will result in employee exposures to asbettos that are below the final standard's action level of o.l f/cc This appendix provides requirements for glovebag procedures to be followed by employers wishing to avail themselves of the standard's exemptions for etch sctivities. OSHA has determined that the use of these procedures will reduce the t hour time weighted average (TWA) exposures of employees involved in these work operations to levels below the action level end will thus provide a degree of employee protection equivalent to that provided b) compliance with all provisions of the final rule
005033
A-l
INDUSTRIAL HYGIENE DIRECTIVE
July 27, 1988
ASBESTOS DEMOLITION AND REMOVAL
It is the policy of Reynolds Metals Company that all`employee exposures to asbestos be kept as low as possible. Consequently, where feasible, all asbestos demolition/removal work should be performed by qualified outside contractors. A list of qualified contractors and a Performance Audit Form are enclosed. The Performance Audit Form should be returned to the attention of R, E. Benton, Industrial Hygiene, upon the completion of each job.
For small-scale asbestos demolition/removal jobs, where time is critical and a contractor cannot be obtained, properly trained RMC employees may perform the asbestos demolition/removal work. These employees, however, must be thoroughly trained on proper work practices for handling asbestos. (See Appendix A.) Part of the training program should include videotapes which are available from Corporate Industrial Hygiene. Employees must also be advised about the types of asbestos present and their potential health effects.
At least one supervisor should attend an asbestos training course, if the plant'anticipates using Reynolds' employees for any asbestos demolition/removal work. Training courses are sponsored by the Environmental Protection Agency (EPA) Asbestos Training Centers and other groups. (See enclosed list of training centers in Appendix B.) The supervisor who attends the course would then be responsible for training all affected plant personnel, to ensure that proper work practices are used during all asbestos demolition/ removal jobs.
Air sampling is also required on all asbestos demolition/ removal jobs, to assure the effectiveness of the controls and work practices. This requirement may necessitate the purchase of air sampling equipment. (See Appendix C.) Should the plant wish to purchase equipment, please contact Ron Berrton (Ext. 2265) or me (Ext. 3506) , regarding the type of equipment recommended and its proper use.
From an environmental standpoint, EPA's National Emission Standard for Hazardous Air Pollutants (NESHAP) for asbestos dictates: 1) agency notification of planned demolition and renovation activities, 2) adherence to specified procedures for asbestos emissions control during removal activities, and 3) proper handling and disposal of the asbestos materials at the landfill site. These standards are applicable to the renovation and/or demolition of friable asbestos. Please notify c. R. Bent (extension 2918) of the Corporate Environmental Control Department, when asbestos removal activities are planned, to determine the applicability of the NESHAP regulations and/or to discuss the specifics of these requirements.
Homer M. Cole Director Industrial Hygiene and Toxicology
005034
(A) (6)
(C) (0}
ftp** G-l. Di<ptaw Sfcewtag Praf Uw f Clot* a*p * Smell-Beak. Sbofl-Duretwa Miinimsw ad tiaoyiboe Opantms.
These bagt art tingle use control devices
that are disposed of at the end of each job. The bags are made of transparent 6-mil-thick
polyethylene plastic with arms of Tyvek * material (the same material used to make the
disposable protective suits used in major asbestos removal, renovation, and demolition operations and in protective gloves). Clove bags are readily available from safety supply stores or specialty asbestos removal supply
bouses. Clove bags come pre-lsbeled with the asbestos warning Isbel prescribed by OSHA and EPA for bags used to dispose of asbestos waste.
Clove Bog Equipment and Supplies. Supplies and materials that are necessary to sue glove bags effectively Include:
(1) Tape to seal the glove bag to the area from which sbebestos is to be removed.
(2) Amended wster or other wetting agents: (3) An airless sprayer for the application of
the wetting agent:
tent*on of trad* name**' commercial prodyCU
not eorutituK endoreeAeat or
recommendation for u&
f5V
{<) Bridging encapsulsnt fa paste-like substance for eoeting asbestos) to seal the rough edges of any asbestos-containing materials that remain within the glove bag at
the points of attachment after the rest of the asbestos has be removed:
(5) Tools such as razor knives, nips, and wire brushes (or other tools suitable for Cutting wire, etc.);
(6) A HEPA filter-equipped vacuum for evacuating the glove bag (to minimise the release of ssbesios fibers) during removal of
the beg from the work ares and for cleaning any ms tens] that nay hsve escaped during the installation of the glove bag: and
(7) KPA-equipped dust cartridge
respirators for use by the employees involved In (he removal of asbestos with the glove bag.
Clove Bag Work Practices The proper use of glove bags requires the following steps:
(1) Clove bags must be installed so that they completely cover the pipe or other Structure where asbestos work is to be done. Clove bags are installed by cutting the sides
of the glove bag to fit (he size of the pipe from which asbestos is to be removed. The glove
beg attached to the pipe by folding the Open edges together and securely sealing them with tape. All openings in the glove beg must be sealed with duct tape or equivalent materiel. The bottom seam of the glove bag must also be sealed with duct tape or equivalent to prevent any leakage from the bag that may result from a defect is the bottom seam (Figure C--1(B)).
(2) The employee who m performing the aabestos removal with the glove bag must don a half mask dual-cartndge HEPAequipped respirator, respirators should be worn by employees who are in close contact with the glove beg snd who may thus be exposed as a result of small gaps in the seams of the bag or holes punched through the bag by a razor knife or a piece of wire mesh.
(3) The removed asbestos material from the pipe or other surface that has fallen into the enclosed beg must be thoroughly wetted with a wetting agent (applied with an airless sprayer through the pre-cut port provided in most gloves bags or applied through a small hole cut in the bag) (Figure G-1(C))-
(4) Once the asbestos material bat been thoroughly wetted, it can be removed from the pipe, beam or other surface. The choice of
tool to use to remove the asbestos-containing material depends on the type of material to be removed. Asbestos-containing materials are generally covered with painted canvas and/or wire mesh. Painted canvas can be cut with a razor knife and peeled away from the asbestos-containing material underneath. Once the canvas has been peeled away, the aebestos-containing material underneath may be dry. in which case it should be re-sprayed with a wetting agent to ensure that it generates as little dust as possible when removed. If the ssbestos-contamiag material is covered with wire mesh, the mesh should be cut with nips, tin snips, or other appropriste tool and removed.
A wetting agent must then be used to spray any layer of dry material that is exposed beneath the mesh, the surfsce of the stripped underlying structure, and the inside of the glove bag.
(5) After removal of the layer ofasbestoscontaining material, the pipe or surface from which asbestos has been removed must be thoroughly cleaned with s wire brush and wet wiped with s wetting agent until no traces of the asbestos containing material can
be seen. (6) Any asbestos containing insulation
edges that have been exposed as a result of the removal or maintenance activity must be encapsulated with bridging encapsulsnt to ensure thst the edges do not release asbestos fibers to the atmosphere after the glove bag bis been removed.
(7) When the asbestos removal and encapsulation have been completed, a vacuum hose from s HEPA filtered vacuum must be inserted into the glove bag through the port to remove any air in the bag that may contain asbestos fibers. When the sir be* been removed from the bag. the bag should be squeezed lightly (as close to the top as possible), twisted, and sealed with tape, to keep the asbestos materials safely in the bottom of the bag The HEPA vacuum can
005035 a-2
thee> b removed horn tht b*g and the glove
bag itself un be removed from the work area to be dmpoaed of property (Figure C-l(D)).
Top Tit* 510# T1*
Vork Arta
-------1
( II II M
ti
1 1 1
Mostl c curtain
Change fcooa t,
1 1 tl ||
II II 1
1
Misti c curti In
v
Yacuwt host
Mastl c Cvrti In
\
rustic Curt* in /
Vork Area
Change tees
I Caution! {Centalas I Usbestosl
ii
C
(
rturt C-a. SdMTMtk af Mini Mftnww
Taeuut hose
Mini-EncJotum
In tome Instance*. such removal of asbestos from a amall ventUation system or from a abort length of duct, a glove bag may sot be either large enough or of the proper Kape to endoae the work area. In such cue*, a mini-enclosure can be built around the area where smsll-scale. ahon-duration asbestos maintenance or renovation work ia to be performed (Figure C-2). Such an
enclosure ahouiu oe constructed of taiu* thick polyethylene plaatic aheeting and can be amall enough to restrict entry to the asbestos work area to one worker.
For example, a mini-enclosure can be built la a amall utility doaet when asbestos, containing duct covering is to be removed. The enclosure is constructed by:
(1) Affixing plastic sheeting to the walls with spray adhesive and tape:
005036
(
A-3
|T] Cvrring ihr floe* w<th plastic and eslmg the plastic eovenng the floor la the plastic on the walla.
t3| Sealing any prnctrsltons such a pip** r efc'Ctricaf conduits with (ape. and
(4) Constructing email change room foppreaimaieit 9 feet square) made of fr-millick polyethylene plastic supported by itorch b> 4-nnch lumber t'*'* plastic should be ttadwd to (he lumber supports with staples r apiey adhesive and upe|.
TV dksnge room should be eoni^uour to tbe mini enclosure. and is necessary to allow the warier to vacuum ofT hit protective overfill and remove lhc before leaving the wort ores While iasidr the enclosure, the mortar should wear Tyuok' disposable overalls and ae the appropriate HEPA fWiered dual cartridge respirator) protection.
The advantages of Runi^ncloswres are (hat #*ey limtt the spread of asbestos contamination. reduce the potential exposure f bystander* and other workers who may be wording in sd(crrtt areas, and are Quick and as) to install The disadvantage of mistcloautes is that they may be toe small to contain the equipment neerwar) to mate a egaltee pressure within the enclosure: however. the double layer of plastic sheeting mill arn*e to restrici the release of asbestos fibers to the area outside the endwaurc.
Pemcre/ ofCntire Structures
When pipes are Insulated with asbestosContaining materials. removal of the entire pipe may be men protective. *s>er. and sore cost-eflectivc than stripping the asbestos insulation from the pipe Before uch a pipe Is cut. the asbestos containing insulation must be wrapped with 4-mil polyethylene plastic and securely sealed with duct tape or aquivAJefti This plastic covering will prevent asbestos fibers from becoming irbome as a result of the vibration created toy the power sews used to cut the pipe. If possible, the pipes should be cut at locations toa< are not insulated to avoid disturbing the ' abet too. If a pipe is completely insulated with asbettoKontaining materials, small CCtioni should be stripped using the glovetong methed described above before the pipe to ost at the stripped sections.
tdrnanmnrs Frvfram
As asbestos maintenance program must hu toitiuted in all facilities that have asbestosontoming materials- Such a program should tosdude:
Development of an Inventory of all Mbestos-containing materials in the facility
Periodic examination of all asbestosContaining materials to detect deterioration:
Written procedures for handling asbestos material# during ihe performance of smallscale, shortduration maintenatw and penovation activities:
Written procedures (or asbettoa disposal and
Written procedures for dealing with sbestos-related ameryendea.
Ucmben of the building's maintenance ogineenng staff (electnoans. hesting/atr conditioning engineers, plumbers. eu~] who way be required to handle asbestoscontaining materials should be trained in aafe pnjecdufes. Such training should indude at a Minimum:
information regarding types of aalwstos d its various uoes arid forms:
Information on the health effects aeociiird with asbestos exposure:
Descriptions of the proper methods of handling asbeatos-contsining materials, and
Information on the use of HPAquipped dual cartridge respiratory and other personal protection dunng maintenance aiviue*.
Prohibited Aetrirda
Tht mining program for the maintenance sgincenag sufT should describe methods of handling asbestos-containing matenefs aa well as routine maintenance activity* that sty prohibited when aabcsios-oontaimng materials are involved For example, maintenance staff employees should be tootrvaad.
Sot to drill holes in asbestos containing materials;
S'ot tu hang plants or pictures on Irurfurrs covered with asbrsttrsconiaining MteriaU:
,'u tu sand asbestm-containing floor I0e:
.Mr/M damage aabustiK^ontainin* materials while moving turmturc or othrr bjecU;
.Vor to install cvnains. drapes, or dividers in such a way that they damage abcsios-containing materials:
Aor to dust floors, ceilmgv molding* or other surfaces in athestov-ennwmmamd cnvimnmenU with a dry brush or swe<*p with dry broom:
Sot to use an ordinary vacuum to dean p ashf-stui-containing debris:
Sot to remove ceiling tiles bvluv* asb>r>tus-contaimng materials without wearing the proper respirator)- protection, clearing the area of other people, and observing asbestos removal waste disposal procedures:
A'ot te remove ventflali<*i system Alters #y and
Sot to shake ventilation systen fillers.
005037
A-4
ASBESTOS DEMOLITION AND REMOVAL July 27/ 1968
OVERVIEW OF THE GLOVEBAG PROCEDURE
A glovebag is a 6-12 mil bag fitted with long-sleeved gloves, a tool pouch, and a two-inch opening for water. Although glovebags can be fabricated by the user for each project, most contractors prefer to purchase readymade bags. The size, quality, style, and cost vary depending on the manufacturer. In addition to the glovebag, several other tools and materials are commonly reguired to perform the project successfully. These materials, listed below, are readily available from most asbestos abatement contractor suppliers.
MATERIALS
1. Glovebag (one or more, depending on project size)
2. Pump-up garden sprayer (2-3 gallon size)
3. Amended water (surfactant, availble from local garden shop or
safety supply company)
4. Duct tape (3-inch width)
5. Polyethylene disposal bags (6 mil) 6. Smoke tubes with aspirator bulb
7. HEPA-filtered vacuum cleaner 8. Bone saw
9. Utility knife with retractable blade
10. 11. 12. 13. 14. 15.
Wire cutters Tin snips (if aluminum jacket is present) Polyethylene plastic (roll of 4 or 6 mil) Dual cartridge respirators with high efficiency cartridges Disposable full-body suits with hood and feet covering Small scrub brush
16. Stapler 17. Several rags
18. Wettable cloth
19. Asbestos caution signs and labels
20. Reinsulation materials, as necessary
BEFORE STARTING A GLOVEBAG PROJECT
Two persons are reguired to perform a glovebag removal project. Also, a third person is sometimes available, to assist with supplies, to keep unwanted visitors out of the area, and to conduct air monitoring. Each of the team members should be trained on the use and limitations' of glovebags. They should also be included in the respiratory protection and medical surveillance programs.
Before any work begins, all necessary materials should be brought into the work area. The work area should be roped off and warning signs should be posted on the perimeter to minimize the chance of visitors entering the area. Barrier tape (3-inch) with a pre printed asbestos warning is recommended. If applicable, the HVAC supplying the work area should be shut down.
Employees should also be trained about emergency procedures, in the event of a glovebag rupture. The emergency training should cover wet cleaning, HEPA vacuuming procedures, and shower use. The following guidelines may be used for most pipe lagging projects:
005038
A-5
ASBESTOS DEMOLITION AND REMOVAL July 27, 1988
REMOVAL PROCEDURES
1. Follow the manufacturer's directions and mix the surfactants with water in the garden sprayer*
2. Each employee should wear a cartridge respirator and check the face-fit.
3. Each employee should wear a disposable full-body suit, being mindful that the hood goes over the respirator straps.
4. The pipe on which the work will be performed should be checked. REMEMBER.* .NEVER PERFORM GLOVEBAG REMOVAL ON HOT PIPES OVER 150F. This may cause the bag or gloves to melt over the workers' hands and arms. If the pipe is damaged (broken, lagging, hanging, etc.), the entire length of the pipe should be wrapped in polyethylene plastic and "candystriped" with duct tape. A common problem with glovebag work is that loose pipe lagging several yards from the glovebag may be jarred during the work, causing a release of asbestos into the air. Another problem is failure to clean up debris on the floor and% other surfaces. If the pipe is undamaged, it is still necessary to place one layer of duct tape around the pipe at each location where the glovebag will' be attached. This serves two purposes. First, it gives a good surface on which to seal the ends of the glovebag. Second, it minimizes the chance of releasing fibers when the tape at the ends of the glovebag is peeled off at the comple tion of the job.
5. Slit the top of the glovebag open (if necessary) and cut down the sides to accommodate the size of the pipe (about two inches longer than the pipe diameter). One brand has a zipper top and straps at each end facilitating installa tion of the bag on the pipe.
6. Place the necessary tools into the pouch located inside the glovebag. This will usually include the bone saw (flexi saw), utility knife, rags, scrub brush, wire cutters, tin snips, and vettable cloth. Note: It is easiest to pre-cut the vettable cloth at this point. Cut out a donut shape with the inner diameter 1/2-inch smaller than the diameter of the pipe beneath the in sulation. The outer diameter of the donut should be three inches longer than the diameter of the pipe in sulation being removed. Finally, cut a slit in each of the two donuts, so they can be slipped around the pipe..
7. Place one strip of duct tape along the edge of the open top slit of the glovebag for reinforcement.
005039
ASBESTOS DEMOLITION AND REMOVAL July 27, 1988
8. Place the glovebag around the section of pipe to be worked on and staple the top together through the reinforcing duct tape. Staple at intervals of ap proximately one inch. This should provide an ade quate seal along the top. Next, duct tape the ends of the glovebag to the pipe itself, previously covered with plastic or duct tape (See Step 4).
9. A smoke tube and aspirator bulb are needed to test the glovebag. Place the tube into the water sleeve (two-inch opening to glovebag). By squeezing the bulb, fill the bag with visible smoke. Remove the smoke tube and twist the water sleeve closed. While holding the water sleeve tightly, gently squeeze the glovebag and look for smoke leaking out, especially at the top and ends of the glovebag. If leaks are found, they should be taped closed, using duct tape, and the bag should be retested with smoke.
10.
Insert the wand from the water sprayer through the water sleeve. Using duct tape, tape the water sleeve tightly around the wand, to prevent air leakage.
11.
One person should place his hands into the long-sleeved gloves, while the second person directs the water spray at the work.
12.
If the section of pipe is covered with an aluminum jacket, it should be removed by first using the wire cutters to cut any bands and then using the tin snips to remove the aluminum. It is important to fold in the sharp edges to prevent cutting the bag when it is placed in the bottom. Use caution to prevent cuts - these edges are sharp!
13.
With the insulation exposed, use the bone saw to cut the insulation at each end of the section to be re moved inside the glovebag. Note: A bone saw is a serrated heavy-gauge wire with ring-type handles at each end. Throughout this process, water is sprayed on the cutting area to keep dust to a minimum.
14.
Once the ends are cut, the section of insulation should be slit from end to end, using the utility knife. The cut should be made along the bottom of the pipe and water continually supplied. Again, care should be taken, when using the knife, not to puncture the bag. Some insulation may have wire to be clipped, as well.
15. Spray all tools with water inside the bag and place back into pouch.
16. The insulation can now be lifted off the pipe and gently placed in the bottom of the bag.
005040
A-7
{
ASBESTOS DEMOLITION AND REMOVAL July 27, 1988
17.
Using the scrub brush, rags, and water, 6crub and wipe down the exposed pipe inside the glovebag. Note: The inexpensive horse rub-down mittens work well for this.
18.
Wet the donut-shaped pieces of wettable cloth over the exposed ends of insulation remaining on the pipe. Wettable cloth is a plaster impregnated fiberglass webbing available at many hardware and/or plumbing supply stores.
19.
Remove the water wand from the water sleeve and at tach the small nozzle from the HEPA-faltered vacuum. Turn on the vacuum only briefly to collapse the bag.
20. Remove the vacuum nozzle, twist the water sleeve closed, and seal it with duct tape.
21.
From outside the bag, pull the tool pouch away from the bag and twist it to separate it from the bag. Place duct tape over the twisted portion and then cut the tool bag from the glovebag, cutting through the twisted/taped section. 'This will allow the contami nated tools to be placed directly into the next glovebag without cleaning. Alternatively, the tool pouch with the tools can be placed in a bucket of water, opened underwater, and the tools cleaned and dried without releasing asbestos into the air. Note: Rags and the scrub brush cannot be cleaned in this manner and should be discarded with the asbestos waste. If more than one adjacent section of pipe is to be removed, the glovebag may be loosened at each end and slid along the pipe to the next section. In this case, the tools would remain in the bag for continued use.
22.
With the removed insulation in the bottom of the bag, twist the bag several times and tape it to keep the material in the bottom during removal of the glovebag from the pipe.
23.
Slip a 6 mil disposal bag over the glovebag (still attached to the pipe). Remove the tape, open the top of the glovebag, and fold it down into the dis posal bag.
24. Remove the disposable suits and place these into the bag with the waste.
25.
Twist the top of the bag closed, fold this over, and seal it with duct tape. Then put a warning label on the bag.
26. Using a clean damp rag, wipe the exterior of the respirator and leave the work area. Then, remove the respirator.
O05041
A-8
ASBESTOS DEMOLITION AND REMOVAL July 27, 1988 27. Asbestos-containing material must be disposed of at an
approved landfill in accordance with EPA regulations.
005042
A-9
ASBESTOS DEMOLITION AND REMOVAL July 27, 1988
APPENDIX 2
ASBESTOS TRAINING CENTERS
INSTITUTION
Southeast Asbestos Info. Center GEORGIA INSTITUTE OF TECHNOLOGY Atlanta, GA 30332
Asbestos Information Center TUFTS UNIVERSITY Medford, MKA 02155
Natioal Asbestos Info. Center UNIVERSITY OF KANSAS Shawnee Mission, KS 66207-3398
MEDICAL COLLEGE OF VIRGINIA Dept, of Preventive Medicine Richmond, VA 23298-0212
PACIFIC ASBESTOS INFORMATION CENTER UNIVERSITY OF CALIFORNIA, EXTENSION DIV. 2223 Fulton St. Berkeley, CA 94720
MIDWEST ASBESTOS INFORMATION CENTER School of Public Health UNIVERSITY OF ILLINOIS 2035 West Taylor St. Chicago, IL 60612
TELEPHONE * 404/894-2400
617/381-3531
913/648-5790 804/786-9785 804/786-0494 415/643-7143
312/996-5762
005043
\<
B--1
PERFORMANCE AUDIT
CCKTR'CTCR ASBESTOS REM^AL/HEPAIR
DKCE tEyAKE'ESO' 1MB CF AODEICR
PLANT TXTO HCDLATIQN
To ensure that the contractor is cczsplying with the contract, please answer the foilcuing questions. Ary question which is answered "Ho* should be eaq&ained in detail cn the back of this fana.
i.
2,
3.
4.
5.
6.
7.
8.
9.
10.
11
0O
N/A
KAS A REGULATED AREA WITH WARNING SIGNS BEEN ESTABLISHED?*
ODD-
IS AN ENCLOSURE BEING USEO (CONTAINMENT ROOM OR A GLOVE BAG)?
DD O
DOC ca
IF THE ENCLOSURE IS A CONTAINMENT ROOM, JS IT KEPT UNDER NEGATIVE PRESSURE WITH A VENTILATION SYSTEM EQUIPPED WITH WEPA (HIGH EFFICIENCY PARTICULATE AIR) FILTERS?
IF THE ENCLOSURE IS NOT BEING USED, HAS THE CONTRACTOR ESTABLISHED BORDERS TO HIS REGULATED AREA BASED ON AIR SAMPLING RESULTS?
tS ACCESS TO THE REGULATED AREA LIMITED TO THOSE INVOLVED IN THE REMOVAL/REPAIR PROJECT?
DD
ARE PERSONS ENTERING THE REGULATED AREA PROVIOED WITH RESPIRATORY PROTECTION AND PROTECTIVE CLOTHING (RUBBER FACEPIECE RESPIRATOR, HEAD, HA?, WHOLE BODY. AND FOOT COVERINGS)?
ARE PERSONS LEAVING THE REGULATED AREA REQUIRED TO DECONTAMINATE THEMSELVES?
O
ARE WET METHODS USED TO REMOVE AT CLEAN UP THE ASBESTOS - CONTAINING MATERIAL?
oO
IS THE WET ASBESTOS - CONTAINI NG WASTE PLACED IN IMPERMEABLE, LABELED PLASTIC BAGS?**
COD
AFTER THE ASBESTOS -CONTA IN1 NG MATERIAL HAS BEEN REMOVED OR REPAIRED, IS A HEPA VACUUM CLEANER USED TO CLEAN ALL CONTAMINATED SURFACES?
0O C
AFTER THE VACtAJMING, ARE THESE SURFACES WET WIPED/MOPPED?
* Warning Sign language;
Danger A^oestos Cancer and Lung Disease Hazard Authorized Personnel Only Respirator and Protective Clothing T-rv-raired in this Area.
AUDITOR'S sra^ruHE
** label language:
Esnger Contains Asbestos Fibers
Avoid Creating IXast Cancer and Lung Disease Hazard
005044 B_2
oimyncN l
explanation
c
C
005045
C
B-3
ASBESTOS DEMOLITION AND REMOVAL July 27, 1988
APPENDIX C
RECOMMENDED SAMPLING PROCEDURE FOR ASBESTOS .
1. The preferred collection device shall be the 25mm mixed cellu lose ester filter in a cassette with an open-faced 50mm extension cowl. The 37mm cassette may be used in those situations where dust loadings reduce the sampling time to less than one hour. (See Item 3, below.)
2. An airflow rate between 1.5 liter/min. and 2.5 liters/min. shall be used for either the 25mm or 37mm cassette.
3. If, during sampling, the filter darkens noticeably (i.e. changes color) , or if loose dust is seen on the filter, a second sample shall be started.
4. All pumps should be calibrated with a bubble flow meter before and after each day's use. An inverted 500ml buret will suffice as the bubble meter.
5. Before starting the sampling, record the date, plant name, sample number (written on the white shrinkband), pump number, employee's name, work description, and controls used on the enclosed sampling data sheet. Also, note the type of protective clothing and respirator worn by the employees.
6. The tubing from the pump should be attached to the end of the cassette that has the "ribbed" appearance. The cassette should be sampled with an open face (i.e. entire cap removed from the end of the cassette, rather than the small plug) and attached to the worker's shirt collar.
7. After the pump is turned on, ensure that it is functioning properly and has an 8-hour charge. The time the pump is started is also recorded on the sampling data 6heet.
8. Unless the filter darkens, as in Item 3, the sampling period should be a series of 4-hour samples until the project has been finished and clean-up completed. At the end of each sampling period, the cassette should be removed from the tubing, the end cap and bottom plug replaced, and the time pump stopped should be recorded on the sampling data sheet.
9. During sampling, any conditions which might affect the results should be noted on the sampling data sheet (e.g. glovebag rupture, insulation not kept wet, etc.).
10. After sampling has been completed, each cassette should be taped around the ends, to prevent accidental opening during shipment, and returned to Corporate Industrial Hygiene in a rigid container, along with the completed sampling data sheets. (Note: One unused cassette should be returned as a blank, for every 6 filters' used.)
***
005046