Document 6BBROj5op7x1XkO2KMqnGo613
PERSONAL & CONFIDENTIAL
UNION CARBIDE CORPORATION Chemicals ancThastics
Texas City, Texas
.Mr, M. E. Elsenhour
Mr. D. 1 Engle
4 Mr. R. L. Frantz
Dr. D. H. Glenn Mr. J. L. Hockersmlth Mr. D. R. Hutchinson Mr. J* B. Leverton Or. D. R. Montgomery
Mr. K. E. Ross Mr. R. W. Sesler Mr. W. R. van der Hoeven
February 7, 1975
Subject: VCM Perimeter Survey - November 11>15, 1974
Gentlemen:
For your information, attached are the results of a carbon tube study of vinyl chloride dispersions downwind of production facilities November 11-15, 1974. This was an effort to assist in defining "action level" areas (above 0.5 ppm) and "regulated areas" (above permissible levels).
Operating parameters at the time included venting high pressure streams to the air. Widespread elevated levels reflect this. (See red circled sampling points on map.)
New data taken with vent streams fed to Building 11 boilers will be forthcoming. Hopefully, the magnitude of dispersion will be significantly reduced.
Very truly yours.
0. E. Deese Industrial Hygiene Director
Attachments
ucc
034003
VINYL CHLORIDE PERIMETER SURVEY
A survey was conducted by the Industrial Hygiene group in an effort to establish a 1.0 ppm and 0.5 ppm vinyl chloride concentration level at the perimeter of the polyvinyl chloride manufacturing area.
This activity was carried out during the week of November 11, 1974 and November 15, 1974 at which time the units were operating normally. The data gathered in the survey will be used to establish tentative boundaries for the regulated area around our polyvinyl chloride facilities and required by federal regulations. Since the time of this survey several vents emitting significant amounts of vinyl chloride monomer to the atmosphere are now being burned and further study will be required to establish permanent boundaries.
The sampling strategy and analytical technique were considered very carefully since this is the first time a project of this type has been attempted in the Plant. It was decided to use the Century organic vapor analyzer to get a rough estimate of the concentration levels. The Mi ran portable gas analyzer operated from a 12 volt battery with converter was used to make the necessary qualitative determinations. A van was rented for the week to house the equipment used and conduct the survey.
Carbon tube samples were taken and analyzed by the A.I.D. chromatograph in the laboratory. This is the primary method currently recommended by OSHA.
The attached map and carbon tube analyses data table Indicate the perimeter for the 1.0 and 0.5 ppm levels. Although the numbers may appear startling at first, reduced emission from the units since the survey should decrease the radius of this perimeter considerably.
February 5, 1975 ec Attachments
UCC
034004
VCM PERIMETER DATA (CARBON TUBE ANALYSES)
DATE
11-11-74 11-11-74 11-11-74 11-11-74 11-11-74 11-11-74 11-12-74 11-12-74 11-12-74 11-12-74 11-12-74 n-13-74 11-13-74 11-13-74 11-13-74 11-13-74 11-14-74 11-14-74 11-15-74 11-15-74 11-15-74 11-15-74 11-15-74 11-15-74 11-15-74
____ SAMPLE_____
1* 2 * 3 4* 5* 6* 7* 8* 9*
10 * 11 *
12 it
13 ,
it
14 161
15 161 16 *
17 it
18 it
19 232
20 124
21
*
I-------------------
22 +
23 *
24 20
25___ 20
PPM VCM
2.20 0.28 0.22 0.14 0.22 0.18 0.36 0.22 0.20 0.40 0.30 0.70 0.20 0.50 0.20 3.10 2.00 0.40 0.60 0.04 0.60 0.40 1.30 1.80 1.50
1----------------- TM------------------ 1 1 DIRECTION VELOCITY MPh
NW 10-15 NW 10-15 NW 10-15 NW 10-15 NW 10-15 NW 10-15 NW 10-26 NW 10-26 NW 5-10 NW 5-10 NW 5-10 SW 3-7 SW 3-7 SW 3-7 SW 10-20 SW 10-20 SW 5-12 N 10-15 N 18-20 ENE 18-20 ENE 18-20 ENE 18-20 ENE 18-20 ENE 20-30 ENE 20-30
.* 15 Minutes.
Harold Zeller February 5, 1975
UCC
034005
(