Document 697623gopnrM9o57JaOMD6JE
CHEVRON U.S.A. INC. MANUFACTURING DEPARTMENT EL PASO, TEXAS
SPECIFICATION NO. EP-585-S June IS, 1985 (CCL) Page 1 of 5
SPECIFICATION NO. EP-585-S EARTHWORK - DISPOSAL SITE EXPANSION
EL PASO REFINERY
1.0 SCOPE OF WORK
.
CONTRACTOR shall provide all labor, equipment, supervision and inspection to construct non-hazardous waste disposal sites at the Chevron U.S.A. Inc., El Paso Refinery as detailed in this Specification.
2.0 GENERAL PROVISIONS
2.1 Addendum No, 1
_
CONTRACTOR will abide by the rules and regulations as set forth in Addendum No. 1, dated October 1981 and entitled "Additional Provisions for the Performance of Work", Pages A1 through A15 and Appendices BI and BII. Addendum No. 1 supplements the Contract Terms and Conditions, Form GO279 (CD-9-84).
2.2 COMPANY Review and Approval
CONTRACTOR shall require/written approval from COMPANY when any material substitutions or changes are made to the specifications hereunder.
2.3 Permits
^
The CONTRACTOR is required to obtain all State and local permits, other than those called out as provided by COMPANY in the specification, if any.
2.4 Salvabie and Non-Salvable Material
2.41 All salvabie material -and equipment shall remain the property of COMPANY, except those: materials supplied by the CONTRACTOR not incorporated in the finished facility. Declaration of items as salvabie or non-salvable shall be made by Company Representative.
2.42 All salvabie and non-salvable material shall be removed by CONTRACTOR to areas designated by Company Representative.
2.5 Schedule
CONTRACTOR shall maintains construction schedule for all phases of work and shall conform with the commencement and completion dates set forth in
Chevron BB 014980
CHEVRON U.S.A. INC. MANUFACTURING DEPARTMENT EL PASO, TEXAS
SPECIFICATION NO. EP-585-S June 18, 1985 (CCL) Page 2 of 5
the Facing Sheet of this Agreement. The schedule shall indicate start of construction, job progress and completion date for each portion of the work.
2.6 Other Contracts
COMPANY reserves the right to let other contracts or perform other services
in connection with CONTRACTOR'S work hereunder. CONTRACTOR shall
afford others equitable opportunities for the introduction and storage of their
materials and the execution cJf their work and shall properly coordinate its
work with theirs.
^
2.7 Work Space and Storage Areaas
If the CONTRACTOR requires, the COMPANY will assign space for CONTRACTOR'S office, work space and storage area.
2.8 Temporary Construction Facilities, Materials and Equipment
2.81 CONTRACTOR shall .provide and install all necessary temporary facilities including, buY not limited to, tool rooms, locker rooms, toilets, office and storehouse. Ail temporary installations shall be
subject to approval by COMPANY prior to installation.
2.82 In addition, CONTRACTOR shall provide ail necessary temporary equipment and material Jncluding, but not limited to, shoring, concrete forms, bracing, ladders, scaffolding, staging, drop cloths and tarpaulins.
2.83 CONTRACTOR shall maintain all temporary facilities, material and equipment in a saferrand adequate manner and remove them immediately upon completion of the work requiring their presence.
2.9 Guarantee
...
CONTRACTOR guarantees that ail of the materials and labor furnished hereunder by CONTRACTOR shall be free from defects in workmanship for a period of one year from therdate of the Acceptance of the Facility by COMPANY. Any such materials and/or workmanship found to be defective during said one year period and any damage caused by such defects or the repair or replacement of them shall be replaced by CONTRACTOR at his sole expense with materials and workmanship that are satisfactory to COMPANY. COMPANY will notify CONTRACTOR of such defects in writing and CONTRACTOR shall promptly thereafter replace the defective materials and/or workmanship and repair^ any damage caused by such defect or such
replacement. If CONTRACTOR does not commence and pursue with diligence
Chevron BB 014981
CHEVRON U.S.A. INC. MANUFACTURING DEPARTMENT EL PASO, TEXAS
SPECIFICATION NO. EP-585-S dune 18, 1985 (CCL) Page 3 of 5
the replacement of defective fitaterials and/or workmanship, or damage caused
by such defect or such replacement, COMPANY may replace defective material and/or workmanshiprHnd repair any damage, and COMPANY shall deduct from any sums due or to become due CONTRACTOR or CONTRACTOR shall reimburse COMPANY for all of COMPANY'S expenses in replacing such defective mafgrial and/or workmanship and repairing such
damage.
3.0 PERFORMANCE OF WORK
3.1 Codes
All work described in this specification shall be performed in strict confor mance with the codes and industrial standards hereunder.
3.11 All applicable municipal codes, laws, and ordinances governing the
work.
--
3.12 All OSHA rules and regulations shall apply as specified in Section 22.0 of Addendum No. 1. C
3.2 CONTRACTOR shall be solely ^responsible for thorough craft inspection during
construction and for the quality of the work and material. COMPANY will make such inspection as COMPANY may desire in order to check the progress
and quality of the work and material, to see that CONTRACTOR'S employees
are properly qualified in their respective crafts, that workmanship is of an acceptable grade, and that aU_requirements of this Specification are being met. Such inspection and/or any other inspection or testing by COMPANY shall not relieve CONTRACTORTof full responsibility for the work hereunder.
4.0 MATERIALS FURNISHED BY COMPANY
4.1 COMPANY will furnish all earth fill material with the exception of caliche. The material is available at the site. CONTRACTOR will ascertain that fill material is "suitable to provide required compaction in accordance with Section 5.44. Pieces of debris larger than 4 inches in diameter in fill material shall be removed by CONTRACTOR before compaction.
4.2 COMPANY will furnish clay forluse in capping old disposal pits. This material
is available on COMPANY property near the site. CONTRACTOR will load
and haul clay to site.
~
4.3 COMPANY will furnish water at the nearest source for CONTRACTOR'S use in wetting surfaces and compacting fill material.
Chevron BB 014982
CHEVRON U.S.A. INC. MANUFACTURING DEPARTMENT EL PASO, TEXAS
SPECIFICATION NO. EP-585-S June 18, 1985 (CCL) Page 4 of 5
5.0 DETAILS OF CONSTRUCTION
5.1 General
~
The area to be graded is showrion drawing PD-03-33868-0.
5.2 Site Conditions
~~
The earth to be graded consists primarily of fine sand with some buried construction debris such as cofErete and bricks. The site will be available for CONTRACTOR inspection or tasting during the bid meeting.
5.3 Work To Be Done ByCOMPANY
COMPANY willfurnish a bench mark and grade stakes for CONTRACTOR'S use. "
5.4 Work To Be Done By CONTRACTOR
5.41 CONTRACTOR shall famish all labor, materials, tools, equipment and services except as specified in Section 5.3 herein, necessary to
complete the work set forth in this Specification. This includes, but is not limited to stripping-and moving excess top soil, excavating, hauling, placing and compactin^sf earth as required for road and fill area. -
5.42 CONTRACTOR shall, by use of drawings, points, lines, grades and elevations provided byJJOMPANY, lay out the work as required and shall be responsible for accuracy.
5.43 Volume of material to he excavated, filled or handled in any way shall be calculated by CONTRACTOR from site examination.
5.44 Fill used in the construction of disposal site shall be compacted with rollers or mechanical tampers which will provide uniform compaction through the full depth odtthe fill. Earth fill shall be compacted to 90% of maximum density ofToptimum moisture as determined by ASTM-D-
1557. The area should be thoroughly compacted and unyielding as shown by no further settlement or movement under the roller.
5.45 Surplus fill generated inTSxcavation of disposal sites shall be moved to an adjacent area designated by Company Representative. This soil need not be compacted buttshall be distributed in the area in a manner acceptable to Company Representative.
Chevron 014983
CHEVRON U.S.A. INC. MANUFACTURING DEPARTMENT EL PASO, TEXAS
SPECIFICATION NO. EP-585-S June 18, 1985 (CCL) Page 5 of 5
5.46 All completed cut and fill surfaces shall be graded to within 0.5 feet of the specified elevation.
5.47 Upon completion of new!disposal pits, old disposal pits will be capped with a minimum of 12 inches of clay. Old pits are located on drawing PD-03-33868-0.
5.5 ROAD CONSTRUCTION
^
5.51 All roads and ramps extending from Top Trail Road to the disposal sites shall have a 6 inch thick,d0 foot wide caliche wearing surface.
5.52 Top Trail Road will bejvidened along the length bounding the disposal site area and shall have a 6 inch thick, 60 foot wide caliche wearing surface along the front of the disposal site area.
6.0 MATERIALS FURNISHED BY CONTRACTOR
CONTRACTOR will furnish all caliche required to construct roads and ramps.
7.0 INSPECTION AND TESTING
Z~
CONTRACTOR will furnish all compaction tests as described in Section 5.44 above. Results of these tests shall be submitted to Company Representative for acceptance before site will be considered complete.
8.0 DRAWINGS
ZZ
Drawings listed below are part of this Specification.
Disposal Site Plot Plan
Disposal Site Layout Disposal Site Plan Disposal Site Cross Sections
:--
PD-03-33868-0
PD-03-33869-0 PD-03-33870-0 PD-03-33S71-0 & PD-03-33872-0
Superin tendent-TeZhhicb.1
Chevron BB 014984