Document 65bYBq4QpLNjEJjqNBkJvvzQ1

m Ii! if! m!t|:U : li DIS JOACHIMS PROJECT, one of three built on Oltowo River by Hydro-Electric Power Convnluion of OntorlO, run* with 13S>ft head. Ho* total-copocity of 496,000 hp Installed^! eight 62,000-hp fronds turbine* turning at 105.9-rpm tpatfl Section through turbine bearing and W water *eal on the La Cove units 1-4 4viscosity-oil pump Installed on La Cave units 1-4 Section of guide bearing shows oildistribution grooves, Lo Cove units Design Features of Three i CanadiaifHydroelectric Projects Analyzed Hero ore factors thot influenced turbine selection for three hydro plants with 40, 77 and 135 ft heads and total capacity of 900,000 hp. Authors discuss reason for using oiMubricated guide bearings, different bearing designs and shaft water seals* By A C AEBERII, Mtcfienrcof Engineer and O F SIMSON, lltclfieet fngmttr Generation Dopt, Hyrfra-C/ectno Powar Committion of Ontario From the northern end of Like Temiskaming to Point Fortune, 22 miles ibove Montreal Island, the distance is 450 miles. Here the Ottawa River forms the boundory between the provinces of Ontario and Quebec, Canada. On the upper section of this river the HydroElectric Power Commission of Ontario is developing three large power site*. Thro* Plants. About 33 miles below the outlet of Lake Temiskaming, La Cave development ws* completed in 1952. It has a capacity of 264,000 Itp in eight 33,000-hp units, to operate under a 77-ft head. Des Joachims, 60 miles down river from La Cave, is the largest of the three plants. It has 135-ft head, eight 62,000-hp units for a total capa city o/ 496,000 hp, and is now In full operation. Chenaux, obout 11 miles ahove Renfrew, Ont., has the relatively low head of 40 ft, eight 21,000>hp units or a total capacity of 168,000 hp. All 86 ENGINEERING ANO MANAGEMENT SECTION eight units are now in full opettiiot I 'WrTfrancii type above 50% load. Kaplan Water Storage. Upstream fromtl^ ^/^turbines have their beat efficiency at Cave severs) woter-storage basins vii 3$`*ebout 60% load. Rut, In plants that 5,000,000; acre-ft capacity regulate d* "luo several unit*, high efficiency can river flow. Ono of these basins, Ult< ^^i^be msintained by.adjuiting the load on Temiskaming, when drawn down ta ler, V-rV;* number of uoits and starting and stop- levels will reduce the head at La Cut. -V: pldj machines as load requires- This slightly- Out generally at all thfsj J^lvean be readily done by automatic startplants forebay levels will be conlrof ,.,gvfiop governors and synchronising equip* for daily pondage needs. ,b~V,jraeiit operated from the control room. Tarblne-toleetlon- Factors, Rangel* heads, 77, 135 and 40 ft, afforded an b; teresting selection of turbines, ft* Kaplan turbines' advantage of &?!igh elficlency over a wide range of 1-jiyWds is largely discounted in a group heads between 60 and 90 ft a choice'eu plants having several units. TVl* Is be m&do of high-speed propeller uj OIL^the experience in Oiats Falls plant, 30 the slower-speed froncis types. To nub voKmiles below Chenaux, whleh went into the selection requires a study of: (}) Y^i-^rvlce in 1932 with eight fixed-blade cost for equipment (2) substruciaiiu^ ^/'vPropeller turbines. In spite of the units' (3) excavation (4) crane capacity-.!* V'^Ppuked efficiency curvet, over-oil plant addition, reliability, maintenance cow, ^^.efficiency is high. and kilowatt-hours output for the dJ 1st*'?,.'. 2- Kaplan and propeller turbines have ferent types of turbines have to beertk; .'K'i (`decided advantage over froncis run- ated. When selecting the turbines c4ho| v* >n the site of their water passages factors itiust also be considered. uth*| ^:V,*nd higher speed. The loiter reduces 1. Adjusiable-blode propeller (k*F generator cost. Since koplttn turbines Isn) turbines hare over 80% efficient! *,^V.h'ave more moving ports than a fronds at loads above 25%. This efficiency ctjl HY/ Pr'P^r runner, they may be out be had -with fixed-blade propeller Rfj; lonaer for maintenance. mbines at loads above 70%, ond ft*V {': pecifie speed of the runner is ly^MUAiy 1933 increased the turbine must be set lower to prevent cavitation. This increases the cost of excavation and draft tubes. Ad vantages here rest with the froncis tur bine as it can be set higher above tail-water level without, aerious runner pitting. 4. At the plants discussed, heads will be reduced during spring floods because of increased (allwater level and maybe (orebay level will be reduced. Reduced heed decreases output of frsncls tur bine more than kaplan or propeller types. But a seasonal load reduction on the Southern Ontario system usually occurs during flood period on the Ot tawa River. So, reduction in head on the plants due to floods was not impor tant when selecting the turbines. Chelc* of turbines was based on a careful evaluation of these and other factors. For Ihe La Cave 77-ft-head plant, choice, wos between froncis and propeller turbines of either fixed or adjustable-blade types. Francis turbines were chosen. Under 135-ft head at-Dcs Joachims, froncis turbines were a notural choice, even ihoughjhe knplsn was considered. Choice for the 40-ft-head Chenaux lay between fixed-blade pro peller units and kaplan automatically adjustable-blade type. Fixed-blade pro peller turbines were selected as best suhed to pnwer-systein conditions. Difference in unit capacity at the three plants is due largely to the difference In head. There is not a wide difference in physical lire and weight, and all tur bines may be considered of large site. Table, p 88, gives main physical features. Wafer Passages. Chenaux and La Cove turbines have reinforced concrete sctoU cases. Three passages (armed in the concrete as part of the aero]! ease conducts water from the foreboy to tho Chenaux turbines. Two passages do a (ike service on La Cave units. Low pressure on the Chenaux easing permit ted using partis! speed rings. These hsvo separate steel stay venes bolted to o top east-steel ring. Lower end of each vane is cast in concrele end arranged to carry load from (op to bottom of the scroll case. At La Cave the higher pressures, 77- ft head, required complete cast-steel speed rings with separate slay vanes bolted to upper and lower rings. In ENGINEERING ANO MANAGEMENT SECTION hm,