Document 65BpYB6vja1x64GK6NBoZJnjo

To: T. H. Huffman From: Dale: Subject: D. C. Skokna November 17, 1989 ABERDEEN MONTHLY PROGRESS REPORT OCTOBER, 1989 There were two first aid and one recordable cases reported during the month. The recordable case involved a mechanic who received a second degree bum to his chin. As of October 31, the plant's employees have worked 3,771 days (4,989,563 manhours) since the last lost time injury. PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M Capacity .Utilization Factors Resin Flexible Compound Rigid Compound Plasticizer Offsite, Hazardous Wastes Recycled, Hazardous Wastes Offsite, Non-Hazardous Wastes Vulnerable By-Products Total Waste Water Air and Water (1) Three-month rolling average. 32.9 75.4 97.5 0.9972 6.6 97.9 3.5 98.6 1.5 90.6 < 3.9> 60.5 74.8 32.9 75.4 97.5 0.9972 6.6 97.9 3.5 98.6 1.5 90.6 < 3.9> 60.5 74.8 0.87 0.84 0.56 0.81 0.87 0.84 0.56 0.81 91.4<0 94.7n> 100.7<n 90.0n> 104.3(1> 78.6(1> 108.1 69.4 108.8 79.2 122.1 85.9 VAB.0001190302 T. H. Huffman 11/17/89 Aberdeen Monthly Progress Report Page 2 - October, 1989 The annual new module turnaround was completed during the month. Key work Included vessel Inspections, shutdown repairs, tie-in of the Plant Electrical Upgrade Project and installation of dryers #5 and #6 baghouses. The old module was down for three days to allow electrical tie-ins. Variable costs were favorable due to good raw material efficiencies in the resin unit, a favorable product mix variance in the flexible compound unit, partially offset by above budget raw material consumption in the plasticizer unit. Fixed costs were favorable due to lower than budget benefit charges, a favorable property insurance variance, partially offset by an unfavorable MM&C variance related to the new module turnaround. 1. Fifty-five percent of the plant's natural teams met during October. AT&T (a flexible compound customer) audited the plant. We received an " adequate with recommendations" rating. Their audit is based on the sixteen elements of the ASQC National Standard for OQualityv Svysstteem Elements. Three levels of scoring are possible: Adequate, Adequate with Recommendations, and Inadequate. The lowest rating received in any element is the overall rating. We received "adequate" ratings in eight elements and "adequate - with recommendations" in eight elements. The changes necessary to upgrade the overall rating not major. We plan to have implemented the recommendations by mid-1990. 3. Uniroyal (a resin customer) performed an audit of the plant. We received an overall rating of 78.7% (considered to be "acceptable"). Uniroyal compli mented the plant on the consistency of the resin we sell them - they said that improvements made in 1989 have cut their scrap rate from 24% to 12%. 4. Exxon representatives visited the plant to discuss plasticizer quality and to tour the plasticizer unit. T. H. Huffman 11/17/89 Aberdeen Monthly Progress Report - October, 1989 Page 3 OMP - continued 5. The Lab-Vinyl Team made its presentation to management. This team reduced delays that had been occurring from the time a resin railcar was loaded until it was approved for shipment. These improve ments will save over $30,000 per year in railroad switching charges. No investment is needed. 6. The Vinyl Operations Superintendent's Natural Team implemented procedural changes that reduced the amount of off-grade resin produced in October by 750,000 pounds (the reduction is based on FY1989 average off-grade production rates). This will generate about $15,000 in additional revenues (assuming off-grade sells for 2C/lb. less than prime grade). No investment was necessary. 7. Nine employees from the Aberdeen Plant participated in "Excellence in Mississippi" in Jackson, MS. The seminar, sponsored by the Association for Quality , featured presentations fro: Mississippi academic institutions about quality 1. All the new dryer baghouses are operational. Stack sampling shows particulate emissions being reduced from seven lbs./hour to 1.5 lbs./hour. This meets the design goal. 2. Stabilizer spill was accepted at Ghem Waste Management's Lake Charles facility. Plant Superintendent rah Houston Hammond Blane COVER LETTER J. D. Burns X R. T. Ferrell X T. H. Huffman C. J. Matson r D. F. Harman H. R. Flammer R. R. Smith B. J. Bean R. H. Gerlach R. D. Gamblin S E. McGuire R. L. Poe X H. J. Hall H. G. Garrison R. A. Conrad J. Friend J. W. Ware X L. R. Bauer X J. B. Maher X C. R. Miller P. L. Foote RWS/DCS (File Copy), PJK, JEN, MRK, DAM, JEB, HGC, JEL, REP, BLT, RBN, SCH X X X X X X X X X X X X X X X mrnrnmmmmt N VAB.0001190305 SAFETY - B. L. Trego, J. V. Uptain First Aid OSHA Recordable Total Injuries Number of Restricted Workday Cases Number of Lost Workday Cases 2 1 3 0 0 Fiscal 0 0 Fiscal Y.T.D. 1989 2 Q 2 0 0 Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office Totals Injuries bv Type Cuts and Abrasions Eye Injuries Burns Bruises Strains/Sprains Stings Other Totals 00 00 22 00 00 1 33 0 0 2 0 0 0 2 00 1 00 0 11 0 11 1 00 o 11 0 0 0 _0 33 2 Lost Workday Cases Days Lost Safety Record 00 27 0 Last lost time injury - 7/5/79 Days since - 3771 Employee hours since - 4,989,563 On October 31, 1989, the employees of the Aberdeen plant completed 3771 days with no lost time injury. The topic for plant safety meetings during the month was annual fire training. A VAB.0001190306 SAFETY - Continued Routine dosimetry results for the month were: Chemical >_________________________ NunAar VCM Lead Total Particulates 79 98.7 15 100.0 3 100.0 1 0 0 1.3 0.0 0.0 The single VCM overexposure was without benefit of respirator protection. Psggrirtiwi FA Maintenance Contusion of third, right finger FA Engineering Bee sting of right thumb. MT Maintenance Bum to chin. The medical treatment case occurred during annual fire training when a maintenance employee received a small second degree burn to his chin. 1 4 VAB.0001190307 J t M. R. Kane General Nine plant employees participated in "Excellence in Mississippi" in Jackson, MS. The seminar, sponsored by the Association for Quality Progress, featured presentations from Mississippi industries and academic institutions about quality efforts. Plant Manager The Plant Manager's Natural Team worked on developing measures for teams being formed and finishing to emphasize and encourage teams. Other measures which will be developed include a measure of employee development. The Vinyl Natural Team met during the month and developed a list of team measures from which the most critical will be selected and base line data will be collected on those. Waste minimization was discussed and areas of potential reduction were discussed. Uniroyal Plastics visited the plant during the month and conducted a quality audit. The audit score was 78.7% which represents an "acceptable" rating. The Vinyl Department Head participated in a meeting with Southwire Executive Management in Houston. The meeting included signing of the Vendor Excellence Program by Vista and Southwire. Compound AT&T audited the plant. We received an "adequate with recommendations" rating. The audit was based on sixteen of the elements of the ASQC National Standard for Quality Systems. There are three levels of scoring possible: Adequate, Adequate with Recommendations, and Inadequate. The lowest rating received in any element is the overall rating. We received "adequate" ratings in eight elements. The improvements required are not major and we plan to be able to be re-audited (hiring 1990. ***** mmmmpimmm mm mm VAB.0001190308 WH * wmmmmf wmmmmmmmm COST VARIANCES - D. C. Skokna X2fil PVC Flexible Compound Rigid Compound Plasticizer $ 77.8 39.6 1.7 < 44.4> $ 74.8 $562.3 15.9 56.6 -<2$L,Z> $614.1 $640.2 55.5 58.4 $688.9 PVC - Raw material (primarily VCM and initiator) use was below budget. The favorable variance was a result of a favorable "product mix" variance. Rigid Compound - Operations were essentially at budget. Raw material use was above budgeted levels. Price Variances - VCM - Resin to Rigid Compound - Resin to Flexible Compound - Natural Gas - Alfol* Alcohols - 610P to Flexible Compound - Other Price Variances Total $541.2 50.5 43.8 27.9 <20.3> <44.1> 15-1 $614.1 F.L%d.Cgp Yfliiancafi SM - Payroll and Benefits - MM&C - Miscellaneous - TI&D - Clearances Total $34.0 < 39.7> 47.5 15.0 3r7 $60.5 Payroll and Benefits - Employee benefits were $23.7M favorable. M. M. & C. - Costs were above budget due to new module turnaround charges. Miscellaneous: - Processing Supplies - Shipping Costs $16.0M favorable $14.0M favorable (due to the plant shutdown) T.I.& D. - Property insurance - $11.2 favorable. VAB.0001190309 * * 4 P. J. Kober, D. A. Hiller, J. . Nickerson Safety The Operations Departments worked without injury in October. The Mechanical Department had one medical treatment case and two first aid cases. The medical treatment case involved a mechanic who received a small second degree bum to his chin during fire training. The first aid injuries involved: - A mechanic who pinched a middle finger lifting a pump impeller from its case. An engineer who was stung by a wasp. The monthly safety meetings were the annual fire fighting training. A VAB.0001190310 VINYL - P. J. Kober, K. W. Birck General 1. Production was limited in both modules for seventy-two reactor hours to repair an electrical distribution problem. This was an unscheduled shutdown. 2. The annual New Module shutdown was completed this month. Routine vessel inspections) necessary repairs and capital tie-ins were performed during this shutdown. The Old Module was also shut down to complete necessary electrical tie-ins for the Plant Electrical Upgrade Project. 3. Dryers #5 and #6 baghouses were replaced during the month as part of the Rotary Dryer Baghouse Replacement Project. Dryer #4 is the last one to be replaced. Work is in progress to complete dryer #4. 4. During the month, there was an attempt to produce a batch of resin with 0.52 inherent viscosity (IV) resin. The actual IV came out to be 0.57. Though not on target, this batch provides important information for future ultra low resin inherent viscosity testing. 5. Produced this month in the Old Module was 5415.- 6. The resin raw materials in the 744 account were valued at $417.8M. - Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime % 32.9 1061.0 87.0 780.0 25.2 75.4 76.1 76.1 97.5 Reactor Operational downtime (recovery scheduling conflicts, rinsing chem wash tanks, New Module rinse/charge water conflicts, no place to dump, changing filters, Waiting on Q.C. data before charging, and inclement weather). 32.9 1061.0 87.0 780.0 25.2 75.4 76.1 76.1 97.5 191 4 * wmmm UMM * VAB.0001190311 VINYL - Continued Reactor Downtime - continued Maintenance downtime (hydroblast/drill D700 and D745, power outage to change coils on new electrical switchgear, D600 reactor jacket welding, D745 agitator gearbox repairs, D744 rupture disc replacement, low steam pressure and miscellaneous instrument and valve repairs). New Module shutdown (including Old Module shutdown for electrical tie-ins). Hours 237.1 1405.2 Reactor limited production. Operational downtime (centrifuge plugs, clean dryers, activator transfer problems, check dust collector socks, and flameouts). Maintenance downtime (repair activator valves, shear pins, burner maintenance #6, and various other activator and centrifuge repairs). 31.2 5.9 3.7 Other (not needed due to New Module shutdown and dryers #5 and #6 baghouse replacement). 59.2 Kev Maintenance Work - J. B. Autrey, J. B. Hegwood The following major work items were completed during the New Reactor unit shutdown: Rectors 741-745 were hydroblasted and dye-checked. There was a small crack found on the relief valve flange of reactor 744. The crack was directly below a bolt hole. The original bolt hole was drilled and tapped too deep which caused a weak spot at the bottom of the hole. The frequent removal and torquing of the relief valve eventually caused the crack. The crack was repaired and the bolt hole was re-drilled and tapped. There were no other problems found with the other reactors. Reactor 745 gearbox was removed during the shutdown for repairs. The bearing on the input pinion shaft failed and was replaced. The input pinion gear set was replaced along with the shaft for the bull gear. continued The condensers on reactors 700 and 745 were drilled as part of the contamination control prograi The condenser base gasket on reactor 742 was replaced due to the deteriorating condition of the existing gasket. A Flexitallic spiral-wound gasket was installed in place of the stainless steel jacketed gasket. The 805 gearbox was replaced under reactor 741 with a new model 881 gearbox. The 804 gearbox will be sent out for inspection to determine if it can be repaired and used as a spare. The relief valves on the sphere were refurbished during the shutdown. All switchgear for the unit was cleaned and inspected as part of an annual inspection program. The pressure vessels in the unit were internally inspected. The vessels were found to be in good condition. Reactor 744 rupture disc was changed out as part of the annual rupture disc program. The #4 dryer burner was changed due to it deteriorated condition. New Maxon gas valves were installed during this time. The condenser shells were acid-cleaned on reactors 741-745. The slurry dump lines, 747 blend tank and the sewer lines in the unit were also acid-cleaned. The west pump on #1 cooling tower sump was removed and sent out for repairs and reinstalled. There were three major valves changed out in the reactor area during the month. COMPOUND - J. E. Nickerson, K. 6. Akins Demand for flexible compounds continued steadily in Oct were able, however, tdule longer production runs inventory lost in September. Flexible compound inventory 3947M pounds to 4490M pounds We Orders were again light in October for rigid compound The dry blend unit was down several days to control inventory Some problems were experienced during the month with 80273G production. These quality control problems limited production for several days. The final cause of the problems has not yet been completely identified. A test run to identify rigid pellet processing parameters was conducted on Line V. The test run used 90172D dry blend. Rigid pellets using slightly modified 90172D formulation will be produced on Line V in November. A low-smoke, low-flame compound was produced on Line I. Samples of the compound were shipped to Prestolite for evaluation. Operating Month Line I 29.5 Line III 29.5 Line V 20 Total % Prime Capacity Utilization Factor 2093 71 3649 124 831 42 6573 97.9 .842 2093 3649 -Jtl 6573 97.9 .842 A - Product Changes - Quality Problems & Control - Miscellaneous Maintenance Line III - Product Changes - Hydro therm Maintenance - Miscellaneous Maintenance - Quality Problems & Control - Product Changes - W-P Maintenance - We lex Problems A Maintenance - Miscellaneous Maintenance 94 13 8 71 22 15 8 63 36 20 20 mm m mmmm m VAB.0001190314 COMPOUND - Continued Operating Month Avg./Dav Rigid Compound 25 3472 % Prime 98.6 Capacity Utilization Factor .561 139 Downtime - Quality Problems & Control - Product Changes - Miscellaneous Maintenance 116 61 12 Operating Davs Month Avg./Dav Plasticizer 29 % Prime Capacity Utilization Factor 1681 90.6 .806 3472 98.6 1681 90.6 .806 J. B. Autrey, J. B. Hegwood The #4 VCM compressor was changed out and rebuilt because of a leak. The east bio-disc pump was removed and rebuilt during the month. - The south nitrogen blower was removed and rebuilt during the month. mmummmm mmmtmmrmm VAB.0001190315 J. B. Autrey, J. B. Hegwood Number 3 boiler was shut down for inspection during the month. A buildup was noticed on the tubes and in the firebox during the inspection. Because of this, the tubes, firebox, steam and mud drums were hydroblasted. The water piping to the boiler was replaced in conjunction with a capital project, also. Several maintenance items were performed during this time. The relief valves were sent out for reconditioning and all of the boiler controls were inspected. Several maintenance items were taken care of in the boiler area during the steam outage for the electrical upgrade project. All instrumentation on #1 and #2 boilers was Inspected. The three header valves were repaired, #2 boiler gas valve, the steam flow transmitter and block valves were replaced. VAB.0001190316 - R. E. Polk, S. G. Hillman, C. J. McDonald 4 y Testing for 5415 contamination sources Is complete, The recommendations that have been completed have lowered the upper control limit for 5415 contamination below sixteen. The rest of the team's recommendations are still needed to reduce the number of statistically out-of-control points. Dryer Dust Collectors All the rotary dryer baghouses have been started up. Stack sampling shows particulate emissions have reduced to 1.5 lbs./hr. from 7 lbs. /hr. VCg VCSM (Vinyl Distributed Control System) engineers attended Taylor courses about ladder logic and Taylor control language. Aberdeen process engineering participated in technology reviews with European FVC producers covering external slurry stripping and reactor clean wall technologies. EVC has a clean wall technology that has great potential. We are pursuing a licensing agreement which will include two test periods. Norsk Hydro and EVC both had external stripping technologies which looked promising. Operationally, the Norsk Hydro is preferred. However, Chisso Technology has yet to be reviewed. During the technology trip, we also discussed the 5305 Klockner graininess problem with BASF. They feel it is a problem of foreign particles which is partially calcium. Some film imperfections, which may be graininess, were observed while calendaring 5305 on their lab calendar. This may be the graininess test we are looking for. Two railcars were made for Klockner filtering charge water and VCM to ten microns absolute. It is hoped this will remove foreign contamination that may cause graininess. Samples have been sent to BASF and R&D for testing. i .. Ml VAB.0001190317 4 Continued The D744 modified slurry stripping procedure test was completed. The new procedure reduced slurry RVGM by 40%. Reactor condenser fouling is still a question mark because two early kill batches foamed during the test. Low molecular weight reactors will try the new procedures next month which should clarify this issue. A preliminary design for carbon bed adsorption of VCM has been issued for estimation. Carbon bed adsorption of VCM stack emissions may be an alternative to external stripping to reduce plant VCM emissions. A fwmmm mm * mm mmmmmm VAB.0001190318 DGiuniK- 8.1. poii, s.c. mm* c.j. c &3 * S3 w I * VAB.OOOl190320 - u. u.DcinniK pou, s.c. munu, hcdouui F. G. Jeanson r All wastewater discharge parameters were met for the month of October. Results from the annual monitoring of our wastewater outfalls by the Mississippi DEQ were received this month. We received a 100% compliance rating. The testing was completed during the month of July. A SARA team meeting was held this month. During this meeting, the four subteams decided on areas they would concentrate on. The four sub-teams are: 1. Employees and Families 2. Local Emergency Planning Committee 3. Community Relations 4. Schools and Education The Aberdeen Plant video was updated. Pictures for the new brochure were taken. The brochure will be published in November. A presentation for the employees at the Plant was put together to inform them of the 1988 SARA emissions and other environmental items. The department heads will give this presentation to their respective people during the month of November. Waste Waste shipments for the month of October included: One bulk load of lead/antimony bags to Chemical Waste Management, Erne lie, Alabama. - One bulk load of separator oil to Systech in Demopolis, Alabama. Stabilizer spill was approved at CWM's Lake Charles, Louisiana facility. A shipment will be sent there in November. The CMA waste survey was completed for wastes generated in 1988 and returned to the CMA. I visited the Chemical Waste Management (CWM), Emelle, Alabama facility for their annual site tour and regulatory update meeting. CWM thinks they have a good chance to win the lawsuit they filed against Alabama for banning hazardous waste from certain states. They are still receiving nonhazardous waste from the banned states and do not foresee any problems with that. mmmmmrnm PMPN* t * VAB.0001190321 Continued A meeting was held with the Mississippi DEQ to discuss permitting issues for the VCSM Project. This project would require a PSD permit if we remain a major stationary source. The State agreed that with our new baghouse project we could become a minor source. However, they specified that the permit limits in the air permit would have to be revised to be under the 100 tons/year limit. We are currently evaluating the air permit to make the necessary revisions so that we can become a minor source. With minor source status, a PSD permit will not be required for the VCSM Project. The Mississippi DEQ was here to do an inspection of air emission points this month after they received a complaint from a neighbor about particulates. 1 toured them around the plant and also showed them the new baghouses. I explained that we were in the process of starting up the new baghouses. Nothing else resulted from their visit. Preliminary tests conducted on the new dryer baghouses indicate the baghouses are operating less than the guaranteed amount (2.4 lbs./hr.) but greater than the expected amount (0.6 lbs./hr.). Work is continuing to reduce the amount of particulate emissions so that the baghouses will operate at the expected amount. The annual VCM valve and flange survey was completed this month. The New Module and sphere were surveyed. The total number of leaks found were twenty-one. These leaks were repaired and then rechecked. Miscellaneous I attended the 1989 Environmental Conference held in Jackson, Mississippi. The waste minimization coordinators met in October to decide on a measurement system for the monthly reports. The measurement system includes six categories which are listed on the following table. A waste reduction index (WRI) is calculated for each of the categories and their main subheadings. The percent waste reduction (% WRI) will be reported monthly on a three- month rolling average basis versus FY1988 on a per unit of production basis. The formula is: 100 x 1 Most Recent 3 Months Lbs. of Production FY1988 Total Lbs. of Production We have also included a table on the type and pounds of each waste that are included under each category. VAB.0001190322 HASTE REDUCTION INDEX SHEET October 1989 OVERALL 3 MONTH %HRI 90 TCD 1989FY 104.30% 122.00% 95.03% I. Offsite, Hazardous Wastes 91.36% 108.10% 122.77% a. Land Ban Wastes b. Hazardous Solids c. Non-Hazardous Treated as Hazardous II. Recycled Hazardous Wastes 90.90% 103.44% 86.42% 1 94.70% 0.00% 0.00% 153.79% 69.43% 63.20% 117.50% 125.72% 103.51% III. Offsite, Non-Hazardous Waste a. Recycled b. Non-Recycled 100.73% 108.81% 101.30% 100.71% 116.30% 108.65% 98.27% 98.48% 98.27% IV. Vunerable By-Products 90.02% 79.24% 116.90% V. Total Waste Water 104.32% 122.07% 95.01% VI. Air & Water a. SARA - Air b. SARA - Water c. Non-SARA - Air d. Non-SARA - Water 78.55% 85.90% 91.91% 89.04% 1126.67% 89.95% 66.12% 86.63% 1316.32% 79.52% 90.97% 86.25% 575.76% 96.30% 87.22% * j VAB.OOOl190323 A f"N WASTE REDUCTION INDEX SHEET October 1989 Offsite, Hazardous Wastes a. Land Ban Wastes. 1. Phthalic Anhydride b. Hazardous Solids 1. Stabilizer Spill 2. Floor Sweep c. Non-Hazardous Treated as Hazardous 1. Plast. Filter Cake 2. Lead Bags 3. API Sludge 4. Pit #1 Solids Recycled Hazardous Wastes a. Recycled 1. Separator Oil 2. Safety Kleen Solvent Offsite, Non-Hazardous Waste a. Recycled 1. Drums 2. Pallets 3. Aluminum Cans 4. Scrap Metal * b. Non-Recycled 1. Landfill 1988EY 259962 2412 2412 74821 12742 62079 182730 61670 11440 29620 80000 653226 653226 651700 1526 6699074 140601 49600 39000 0 52000 6558473 6558473 POUNDS 1989FY 90 YTD 324789 1551 1551 20695 0 0 89465 22425 67040 0 0 0 233773 56573 67880 29320 80000 20695 0 13900 0 6795 688080 688080 686210 1870 33397 33397 33180 217 3 Month 59594 550 550 19420 0 19420 39624 0 19460 0 20164 155224 155224 154790 434 6699373 140900 49600 39000 300 52000 6558473 6558473 536788 12041 4213 3312 100 4416 524747 524747 1693095 35739 12502 9830 300 13107 1657356 1657356 Vunerable By-Products a. PVC 1. Culls 2. Vacuum Vent Dust 3. Sifter Overflow 4. Pond Resin 5. Pit #2 Resin 3597456 3597456 471409 329460 801007 1915560 80000 4279372 4279372 533237 541016 504106 2621013 80000 209932 209932 21520 41706 9212 130699 6795 812589 812589 70587 121146 63270 537422 20164 Total Waste Water a. Effluent 1. Pond 6 4424987560 4278245861 397762756 1158280284 4424987560 4278245861 397762756 1158280284 4424987560 4278245861 397762756 1158280284 Air & Water a. SARA - Air 1. VCM 646617 73316 73316 604755 65843 65843 40905 4677 4677 127437 16379 16379 VAB.OOOl190324 fMMM b. SARA - Water 1. VCM 2. Di-n-octyl Phthalate c. Non-SARA - Air 1. Particulates 2. Sulfur Dioxide d. Non-SARA - Water 1. BOD 2. TSS 3. COD 4. NH3 55 22 33 264206 263300 906 309040 43689 68392 195581 1378 324 21 303 264300 263300 1000 274288 46841 53152 173096 1199 54 2 52 15471 15390 81 20704 4458 3739 12466 40 156 6 151 59633 59393 240 51269 10653 10218 30237 161 i I \ VAB.0001190325 ENERGY D. A. Moore A. Unadjusted EUI B. Adjusted EUI C. BTU/Lb. Product D. Total Energy Consumption MMM BTU -2.8% -3.9% 2532.0 112.9 -2.8% -3.9% 2532.0 112.9 (1) Plant electrical usage is an estimate because an additional meter was added during the Electrical Upgrade Project and was not read. This will be reconciled in the November energy numbers. There were twenty-eight energy related items completed in October, 1989. Six of these items were steam leak repairs. The remaining twenty-two were steam trap repairs. No. 1 No. 2 No. 3 83.63% 83.51% 83.01% 83.63% 83.51% 83.01% VAB.0001190326 J. E. Beall Employment Debbl Lemons, New Hire William Caldwell promoted from Lab Trainee to Lab "A" Technician. Richard Face promoted from Lab Trainee to T-h "A" Technician. Nathaniel Smith transferred from Lab Trainee to Compound Utility. Janice Cullui Relations Maintenance Typist Employee Joe Ann Williams transferred and promoted from Employee Relations Assistant - Aberdeen plant to Employee Relations Assistant Baltimore plant. None None None VAB.0001190327 A 4 f # CM I I I I 1 in * 1 f 0 in+ i in 11 CM4 1 1 1 in CM* a 1| o 04 a 1 m CM t | 0 m4 1 0 in* a 11 0 0m CM t CM 1 CM 1 CD CM 1 1 in i\ fn 1 a 0 in 1 1 O* CM 1 CO i ro 0 1 1 1 j 1 1 CM t in 3I tII I II* II t I I iiiiiiaii I I sa *airiii \i a 3 CO in i r* i ni 3 CM I in i in ncm ii o R!3 m 0 in i t in :s t i 0 m w i 0 f *o i <o 01 1 w* 1 CM 0 ro r 0 1 o* IA I IA CO I in # cm in IIII o i in 3!iiiiaiii ia i UI t I i II cn ti II II ai yj i <e *iI t 3! 3 S cn VAB.0001190328 ABERDEEN, MISSISSIPPI Salaried Employees Hourly Employees Total Employees 79* 172 251 Nev Employees Terminations 0 0 Warehouse 16 Gem. Plant 13 Maintenance 41 Laboratory 24 Compound 40 Vinyl 33 Plasticizer 3 41 23 39 33 5 10 5 26 10 2 report Minority Employees #, % Salaried 6 8% Hourly 66 38% Total 72 29% Hourly Min. Hired ____ 0 % Min. Hired ____ Q Hourly Min. Term. 0 % Min. Term. 0 Number of Applicants: Month 0 Tear To Date 21 APPLICANT BREAKDOWN: # Minority 0 % Minority 0 # Female 0 % Female 0 * Includes 2 Co-op Engineers. Hires (Hourly) Month 0 Tear To Date Terminations (Hourly) Month 0 Tear To Date Overall Turnover 0 Projected Annual Turnover 7 2 VAB.0001190329 wmmmm A4 iuttfi! cuucu puit siippik Mums OCTOin 1989 -SIIMDRS 1! PHMCT3- IISIIBOLI usii-mcugid rmici 11,514,15! 371,572 ioiti IPT/ITC i 10,1(2,010 199,990 p ncaun M 0 0 IU1IIU CMMD-NU 1,212,310 1,474,299 ruiuu ccvom-Picutu 3,212,113 113,972 9 9 II8IB COHPMID-NU inn comm-picusn 4,342,810 512,535 125,100 9 0 0 PUSTICIIII 131,210 599,990 9 totu 21,021,25! 12,115,102 9 -siinms it mi- f4 1 t1 1 1 i1 l1 1 no PlUIC IPf/ITC IICIAKI 19,394,959 19,147,919 371,572 199,999 9 0 1,272,319 1,424,200 3,212,113 113,972 0 9 4,342,010 312,335 125,100 9 0 9 139,299 500,000 9 20,020,25! 12,015,002 9 I1 $ iI a a a 1t i1 1 t BOU: tocroiut IXSII rumucomm mu comm pusncizn TOTU OCTOin UILC1B 130 14 23 3 179 cisToni COUOI non CAIIIII 30 99 95 5 10 93 35 02 TOTU 235 19 39 9 299 tm* IISII iuiiiu comm mu comm PUSTICIIII TOTU TTD PACIAGID: tvOVCvlTVOBMIKIft IISII fUIIUI C01POH9 mn comm nuTicim TOTU 0CT08II *tw IISII iuiiiu comm IISII COflPOBID PUSTICIIII TOTU in 139 14 23 3 179 enroll! PICIIP 4 17 0 9 21 39 9 5 0 35 COUOI CA1IIII 14 79 12 9 194 99 5 19 3 97 1 < 1 1 1 t1 1 1 Tore comun 4II/IPS 90 99 99 09 7 1 1 1 99 19 4 17 0 0 1 21 14 79 12 9 194 9 0 0 9 -------------------------------------------------- 0 97 91 01 01 ________________________________________________________ 9 19 t1 I 1 1l I 1 l1 1 1 a 235 19 39 9 299 a a a a TOTU * 25 99 13 1 135 25 99 13 1 ___yABiiDOl190330 135 LABORATORY - H. G. Coleman A. Safety - There were no safety incidences in the Laboratory this month. Richard Williams coordinated the monthly safety meeting a discussion on holiday safety, changing weather conditions, and safety at the workplace. 10/10-11 - The Lab participated in an audit by AT&T, represented by Cheryl Cincetti. 10/17 - Exxon visited the plant to observe our plasticizer operation; D. C. Cox participated. 10/19 - Uniroyal Plastics Company performed an audit of the Aberdeen Plant. Uniroyal representatives were Lynn Bakker and Fay Karpuleion. 10/24 - H. G. Coleman visited Dayton Extruded Plastics in Springboro, Ohio, to discuss resin specifications and rigid compound consistency. 10/9 10/23 & 10/30 Southwire Company rejected one compartment of 5415 railcar 41147 for excessive contamination. Uniroyal Plastics rejected two bulk trucks of 5385 Type I resin for foreign contamination. Contamination was determined to be from material caked on the walls of commercial carriers prior to loading. American Mirrex Blane Polymers Eagle Plastics Eagle Plastics Essex Essex Essex Rustique UTA 5265 5415 80273G WHT 110 80273G WHT 110 5415 5415 5415 RP-123 WHT 111 5415 Viscosity Static Flow % on 40 Mesh Short Stability Average Microns Low % on Pan Static Flow % on 40 Mesh Static Flow r*' No. 1 R/C 1 H/T 2 R/C 1 R/C 1 H/T 2 R/C 1 H/T 1 H/T 1 R/C VAB.0001190331 * t p LABORATORY - Continued A The following is a summary of residual VGM results on inprocess samples. None of the reactor daily averages exceeded 400 ppm RVCM during the month of October, 1989. Reactor Number of Samples Average RVCM, ppm 786 133 26 0.927 61 0.801 The following is a summary of the residual VCM analysis of shipment samples for the month of October, 1989. 5265 5305 5385 5395 5415 5465 Dry Blend Debox Pond 26 86 36 0 58 0 51 12 0 0.335 0.499 0.371 0.205 0 0.224 0.377 0 E. (based on dryer "regulars") 5265 im mi 5415 Bulk Density Inherent Viscosity (vs. 0.715 - 0.744) L Color A Color B Color % on Pan (vs. 2%, max.) % thru 140 Mesh Drytime Mets I.R. (vs. 95% of control) Hard Particles, (% > 10) 1.67 1.29 -- 3.19 3.00 2.67 1.25 -- 0.56 -- -- -- -- 1.56 0.50 0.22 3.08 3.67 4.67 1.67 ---- 0,77 -- -- ------- 2.17 0.73 .... 6.33 .... 2.67 2.20 ------ 1.59 2.33 --~------ 0.3 1.03 0.57 --- 6.50 __ 6.33 1.57 0.14 2.26 2.67 2.38 1.43 6.0 Average particle size, microns 135 141 166 168 m pMW mmm m VAB.0001190332 LABORATORY Continued Hardness Color/Clarity Hard Particles Dicing Heat Stability Cross Contamination Streamers Totals M Lbs, ill 54.0 ------------------10.0 ------------64.0 (0.82) ------------------- (0.15) ------------- (0.97) M Lbs. (%) 1.5 38.6 13.8 18.4 6.3 7.6 12.8 99.0 (0.02) (0.59) (0.21) (0.28) (0.10) (0.12) (0.19) (1.51) 4 Torque Rheometry Color 40 Mesh Retention Mischarge Total 29.9 7.7 3.6 JLJL 48.8 (0.86) (0.22) (0.10) (0.22^ (1.41) 1. Our new Brabender PL2000 torque rheometer was received and installed. Precision testing is being performed by D. S. Cox prior to commission. 2. The new Sintech tensile tester was installed and serviced by a factory representative. It is temporarily located in the Tech Service Lab while we review the operation of our constant temperature/constant humidity room. 3. H. G. Coleman participated in the annual Southwest Region Customer Interaction Program. J. R. Williams and Gary Fritch attended the seminar on October 13. 5. H. G. Coleman attended a presentation by Pennwalt (Lucidol) on October 31. Their SPC program and charting were discussed. * RESIN Ship Date 10/04/89 10/09/89 10/12/89 10/12/89 10/18/89 10/23/89 10/23/89 10/30/89 10/30/89 10/31/89 SAMPLE SHIPMENTS OCTOBER 1989 Product 5415 5416 Pond Resin 5265 5415 5386 Pond Resin 5385 5385 5265 Aaount 400 lbs. 50 lbs. 2 lbs. 2 lbs. 50 lbs. 50 lbs. 1249 lbs. 100 lbs. 100 lbs. 100 lbs. Custoaer C ITOH A CO ANDROMEDA INTERNATIONAL Jin Beightol Oatey Coapany Wirekraft Witco Corporation ANDROMEDA INTERNATIONAL NISSHO IWAI CORP. Argus Cheaical Morton International COMPOUND Ship Date 10/02/89 10/04/89 10/04/89 10/06/89 10/06/89 10/13/89 10/25/89 10/26/89 10/26/89 Product 2163 NAT 36851 NAT 35852 NAT 2153 NAT 38601 NAT 151-176 CB 50 48562 BLK 35852 NAT 419-66-1 NAT 38201 GRT 573 38901 GRT 573 16841 NAT (BC) 17461 NAT (BC) 17561 NAT (BC) 416-74-1 NAT Aaount 400 lbs. 400 lbs. 400 lbs. 2745 lbs. 3000 lbs. 300 lbs. 500 lbs. 25 lbs. 200 lbs. 500 lbs. 500 lbs. 5 lbs. 5 lbs. 5 lbs. 500 lbs. Custoaer TELMAG S.A. DE C.V. i Encore Wire Corporation Deckerville Plastics TREMPEX AB Vista - Austin Superior Optics P. W. Pipe Conex of Georgia Prestolite Wire Corp. A * DRTBLEND Ship Date 10/10/89 Product 802730 WHT 110 Aaount 100 lbs. Custoser AHI PLASTICS LTD. PLASTICIZER Ship Data Product 10/18/89 610P Aaount 55 Ral. wmmmmmmmmamm Customer CHISSO PETROCHEMICAL HMPMPMMV^NMHMiJMJlPPPJWPPPVfMMVIVWV^MViM........ ................... * VAB.0001190334 ABERDEEN CHEMICAL PLANT INJURIES (Twelve Month Running Totals) V JS7F MAMJJASON DJ'WF MAMJJASON DJ'89F MAMJJASO TOTAL INJURIES O OSHA RECORDABLE NUMBER OF INJURIES VAB.0001190335 W#*** A ABERDEEN ENERGY CONSUMPTION MWP mmmm en/ruM VAB.0001190336 dir