FINAL REPORT OPERATIONAL SAFETY/HEALTH SURVEY
NO. 3 POWER HOUSE TEXAS CITY PLANT
SURVEY DATE: FEBRUARY 13-17, 1984 OS/HS SURYEY TEAM: B. V. Bfnford G. R. Halter 0. C. Kfrby G. D. Twait
PLAINTIFF'S EXHIBIT
i
1 l
SUMMARY - Cont'd
BUSINESS CONFIDENTIAL
6. The safety awareness of all levels of management was quite evident and is perceived by all levels of unit operation.
7. A strong ''team1' relationship exists among staff, operations, and maintenance personnel.
8. Unit and maintenance personnel that were Interviewed had an overall very positive attitude toward working in the unit and the unit itself.
None of the deficiencies or concerns identified by the 0S/H$ Team were judged to represent an 'imminent' hazard requiring immediate correction. Two equipment related safety concerns were identified as "major*, deserving special attention. These were:
^
M.l - Frequent excursions allowing water carry-over into Nos. 35 and 36 superheaters, with potential for damage from thermal and physical shocks.
M.2 - Potential for runaway of No. 31 Steam Turbine if a power operated check valve falls to operate properly.
A number of other concerns were classified as "less serious" but still deserving of attention. These less serious concerns have been categorized as:
SL.l - Fire Protection Concerns SL.2 - Equipment/Facillties Concerns SI.3 - Control Systems/Instrumentation Concerns St.4 - Pressure Relief/Emergency Yenting Concerns SI.5 - Operator Training Concerns St.6 - Boiler Safety Criteria Deficiencies SI.7 - Personnel Exposure Hazard Concerns HL.l - Knockout Pots, Health Exposure HL.2 - Removal of Asbestos-containing Insulation Concerns
Details pertaining to all of these concerns together with comments and/or reconmendations are presented in the "Discussion" section of the report. A laundry list of minor concerns was presented separately to departmental personnel at the time the Team was on-site.
DISCUSSION
BUSINESS CONFIDENTIAL
MAJOR CONCERNS
M.1 Water Carry-over to Nos. 35 and 36 Superheaters The water separator In the high pressure steam line from No. 3 Olefins does not adequately protect Nos. 35 and 36 superheaters against water carry-over. Upsets at No. 3 Olefins reportedly result in conditions that allow carry-over an estimated once or twice a month. Water carry-over results in thermal shock to the superheaters (200 to 30Q*F rapid temperature changes are reportedly not uncommon), the potential for water hammer, and excessive swings In Toads at the superheaters - which usually require going to manual control of No. 36.
Recommendation
:
Consideration should be given to providing an adequately designed water
separator to protect Nos. 35 and 36 superheaters against water carry-over
under the most severe upsets likely in the No. 3 Olefins high pressure
steam supply.
M.2 Potential for Runaway of No. 31 Steam Turbine The 1100 psig No. 31 steam turbine has a power operated check valve to prevent backflow from the extraction 600 psig header backwards through the second stage to the exhaust 200 psig steam header when the machine trips. Failure of this power check valve to operate will result in a runaway of the steam turbine. The reliability of this valve for this type of service Is questionable. Recently the valve failed to operate during a non-routine test (the valve Is not on the RM program).
Reconmendatlon The design and reliability of this valve should be reviewed to determine whether or not the valve Is acceptable for this type of service. Consider installing a standard design! steam stop valve to prevent backflow. The valve should be added to the RM program.
(3)
t
1
LESS SERIOUS SAFETY CONCERNS
BUSINESS CONFIDENTIAL
SL.l Fire Protection Concerns 1.1 The Wo. 31 Motor Control Center (underneath the Control Room in Bldg. 180) has extensive overhead wiring in cable trays with difficult access for manual fire fighting. Wiring openings into the control room above are not well sealed. The room had storage of "Microwipes" and paper towels in cardboard cartons.
Recommendation Consideration should be given to providing smoke detectors and automatic Halon or Carbon Dioxide protection for this room. Openings through the ceiling should be adequately sealed. All maintenance supplies should be removed from this room.
1.2 An oil leak and oil accumulation above the lube oil reservoir at * No. 31 Gas Turbine presents a fire hazard in this area. The hazard is increased by the presence of a large amount of paper towels which are being used to soak up the oil.
Recommendation Repair the source of the oil leak and clean up the area.
1.3 The Computer Room has no fixed fire protection or fire detection for the cable area under the raised floor.
Recomnendatlon Consideration should be given to providing fixed Halon protection for the raised floor area of the Computer Room, automatically actuated by cross-zoned ionization and photo electric smoke detectors. Actuation of this protection should also be interlocked to shut down the air conditioning system.
(4)'
51.1 Fire Protection Concerns - Cont'd
BUSINESS CONFIDENTIAL
7.4 The "Bowser" of7 ffTter on Mo. 37 Steam Turbine has a leaf: at the pump seal and leaking oil has the potential of exposing adjacent facilities (Including the overhead cable trays) to fire damage.
Recommendation The oil leak should be repaired and oil deposits cleaned up in this area.
51.2 Epuipment/FaciHtfes Concerns 2.1 The deaerators have a high water level alarm but do not have a high level trip that would prevent flooding. Deaerator flooding has the potential of causing serious damage to the low pressure steam lines _ from water hammer in case the high level alarm in the control room is disregarded or not acted upon quickly enough.
Recommendation The addition of high-high water level trips should be considered for all deaerators to prevent this potential for water hammer.
2.2 There is no level indication in the first stage entrainment separator at Mo. 31 compressor. Tube leaks or breaks in the first stage intercooler for the Compressor might not be noticed until severe damage had occurred due to water entering the second stage compressor.
Recommendation
Consideration should be given to addition of a high level alarm in
the water entrainment separator for the first stage Intercooler for
Mo. 31 Compressor.
I
2.3 There have been reported failures of Instrument leads In high pressure steam and condensate service due to internal erosion and exterior corrosion. In either case, the condition of these lines
1$ not apparent because most are insulated.
(5)
SL.2 Equlpment/Facllitles Concerns - Cont'd
BUSINESS CONFIDENTIAL
Recomnendatfon The OS/HS Team recommends that a program for checking the integrity of these leads be instigated to insure that failures will not occur.
SL.3 Control Systems/Instrumentation Concerns
3.1 TDC-2000 System Several concerns were expressed to the OS/HS Team regarding
automatic operation by the TDC-2000 System, including:
1) The alarm configuration is inconsistent among the different
groups in the system.
2) Some alarms are duplicated In the TOC and the Panalarm Systems..
13) Instrument repair at 81dg. 11 can affect the TDC controls at
Bldg. 180 without the knowledge of the Powerhouse No. 3
operators.
4) Miscellaneous keys can be used to enter the TDC-2000 security
system.
5) Some critical process controls, such as drum levels, are not
controlled by the TDC-2000 system.
6) Numerous nuisance alarms from Bldg. 11 also alarm fn Bldg. 180,
which causes operators to routinely de-acttvate and disregard
control room alarms.
*
The OS/HS Team also noticed that the TDC-2000 printers are not readily accessible to the operators (printers are located in the computer room) and that computer files and the highway traffic director were not secured and were accessible to anyone.
i
Recommendation Consideration should be given to reviewing the TDC-2000 system wfth the objective of: 1) Regrouping and simplifying alarms to minimize operator
confusion. 2) Including all critical process controls on the TDC-2000,
(6)
SL.3 Control Systems/Instrumentation Concerns - Cont'd
BUSINESS CONFIDENTIAL
3) Improving effectiveness of system by moving the printers to nearby access by the operators.
4) Securing the computer room to prevent access by unauthorized personnel.
3.2 Steam tracing for freeze protection is sometimes left on during periods of warm weather and has caused false readings in important process instruments, such as boiler drum water level controls, by vaporizing the process fluids in the instrument leads.
Recommendation
i
Consideration should be given to installation of a thermostat in
the steam tracing line to critical instruments.
p
3.3 The flame scanners on No. 33 and 34 Boilers have a shutoff valve in their mounting pipe which, if closed, will cause a false indication of flame failure.
Recommendation
t
|
Remove the valves or car seal the valve handwheels open. I
i i
SL.4 Pressure Relief/Emergency Venting Concerns
4.1 Flanges on safety valve discharge piping were noted to have 501 of the flange bolts missing. Some specific examples include: 1) 4 of 8 bolts missing on No.' 34 Boiler mixed fuel gas line
safely valve discharge. ( 2) Missing bolts on steam safety valve discharge at No. 34 Boiler. 3) 4 of 8 bolts missing on the 70 psig flash tank safety valve
discharge. 41 4 of 8 bolts missing on the No. 33 and 34 flash tank safety
valve discharges. 5) 4 of 8 bolts missing on the No. 33 and 34 Deaerators safety
valve discharges.
,
BUSINESS CONFIDENTIAL SL.4 Pressure Relief/Emergency Venting Concerns - Cont'd
6} Missing bolts on the safety valve for the 1100 psig No. 3 Olefins knockout steam separator.
The OS/HS Team is concerned that the reaction force developed by the venting process could result in failure of the flange bolts if less than a full compliment of bolts are provided.
Recommendation
Review the reasons for this common practice and consider replacement of the missing flange bolts during the safety valve inspection procedures.
4.2 The OS/HS Team observed that safety valves are not provided at the following locations: 1) No. 31, 32, 33, and 34 lube oil transfer pump discharges. 2) Bowser oil filter pump on the No. 31 steam turbine. 3) No. 33 and 34 lube oil filters and coolers. 4) No. 31, 33, and 34 Boiler mixed fuel gas knockout pots. 5) No. 35 and 36 superheaters mixed fuel gas knockout pots. 6) Cooler 2204E-434 near the sulfite tank. 7) No. 31 Boiler feedwater pump cooler and filter. 8) No. 31 Atr Compressor Coolers on the water side.
Recoeroendation Review this equipment and install safety valves where needed according to CED S/H Technology Manual Standard Practices and Criteria.
i
1. The following safety valves should be sized for positive displacement pump closed discharge: No. 31, 32, 33, and 34 lube oil transfer pump discharges a Bowser oil filter pump on the No. 31 steam turbine
C
l
I BUSINESS CONFIDENTIAL
SL.4 Pressure Relief/Emergency Venting Concerns - Cont'd
2. The following safety valves should be sized for fire exposure: No. 33 and 34 lube oil filters and coolers No. 31, 33, and 34 Boiler mixed fuel gas knockout pots No. 35 and 36 superheaters mixed fuel gas knockout pots
3. The following safety valves should be sized for valving In the coolant In the heat exchanger: Cooler 2204E-434 near the sulfite tank No. 31 Boiler feedwater pump cooler and filter No. 31 Air Compressor Coolers on the water side.
4. The No. 33 and 34 lube oil coolers should have safety valves
that are sized for fire exposure or for the coolant valved In, s
whichever Is greater.
t
f
4.3 The two safety valves on top of No. 31 Boiler feedwater heater do not have supports on their outlet piping. Overstressing might occur if those valves discharge.
Recommendation
These valves should be analyzed for reaction forces and adequate
supports for both safety valve discharge lines should be designed
and Installed.
4.4 The 10 pslg excess steam vent, supported off No. 31 deaerator, discharges near the adjacent operating platform.
i
Recommendation Raise this vent discharge to at least 8 feet above the platform level.
(9)
BUSINESS CONFIDENTIAL SL.4 Pressure Relief/Emergency Venting Concerns - Cont'd
4.5 The portable sample cooler stored on the top platform at No. 31 Deaerator has a blind flange in place of a rupture disc.
Recomnendation Replace the blfnd flange with,the required rupture disc.
SI,5 Operator Training Concerns Although the operating personnel are well experienced in powerhouse
operations, the need for better initial and periodic training was reported to the OS/HS team from various sources. The operators appear overly dependent on the SOP's and are reluctant to use the new TDC-200Q controls during upsets because they lack training. Operators must rely on staff and instrument mechanic assistance to startup the unit and to handle upsets. The OS/HS Team . is also concerned that the unit can sometimes be operated entirely by relief * operators who may lack experience with operation of No. 3 Powerhouse.
Reconinendatlon Consideration should be given to implementation of a refresher
operator training program on the TDC-2000. Training for relief operators should be reviewed and, where feasible, supplemented with additional training.
SL.6 Boiler Safety Criteria Deficiencies
6.1 Fuel Trip Valves 1) No. 33 and 34 Boilers and No. 3S Superheater do not have automatic vent valves on the main burner fuel gas lines between the existing double trip valves.
(10)
SL.6 Boiler Safety Criteria Deficiencies - Cont'd
BUSINESS CONFIDENTIAL
Recommendation Add main burner gas automatic vent valves to these boilers and superheater to comply with Standard Practice ES-101, Paragraph 3.6.
2) Nos. 33 and 34 Boilers and No. 35 Superheater do not have automatic double trip valves and vent valves on the pilot gas lines.
Recommendation Provide pilot gas double trip valves and vent valves to these boilers and superheater to comply with ES-101, Paragraph 3.6.
6.2 Master Fuel Trips Nos. 33 and 34 Boilers and No. 35 Superheater do not have high/low fuel gas pressure trips.
Recommendation Provide high/low fuel gas pressure trips to these boilers and superheater to comply with ES-C110 Paragraph 3.2. Also refer to ES-101 Paragraphs 3.10.2 and 3.10.3.
6.3 First Out Alarms Nos. 33 and 34 Boilers do not have first-out trip alarms.
Recommendation
.
Provide first-out trip alarms to these boilers to comply with
ES-C110 Paragraph 3.8. Also refer to ES-101 Paragraph 4.3
6.4 Fuel 6as Knockout Pot Alarms & Trips Nos. 33 and 34 Boilers and No. 35 Superheater do not have high
level alarms nor high-high level trips on their mixed fuel gas liquid knockout pots.
{in:
SL.6 Boiler Safety Criteria Deficiencies - Cont'd
BUSINESS CONFIDENTIAL
Recommendation Provide high level alarms and high-high level trips on these
knockout pots to comply with ES-C110, Paragraph 3.12.
6.5 Indication of Bypassed Trips . Nos. 33 and 34 Boilers do not have indication of bypassed trips.
Recommendation
Provide indication of bypassed trips on these boilers In
accordance with ES-C110, Paragraph 3.7. Also refer to ES-101,
Paragraph 3.13
i
SL.7 Personnel Exposure Hazard
7.1 Motor heaters fed by Substation No. 37 do not disconnect when the main motor breakers are pulled (for example to feed water pump' motors 33-A and 33-B). This could result In a serious injury to personnel when working on these motors because, even though the main breaker has been pulled anId locked out, there will be a live circuit at the motor. This Is complicated by the fact that the breaker which serves the motor heaters handles more than one motor.
(12)
BUSINESS CONFIDENTIAL
3) Insulator's outer clothing which is contaminated with asbestos fibers is not properly removed.
4) Winds carry the asbestos fibers outside the area that is barricaded for the removal operation.
Recommendation Continue emphasizing to unit personnel the importance of obeying barriers and the importance of following established procedures when removing asbestos-containing insulation and when removing asbestos-contaminated clothing. When the insulation material is unknown, the insulation should be treated as though it contains asbestos.
75490