DOCUMENT DESCRIPTION: Memo RE Results of Asbestos Air Monitoring Nov 1978
Internal M em orandum
Date January 5, 1979
Le>tter, No
(f it
Executive O ffices jj. Southfield, M ichiearJU
To
From Subject
Gordon Detenbeck
Ben Wong
\
<
. z ff
g o t-
tV 80 oe
;\c u --
U Q W
Results of asbestos air'.monitoring .-November 14, 15, 19783 U|
'AX
' '
J o *L
u. . Sigg2$ B38?8HBgassa-E?{!a
U3 ^ O -
C**C* CO 2: -
,
. . LU ^
Outlined in the following are the results of the air monitoriitg s
conducted for asbestos along with a comparison of previous sailing
results. The results show that exposure concentration has reig&ined
insignificant from both an occupational health and legal viewpoint.
As always please retain the results for documentation purposes.
The majority of samples are breathing zone samples which is most indicative of employee exposure. It is cautioned tht area samples, because they are not mobile like the employee, are indicative of contamination sources only and not, personal exposure.
Overall housekeeping in the asbestos areas was noted to be good. However, the one problem area remains to be the bagging enclosure area of the dust collector. Accumulations of asbestos dust was still noted and it was learned that outside contractor bag house cleaning operators were not equipped with proper personal protective gear. It is extremely important, from liability aspect, that the dust collector area is as free of asbestos accumulations as possible and that dust collector cleaning operators are equipped with proper protective gear.
AREA OR OPERATION
Prince Road Plant
June 26, 28, 1978
Pack & Inspection, Hand line (S. Zans) ,
.21 f/cc
1st Shoe Assembler, Hand line (J. Trisan)
.28 f/cc
Stockman, Hand line (Z. Duchnowski)
.06 f/cc
2nd Shoe Assembler, Hand line (S. Lustig)
.10 f/c.c
Pin & Lever, Hand line (P. Brnett)
.09 f/cc
November 14, 15, ^
.064 f/cc (S. Kawa)
--
refused to be sampled
.017 f/cc (D. Eiper)
.11 f/cc (G. Verkie)
1 PLAINTIFF'S
EXHIBIT
I3z
LU
it i te i a i
M emorandum
Date
January 5 , 19 79 Page -2-
Letter No.
Prlnce Road Plant (continued)
Second Holddown
Area Sample 15' behind shoe & lever
Argyle Road Plant
Grinder, Line #1 (M. Bryant)
Grinder, Line #4 (C. Scandale)
Grinder, Line #2 (F. Bonofiglio)
Inspection, Lines #3 & #4 (J. McCann, A. Tortola)
Riveter, Line //5 (J. Pisani)
Sweeper (S. Moroz)
Repair and Rework (M. Kajan)
Drilling (M. Bryant)
Stockman (N. Nadon)
Inspection Line #1 (P. Dunn)
Area Sample, top of auto drill control panel
-
.14 f/cc .15 f/cc .10 f/cc .07 f/cc .10 f/cc .03 f/cc .12 f/cc .10 f/cc
-
.013 f/cc (J. Renand)
.018 f/cc
.024 f/cc (C. Guiseppe) Not operating
Not operating
-
.24 f/cc: (D. Jacques)
-
.44 f/cc (M. Jezoni) .22 f/cc (J. Marra) .039 f/cc
.018 f/cc
.025 f/cc
Internal M emorandum
Date January 5, 1979
Page -3-
Letter No.
Argyle Road Plant (continued) Area Sample, outdoor dust collector
.04 f/cc
.26 f/cc.
BW/af
cc: R. M. Robbins T. C. Schaefer