Document 5zeGpOzV5VR96E3vmZM8vJ55

Clean Water Act Section 404: Site Visit/Case Development For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) This report includes only factual information gained by documentation, onsite observations, and/or onsite interviews. Inspector Name(s) Christopher Parker Time In 8:30 AM Time Out 4:30 PM Start Date November 1, 2023 End Date November 1, 2023 Inspector's Organization Enforcement and Compliance Assurance Division/Waterways and Wetlands Enforcement Section Organization Requesting Inspection (if different) Inspection Type Section 404 of the Clean Water Act Inspection Status Original Site Name Turkey Creek Sand and Gravel Site Address* 347 County Road 24 City* Winfield County* Fayette State* AL Zip Code* 35594 Mailing Address* 347 County Road 24 City* Winfield County* Fayette State* AL Zip Code* 35594 Latitude* 33.8728 Longitude* -87.7801 Estimated Size of Site (acres) 345.6 Is there a home on the site? Yes No Signature Inspector CHRISTOPHER PARKER Date: 2023.11.07 15:56:24 -05'00' Digitally signed by CHRISTOPHER PARKER Date Signature Supervisor AHMAD DROMGOOLE Date: 2024.01.03 17:18:40 -05'00' Digitally signed by AHMAD DROMGOOLE Date Effective August 2020 Page 1 of 5 Clean Water Act Section 404: Site Visit/Case Develoment For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) Site Name Turkey Creek Sand and Gravel Start Date November 1, 2023 End Date November 1, 2023 Inspection Purpose Initial Site Visit Presentation of Inspector Credentials Opening Conference Name and Title (Use N/A if owner/operator not available to join the inspection) Stephen Farris - owner/operator and James Weiss - consulting engineer Opening Conference Name of person authorizing access if applicable Stephen Farris Notes from Opening Conference Site access was arranged through Stephen Farris, owner/operator. We discussed inspection purpose, scope, and objectives of the inspection. We planned to conduct reviews in two main areas of the Site and reviewed those areas with Mr. Farris before departing. The 404 team departed for the field and the 402 team remained with Mr. Farris to review documents. Access Issues if Any Describe Portions of property presented dense vegetation. However, most areas were accessible. Inspection Observations and Sample Collection Site Owner/Site Operator/Responsible Party (Name, title and contact information) Turkey Creek Sand and Gravel, Inc. Stephen Farris (owner/operator) turkeycreeksmiles@yahoo.com Additional Persons Present at Inspection Lonnie Dorn - EPA, Region 4 Celina Russo - EPA, Region 4 Jasmine White - ADEM Cortney Shay, Bryan Moatts, Samantha Rhoades, Molly Hacker - Corps of Engineers, Mobile District General Site Characteristics (layout of property, etc.) See Attachment A. Purpose and Need for Discharge of Dredged and/or Fill Material Stated need was for water withdrawal for the wash plant (no withdrawals nor infrastructure to do so were observed). Site Overview (Past inspections, site description, permits, etc.) The Site is an approximate 345.6 acre parcel located at 347 County Road 24, Winfield, Fayette County, Alabama (See Attachment A). ADEM issued a general permit - AL0066877 for storm water and/or wastewater. Effective August 2020 Page 2 of 5 Clean Water Act Section 404: Site Visit/Case Develoment For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) Site Name Turkey Creek Sand and Gravel Scope of Inspection (Areas inspected or not inspected) See Attachment A. Start Date November 1, 2023 End Date November 1, 2023 Effective August 2020 Page 3 of 5 Clean Water Act Section 404: Site Visit/Case Develoment For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) Site Name Turkey Creek Sand and Gravel Start Date November 1, 2023 End Date November 1, 2023 Environmental Conditions (e.g., wind, rain, smoke, dust, temperature, snow) Weather conditions during the Site Inspection: Sunny, temperatures low 30's in the morning becoming warmer through the day mid-50's. Antecedent precipitation was drier than normal on the date of the inspection (see Attachment B). Field Work Conducted Observations and/or sampling points were conducted throughout the Site and their locations were recorded using a GPS enabled Nikon AW120 camera. Photographs were taken of stream and wetland locations and field observations. Locations of observations are included on the attached photographic log (see Attachments A and C). Closing Conference Documents Received and/or Requested During the Inspection None. Compliance Assistance Provided (If any) None. Observations Relayed to Site Owner/Operator I informed Mr. Farris that I would discuss my observations with EPA managers and the Office of Regional Counsel and that the EPA inspection report would be released to Turkey Creek Sand and Gravel within 70 days of the closing conference. Mr. Farris asked about generally what, if any, concerns were observed and what would be needed to address those concerns, if any. I explained to Mr. Farris that the recent fill material used to construct the dam would likely need a Section 404 permit. Mr. Farris asked what that would entail and I explained that a purpose and need would be required along with mitigation if the Corps could/would entertain a permit application (Note: Corps personnel not present at exit conference). In general terms I explained that the permitting process could be an avenue with approximate cost of mitigation credits (with no speculation as to the amount of mitigation that would be required). Mr. Farris commented that he would just remove the fill to alleviate the need for permitting and mitigation. I asked that Mr. Farris hold off on any such activity and that we would need to have a follow-up conversation on next steps. Mr. Farris thanked the team and we concluded our inspection at approximately 4:30 pm (central). Actions Taken by Owner/Operator During the Inspection (If any) None. Potential Issues of Concern Including Regulatory Citations Unauthorized discharges of dredged and/or fill material into wetlands (Sections 301 and 404 of the CWA, 33 U.S.C. 1311 and 1344). Attachments* Maps and Sketches Photographs (including location) and Photo Log Other Attachment A - Site Map Attachment B - Antecedent Precipitation Data Attachment C - Photographic Log Effective August 2020 Page 4 of 5 Site Name None. Clean Water Act Section 404: Site Visit/Case Develoment For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) Turkey Creek Sand and Gravel Additional Notes Start Date November 1, 2023 End Date November 1, 2023 Effective August 2020 Page 5 of 5 ATTACHMENT A - SITE LOCATION MAP TURKEY CREEK SAND & GRAVEL, LLC FAYETTE COUNTY, ALABAMA I Imagery Date: October 10, 2023 0 500 1,000 2,000 Feet ATTACHMENT B Antecedent Precipitation vs Normal Range based on NOAA's Daily Global Historical Climatology Network 10 2023-09-02 8 Daily Total 30-Day Rolling Total 30-Year Normal Range Rainfall (Inches) 6 4 2 0 Apr May 2023 2023 Coordinates Observation Date Elevation (ft) Drought Index (PDSI) WebWIMP H2O Balance 2023-10-02 2023-11-01 Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 2023 2023 2023 2023 2023 2023 2023 2024 2024 2024 33.876746, -87.777638 2023-11-01 481.584 Not available (2023-10) Wet Season 30 Days Ending 2023-11-01 2023-10-02 2023-09-02 Result 30th %ile (in) 2.492126 2.34252 3.62874 70th %ile (in) 5.651969 4.259843 5.160236 Observed (in) 0.523622 0.188976 8.196851 Wetness Condition Dry Dry Wet Condition Value 1 1 3 Month Weight 3 2 1 Product 3 2 3 Drier than Normal - 8 Weather Station Name WINFIELD 2 SW WINFIELD 6.9 S GUIN 1.1 NW SULLIGENT Coordinates 33.9108, -87.8469 33.8303, -87.8117 33.9793, -87.9214 33.9158, -88.1014 Elevation (ft) 520.013 518.045 561.024 402.887 Distance (mi) 4.617 5.917 6.375 14.597 Elevation 38.429 1.968 41.011 117.126 Weighted 2.255 2.674 3.13 8.278 Days Normal 11027 44 63 218 Days Antecedent 71 0 19 0 ATTACHMENT C Turkey Creek Sand and Gravel, Inc. Turkey Creek Sand and Gravel Photographic Log Fayette County, Alabama November 1, 2023 Overview Map ATTACHMENT C Page 1 of 25 PHOTO 1 Title Comment Description Photo 1 Taken by Chris Parker. Soil profile at Data Point A1. ATTACHMENT C Page 2 of 25 PHOTO 2 Title Comment Description Photo 2 Taken by Chris Parker. Soil pit at Data Point A1, water 6 inches from soil surface and saturation to the soil surface. ATTACHMENT C Page 3 of 25 PHOTO 3 Title Comment Description Photo 3 Taken by Chris Parker. Striking west over Data Point A1. ATTACHMENT C Page 4 of 25 PHOTO 4 Title Comment Description Photo 4 Taken by Chris Parker. Striking east over data point A1. ATTACHMENT C Page 5 of 25 PHOTO 5 Title Comment Description Photo 5 Taken by Chris Parker. Striking downstream of Turkey Creek, just upstream of the UT's confluence with Turkey Creek. Site conditions did not allow access to the confluence. Red arrow indicates direction of flow. ATTACHMENT C Page 6 of 25 PHOTO 6 Title Comment Description ATTACHMENT C Photo 6 Taken by Chris Parker. Striking upstream of Turkey Creek, just upstream of the unnamed tributary's (UT) confluence with Turkey Creek. Site conditions did not allow access to the confluence. Red arrow indicates direction of flow. Page 7 of 25 PHOTO 7 Title Comment Description Photo 7 Taken by Chris Parker. Striking downstream of UT to Turkey Creek. Red arrow indicates direction of flow. ATTACHMENT C Page 8 of 25 PHOTO 8 Title Comment Description Photo 8 Taken by Chris Parker. Striking upstream of UT to Turkey Creek. Red arrow indicates direction of flow. ATTACHMENT C Page 9 of 25 PHOTO 9 Title Comment Description Photo 9 Taken by Chris Parker. Striking upstream of UT to Turkey Creek from earthen fill material. Red arrow indicates direction of flow. ATTACHMENT C Page 10 of 25 PHOTO 10 Title Comment Description Photo 10 Taken by Chris Parker. Striking downstream of UT to Turkey Creek from earthen fill material. Red arrow indicates direction of flow. ATTACHMENT C Page 11 of 25 PHOTO 11 Title Comment Description Photo 11 Taken by Chris Parker. Striking over earthen fill material at UT. Red arrow indicates direction of flow. ATTACHMENT C Page 12 of 25 PHOTO 12 Title Comment Description Photo 12 Taken by Chris Parker. Striking over earthen fill material at UT. Red arrow indicates direction of flow. ATTACHMENT C Page 13 of 25 PHOTO 13 Title Comment Description Photo 13 Taken by Chris Parker. Striking upstream of UT2. Red arrow indicates direction of flow. ATTACHMENT C Page 14 of 25 PHOTO 14 Title Comment Description Photo 14 Taken by Chris Parker. Striking downstream of UT2. Red arrow indicates direction of flow. ATTACHMENT C Page 15 of 25 PHOTO 15 Title Comment Description Photo 15 Taken by Chris Parker. Striking downstream of Turkey Creek at County Road 24 crossing. Red arrow indicates direction of flow. ATTACHMENT C Page 16 of 25 PHOTO 16 Title Comment Description Photo 16 Taken by Chris Parker. Striking upstream of Turkey Creek at County Road 24 crossing. Red arrow indicates direction of flow. ATTACHMENT C Page 17 of 25 PHOTO 17 Title Comment Description Photo 17 Taken by Chris Parker. Striking upstream of Turkey Creek at Sand Springs Road crossing. Red arrow indicates direction of flow. ATTACHMENT C Page 18 of 25 PHOTO 18 Title Comment Description Photo 18 Taken by Chris Parker. Striking downstream of Turkey Creek at Sand Springs Road crossing. Red arrow indicates direction of flow. ATTACHMENT C Page 19 of 25 PHOTO 19 Title Comment Description Photo 19 Taken by Chris Parker. Striking downstream of Turkey Creek at Sand Springs Road crossing. Red arrow indicates direction of flow. ATTACHMENT C Page 20 of 25 PHOTO 20 Title Comment Description Photo 20 Taken by Chris Parker. Striking downstream of Turkey Creek at County Road 115 crossing. Red arrow indicates direction of flow. ATTACHMENT C Page 21 of 25 PHOTO 21 Title Comment Description Photo 21 Taken by Chris Parker. Striking upstream of Turkey Creek at County Road 115 crossing. Red arrow indicates direction of flow. ATTACHMENT C Page 22 of 25 PHOTO 22 Title Comment Description ATTACHMENT C Photo 22 Taken by Chris Parker. Striking upstream of the Sipsey River at County Road 95 crossing. Red arrow indicates direction of flow. Page 23 of 25 PHOTO 23 Title Comment Description ATTACHMENT C Photo 23 Taken by Chris Parker. Striking downstream of the Sipsey River at County Road 95 crossing. Red arrow indicates direction of flow. Page 24 of 25 PAGE INTENTIONALLY BLANK ATTACHMENT C Page 25 of 25