C-8 SAMPLING FORECAST
RCRA CORRECTIVE ACTION PERMIT
0 VERIFICATION INVESTIGATION (VI) WORK PLAN - FALL 1991 - WHAT IS THE VI ? WHY ARE WE DOING IT ?
- 30 WATER SAMPLES TO BE ANALYZED - 40 SOIL SAMPLES TO BE ANALYZED
- ALL C-8 SAMPLE ANALYSES COMPLETE BY 1/15/92 0 RCRA FACILITY INVESTIGATION (RFI) ESTIMATE - FALL 1992
- WHAT IS AN "RFI" ?
- ASSUME 4 PERMANENT WELLS AROUND ANAEROBIC DIGESTION POND SWMU. SAMPLE WELLS TWO TIMES PER YEAR.
- ASSUME 4 PERMANENT WELLS LOCATED BETWEEN ADP AND OLD LUBECK WELLS. SAMPLE WELLS TWO TIMES PER YEAR.
- 6 ADDITIONAL SOIL CORE SAMPLES TAKEN FROM ANAEROBIC DIGESTION POND SWMO. ASSUME 3 SAMPLES PER CORING = 18 SAMPLES. 16 WATER SAMPLES AND 18 SOIL SAMPLES TOTAL ESTIMATE OF OTHER SAMPLING NEEDS IN 1992 48 WATER SAMPLES (HO GW MONITORING AT LETART AND DRY RUN)
ADD 64 MORE WATER SAMPLES IF WE DO QUARTERLY
MONITORING AT LETART AND DRY RUN
0 SOIL SAMPLES
EID933883
C-8/NATER MEETING AGENDA
(THURS, NOV. 7- B21 LCR)
*
GLOBAL C-8 ISSUES
- ROGER ZIPFEL
*
VERIFICATION INVESTIGATION
- DAN NEBER
*
C-8/MATER FUTURE SAMPLING NEEDS, BOTH NN & COMMUNITY
- DAN NEBER
*
CLIENT SERVICES - CH2MHILL
- CHICK PHILLIPS
*
C-8/NATER METHODS DISCUSSION
- CH2MHILL, JENELL SMILEY
- EXP. STATION, MARIBETH KRUEMPELMAN
*
PATH FORWARD
- MIKE MCCLUSKY