Document 5kQmYngJ2ey7GzOJrowB778xJ

PLAINTIFF'S EXHIBIT l PROPOSAL AS REQUESTED GEMCO CONSTRUCTION, INC. GENERAL/SPECIALTY CONTRACTOR 415 N. MESA, SUITE 110 EL PASO, TEXAS 79901 (915) 533-8851 - FAX (915) 533-1988 PROPOSAL SUBMITTED TO: ASARCO, INC. STREET: P.O. Box 1111 CITY. STATE AND ZIP CODE: El Paso, Texas 79999 Attention: Greg Parham/Peggy Munsell ARCHITECT: N/A DATE OF PLANS: N/A PHONE: DATE: 541-1800 January 14, 1997 JOB NAME: Abatement Asbestos Removal at ASARCO JOB LOCATION: El Paso Plant JOB PHONE: GEMCO hereby submits its quote for removal of asbestos as ffer instructions and plans provided by ASARCO: Abatement . Disposal Total (1) Remove asbestos from heat exchanger 1,800.00 750.00 ift 0^4 (2) Remove asbestos from Dross Reverb Stacks UZi rl 19,750.00 2,500.00 (3) Remove asbestos from Breeching Stack j , ;; ' 10.875.qo/ 1,500.00 \All work and disposal shall be performed in strict accordance with speVcifications provided. 2,550.00 22,250.00 12,375.00 EXCLUDES: Structural on miscellaneous steel work, rotation of stacks. 1------10-day notification, insulation. Project Duration for Dross Reverb Stacks - 28 days. WE PROPOSE hereby to furnish material and labor - complete In accordance with above specifications, for the sum of: SEE ABOVE Payment to be made as follows: TERMS: NET 15 DAYS All material is guaranteed to be as specified. AH work to completed in a substantial workmanlike manner according to specifications submitted per standard practices Any alteration or deviation from above specifications involving extra costs wiH be executed only upon written orders and will become an extra charge over and above the estimate All agreements contingent upon strikes, accidents or delays beyond our control Owner to carry fire, tornado and other necessary insurance. Our workers are fully coveted by Workman's Compensation Insurance Authorized ^ V = Av y ------- Signature: _________ JAMES E. BISSUETT Note: This proposal may be withdrawn by us if not accepted within 30 days. Acceptance of Proposal - The above prices, specifications and conditions are satisfactoiy and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Signature Signature Date of Acceptance: ASBESTOS ASARCO ELP 0010699 COMPARISON BIDS SUBMITTED BY ASBESTOS CONTRACTORS: CONTRACTOR HEATEXCHANGER DROSS REVERB STACK LEAD BREECHING STACK GEMCO* ERI** NORTHWEST f^ao -"mi- 3,333 9,280 23,333 39,800 /o s? -7 < 33oo ' 31,111 19,800 *GEMCO DOES NOT IDENTIFY IN BID, THAT DISPOSAL IS INCLUDED. BID GOOD FOR 30 DAYS. **ERI BID RECEIVED 01/03/97. BID REQUESTED BYDEC. 31, 1996. BID INCLUDES GASKETS ON REVERB STACK. GASKETS WERE NOT TO BE INCLUDED IN BID. BID GOOD FOR 30 DAYS. NOTE: The quotes cover the removal of Asbestos Containing Material (ACM) only. Where applicalbe, steal removal must be done prior to the removal of the asbestos. Removal and disposal of fiberglass insulation under the asbestos will have to be removed and disposed of according to results of T-CLIP findings. f:\uscre\peggy\drossbid.doc ASARCO ELP 0010700