Document 5j9BqZVYZVwY13MVVqdpBbYe
ABDOO164799
4 Page 1 of 6 A
VCM LEAK SURVEY -VINYL AREADATE:
INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module
A. Ground Level
1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743
0
X2. 6> /L
7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area)
.o
0
B. Third Level (Top of Reactors)
a.
1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve
________ ________ ________ ________
/) Q
4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 742-Rinse Water Line 9. 743 Leanpe Seal
________ ________ ________ ________ 0
________ ________ ________ ________ ___ o_ Q
q
0
10. 743 Condenser Bottom Seal
<7
ABDOO164800
Page 2 of 6
A
B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust
C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve
II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow
________ _____ ________ ________
0 0 f) $ Q d Q
0
0
________ ________
________ ________
________ ________
________ ________
f0
/u
0
0
0
O
0
________
________ ________
________ ________ ________ ________
& j
________ ________ ________ ________
0
o_
________ ________ ________ ________ ___
________ ________ ________ ________
d
________ ________ ________ ________ ___ 0_
________ ________ ________ ________ ___
________ ________ ________ ________
O
________ ________ ________ ________ ___
ABDOO164801
n , ^, Page 3 of 6
A
II. New Reactor Area - Recovery Unit (Cont.)
A. 2nd Floor (Cont.)
11. VCM Collection Tank (Area)
________ ________ _____ _____
12. East Recovery Condensor (Area)
13. West Recovery Condensor (Area)
B. Ground Level
1. East VCM Storage Tank Bottom (Area)
________ ________ ________ ________
2. East VCM Storage Tank Top (Area)
_____ _____ ________ ________
3. Middle VCM Storage Tank Bottom(Area) __________
4. Middle VCM Storage Tank Top (Area)
________
5. West VCM Storage Tank Bottom (Area)
________ ________ ________ ________
6. West VCM Storage Tank Top (Area)
_____
7. East (894) Rec. VCM Return Pump Seal ________ _____ ______ ________
8. West (893) Rec. VCM Return Pump Seal ________ _____ ______ ________
9. South (891) Seal Water Separator Pump Seal
________ ________ ________ ________
10. North (892) Seal Water Separator Pump Seal
________ ________ ________ ________
11. Seal Water Filter Pack Head
________ ________ ________ ________
12. East Rec. VCM Charge Pump Seal
_____
13. East Rec. VCM Charge Pump Overflow
________
14. West Rec. VCM Charge Pump Seal
15. West Rec. VCM Charge Pump Overflow
________
16. Rec. VCM Filter Pack Head
17. East Rec. Charge Pump Seal
______
18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal
______ ________ ________ ________ ________ ________ ________ ________
0
Q p
Q 0 Q p Q Q O 0
n
p Q O n n Q O $ & 0
ABDOO164802
II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head
III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13.
14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor
1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal
Page 4 of 6
A
XL
xl
XL
XL XL XL XL XI XX
XL XL XL O XL XL
XL XI XI XL
XL o XL o_ O
ABDOO164803
Old Reactor Area - Reactor Module
Top of Reactors
1. East Steam Jet Exhaust
2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal
4. D-300 Condensor Bottom Seal 5.. D-300 Lenape Manway Seal 6. . D-400 Condensor Top Seal
7. D-400 Condensor Bottom Seal
8. D-400 Lenape Manway Seal
9. D-500 Condensor Bottom Seal
10. D-500 Condensor Bottom Seal
XI. D-500 Lenape Manway Seal
12. D-600 Condensor Top Seal
13. D-600 Condensor Bottom Seal
14. D-600 Lenape Manway Seal
Bottom of Reactors
1. D-300 Dump Valve
2. D-400 Dump Valve
3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line
6. VCM Charge Manifold Line (Areal
7.
S 4TJJtfi -c. 9^^
\/
Page 5 of 6
0 0 0 0 0 Sj # 0 0 0 0 0 0 0 0
0 0
0 (0 0
0 //a J.D
ABDOO164804
Page 6 of 6
VCM Tank Farm 1. #1 Compressor (North)
2. r.2 Compressor
3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere)
A
/ooo
f- D
HA J. 9o
n.
t
o n