Document 5evn4Q24gbx3qmrLx6409GkD
Q.ELANESE
CHEMICAL COMPANY. INC.
PLAINTIFF'S EXHIBIT CEL-798
cmcmccl plant
April 28, 1982 JJF-57-82
CERTIFIED MAIL 5561475
Mr. Bill Stewart, P.E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723
Dear Mr. Stewart:
The Celanese Chemical Company, Inc. plant at Bishop plans to reclaim about 1500 linear feet of steel pipe ranging in size from 2" to 20" In diameter. This reclamation work will start May 10, 1982. The pipe Is lnsulaced with friable asbestos Insulation, so Insulation will be removed as the first step, and landfilled In the designated asbestos landfill located on the plant site. All precautions, outlined in 40 CFR 61.20 61.25, will be observed.
This letter will serve as a notification of this work, as required by 40 CFR 61.22 (d)(2). The attached data sheet lists all the pertinent data.
Please contact me if you have any questions or comments.
Very truly yours,
CELANESE CHEMICAL COMPANY, INC.
JJF/bJw bcc: CCC, Bishop
Mr. J. Garza Mr. J. F. Harper Mr. T. L. Markham Mr. W. H. Meyer
Austin Mr. R. K. Golemon
A.B.I., Bishop Mr. Juan Gonzalez
Plant Manager CCCTC
Central Files (2)
J BISHOP CENTRAL FILES: 202.1 ^
CELANESE CHEMICAL COMPANY. INC. BOX *28. BISHOP TX 78343 TELEPHONE: 512-584-3511
009287
NOTIFICATION INFORMATION - RECLAMATION
I. OWNER:
Celanese Chemical Company, Inc.
II. ADDRESS:
P. 0. Box 47320 1250 Wesc Mockingbird Lane Dallas, Texas 75247
III. DESCRIPTION:
Remove friable asbescos insulation from 1500 linear feet of steel pipe ranging in size from 2" to 20" in diameter.
IV. ADDRESS OF SITE:
Chemcel Plant Celanese Chemical Company, Inc. P. 0. Box 428 Bishop, Texas 78343
V. STARTING AND COMPLETION DATE: Start - May 10, 1982 End - May 31, 1982
VI.NATURE OF RECLAMATION:
See III above
VII. PROCEDURE:
Wet insulation thoroughly, strip off insulation, pack in plastic bags and iandfill in registered (on-site) landfill.
VIII. LANDFILL SITE:
Texas Department of Water Resources Registration No. 30084
EPA ID. No. TXD 008113441
009288