Document 5bq2qMO7gaNREeJaJjn4XgaoD
INTER-OFFICE CORRESPONDENCE
DATE:
March 15, 1985
TO: See Distribution
FROM:
D. A. Longhini
LOCATION: Barberton Development
SUBJECT:
PVC Latex Pilot Plant Personnel SafetyReview Meeting Minutes
A meeting was held on March 14, 1985, to discuss personnel safety
in regards to the proposed PVC latex pilot plant.
Roger Corley,
Maggie Virostko, Steve Hanna, Mike Hogan, Gary Gardner, Brian
Warnock,
and David Longhini attended the meeting.
The
discussions were centered around the OSHA requirements for
handling vinyl chloride monomer.
Subjects covered were as
follows:
1. Regulated Area. A regulated area must be established which
will include all areas where the possibility exists for the
vinyl
chloride concentration to exceed the permissible
exposure limits.
This area will probably include at least
the bottom three floors of the biochem mini pilot plant
building and any outside area where VCM is stored. Access to
this area will be limited and warning signs must be posted at
entry points.
2. Medical Surveillance. Anyone who works in the regulated area
on a regular basis must be included in the medical surveil
lance program.
Lake Charles uses a standard which requires
anyone who will work in the plant for more than three days to
participate in the program.
Contractors and maintenance
people are included.
Casual visitors do not need to be
included although access to the area should be limited.
Dr. Del Greco is familiar with testing requirements. Dr. Del Greco may want to consult with the Lake Charles plant doctor because of some problems they've had in the past with the liver function test.
3. Monitoring.
Two types of air monitoring systems will be
utilized in the pilot plant. First, a gas chromatograph will
continuously sample and analyze several key points in the
area.
This system will function primarily as a leak detec
tion system and will sound an alarm if a high level of VCM is
detected.
The second type of monitoring equipment used will
consist of portable personnel monitors carried by workers in
the area. This type of monitoring will be used to determine
whether or not the OSHA guidelines are being met. While this
level of monitoring is not required for every person working
in the area, every job type (engineer,_technician, mechanic,
etc.) must be covered.
SL 067655
PVC Latex Pilot Plant Personnel Safety Review Meeting Minutes
March 15, 1985 Page 2
4. Training.
A training program must be established to inform
workers in the area of the hazards related to handling VCM.
Procedures for handling emergency situations must be estab
lished and documented. Clyde Dennis and Murray Davis are the
Lake Charles contacts in this area.
5. Respiratory and Skin Protection. Three levels of respiratory protection will be provided:
I. Cartridge Respirators. These should be carried on normal rounds and worn when taking samples or any other time when low level exposure (<10 ppm) is probable.
IX. Bottled Air System.
This system will consist of a full
face mask with a hose and bottled air supply. It will be
used when opening vessels or other situations where the
potential exists for higher level exposure.
III. Scott Air Packs. purposes only.
These should be used for emergency
Chemical resistant rubber gloves are usually all that is necessary to prevent skin exposure. A slicker suit should be available in case of a major liquid leak.
6. Reporting and Record Keeping.
A system is already in place
for maintaining the records related to personnel monitoring
and medical surveillance.
A report must be issued to OSHA
within a month after startup of the facility.
OSHA must be
informed within 24 hours of any emergency situations if they
result in a "massive release of vinyl chloride" and if a
worker is exposed to the release.
If personnel monitoring indicates that an individual has been
exposed above the permissible exposure limits, he must be
informed within ten working days.
There is already a system
within the plant which should take care of this requirement.
7. Assignment of Responsibilities. While everyone involved with the project is responsible for making sure the operation is safe, certain areas of responsibility were established to prevent duplication of efforts.
A. Medical Surveillance - Virostko B. Personnel Monitoring - Kuryla; Hogan C. Respiratory Protection - Hanna D. Training - Project Engineers E. Reporting and Record Keeping - Hanna, Virostko
SL 067656
PVC Latex Pilot Plant Personnel Safety Review Meeting Minutes
March 15, 1985 Page 3
No specific actions are required at this time because the
project has not yet been approved.
However, cost estimates
for building and operating the plant will be formulated
within the next few weeks.
Individuals may be asked for
input for these estimates regarding their areas of
responsibility.
Insurance regulations were discussed briefly.
IRI will be
informed after the details of the project are further
defined.
Since the expected cost of the project is well
below the deductible level of the insurance policy, only an
informal notification will probably be necessary.
Roger
Corley will interface with IRI.
/7
D. A. Lcnghmi
/vf
Distribution Gary Gardner Brian Warncck Maggie Virostko Lynn Kuryla/Mike Hogan Roger Corley (G.O.) Steve Hanna Gerry Neikirk Dennis Kowalczyk (Springdale) Gene Laukonen/Al Mavity
SL 067657