Document 5bmV7OEQyMDQmnedZ7OR6ybqV
ABDOO107432
(conoco)
Interoffice Communication
In : 0. G. Draper
From ; A. 11. Sathcr
Dole I Apr i 1 5, 1977 Subject 1 INDUSTRIAL IlYG.iLNl- INSIMiCTlON
FEBRUARY 7-10, 1977
RECEIVE^
APR 12 J3W MEDICAL 01V.
The f`o 1 lowing comments arc in response to those made by Dr. Oran 0. Steffey in his Aberdeen Plant Industrial Hygiene Inspection Report dated 2/18/77.
DRY Bl.liNi.) CONTROL
A Central Vacuum Cleaning System will be installed tinder AFP. 9176 through out t lie Compound Pcpnrtmcnt Area. Our Mechanical engineering Croup lias targeted completion for 7/77. This will place a Central Vacuum System outlet inside the Dry Blend Control Room.
BLAST IC1 ZLR BUILDING
Jerald V. llptain lias done some preliminary job task sampling in this area. Sampler, taken to date Indicate that our sampling equipment is inadequate For current needs. A high-volume sample pump (88 lifers per minute} lias been identified for purchase under the 1977 Safety equipment API*. The high-volume drawn by this sampler will allow us to gather definitive exposure samples within the required limits of accuracy for short-term exposures (less than 5 minutes).
C:0MPKI ISSOR BUILDING
ilic stored materials noted in this area will be moved to a relocated storage building north of the Powerhouse Building by <1/18/77. This will eliminate the congestion around equipment in the west end of this building.
SHOPS
'Ihe maintenance area improvements noted during Dr. Stei'fey's inspection have begun. The stores area relocation is now complete. The layout for the Instrument Shop has been finalized and contract let. for construction. Current estimates for the completion of this project, is the second quarter in 1977.
COLOR IVLKIIl ROOM
The color weighman has been instructed to use the foot operated pad for controlling the ventilation system while weighing up material. Chemical exposure monitoring will be conducted to determine if an exposure problem exists.
ABDOO107433
(1. H. Draper I ltd ns t r i a I llyg i cnc April S, 197 7 Pape 2
1aspect \ on
OUTSim- DRUilMlil) C11HM1CALS STORAQl
fin tori al stored in the noted damaged corrosive chemical storage drums will be transferred to new drums by 4-29-77. The Administrative Services Raw Material Hroup will check this area on a monthly basis to insure that any damaged containers arc taken out of service immediately. New signs will be ordered and pressed into service as soon as they arc received.
POW1-.R I IQllSh mil 1,1) I NCI
The new control room is progressing at a satisfactory rate. Dr. Steffey's recommendations for the maximum segregation of foodstuffs and water analysis chemicals have been adhered to in the design specification.
PlITilAhlC AllNYimiUli* STORAG1:
AITis 9365 ami 9027 covering the much needed im{)rovements in the Phthalie Anhydride Un1 oad ing System arc currently under construction with an estimated completion date of S/lb/77. To date, 2 design and safely reviews have been he 1 d. The first review occurred following, the design phase of the project and tlie second occurred after the unloading equip ment was placed and the piping phase was nearly complete. A final pre startup safety review is scheduled prior to unit startup.
We enjoyed having Dr. Stcffey visit our plant. His comments ucrc viewed as construct i.ve and arc appreciated. Wc look forwarded to his next visit.
A. 11. Sat her Safety Director
ct
c: Department Heads