SITE WORK ORDER
CONTRACTOR
OATE
S W.O. NO
KIMMINS ABATEMENT CORPORATION
CONSTRUCTION CONTRACT
CONTRACT OATE
BEGIN WORK
190CT88
complete work
KA-001
S 0 NO
CE269020PN .
TO BE USEOFOR:
02SEP88
170CT88
18N0V88
ADDITIONAL ASBESTOS/INSULATION REMOVAL
THE FOLLOWING CHANGES TO THE ABOVE REFERENCED CONTRACT ARE HEREBY AGREED TO IN ACCORDANCE WITH ARTICLE 7 OF THE GENERAL CONDITIONS THEREOF:
AUTHORIZATION NO.: AS-880278 ACCOUNT NO.: 444-600
REMOVE AND DISPOSE OF ALL INSULATION AND COVERING AS SHOWN ON THE ATTACHED SCOPE OF WORK.
A LUMP suh * 21.725.00
OWNERS
t^7 l--T~.
ENGINEER -W.J-^//-'IBSRT.UZNtO* ^
->
____
PRICE
ICOMPLETE A. B OR C)
O UNIT D. price >
ESTIMATED
total
^
n COST PLUS--REFER w. ARTICLE 7 PAR C
ESTIMATED
TOTAL
$
-- ALUMINUM COMPANY OF AMERICA
SIGNED BY:.
Spiral(L*.
Technical Purchasing Agent
SF-JSII
emmueiMi KIMMINS ABATEMENT CORP.
SIGNEO BY:. TITLE:.
fops),
377821 0085
SITE WORK ORDER #KA-QQ1 SCOPE OF WORK
Remove and dispose of all insulation and insulation covering for the items of work listed below. All insulation and covering shall be disposed of in roll-off buckets provided by the Owner for items inside Bldgs. 101 and 182. All other insulation to be disposed of per original contract.
1. Bldg. 101 North West corner consisting of two primary filters and one secondary filter and related piping between Col. C24.5 and C27. Steam piping on the West wall is not included.
L.S. 8,000
2. Bldg. 182. Three demister vessels and mi sc. piping sections will be moved into Bldg. 182 by Others. These vessels and mi sc. pipe sections shall be stripped of insulation by this Contractor. This item also includes the misc. pipe sections between Bldg. 182 and Bldg. 043.
L.S. 3,000
3. Steam lines on the West and East sides of Bldg. 182 from Col. C14 to the South side of the building including the extension outside the building.
L.S.
3,075
4. The stack on the West side of Bldg. 182. The stack extending above the low roof on the outside of the building will be set down on the ground by Others for insulation removal by this Contractor.
L.S. 1,600
5. Remove insulation from the legs of the 120B tank and misc. eyewash stations
L.S.
650
6. Remove one foot sections of demister piping on the East side of Bldg. 101 as directed by Owner's Engineer. For this work, protective clothing (chemical suits and gloves) supplied by Owner shall be used by Contractor employees and discarded in roll-off buckets when work is complete.
L.S. 3,100
7. Misc. insulation not included in bid, i.e. white covered insulation, wrapped instrument tubing, burner piping (Oil), etc.
L.S. 2,300
GRAND TOTAL
L.S. 21,725
377821 0086
ALUMINUM COMPANY OF AMERICA
REQUEST FOR S.W.O.
ROUTING
OEPARTMEI HEAD
REPRODUCTION DEPT
3
FROM: IV'
AsCs__________________________________
DATE:
&& ~ 11 3 CODE
--QO'2-
CONTRACTOR
SUGGESTED BIDDERS
KlMMi/0^> AB)ATc. McAJ 7 02/3.P.
PURCHASING DEPT.
PURCHASE ORDER NO.
DATE
C-2t9oZ>M /968-c9-02-
SCHEDULE: START NS8. -- // -o4-________________
AUTHORIZATION NO. /)S-6&C "2.7&______________
ACCOUNT NO. 44-4 - <jOO
COMPLETE l?8&~ /l-XS~____________
____________________________________
TO BE USED FOR: REMOVAL- AA/T> Pl^r'CSAL Or /4PT>L. TkiSuiArtOU_________________________
DESCRIPTION: REKcL`. AWb PtfScSS. 6f XtiSVLATlCAl AS PCLA.otJ-S 1
/. <5f>r$Kr tfATEAlAL. GAJ EACH /JJ> CP PtP& W BlDC. /82-
2, AT>t>< ricAJAL___ CUTTJ/JC CAJ CAALI* aa) P Ca64J TAAY tN A? PC 'gt-OSS.________________________________________________________
3. Cesr To //0</ /ti AfJb OUT Tr> APa/auT FLAUASTic. o/j
_____C4ALE AAJb CAAl 77iAY M &Lt><S, 086X, TgJJT DaTFTo
___Rz.rvfuQ n/zQ/ee, ________________ ____________
1. NON-PRODUCTIVE
COMMIT
$_
2. PRODUCTIVE ACTUAL COST COMMIT $ _
3. PRODUCTIVE
ESTIMATED COST
EST. AT
$_
REFERENCE DWGS. NODE.
'<?.7 8o ESTIMATED COST
SF-6703 86/02
TOOL ALLOWANCE
@%
MATERIAL BY CONTRACTOR AT $______
PER ACTUAL PRODUCTIVE MAN HOUR
TOOL ALLOWANCE @% MATERIAL BY CONTRACTOR AT $L.S.
'Kf LUMP SUM UNIT PRICE COST PLUS
PROCUREMENT
377821 0087