J. T. Bell J. L. Corder A. S. Hill G. L. Jessee
L. c. Lahman
J. C. Landwehr H. E. Schulte W. P. Taffee
General Offices
IllWtlUlUJ
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Summary
H. c. Carder
D. Oanna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel 0. B. Hosmer R. E. Howard W. K. Johnson C. F. Lueeke W. R. Richard W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens
South Second St.
P. 0. DeGazmo
Other Locations
A. H. Forsten Alvin, Texas
D. W. Jackson W.G.K.
Month YTD
DECEMBER 1970
COST IMPROVEMENT RESULTS
Est. Act. $70,190
Target $52,175
% of Target 134%
$896,400
$728,905
123%
Specialty Products
PREP work on PCB removal from waste water is continuing. The final report on PCB removal by sand filtration will be issued 1-8-71. The carbon adsorption studies of the Aroclor sump effluent have continued for three months with removal to less than 10 ppb in the first of 4 five-foot long columns. The experimental work will be terminated and reported as soon as the Monsanto-vendor (Calgon Corporation) development of scaleup factors is complete. The reactor-clarifier studies to evaluate PCB removal by addition of a cheap solid adsorbent (such as clay, limestone, etc.) followed by solids removal by flocculation-clarification are targeted to begin by 2-1-71.
ATS 3643 ($2S.3M capital and $9.7M expense) submitted to allow production and storage of low color Solid Aroclor 5460.
Construction on CEA 1482 (HB-40 Expansion) was resumed the week of 12-20-70 after receipt of the old (repaired) auto clave. file vessel was reinstalled and successfully started up on 12-23-70 using the new automatic temperature control system. The new automatic Santowax charging system was completed and successfully demonstrated on 12-30-70, thereby eliminating use of the old preheat tanks. Dismantling of these tanks was begun on 12-31. Final project completion date is still not firm due to continued ironworker strike.
0SW 014900
104 CONFIDENTIAL INFORMATION
"TWA tocaaiaat eaatato ctafMttoaf iMtnaatfaa vMdi U Mm Mtatrfr a# MmhM Cr#m^ Oatf ftotv
af fto totMaaa* i torM tv a
Mf tattorixto ttolrltoal't aato ta kav wy to taaartoto for Mm. Tto rapart mmt Mt to Mat nM4i 1 CaMpato wWtoafr ailHta immuI ato
tto aattoriiad racial It acaaaataMa far safe kaaptat, tacarptfto tr rltinHw PladaMafe al
tto far to prapar dtoaato-Tto toe*
mato raatoaa tto mma# MaaMata Caatpaap to rftol to rtowto vHMa torn. Maalto totto.
to apMV^Mdaf aattotototo-to-M*
as.*- tof i tofu
STLCOPCB4003276
)
2.
Newport Santowax arrived at the plant and is stored in the pond until needed. AFE 3718 ($10M) has been submitted to modify equipment to distill to Santowax R. It will cost 9.2C per pound to convert to Santowax R.
Multipoint injection of Cumene Promoter, as outlined in Polyphenyl Pilot Studies Work Plan V, is now targeted to begin on 1-13-71 upon completion of provisions for three point promoter injection. This is designed to measure the accumulative effect of cumene on biphenyl con version. The EDC of this phase is now 2-15-71.
Phase I of the EVOP in Aroclor 5460 has shown a significant 2.2% in crease in yield from closer regulation of crude softening points. The three months of EVOP study have averaged 1.5 lbs./cwt lower Santowax R usage, with December setting a record low for 1970 (.6% below standard).
Repairs on the No. 1 (old) HC1 Neutralization Pit are 70% complete. Construction has been slowed by rain; however, return of the pit to service by 2-1-71 is still firm. Approximately 20 tons of limestone inerts and 260 pounds of Aroclor were pumped from the No. 2 (new) pit on 12-18-70, thereby extending the solids removal life of the new pit.
The final issue of the Electrical Preventive Maintenance Program was completed and published on 12-24-70, completing this TSD responsibility resulting from the Aroclor Motor Control Center fire on schedule. A cooperative TSD-Maintenance program will now be undertaken to apply this program in-plant.
All equipment has been ordered for modification of Aroclor chlorine unloading facilities to complete CEA 1831 variance. Design will be transmitted and equipment will be on hand by late February. The equip ment is on hand and design is 90% complete for a hygrometer instrument to measure dew point of chlorine pad air to assist in maintaining dry pad air.
General Chemicals
HCl Off-Gas Catch Tank Replacement - Field installation complete with exception of repairs to concrete. The new catch tank has modifications including a coke bed and "York" demister pad. A pumpout system in cluding a level indicator was also installed to enable improved handling of collected organics and future potential for recycle to Aroclor plant.
Muriatic Acid Department Fume Collection & Scrubbing System. Formal project approval was received. Design was completed and review drawings are in circulation. All equipment and materials expected on hand by 1/15/71. EDC for transmittal to Maintenance 1/15/71.
Agricultural Division
Rough draft of Niran Safety Audit submitted to superintendent for approval.
All refined ethyl PCT from storage tank has been decolorized and shipped to customers.
DSW 014901
STLCOPCB4003277
3. Quality Control The Plant Quality Score was 86.5, up 3.5 from November, with a YTD score of 84.4 against a target of 95.0. The semiannual process capability report showed improved process control. Pollution Control All Aroclor waste water samples were collected by Pollution Control personnel during December. These samples were the most consistent to date and causes for each of four unusually high daily discharges were known. No instances of sample contamination existed. The results from the Aroclor air sampling program were communicated to management during December..
:kd
DSW 014902
STLCOPCB4003278
)
4.
PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. O . Kemp
Complaint Report
Quality Number NY-116-P
Material Biphenyl
Customer Textile Products Company
Recison Caking
YTD Quality Complaints/100 Shipments 0.29
Target 0.20
DSW 014903 STLCOPCB4003279
COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT Personnel Development 1. Billy Secrest returned to Georgia Tech after finishing his
first quarter working as Co-Op under the supervision of W. B. Dunlap. (December 24) 2. J. C. Landwehr attended TSD Superintendents Meeting in St. Louis, December 10-11. 3. TSD/LAB Departmental Safety Meeting was held December 17, 1970 With topic Of PROCESS DESIGN POR PROCESS SAFETY.
DSW 014904
STLCOPCB4003280
)
1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE
EXISTING PRODUCT TECHNOLOGY IMPROVEMENT
NEW PRODUCT EVALUATIONS MAJOR PROJECT SUPPORT PROCESS CONTROL
IMPROVEMENT
PROJECT DESIGN
PROCESS MAINTENANCE
TECHNOLOGY AND TECHNICAL SUPPORT
TECHNICAL MANPOWER
PLANT IMPROVEMENT PROGRAM
REAL ESTATE MANAGEMENT
DSW 014905 STLCOPCB4003281
ORGANIC DIVISION' . 1970TSD COST IMPROVEMENT
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
SPECIALTY
TAR EST
1
PRODUCTS
ACT
Disposal of Liquid Montar
#3 Aroclor Still New Burners
TAR EST ACT TAR EST ACT
1500 600 600
108C C
c
1080 1080 1080 1080 1080 1080
,0 0 0 U 0 C0 0 0 Q
0 0
1500
500
500
1080 0
1080 0
0
1030 0
#2 Still Entrainment
Separator
TAR EST ACT
3000
0 0
3000 0
1242 Distillatio 1 Productivity
TAR EST ACT
150C 1500 1500 1500 1500 1500 150C 1500 1500 C 100 looO 1520 2565 2UUU 1210 660 900
. C 100 1000 1520 2565 2000 1210 660 900
1500 0
TAR
EST
ACT
SPECIALTY PRODUCTS
TAR EST ACT
Flaking & Drum ming Facilities Headcount
Solid Aroclor Instrumentation
TAR EST ACT TAR EST ACT
TAR
Sandvik Belt
EST ACT
Add Tray Strip ping Sections to
TAR EST
Santowax
ACT
TAR
Clj Bulk Handling
Facilit
l.es
EST ACT
Solid Aroclor --Expansion
TAR EST ACT
Chlorinator Back Pressure
TAR EST ACT
3000 3000 3000
?nnn 3500 3500
dodM
3000 2000 1000 1000 3000 2000 1000
oH* oO
3000 2000 1000
3750 3750 3750 3750 3750 3750 3750
0' 0
0
U 00
0 0 0 0 Q ~0
2250 2250 2250 2250
0 0
0 0
0 0
"o
4580 4580 4580 4580 4580 4580 4580
a 00 0 00
c00
00
00
3750 0
0 2250
U
0
4580 U
'0
1 3750
0
2250] l
4580j
1
?nnn 2000 2000
i
3550 1950 344C
3550 3050 344C 30000 5000C
30000
49500 5000C 1000C 36000 24000 20000 L7900 4300C 72000 70000 55000 5190C 5590C 1050C 38500 23500 24700 27600 45Q0C 86000 B5900
- 360 360 360 360
0 00
00 0
TAR
EST
ACT
TAR
EST
ACT
TAR
EST
ACT
TAR --
-
EST
, ACT
-----
osw 014906
STLCOPCB4003282
ORGANIC DIVISION
) 1970 TSD COST IMPROVEMENT
SPECIALTY PRODOCTS
TAR EST ACT
JAN FEB' MAR APR MAY JUN JUL AUG SEP OCT NOV DEC i
Aroclor Ware house Reduced Headcount
Unproved Santowax Yield
HB-40 Reduce Nickel Catalyst Usaqe Substitution of Santowax C for Santowax R
TAR --1QQQ 1000 EST 1000 1000 ACT 1000 1000
TAR
EST
ACT
TAR
EST
ACT TAR
1160
EST
ACT
TAR
1000
10Q0 1000
4Q00 4000 4000 4000 5900 2800 5800 4000 4450 2800 5800 4000
700 700 700 700 1330 525 1230 425 1335 525 2080 565
4000 anno anon dnnr\ 4QQQ 97C 663C 6280 1910 5200 97C 6630 628C 1910 5200
700 700 700 0 C 540
( 0 45C
920 775
20QQC 0
Q
4Q0Q 5885
0
2QQQC 0
EST
ACT
general
CHEMICALS
TAR EST ACT
(PNP, HC11
Biphenyl Cool ing Water Treatment
PNP Modify Acidifies Dump Valve Svste m Install Entrain ment Separator Production
Op Lui Variables-PNP
Re-use Well Water
TAR EST ACT TAR EST
ACT TAR EST ACT TAR EST ACT TAR EST ACT
600 670 670
3150 520 520
600 600 680 580 680 580
3150 3150 1277 2164 3016 2164
600 600 600
6QC 600 67C 440
675 440
600 290 294
625 625 625 625
625 625 625 625 625 625 625 625 625 625 625 625
-
5500 5500 5500 550Q 0 0 000 0
463C 4630 463G 4630 4630 4630 4630
12: 1604
0 1525 1780 2365
12' 1 1605
0 1525 1780 2366
5Q0
625 625 -:
5500 5500
'I
_
4630 4630 :
500 500 \ "
;
Untargeted PNCB Heel Credits
TAR EST ACT
2275 563 3078 1650 920 410 550 753 2275 563 3078 1650 920 410 550 753
HC1 HCT Catch Tank & Coalescer
150 M Gallon Storage Tank
. TAR 5700 5700 5700 5700 57Q0 EST 2500 7560 9000 1030C 6545 ACT 2500 7560 9000 1030C 6545 TAR 4300 T3TO TJOTT 4300 4300 4300
EST 4300 4300 4300 4300 4300 4300. ACT 4300 4300 4300 4300 4300 4300
HC1 Instrumentation
TAR EST ACT TAR
1875 1875 1875 1875 1875 1875 iazs_ 1875
4000 1230C 3440 6500 3940 8160 129QC 4000 1230C 3440 6500 3940 8160 1040C
0 9700 0
1875 9300
EST
ACT
TAR ----- - -- --
EST
-- ------ --
ACT
OSW 014907
STLCOPCB4003283
) ORGANIC DIVISION
1970 TSD COST IMPROVEMENT
PLANT WIDE Improve Plant Power Factor Central Air Compressor
Chlorine Plant Shutdown RTN Cooling Water to Tower Cooling Con veyor - ?2s5
Total Organic Month - M $ Total Organic YTD -MS
JAN_____ FEB MAR APR MAY JUN JUL AUG SEP OCT NOV D!_/ kE. C TAR
EST
ACT TAR EST ACT TAR 950 EST 900 ACT 940 TAR
EST
ACT TAR 19900 EST 19900 ACT 19900
950 950 950 950 900 816 790 rotr 914 840 790 810
19900 19900 19900 9950 19900 19900 19900 9950 19900 19900 19900 9950
950 645
845
1000 1000 1000 -
TAR EST ACT
25 25 25 25 25 25
0 00
-
-
TAR EST ACT
TAR
EST
ACT
TAR EST ACT
40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.88 64.68 51.68 51.68 36.29 94.54 103.6 70. 39 74.61 13753" 30.33' 37.65 6 /.68 74.57 86.72 70.19 36.33 99.86 109.1 70.89 77.98 42.22 35.03 47.35 67.09 88.57 10248
TAR 40.6 112.7 209.6 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.8
EST 36.29 130.9 239.8 315.7 390.8 137.7 467.7 510.0 587.6 661.4 762.1 848.1 ACT 36.33 136.2 245.3 316.2 394.1 437.3 472.4 519.7 586.8 675.4 777.9
OSW 014908 STLCOPCB4003284
)
AG DIVISION 1970 TSD COST IMPROVEMENT
JAN FEB MAR APR TAR
MAY JUN JUL AUG 1
SEP OCT
NOV DEC
PARATHIONS
EST
ACT
Replace #3 Chlorinator
TAR EST ACT
3500 3500 3500 4860 "2340 0 0 4860 2340 0 0
3500 0
Improve Cl,Still Yields
TAR EST ACT
3000 3000
00 00
3000 0
0
3000 0
0
3000 0
0
3000 -
Increase Chlor- TAR inator Coolings EST
ACT
8500 8500 0 ---------0"
00
8500 --
Acetone Recovery
TAR 2800 2800 EST 1957 "1069 ACT 1957 1069
2800 1225
1225
2800 1935 1935
2800
130 130
2800
715 715
2800
0 0
2800 2800 0 -------- 0" 00
2800 *
2800! _ --
Chlorine Unloading
TAR 2250 EST 3634 ACT 3634
2250 4237
4237
2250 3350
3350
3200
1406 1406
3200 3200 3431 2430
3431 2430
3200 1750 1750
3200
2710 2710
Optimize Methyl TAR
3000 3000 3000 1500
.PNP/PCT Ratio
EST ACT
00 00
00 00
Optimize Ethyl PNP/PCT Ratio
TAR EST ACT
500
0 0
750 2641
2641
750 0
0
500 5C --
Change Cooling H-0 - Item 737
TAR EST ACT
200 310 310
200 230
230
200 270
270
Untargeted: Plant Test -
TAR EST ACT
2430 5270 2430 5270
TAR
EST
ACT
Total AG Month M $
TAR EST ACT
5.75
5.90 5.90
6.0
8.17
8.17
6.0 4.85 4.85
6.0
10.63 10.6:
15.5 11.1
11.2
15.5 3.15
3.15
15.5 1.75
1.75
22.5 2.11 2.71
14.3 U 0
14.3 -
3.3 -
-
Total AG YTD M $
TAR EST ACT
5.75 11.75 17.75 23.75
5.90 14.(58 18.92 29.55
5.90 14.08 18.92 29.55
39.25 54.75 40. ! -i 43.87
40.73 43.87
70.25 92.75 rio7 :i 121.'4" 124.71 125. 45.62 48.33 48.33 48.33 48.33 4a. 45.62 48. 33 48.33 48.33 48.33
TAR
EST
Total Plant Month M 5
Total Plant YTD M $
ACT
TAR 46.35 73.1 102.9 64.07 60.12 43.47 EST 42.19 102.8 108.5 3T:02~' as'.Ty 46.72 ACT 42.2*1 108.0 113.9 81.52 89.15 45. 36
49.62 53.02 45.18 78.981 54.98 " c . I 32.08' 40.36 67.68 74.57 bo. / ^ i u _ 36.7Sj 50.06 67.09 88.57 102.481
TAR 46.35 124.5 227.3 291.4
EST ACT
42.19 42.23
145.0 150.3
258.8 264.2
345.3 345.8
351.5 395.0 444.6 431.5 481.6 513.3
434.9 481.2 518.0
497.6 542.8 621.8 558.3 635.7 709.7 568.0 635.1 723.7
676.7 "f 28 . biu .-i 896.4 826.2)
DSW 014909
STLCOPCB4003285
Annisfon
J. T. Bell J. L. Corder A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee
General Offices
H. C. Carder D. Danna (5) M. w. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard w. K. Johnson C. F. Luecke w. R. Richard w. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens
South Second St.
P. 0. DeGarmo
Other Locations
A. H. Forsten Alvin, Texas
D. W. Jackson W.G.K.
COMPANY CONFIDENTIAL
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Summary
NOVEMBER 1970
Month
COST IMPROVEMENT RESULTS
Fst. Act. $86,720
Target $54,975
% of Target 157%
YTD
$810,423
$676,730
120%
Organic Division
Issued progress report on 50/50 - biphenyl/Santowax C split test^ on the Polyphenyl Tubular Unit stating capacity as 92 M lbs./yr.
Issued progress report on explosion hazard of biphenyl flaking. Nitrogen purge will be used to prevent this.
Santowax R deficit report written showing maximum of 8 M lbs. deficit in 1971. This can be made up by stockpiling Aroclor 5460 (in progress), recovering Santowax from pond, and import ing it from Newport. This will be updated depending on final forecasted needs for 1971. A "sample" (80 M lbs.) of Newport Santowax ordered in October is expected to arrive in December. Plans have been made to handle and refine this material for use in Aroclor 5460 and HB-40.
Construction was temporarily suspended on the HB-40 Expansion (CEA 1482) on 11-25-70 after successful demonstration of the new autoclave, Therminol system, motor control center and storage facilities. Work is scheduled to resume in midDecember pending return of the old autoclave after repair. Final completion date is not firm due to continued ironworker strike.
DSW 014910
w-k.
CONFIDENTIAL INFORMATION
'This document contain* confidential information which i* the property of Monsanto Company. Only those portions of the document relevant to a duly authorised individual's need to know may be eicarpted for him. The report must not be sent outside the Company without written approval and the authorised recipient is accountable for its safe keeping, excerpting or otherwise disclosing of its contents and for its proper disposal. The docu ment remains the property of Monsanto Company and shall be returned within two months to its author, except upon special authorisation to hold for a longer period."
STLCOPCB4003286
)
2.
The promoter scanning study and mid-point injection phase of the Polyphenyl Pilot Studies outlined in PR&D Work Plan V are complete. Results were distributed in the mid month report of 11-16-70. The next phase involving evaluation of multipoint injection of cumene has begun and is targeted for completion by 2-1-71.
Carbon adsorption studies of the Aroclor sump effluent are continuing. Efforts are directed toward obtaining design data. The effluent PCB level is still^10 ppb.
Aroclor - detail design of facilities for nitrogen padding of chlorine cars 95% complete. Equipment will be ordered first week of December. A project premise for Experimental Removal of Solids from the Plant Effluent was approved during the month. Agricultural Division PR&D studies show that recycle of filtered organic residue from 96% chlorinated Methyl Intermediate into the next thio acid charge shows promise for increasing yields. Work is continuing to more fully evaluate this possible process. Anniston TSD assisted in an evaluation to determine the economics of producing TPA (Trimethylphosphoric Triamide) in idle equipment at the Parathion Plant. Two alternates were considered for the production of approximately 60,000 pounds of TPA: one for production of TPA in a thio acid reactor and one for a chlorinator-still unit. The final decision will be made in early December. HC1 - Project 3512 - Catch Tank: All prefabrication has been completed with field installation expected during December. Project 3690 - Fume Collection and Scrubbing: Verbal approval given in November, detail design 90% complete, initial orders for equipment out. Transmittal to Maintenance expected first week of January. PNP - p-NPT evaluation completed for interim production at Anniston. Manufacturing costs, changeover costs, capacity and timing were submitted based on latest research information. Quality Control ttie Plant Quality Score was 83.0, up 6.2 from October, with a YTD score of 84.3 against a target of 95.0. A new lot numbering system on HB-40 was set up to protect the validity of statistical surveillance.
DSW 014911
STLCOPCB4003287
3. Pollution Control Several sets of air samples were collected and analyzed for PCB during November. A total of 237 water samples were analyzed. Test ing to evaluate sampling and analytical errors in PCB analyses was commenced in November. The cleaning of the No. 1 (old) HC1 neutralization pit and bypass is 95% complete with rebuilding scheduled to begin in early December. Accumulated sludge in the No. 2 (new) pit was removed in early November thereby extending the effective life of the pit a significant amount.
DSW 014912
STLCOPCB4003288
4.
PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. 0. Kemp
Complaint Report
Quality Number EVT-33-P
Material Aroclor 5460
Customer
Reason
Colonial Press Co. Material Caked Hard
YTD Quality Complaints/100 Shipments 0.29 Target 0.20
4
DSW 014913 STLCOPCB4003289
COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT
5.
Community Relations
1. G. L. Arnett attended "Parathion Study Review" in St. Louis, November 18, 19 and 20.
2. J. L. Brown and D. F. Pittman attended "Polyphenyl Pilot Study Review" in St. Louis, November 18, 19, and 20.
Visitors
1. W. R. Robirds visited the Anniston Plant, November 6th, concerning Parathion Improvements.
2. Tsukashima, MMK, visited the Anniston Plant, November 9 through 20, concerning Aroclor Liquid and Solid, Biphenyl, Santowax, and HB-40.
DSW 014914 STLCOPCB4003290
)
1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE
EXISTING PRODUCT TECHNOLOGY IMPROVEMENT
NEW PRODUCT EVALUATIONS MAJOR PROJECT SUPPORT PROCESS CONTROL
IMPROVEMENT
PLANT IMPROVEMENT PROGRAM
REAL ESTATE MANAGEMENT
10
0
ca
u
u
>, C
ITS 0) 13
a, 13
3
n Cu X < 2
-"I O' 33 n<
a 4J 4) o CO o
>o 0a zQ
DSW 014915
STLCOPCB4003291
ORGANIC DIVISION 1970TSD COST IMPROVEMENT
FUNCTIONAL FLUIDS
TAR EST ACT
JAN f FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
DisDosal of Licuid Nontar
#3 Aroclor Still New Burners
TAR EST ACT TAR EST ACT
1500 600 600
1080 1080 C ,0 Cc
1500
500 500
1080 0
0
1030 1080 1080 1080 0U0 0 000 0
1080 0
1080 0
1080
#2 Still Entrainment
Separator
TAR EST ACT
3000
3000
-0 00
1242 Distillatio ! Productivity
TAR EST ACT
150C 1500 1500 1500 1500 1500 1500) 1500 1500 1500 C 100 1000 1520 2565 'ZUDU 1210 660 "rocr C 100 1000 1520 2565 2000 1210 660
TAR
EST
ACT
TAR
PLASTICIZERS
EST ACT
Flakino & Drum
TAR
ming Facilities EST
Headcount
ACT
Solid Aroclor Instrumentation
TAR EST ACT
TAR
Sandvik Belt
EST ACT
Add Tray Strip ping Sections to Santowax
TAR EST ACT
TAR
Cl2 Bulk Handling
Facilit
. EST leSSCT
Solid Aroclor Expansion
Chlorinator Back Pressure
TAR EST ACT TAR EST ACT
3000 3000 3000
?nnn 3500 3500
3000 2000 1000 1000 3000 2000 1000 ~T(JOT
3000 2000 1000 1000
3750 0
3750 3750 3750 3750 3750 3750 00 000 0 0 0 0 00 2250 2250 2250 2250
0 00 0 0 00
4580 4580 4580 4580 4580 4580 4580
0 00 0 00
C
0
0
00
00
3750 0
2250 u
4580 U
znnn 2000 2000
3550 1950 344C
3550 3050 344C 30000 5000C
30000
4950C 5000C 10000 36000 24000 20000 L7$60 4300C 72000 70000
5190C 5590C 1050C 38500 23500 24700 27600 4500C 86000
360 360 360
0 00
0
3750 2250 4530j
!
t1
360
TAR
EST
ACT
TAR
EST
ACT
TAR
EST
ACT
TAR -------------- ---
EST
--
ncu m 4916
ACT
----
---- 1---------- 1
STLCOPCB4003292
ORGANIC DIVISION
I
1970 TSD COST IMPROVEMENT
FUNCTIONAL FLUIDS & PLASTICIZERS
TAR EST ACT
JAN
FEB' MAR
APR
M. AY 1 JUN
JUL
AUG
SEP OCT |
NOV
DSC 1
GROUpjs) (AFF ECTIN 3 BOT i bus: NESS
Aroclor Ware . house Reduced
Headcount
TAR __1QQQ. 1000
EST 1000 1000 ACT 1000 1000
lOQfl
1000 1000
improved Santowax Yield
HB-40 Reduce Nickel Catalyst Usace
Substitution of Santowax C for
TAR EST ACT TAR EST ACT TAR EST
_4.QQ.Q 4000 4000 4000 5900 2800 5800 4000 4450 2800 5800 4000
1160
700 .. 700 700 700 1330 525 1230 425
1335 525 2080 565
4000 4000 uonn dnnn 4QQQ 97C 663C 62S0 1910 5200 9 7 C 6630 628C 1910
70D 700 inn C C 540
C 0 45C
920
20QQO 0
4C0Q 1
2G0ud)
Santowax R
ACT
TAR
EST
ACT
GENERAL CHEMICALS
Biphenyl Cool ing Water Treatment
PNP Modify Acidifiei Dumo valve Svste m
Install Entrain ment Separator Production
LXUIX^C fLtiCKX LUI Variables-PNP
TAR EST ACT TAR EST ACT TAR EST
ACT TAR EST ACT TAR EST ACT
CRIP HENYL
600 . 600 670 680 670 680
580 580
3150 520 520
3150 3150
1277 2164 3016 2164
PNP HC11
600 600 600
600 600 67C 440
675 440
600 290 29C
625 625 625 625
625 625 625 625 625 625 625 625 625 625 625 625
-
5500 5500 5500 5500
0 0 0-
00
0
463C 4630 463C 4630 4630 4630 4630
12: 1604
0 1525 1780 236E
12" ' 1605
0 1525 1780 236
l i
j
t
1 625 625 i
-i i
5500 5500 i i
*
4630 4630 .
f
Re-use Well Water
TAR EST ACT
500 500 500 ' - ii
Untargeted PNCB Heel Credits
HC1 HUT Catch Tank & Coalescer 150 M Gallon Storage Tank
TAR
EST ACT
2275 563 3078 1650 920 410 550 753 2275 563 3078 1650 920 410 550 753
TAR 5700 5700 5700 5700 57Q0
EST 2500 7560 9000 1030C 6545
ACT 2500 7560 9000 1030C 6545 TAR 4300 4300 TT00 4300 4300 4300
EST 4300 4300 4300 4300 4300 4300
ACT 4300 4300 4300 4300 4300 4300
i
HC1 Instrumentation
TAR EST ACT TAR
1875 187511875 1875 1875 1875 1875 1875 .1871.
4000 1230C 3440 6500 3940 8160 129QC 0 9700
4000 1230C 3440 6500 3940 8160 1040C
o
EST
ACT TAR EST ACT
.-- --
""
DSW
I 014917
STLCOPCB4003293
)
ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
PLANT WIDE Improve Plant Power Factor Central Air Compressor
Chlorine Plant Shutdown RTN Cooling Water to Tower Cooling Conveyor - ?2^5
Total Organic Month -MS Total Organic YTD -M$
JAN TAR
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
EST
ACT TAP.
EST ACT TAR 950 EST 900 ACT 940 TAR
EST ACT TAR 19900 EST 19900 ACT 19900
950 950 950 900 916 790 914 840 790
19900 19900 19900 19900 19900 19900 19900 19900 19900
950 37JZT 810-
9950 9950 9950
950 843
845
1000 -
1000 -
1000
TE_A_S_RT
ACT
25 25 25 25 25 25 on *
TAR EST ACT
TAR
EST
ACT
TAR EST ACT
40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.38 64.68 51.58 51.53
36.29 94.54 103.6 70.39 74.51 43:58
37.65 6 / . 68 74.57 36772|
36.33 99.86 109.1 70.89 77.98 42.22 35.03 47.35 67.09 88.57
TAR 40.6 112.7 209.6 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.3
EST 36.29 130.9 239.8 315. / "390.8 137.7 467.7 510.0 587.6 661.4 762.11
ACT 36.33 136.2 245.3 316.2 394.1 437.3 472.4 519.7 586.8 675.4
!
f
>
V ; ;
:
DSW 014918 STLCOPCB4003294
)
AG DIVISION 1970 TSD COST IMPROVEMENT
FARATHTONS
TAR EST
JAN FEB
MAR
APR
MAY JUN JUL AUG
SEP OCT
________ 1_______
NOV
ACT
Replace #3 Chlorinator
TAR EST
1 ! 3500i 3500 3500
4860 2340
0u
3500 0
ACT
4860 2340 0 0
Improve C1-Still Yields
TAR EST ACT
3000 3000
00 00
3000
0
0
3000
o 0
3000 0 0
30001 -
-
Increase Chlor- TAR inator Coolings EST
ACT
8500 8500 00
00
8500 -
-
Acetone Recovery
TAR 2800 1 2800 EST 1957 1069 ACT 1957 1069
2800 1225
1225
2800 1935 1935
2800
130 130
2800
715 715
2800
0 0
2800 2800 0 -------- 3" 00
2800 -
2800: _
Chlorine Unloading
TAR 2250 EST 3634 ACT 3634
2250 4237
4237
2250 3350
3350
3200
1406 1406
3200 3200 3431 2430
3431 2430
3200 3200
1750 2710 1750 2710
Optimize Methyl TAR
3000 3000 3000 1500
PNP/PCT Ratio
EST ACT
00 00
00 00
Optimize Ethyl PNP/PCT Ratio
TAR EST ACT
500 750 0 2641 0 2641
750 0
0
500
-
Change Cooling TAR 200 200 200 H-0 - Item 737 EST 310 230 270
ACT 310 230 270
Untargeted: Plant Test -
TAR EST ACT
2430 5270 2430 5270
TAR
EST
ACT
Total AG Month M $
TAR EST ACT
5.75
5.90 5.90
6.0 6.0 37TT 4.85 8.17 4.35
6.0
10.63 10.62
15.5 11.2
11.2
15.5 3.15
3.15
15.5 1.75 1.75
22.5 2. /I 2.71
14.3 0 0
14.3
-
-
3.3 -
Total AG YTD M $
TAR EST ACT
5.75 11.75 17.75 23.75
5.90 14.08 18.92 29.55 5.90 14.08 18.92 29.55
39.25 54.75 40 :i J 43.87 40.73 43.87
70.25 92.75 107.1 121.4 45.62 48.33 48. 33 48.33 45.62 48.33 48.33 48.33
124.7 48.33
TAR
EST
ACT
Total Plant Month M S
TAR 46.35 78.1 102.9 64.07 EST 42.19 102.8 108.5 81.02 ACT 42.23 108.0 113.9 81.52
60.12 43.47 35.79 48.73
89.15 45.36
49.62 53.02 45.18 73.98 54.98 32.OS' 40.36 67.68 74.57 "55772" 36.73) 50.06 67.09 88.57
Total Plant YTD M $
TAR 46.35 124.5 227.3 291.4 EST 42.19 145.0 258.8 345.3 ACT 42.23 150.3 264.2 345.8
351.5 395.0 444.6 431.5 481.6 513.3
434.9 481.2 518.0
497.6 542.8 621.8 558.3 635.7 709.7 568.0 635.1 723.7
676.7 diu. 4
DEC
,, 5C
. 125. 52.1 723.