Document 5beye0jkM8yeLJxyD5kRg7L04

J. T. Bell J. L. Corder A. S. Hill G. L. Jessee L. c. Lahman J. C. Landwehr H. E. Schulte W. P. Taffee General Offices IllWtlUlUJ Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Summary H. c. Carder D. Oanna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel 0. B. Hosmer R. E. Howard W. K. Johnson C. F. Lueeke W. R. Richard W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens South Second St. P. 0. DeGazmo Other Locations A. H. Forsten Alvin, Texas D. W. Jackson W.G.K. Month YTD DECEMBER 1970 COST IMPROVEMENT RESULTS Est. Act. $70,190 Target $52,175 % of Target 134% $896,400 $728,905 123% Specialty Products PREP work on PCB removal from waste water is continuing. The final report on PCB removal by sand filtration will be issued 1-8-71. The carbon adsorption studies of the Aroclor sump effluent have continued for three months with removal to less than 10 ppb in the first of 4 five-foot long columns. The experimental work will be terminated and reported as soon as the Monsanto-vendor (Calgon Corporation) development of scaleup factors is complete. The reactor-clarifier studies to evaluate PCB removal by addition of a cheap solid adsorbent (such as clay, limestone, etc.) followed by solids removal by flocculation-clarification are targeted to begin by 2-1-71. ATS 3643 ($2S.3M capital and $9.7M expense) submitted to allow production and storage of low color Solid Aroclor 5460. Construction on CEA 1482 (HB-40 Expansion) was resumed the week of 12-20-70 after receipt of the old (repaired) auto clave. file vessel was reinstalled and successfully started up on 12-23-70 using the new automatic temperature control system. The new automatic Santowax charging system was completed and successfully demonstrated on 12-30-70, thereby eliminating use of the old preheat tanks. Dismantling of these tanks was begun on 12-31. Final project completion date is still not firm due to continued ironworker strike. 0SW 014900 104 CONFIDENTIAL INFORMATION "TWA tocaaiaat eaatato ctafMttoaf iMtnaatfaa vMdi U Mm Mtatrfr a# MmhM Cr#m^ Oatf ftotv af fto totMaaa* i torM tv a Mf tattorixto ttolrltoal't aato ta kav wy to taaartoto for Mm. Tto rapart mmt Mt to Mat nM4i 1 CaMpato wWtoafr ailHta immuI ato tto aattoriiad racial It acaaaataMa far safe kaaptat, tacarptfto tr rltinHw PladaMafe al tto far to prapar dtoaato-Tto toe* mato raatoaa tto mma# MaaMata Caatpaap to rftol to rtowto vHMa torn. Maalto totto. to apMV^Mdaf aattotototo-to-M* as.*- tof i tofu STLCOPCB4003276 ) 2. Newport Santowax arrived at the plant and is stored in the pond until needed. AFE 3718 ($10M) has been submitted to modify equipment to distill to Santowax R. It will cost 9.2C per pound to convert to Santowax R. Multipoint injection of Cumene Promoter, as outlined in Polyphenyl Pilot Studies Work Plan V, is now targeted to begin on 1-13-71 upon completion of provisions for three point promoter injection. This is designed to measure the accumulative effect of cumene on biphenyl con version. The EDC of this phase is now 2-15-71. Phase I of the EVOP in Aroclor 5460 has shown a significant 2.2% in crease in yield from closer regulation of crude softening points. The three months of EVOP study have averaged 1.5 lbs./cwt lower Santowax R usage, with December setting a record low for 1970 (.6% below standard). Repairs on the No. 1 (old) HC1 Neutralization Pit are 70% complete. Construction has been slowed by rain; however, return of the pit to service by 2-1-71 is still firm. Approximately 20 tons of limestone inerts and 260 pounds of Aroclor were pumped from the No. 2 (new) pit on 12-18-70, thereby extending the solids removal life of the new pit. The final issue of the Electrical Preventive Maintenance Program was completed and published on 12-24-70, completing this TSD responsibility resulting from the Aroclor Motor Control Center fire on schedule. A cooperative TSD-Maintenance program will now be undertaken to apply this program in-plant. All equipment has been ordered for modification of Aroclor chlorine unloading facilities to complete CEA 1831 variance. Design will be transmitted and equipment will be on hand by late February. The equip ment is on hand and design is 90% complete for a hygrometer instrument to measure dew point of chlorine pad air to assist in maintaining dry pad air. General Chemicals HCl Off-Gas Catch Tank Replacement - Field installation complete with exception of repairs to concrete. The new catch tank has modifications including a coke bed and "York" demister pad. A pumpout system in cluding a level indicator was also installed to enable improved handling of collected organics and future potential for recycle to Aroclor plant. Muriatic Acid Department Fume Collection & Scrubbing System. Formal project approval was received. Design was completed and review drawings are in circulation. All equipment and materials expected on hand by 1/15/71. EDC for transmittal to Maintenance 1/15/71. Agricultural Division Rough draft of Niran Safety Audit submitted to superintendent for approval. All refined ethyl PCT from storage tank has been decolorized and shipped to customers. DSW 014901 STLCOPCB4003277 3. Quality Control The Plant Quality Score was 86.5, up 3.5 from November, with a YTD score of 84.4 against a target of 95.0. The semiannual process capability report showed improved process control. Pollution Control All Aroclor waste water samples were collected by Pollution Control personnel during December. These samples were the most consistent to date and causes for each of four unusually high daily discharges were known. No instances of sample contamination existed. The results from the Aroclor air sampling program were communicated to management during December.. :kd DSW 014902 STLCOPCB4003278 ) 4. PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. O . Kemp Complaint Report Quality Number NY-116-P Material Biphenyl Customer Textile Products Company Recison Caking YTD Quality Complaints/100 Shipments 0.29 Target 0.20 DSW 014903 STLCOPCB4003279 COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT Personnel Development 1. Billy Secrest returned to Georgia Tech after finishing his first quarter working as Co-Op under the supervision of W. B. Dunlap. (December 24) 2. J. C. Landwehr attended TSD Superintendents Meeting in St. Louis, December 10-11. 3. TSD/LAB Departmental Safety Meeting was held December 17, 1970 With topic Of PROCESS DESIGN POR PROCESS SAFETY. DSW 014904 STLCOPCB4003280 ) 1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE EXISTING PRODUCT TECHNOLOGY IMPROVEMENT NEW PRODUCT EVALUATIONS MAJOR PROJECT SUPPORT PROCESS CONTROL IMPROVEMENT PROJECT DESIGN PROCESS MAINTENANCE TECHNOLOGY AND TECHNICAL SUPPORT TECHNICAL MANPOWER PLANT IMPROVEMENT PROGRAM REAL ESTATE MANAGEMENT DSW 014905 STLCOPCB4003281 ORGANIC DIVISION' . 1970TSD COST IMPROVEMENT JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC SPECIALTY TAR EST 1 PRODUCTS ACT Disposal of Liquid Montar #3 Aroclor Still New Burners TAR EST ACT TAR EST ACT 1500 600 600 108C C c 1080 1080 1080 1080 1080 1080 ,0 0 0 U 0 C0 0 0 Q 0 0 1500 500 500 1080 0 1080 0 0 1030 0 #2 Still Entrainment Separator TAR EST ACT 3000 0 0 3000 0 1242 Distillatio 1 Productivity TAR EST ACT 150C 1500 1500 1500 1500 1500 150C 1500 1500 C 100 looO 1520 2565 2UUU 1210 660 900 . C 100 1000 1520 2565 2000 1210 660 900 1500 0 TAR EST ACT SPECIALTY PRODUCTS TAR EST ACT Flaking & Drum ming Facilities Headcount Solid Aroclor Instrumentation TAR EST ACT TAR EST ACT TAR Sandvik Belt EST ACT Add Tray Strip ping Sections to TAR EST Santowax ACT TAR Clj Bulk Handling Facilit l.es EST ACT Solid Aroclor --Expansion TAR EST ACT Chlorinator Back Pressure TAR EST ACT 3000 3000 3000 ?nnn 3500 3500 dodM 3000 2000 1000 1000 3000 2000 1000 oH* oO 3000 2000 1000 3750 3750 3750 3750 3750 3750 3750 0' 0 0 U 00 0 0 0 0 Q ~0 2250 2250 2250 2250 0 0 0 0 0 0 "o 4580 4580 4580 4580 4580 4580 4580 a 00 0 00 c00 00 00 3750 0 0 2250 U 0 4580 U '0 1 3750 0 2250] l 4580j 1 ?nnn 2000 2000 i 3550 1950 344C 3550 3050 344C 30000 5000C 30000 49500 5000C 1000C 36000 24000 20000 L7900 4300C 72000 70000 55000 5190C 5590C 1050C 38500 23500 24700 27600 45Q0C 86000 B5900 - 360 360 360 360 0 00 00 0 TAR EST ACT TAR EST ACT TAR EST ACT TAR -- - EST , ACT ----- osw 014906 STLCOPCB4003282 ORGANIC DIVISION ) 1970 TSD COST IMPROVEMENT SPECIALTY PRODOCTS TAR EST ACT JAN FEB' MAR APR MAY JUN JUL AUG SEP OCT NOV DEC i Aroclor Ware house Reduced Headcount Unproved Santowax Yield HB-40 Reduce Nickel Catalyst Usaqe Substitution of Santowax C for Santowax R TAR --1QQQ 1000 EST 1000 1000 ACT 1000 1000 TAR EST ACT TAR EST ACT TAR 1160 EST ACT TAR 1000 10Q0 1000 4Q00 4000 4000 4000 5900 2800 5800 4000 4450 2800 5800 4000 700 700 700 700 1330 525 1230 425 1335 525 2080 565 4000 anno anon dnnr\ 4QQQ 97C 663C 6280 1910 5200 97C 6630 628C 1910 5200 700 700 700 0 C 540 ( 0 45C 920 775 20QQC 0 Q 4Q0Q 5885 0 2QQQC 0 EST ACT general CHEMICALS TAR EST ACT (PNP, HC11 Biphenyl Cool ing Water Treatment PNP Modify Acidifies Dump Valve Svste m Install Entrain ment Separator Production Op Lui Variables-PNP Re-use Well Water TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT 600 670 670 3150 520 520 600 600 680 580 680 580 3150 3150 1277 2164 3016 2164 600 600 600 6QC 600 67C 440 675 440 600 290 294 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 - 5500 5500 5500 550Q 0 0 000 0 463C 4630 463G 4630 4630 4630 4630 12: 1604 0 1525 1780 2365 12' 1 1605 0 1525 1780 2366 5Q0 625 625 -: 5500 5500 'I _ 4630 4630 : 500 500 \ " ; Untargeted PNCB Heel Credits TAR EST ACT 2275 563 3078 1650 920 410 550 753 2275 563 3078 1650 920 410 550 753 HC1 HCT Catch Tank & Coalescer 150 M Gallon Storage Tank . TAR 5700 5700 5700 5700 57Q0 EST 2500 7560 9000 1030C 6545 ACT 2500 7560 9000 1030C 6545 TAR 4300 T3TO TJOTT 4300 4300 4300 EST 4300 4300 4300 4300 4300 4300. ACT 4300 4300 4300 4300 4300 4300 HC1 Instrumentation TAR EST ACT TAR 1875 1875 1875 1875 1875 1875 iazs_ 1875 4000 1230C 3440 6500 3940 8160 129QC 4000 1230C 3440 6500 3940 8160 1040C 0 9700 0 1875 9300 EST ACT TAR ----- - -- -- EST -- ------ -- ACT OSW 014907 STLCOPCB4003283 ) ORGANIC DIVISION 1970 TSD COST IMPROVEMENT PLANT WIDE Improve Plant Power Factor Central Air Compressor Chlorine Plant Shutdown RTN Cooling Water to Tower Cooling Con veyor - ?2s5 Total Organic Month - M $ Total Organic YTD -MS JAN_____ FEB MAR APR MAY JUN JUL AUG SEP OCT NOV D!_/ kE. C TAR EST ACT TAR EST ACT TAR 950 EST 900 ACT 940 TAR EST ACT TAR 19900 EST 19900 ACT 19900 950 950 950 950 900 816 790 rotr 914 840 790 810 19900 19900 19900 9950 19900 19900 19900 9950 19900 19900 19900 9950 950 645 845 1000 1000 1000 - TAR EST ACT 25 25 25 25 25 25 0 00 - - TAR EST ACT TAR EST ACT TAR EST ACT 40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.88 64.68 51.68 51.68 36.29 94.54 103.6 70. 39 74.61 13753" 30.33' 37.65 6 /.68 74.57 86.72 70.19 36.33 99.86 109.1 70.89 77.98 42.22 35.03 47.35 67.09 88.57 10248 TAR 40.6 112.7 209.6 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.8 EST 36.29 130.9 239.8 315.7 390.8 137.7 467.7 510.0 587.6 661.4 762.1 848.1 ACT 36.33 136.2 245.3 316.2 394.1 437.3 472.4 519.7 586.8 675.4 777.9 OSW 014908 STLCOPCB4003284 ) AG DIVISION 1970 TSD COST IMPROVEMENT JAN FEB MAR APR TAR MAY JUN JUL AUG 1 SEP OCT NOV DEC PARATHIONS EST ACT Replace #3 Chlorinator TAR EST ACT 3500 3500 3500 4860 "2340 0 0 4860 2340 0 0 3500 0 Improve Cl,Still Yields TAR EST ACT 3000 3000 00 00 3000 0 0 3000 0 0 3000 0 0 3000 - Increase Chlor- TAR inator Coolings EST ACT 8500 8500 0 ---------0" 00 8500 -- Acetone Recovery TAR 2800 2800 EST 1957 "1069 ACT 1957 1069 2800 1225 1225 2800 1935 1935 2800 130 130 2800 715 715 2800 0 0 2800 2800 0 -------- 0" 00 2800 * 2800! _ -- Chlorine Unloading TAR 2250 EST 3634 ACT 3634 2250 4237 4237 2250 3350 3350 3200 1406 1406 3200 3200 3431 2430 3431 2430 3200 1750 1750 3200 2710 2710 Optimize Methyl TAR 3000 3000 3000 1500 .PNP/PCT Ratio EST ACT 00 00 00 00 Optimize Ethyl PNP/PCT Ratio TAR EST ACT 500 0 0 750 2641 2641 750 0 0 500 5C -- Change Cooling H-0 - Item 737 TAR EST ACT 200 310 310 200 230 230 200 270 270 Untargeted: Plant Test - TAR EST ACT 2430 5270 2430 5270 TAR EST ACT Total AG Month M $ TAR EST ACT 5.75 5.90 5.90 6.0 8.17 8.17 6.0 4.85 4.85 6.0 10.63 10.6: 15.5 11.1 11.2 15.5 3.15 3.15 15.5 1.75 1.75 22.5 2.11 2.71 14.3 U 0 14.3 - 3.3 - - Total AG YTD M $ TAR EST ACT 5.75 11.75 17.75 23.75 5.90 14.(58 18.92 29.55 5.90 14.08 18.92 29.55 39.25 54.75 40. ! -i 43.87 40.73 43.87 70.25 92.75 rio7 :i 121.'4" 124.71 125. 45.62 48.33 48.33 48.33 48.33 4a. 45.62 48. 33 48.33 48.33 48.33 TAR EST Total Plant Month M 5 Total Plant YTD M $ ACT TAR 46.35 73.1 102.9 64.07 60.12 43.47 EST 42.19 102.8 108.5 3T:02~' as'.Ty 46.72 ACT 42.2*1 108.0 113.9 81.52 89.15 45. 36 49.62 53.02 45.18 78.981 54.98 " c . I 32.08' 40.36 67.68 74.57 bo. / ^ i u _ 36.7Sj 50.06 67.09 88.57 102.481 TAR 46.35 124.5 227.3 291.4 EST ACT 42.19 42.23 145.0 150.3 258.8 264.2 345.3 345.8 351.5 395.0 444.6 431.5 481.6 513.3 434.9 481.2 518.0 497.6 542.8 621.8 558.3 635.7 709.7 568.0 635.1 723.7 676.7 "f 28 . biu .-i 896.4 826.2) DSW 014909 STLCOPCB4003285 Annisfon J. T. Bell J. L. Corder A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee General Offices H. C. Carder D. Danna (5) M. w. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard w. K. Johnson C. F. Luecke w. R. Richard w. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens South Second St. P. 0. DeGarmo Other Locations A. H. Forsten Alvin, Texas D. W. Jackson W.G.K. COMPANY CONFIDENTIAL Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Summary NOVEMBER 1970 Month COST IMPROVEMENT RESULTS Fst. Act. $86,720 Target $54,975 % of Target 157% YTD $810,423 $676,730 120% Organic Division Issued progress report on 50/50 - biphenyl/Santowax C split test^ on the Polyphenyl Tubular Unit stating capacity as 92 M lbs./yr. Issued progress report on explosion hazard of biphenyl flaking. Nitrogen purge will be used to prevent this. Santowax R deficit report written showing maximum of 8 M lbs. deficit in 1971. This can be made up by stockpiling Aroclor 5460 (in progress), recovering Santowax from pond, and import ing it from Newport. This will be updated depending on final forecasted needs for 1971. A "sample" (80 M lbs.) of Newport Santowax ordered in October is expected to arrive in December. Plans have been made to handle and refine this material for use in Aroclor 5460 and HB-40. Construction was temporarily suspended on the HB-40 Expansion (CEA 1482) on 11-25-70 after successful demonstration of the new autoclave, Therminol system, motor control center and storage facilities. Work is scheduled to resume in midDecember pending return of the old autoclave after repair. Final completion date is not firm due to continued ironworker strike. DSW 014910 w-k. CONFIDENTIAL INFORMATION 'This document contain* confidential information which i* the property of Monsanto Company. Only those portions of the document relevant to a duly authorised individual's need to know may be eicarpted for him. The report must not be sent outside the Company without written approval and the authorised recipient is accountable for its safe keeping, excerpting or otherwise disclosing of its contents and for its proper disposal. The docu ment remains the property of Monsanto Company and shall be returned within two months to its author, except upon special authorisation to hold for a longer period." STLCOPCB4003286 ) 2. The promoter scanning study and mid-point injection phase of the Polyphenyl Pilot Studies outlined in PR&D Work Plan V are complete. Results were distributed in the mid month report of 11-16-70. The next phase involving evaluation of multipoint injection of cumene has begun and is targeted for completion by 2-1-71. Carbon adsorption studies of the Aroclor sump effluent are continuing. Efforts are directed toward obtaining design data. The effluent PCB level is still^10 ppb. Aroclor - detail design of facilities for nitrogen padding of chlorine cars 95% complete. Equipment will be ordered first week of December. A project premise for Experimental Removal of Solids from the Plant Effluent was approved during the month. Agricultural Division PR&D studies show that recycle of filtered organic residue from 96% chlorinated Methyl Intermediate into the next thio acid charge shows promise for increasing yields. Work is continuing to more fully evaluate this possible process. Anniston TSD assisted in an evaluation to determine the economics of producing TPA (Trimethylphosphoric Triamide) in idle equipment at the Parathion Plant. Two alternates were considered for the production of approximately 60,000 pounds of TPA: one for production of TPA in a thio acid reactor and one for a chlorinator-still unit. The final decision will be made in early December. HC1 - Project 3512 - Catch Tank: All prefabrication has been completed with field installation expected during December. Project 3690 - Fume Collection and Scrubbing: Verbal approval given in November, detail design 90% complete, initial orders for equipment out. Transmittal to Maintenance expected first week of January. PNP - p-NPT evaluation completed for interim production at Anniston. Manufacturing costs, changeover costs, capacity and timing were submitted based on latest research information. Quality Control ttie Plant Quality Score was 83.0, up 6.2 from October, with a YTD score of 84.3 against a target of 95.0. A new lot numbering system on HB-40 was set up to protect the validity of statistical surveillance. DSW 014911 STLCOPCB4003287 3. Pollution Control Several sets of air samples were collected and analyzed for PCB during November. A total of 237 water samples were analyzed. Test ing to evaluate sampling and analytical errors in PCB analyses was commenced in November. The cleaning of the No. 1 (old) HC1 neutralization pit and bypass is 95% complete with rebuilding scheduled to begin in early December. Accumulated sludge in the No. 2 (new) pit was removed in early November thereby extending the effective life of the pit a significant amount. DSW 014912 STLCOPCB4003288 4. PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. 0. Kemp Complaint Report Quality Number EVT-33-P Material Aroclor 5460 Customer Reason Colonial Press Co. Material Caked Hard YTD Quality Complaints/100 Shipments 0.29 Target 0.20 4 DSW 014913 STLCOPCB4003289 COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT 5. Community Relations 1. G. L. Arnett attended "Parathion Study Review" in St. Louis, November 18, 19 and 20. 2. J. L. Brown and D. F. Pittman attended "Polyphenyl Pilot Study Review" in St. Louis, November 18, 19, and 20. Visitors 1. W. R. Robirds visited the Anniston Plant, November 6th, concerning Parathion Improvements. 2. Tsukashima, MMK, visited the Anniston Plant, November 9 through 20, concerning Aroclor Liquid and Solid, Biphenyl, Santowax, and HB-40. DSW 014914 STLCOPCB4003290 ) 1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE EXISTING PRODUCT TECHNOLOGY IMPROVEMENT NEW PRODUCT EVALUATIONS MAJOR PROJECT SUPPORT PROCESS CONTROL IMPROVEMENT PLANT IMPROVEMENT PROGRAM REAL ESTATE MANAGEMENT 10 0 ca u u >, C ITS 0) 13 a, 13 3 n Cu X < 2 -"I O' 33 n< a 4J 4) o CO o >o 0a zQ DSW 014915 STLCOPCB4003291 ORGANIC DIVISION 1970TSD COST IMPROVEMENT FUNCTIONAL FLUIDS TAR EST ACT JAN f FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC DisDosal of Licuid Nontar #3 Aroclor Still New Burners TAR EST ACT TAR EST ACT 1500 600 600 1080 1080 C ,0 Cc 1500 500 500 1080 0 0 1030 1080 1080 1080 0U0 0 000 0 1080 0 1080 0 1080 #2 Still Entrainment Separator TAR EST ACT 3000 3000 -0 00 1242 Distillatio ! Productivity TAR EST ACT 150C 1500 1500 1500 1500 1500 1500) 1500 1500 1500 C 100 1000 1520 2565 'ZUDU 1210 660 "rocr C 100 1000 1520 2565 2000 1210 660 TAR EST ACT TAR PLASTICIZERS EST ACT Flakino & Drum TAR ming Facilities EST Headcount ACT Solid Aroclor Instrumentation TAR EST ACT TAR Sandvik Belt EST ACT Add Tray Strip ping Sections to Santowax TAR EST ACT TAR Cl2 Bulk Handling Facilit . EST leSSCT Solid Aroclor Expansion Chlorinator Back Pressure TAR EST ACT TAR EST ACT 3000 3000 3000 ?nnn 3500 3500 3000 2000 1000 1000 3000 2000 1000 ~T(JOT 3000 2000 1000 1000 3750 0 3750 3750 3750 3750 3750 3750 00 000 0 0 0 0 00 2250 2250 2250 2250 0 00 0 0 00 4580 4580 4580 4580 4580 4580 4580 0 00 0 00 C 0 0 00 00 3750 0 2250 u 4580 U znnn 2000 2000 3550 1950 344C 3550 3050 344C 30000 5000C 30000 4950C 5000C 10000 36000 24000 20000 L7$60 4300C 72000 70000 5190C 5590C 1050C 38500 23500 24700 27600 4500C 86000 360 360 360 0 00 0 3750 2250 4530j ! t1 360 TAR EST ACT TAR EST ACT TAR EST ACT TAR -------------- --- EST -- ncu m 4916 ACT ---- ---- 1---------- 1 STLCOPCB4003292 ORGANIC DIVISION I 1970 TSD COST IMPROVEMENT FUNCTIONAL FLUIDS & PLASTICIZERS TAR EST ACT JAN FEB' MAR APR M. AY 1 JUN JUL AUG SEP OCT | NOV DSC 1 GROUpjs) (AFF ECTIN 3 BOT i bus: NESS Aroclor Ware . house Reduced Headcount TAR __1QQQ. 1000 EST 1000 1000 ACT 1000 1000 lOQfl 1000 1000 improved Santowax Yield HB-40 Reduce Nickel Catalyst Usace Substitution of Santowax C for TAR EST ACT TAR EST ACT TAR EST _4.QQ.Q 4000 4000 4000 5900 2800 5800 4000 4450 2800 5800 4000 1160 700 .. 700 700 700 1330 525 1230 425 1335 525 2080 565 4000 4000 uonn dnnn 4QQQ 97C 663C 62S0 1910 5200 9 7 C 6630 628C 1910 70D 700 inn C C 540 C 0 45C 920 20QQO 0 4C0Q 1 2G0ud) Santowax R ACT TAR EST ACT GENERAL CHEMICALS Biphenyl Cool ing Water Treatment PNP Modify Acidifiei Dumo valve Svste m Install Entrain ment Separator Production LXUIX^C fLtiCKX LUI Variables-PNP TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT CRIP HENYL 600 . 600 670 680 670 680 580 580 3150 520 520 3150 3150 1277 2164 3016 2164 PNP HC11 600 600 600 600 600 67C 440 675 440 600 290 29C 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 - 5500 5500 5500 5500 0 0 0- 00 0 463C 4630 463C 4630 4630 4630 4630 12: 1604 0 1525 1780 236E 12" ' 1605 0 1525 1780 236 l i j t 1 625 625 i -i i 5500 5500 i i * 4630 4630 . f Re-use Well Water TAR EST ACT 500 500 500 ' - ii Untargeted PNCB Heel Credits HC1 HUT Catch Tank & Coalescer 150 M Gallon Storage Tank TAR EST ACT 2275 563 3078 1650 920 410 550 753 2275 563 3078 1650 920 410 550 753 TAR 5700 5700 5700 5700 57Q0 EST 2500 7560 9000 1030C 6545 ACT 2500 7560 9000 1030C 6545 TAR 4300 4300 TT00 4300 4300 4300 EST 4300 4300 4300 4300 4300 4300 ACT 4300 4300 4300 4300 4300 4300 i HC1 Instrumentation TAR EST ACT TAR 1875 187511875 1875 1875 1875 1875 1875 .1871. 4000 1230C 3440 6500 3940 8160 129QC 0 9700 4000 1230C 3440 6500 3940 8160 1040C o EST ACT TAR EST ACT .-- -- "" DSW I 014917 STLCOPCB4003293 ) ORGANIC DIVISION 1970 TSD COST IMPROVEMENT PLANT WIDE Improve Plant Power Factor Central Air Compressor Chlorine Plant Shutdown RTN Cooling Water to Tower Cooling Conveyor - ?2^5 Total Organic Month -MS Total Organic YTD -M$ JAN TAR FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC EST ACT TAP. EST ACT TAR 950 EST 900 ACT 940 TAR EST ACT TAR 19900 EST 19900 ACT 19900 950 950 950 900 916 790 914 840 790 19900 19900 19900 19900 19900 19900 19900 19900 19900 950 37JZT 810- 9950 9950 9950 950 843 845 1000 - 1000 - 1000 TE_A_S_RT ACT 25 25 25 25 25 25 on * TAR EST ACT TAR EST ACT TAR EST ACT 40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.38 64.68 51.58 51.53 36.29 94.54 103.6 70.39 74.51 43:58 37.65 6 / . 68 74.57 36772| 36.33 99.86 109.1 70.89 77.98 42.22 35.03 47.35 67.09 88.57 TAR 40.6 112.7 209.6 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.3 EST 36.29 130.9 239.8 315. / "390.8 137.7 467.7 510.0 587.6 661.4 762.11 ACT 36.33 136.2 245.3 316.2 394.1 437.3 472.4 519.7 586.8 675.4 ! f > V ; ; : DSW 014918 STLCOPCB4003294 ) AG DIVISION 1970 TSD COST IMPROVEMENT FARATHTONS TAR EST JAN FEB MAR APR MAY JUN JUL AUG SEP OCT ________ 1_______ NOV ACT Replace #3 Chlorinator TAR EST 1 ! 3500i 3500 3500 4860 2340 0u 3500 0 ACT 4860 2340 0 0 Improve C1-Still Yields TAR EST ACT 3000 3000 00 00 3000 0 0 3000 o 0 3000 0 0 30001 - - Increase Chlor- TAR inator Coolings EST ACT 8500 8500 00 00 8500 - - Acetone Recovery TAR 2800 1 2800 EST 1957 1069 ACT 1957 1069 2800 1225 1225 2800 1935 1935 2800 130 130 2800 715 715 2800 0 0 2800 2800 0 -------- 3" 00 2800 - 2800: _ Chlorine Unloading TAR 2250 EST 3634 ACT 3634 2250 4237 4237 2250 3350 3350 3200 1406 1406 3200 3200 3431 2430 3431 2430 3200 3200 1750 2710 1750 2710 Optimize Methyl TAR 3000 3000 3000 1500 PNP/PCT Ratio EST ACT 00 00 00 00 Optimize Ethyl PNP/PCT Ratio TAR EST ACT 500 750 0 2641 0 2641 750 0 0 500 - Change Cooling TAR 200 200 200 H-0 - Item 737 EST 310 230 270 ACT 310 230 270 Untargeted: Plant Test - TAR EST ACT 2430 5270 2430 5270 TAR EST ACT Total AG Month M $ TAR EST ACT 5.75 5.90 5.90 6.0 6.0 37TT 4.85 8.17 4.35 6.0 10.63 10.62 15.5 11.2 11.2 15.5 3.15 3.15 15.5 1.75 1.75 22.5 2. /I 2.71 14.3 0 0 14.3 - - 3.3 - Total AG YTD M $ TAR EST ACT 5.75 11.75 17.75 23.75 5.90 14.08 18.92 29.55 5.90 14.08 18.92 29.55 39.25 54.75 40 :i J 43.87 40.73 43.87 70.25 92.75 107.1 121.4 45.62 48.33 48. 33 48.33 45.62 48.33 48.33 48.33 124.7 48.33 TAR EST ACT Total Plant Month M S TAR 46.35 78.1 102.9 64.07 EST 42.19 102.8 108.5 81.02 ACT 42.23 108.0 113.9 81.52 60.12 43.47 35.79 48.73 89.15 45.36 49.62 53.02 45.18 73.98 54.98 32.OS' 40.36 67.68 74.57 "55772" 36.73) 50.06 67.09 88.57 Total Plant YTD M $ TAR 46.35 124.5 227.3 291.4 EST 42.19 145.0 258.8 345.3 ACT 42.23 150.3 264.2 345.8 351.5 395.0 444.6 431.5 481.6 513.3 434.9 481.2 518.0 497.6 542.8 621.8 558.3 635.7 709.7 568.0 635.1 723.7 676.7 diu. 4 DEC ,, 5C . 125. 52.1 723. DSW 014919 STLCOPCB4003295