CMP PROCEDURE VENT RECOVERY START UP PROCEDURE
PROCEDURE #
PURPOSE
To assist the operator with the safe start up of vent recovery.
SCOPE
RELATED PROCEDURES DEFINITIONS
Step required to start up vent recovery in a safe and proper manner. Mod V start up checklist. Vent Recovery shutdown
Lining up a control valve- Upsteam and downstream manual B/V's open and bypass closed. All bleeds closed and blinded or plugged. Air lined up to control valve. Lining up a mag drive pump:
Suction and discharge valves are lined up. ARC recirculation or manual recirculation is open. Oil mist and/or other bearing lubrication is OK. All bleed valves are closed and blinded or plugged.
4>
All sample points are reconnected. Seal or bearing flush is lined up. Working pressure gauge is installed and lined up. Switchgear is racked in and reset. Both motors have been bumped. Pump switch has been placed in automatic position.
SAFETY CONCERNS & Minimum Block Standards EQUIPMENT
ENVIRONMENTAL CONCERNS
Ensure all bleed valves are blinded or plugged.
SPECIAL CONCERNS None.
Revision# 2.
Dow Confidential
Revision Date-7/28/93
This procedure is valid for 24 hours from, the date viewed, August 12,1993 2:22 PM
D0 009^93
C0Nft^nttai
Training & Development Procedures
Chlorinated Methanes
VENT RECOVERY LINE UP AND START UP PROCEDURE
The following items must be checked complete and the checklist signed prior to starting up vent recovery.
NOTE: The only time this check sheet needs to be filled out, is if we are down for an extended period of time.
This procedure assumes that K-l 100 is running.
OUTSIDE CHECKLIST:
Step
Action
Check
1 All red tag masters cleared and tags pulled.
2 Line up system.
General Notes: Communicate with the Mod V Boardman to make sure control valves, instrument air, and transmitters are ready to be lined up. When the OK is given, line up the following: (Refer to the definitions "lining up a control valve" and "lining up a pump").
Note on bleed valves: Ensure that the bleed valves are blinded or plugged when checking they are closed. If not, install a bleed or plug. Use common sense when filling out the checklist, (i.e. before lining up the block valves ensure the bleed are closed.)
Note on lining up P-1710 pumps: Check with the board operator to ensure there is enough liquid level in D-1710 to bump the motor on the P-1710 pumps. If there is not, leave the field switch in the "off' position and put a yellow note on the Mod V graphics over the pumps stating the pumps have not been bumped and are in the "off position.
Note on remote seal transmitters: Ensure the tubing valve is blocked in and has a plug on it when lining up a remote transmitter valve.
Platform above E-1710 Deck
E-1710 R-22 vapor PSV's lined up to one side and bleed valves closed. Vent recovery corrosion probe bleed valve closed. Vent recovery corrosion probe upstream B/V lined up. Vent recovery corrosion probe downstream B/V lined up. Vent recovery corrosion probe bypass B/V closed.
E-1700/E-1710 Deck
E-1700 inlet HC1 bleed valve closed. E-1700 outlet HC1 bleed valve closed. E-1700 HC1 bypass valve closed. E-1700 HC1 inlet B/V lined up. JJS 7/26/93
______________ ______________ ______________ ______________ ______________
______________ ______________ ______________ ______________
VentRecsu.Doc
DO 009?94 CONFTDFNTXAl
Training & Development Procedures
Chlorinated Methanes
VENT RECOVERY LINE UP AND START UP PROCEDURE
E-1700 HO outlet B/V lined up. E-1700 process vent bypass valve closed. E-1700 process vent inlet bleed valve closed. E-1700 process outlet bleed valve closed. E-1700 process vent inlet B/V lined up. E-1700 process outlet B/V lined up. E-1710 R-22 level xtmr lined up. E-1710 R-22 indep. level switch lined up. E-1710 R-22 liquid pumpout B/V closed. E-1710 R-22 vapor pumpout B/V closed. E-1710 R-22 vapor oudet B/V lined up. R-22 LCV liquid pumpout B/V closed. R-22 liquid feed to E-1710 flowmeter lined up. R-22 liquid feed to E-1710 level control loop lined up - AO(615).
D-1710 Deck
C-1500 to E-1700 inlet bleed valve closed. Both sides of D-1710 / dry vent diffl pressure xunr lined up. Both dry vent flow meters lined up. Both D-1700 vent pressure xtmr's lined up. Both D-1700 level xtmr's lined up. D-1710 bypass B/V closed. D-1710 vent B/V lined up. P-1710 discharge flow meter lined up. D-1710 level control loop lined up. P-1710 recirculation flow control loop lined up.
P-1710 Ground Level
P-1710 A bypass B/V around check valve lined up. P-1710 B bypass B/V around check valve lined up. P-1710 A lined up. P-1710 B lined up.
Checklist complete: _________________ Date/Time:
Approved by: (supervisor or boardman)
Date/Time:
JJS 7/26/93
VentRecsu.Doc
DO 009295 CONFIDENTTAl
Training & Development Procedures
Chlorinated Methanes
VENT RECOVERY LINE UP AND START UP PROCEDURE
SOS Pre-Start Up Check Sheet The Following Items Must Be Checked and Signed Prior To Start Up.
INSIDE CHECKLIST: Step
Action
Check
1 Vent Recovery Sequence 66 in Step 660. All red tag masters been cleared, control valves and instruments are in auto. System is ready for start up.
2 K-l 100 running.
3 Mod V start up checklist items complete.
4 Vent Recovery Sequence 66 terminated to Step 661.
5 Vent Recovery outside checklist complete.
6 DidOS bump the P-1710 pumps (Yes/No)
If no, put a check on the right stating that a note has been placed on the Mod V graphics stating the pumps have not been bumped. If yes, the write N/A in the slot to the right.
7 Make sure that the following AK's and AP's have the correct setpoints. Use Dynamic Data Display (GPI option 18). Choose (9) Vent Recovery, then choose (1) for AK set points and (2) for AP set points. The AK values are only initial guesses. After the initial start up, we will put in ranges for the AK's.
AK's AK(602) -E-1710R-22 local flow set point for AO(615). AK(616) - E-1710R-22 level set point for AO(615). AK(618) -D-1710 vent pressure set point for AO(608). AK(626) - D-1710 level set point for AO(606). AK(644) -P-1710 minimum flow setpoint for AO(616). AK(647) - D-1710 vent flow local set point for AO(608). AK(648) - Liquid M3 injection flow set point for AO(618).
Value/chk _0__________ _35_________ _5__________
40_________ 500_______ _0__________ 500________
AP's 1. AP(1393) - Liquid injection d/p set point 2. AP(1419) - D-1710 low-low leval alarm set point. 3. AP(1555) - P-1710 A/B high temp set point.
Value/chk _5__________ __5__________
30_________
Checklist complete: _________________
Date/Time:
_________________
Approved by: (supervisor)
Date/Time: ___________
JJS 7/26/93
VentRecs" Doc
DO 009?9> CONFIDENTIAL
Training & Development Procedures
Chlorinated Methanes
VENT RECOVERY LINE UP AND START UP PROCEDURE
PROCEDURE
Vent Recovery Start-Up
Note: This procedure is not intended to explain the Mod V code. Use Dynamic Dowtran and the expanded glossary to guide you through the Mod V portion of the start up. This procedure will only tell you what operations will manually have to do in order to start up the compressor.
Step
Action
1 Complete both the inside and outside checklists.
2 AK and DM the Mod V to Step 662 and the program automatically establish level, feed and heat up the column.
3 If the P-1710 pumps were not bumped because of low level, they need to be bumped after there is liquid level in D-1710. After bumping, place the field switches in the auto position and remove the
note over the pumps on the Mod V graphics.