Document 5bRjKaMxy2Xo6JK0KRaNr9O95
r"'irffpUSTRiAL'maintenance' contr
1001 WALL STREET PHONE 778-6343
EL PASO, TEXAS 7 9 9 i.5
.
October 13, 1966
Standard Oil Co. of Texas P. 0. Box 20,002 El Paso, Texas . 79998
Attn: Mr. Frank Gates Dear Sir:
Re: Boiler Stack F 1001 Boiler Stack Insulatior
. El Paso Refinery
In response to your invitation dated Oct. 5, 1966, we are pleased to quote the above referenced work as follows:
1 - Furnish and install 1^" x l" x
angle support
rings at approximately 9*0" O.C., securely welded,
2 - Furnish and install lj" thick JM "Thermobestos"
calcium silicate block insulation, or equal. .This to be
banded with 3/4" stainless steel bands in lieu of 16 ga.
black annealed wire.
;
3 - Furnish and install .024 mill finishaluminum jacketing, banded with 3/4" stainless steel banding at . lower edge and mid span of 36M continuous sheet. The joint at laps - both horizontal and vertical - to be secured with sheet metal screws approximately 4" O.C.
The work as proposed to be done'with spider staging furnished
by us, with initial stringing of painters trolley to be done
by Standard Oil Co.
.
The price for the above work to be $4,842.00. If poly clad .024 aluminum jacketing is to be provided, add $111.00 to the above price. The thirty day completion time is adequate.
Yours very truly,
JACK WHISL^R, INC
/l )/
JAH/a
:hev bb
>000429