CELANESE CHEMICAL COMPANY TECHNICAL CENTER Corpus Christi, Texas
MINUTES Directors' Meeting
January 6, 1976
PLAINTIFF'S EXHIBIT CEL-737
1. Year-end Costs
Preliminary run shows December actual cost at $662M. Estimate was $751M. Year-end costs would be under previous estimate by the same $69M. MDC will make another check on outstanding expense accounts, as well as other expenses. Remaining MFA inventories will be liquidated; associated costs will be included in 1975 expenses.
2. Cost Reduction Items
The following were identified as potential cost reduction areas:
Maintenance Materials Routine - estimated at $11/hr. Alterations - estimated at $l7/hr. Expense associated w/capital - $24/hr.
Expense Associated With Removal of MFA Unit ($54M) for Transfer to Pampa
Seminar Salaried Overtime Credits for Hercules and Union Carbide Work Outside Engineering (Reduction to offset salary for added
Engineering headcount) Travel Budgets
Cost increases, above budget, are expected in the following areas:
Hourly labor Expense on 30th Anniversary Salaries Computer Rental
3. Stewardship Review
Date for the CCCTC review meeting is being established with Charlie Weaver. Guests to be invited to the meeting will be discussed with Dr. Wheeler. Stewardship summary reports are essentially complete except for a few signatures.
008726
Minutpe of 1-6-76
Page 3
1976. Cost of this project was not included in the 1976 budget.
II. Explosion Work on Dust Materials (Ref. : SDK-75-701-HJK)
Use of CCCTC for explosion testing of dust materials is a good idea but equal results can be obtained more economically under confidential contract with an outside firm. Development and maintenance of an expert in the field would be too expensive for only 10 to 20 samples per year.
/kb
cc: Mr. R. D. Damron Mr. W. E. Heinz Mr. R. W. James Mr. W. T. McNair Dr. L. Starr