Document 5ZNYRDnZgRD2k34gz5YnnVmR

CORPORATION OLOOMINWI ROAO AKRON. NSW YORK 44001 Tf Mil January 3. 1974 Mr. Chaatar C. Vhltaalda, Area Dlractor 0. S. Department of Labor Occupational Safety and Haalth Adminlatration 203 Midtown Plasa 700 Eaat Watar Straat Syracuaa. Mow York 14210 Subjects 0. S. H. A. Citation - CSHO No. P-1568 Akron. Now York Joint System Daar Mr. Vhltaaldat Thla la a follow-up raport on ny Novanbar 30. 1973 roport ragardlng tha above subject. At thla tlaa wa would antar tha following raport. Aa stated. wa hava ravartad to our full aabaatoa aaployaa protactlva program and wa ara following tha "Immadlata Temporary Admlnletrata Controls" aa outlined In your Multl-Stap Abatoment. On Novanbar 12. 1973 wa again marked off tha pack out areas In tha main plant. All employees working Inside the marked araa ara again required to wear approved respirators In accord with our established program. All waata containing aabaatoa and empty asbestos bags ara disposed of In sealed, marked containers. All employaas In tha araa are provided with protective elothlng and foot covering. Wo hava protactlva clothing and foot covering. Wa hava provided these employees with a change room and provided each of them throe Individual dothea lockers. One for their street clothes, one for thalr work clothes, and one for their raaplratora In accord with our respirator program. All aabaatoa caution signs ara posted at all approaches to tha work araa and aabaatoa caution labels ara affixed to containers of finished products, raw materials, and waata containers as required. Wo would further advise that our permanent Engineering and Administrative controls ara nearly completed. Tha now dust collector for tha pack out araa waa Installed and put in use during tha month of December. 1973. At thla time we hava control of tha dust from tha back aide of tha packer. Due to an error In also and shape of aoma of tha dust prefabrication work, completion on tha front side was impossible. Tha contractor la rafabrlcatldg: tha required ducta at thla tins and completion la expected early In January 1974. TIMMS AND * DUIUPIN* MATIA|A|. PUfcf AND PAMA 0HIMIOAIB 2 We will continue all of tho employer protective muutm outlined above until an approved teat indieatee wa have net all requirements. In thia regard we need to be adviaed who wa ean eontaot to run theea taeta that will bo acceptable to your Department. Wa are atill working to improve the non-ashestoe formula that failed to obtain customer acceptance in November 1973. We are sure that tho problems can ba overcome and still have long range plans to eliminate asbestos addition to our product line. If you or your staff require further information, please advise. Vary truly yours. GEORGIA PACIFIC 00RP. cci Mr. Alfred Barden U. 8. Department of Labor. Occupational Safety 4 Health Adn. ISIS Broadway 1 Astor Plasa. Hoorn 3445 Now York, Now York 10036 k Ctp.t-i / /". D. //*// H-1*,' Pc* /(- S ft. 6 Trf.f s F|--OTK