DATE: SUBJECT: FROM: THRU: TO: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS 77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604 MAY 2 3 2019 CLEAN AIR ACT INSPECTION REPORT Ascent LLC Gregory Gehrig, Environmental Engineer AECAB (MI/WI) Sarah Marshall, Section Chief AECAB (MI/WI) File BASIC INFORMATION Facility Name: Ascent LLC Facility Location: 505 N Railroad Ave, Suite 400, Northlake, IL Date of Inspection: May 15, 2019 EPA Inspectors: 1. Gregory Gehrig, Environmental Engineer Other Attendees: 1. Mariusz Popik, Critical Facilities Manager, Ascent LLC Contact Email Address: Mariusz.p..op. ik(Q{ascentcor.p.com Purpose of Inspection: CAA Compliance Facility Type: data server storage and maintenance facility Regulations Central to Inspection: SIP, NSPS and MACT Arrival Time: 1005 hrs Departure Time: 1125 hrs Inspection Type: IZl Unannounced Inspection Facility Name: Ascent LLC Facility Location: 505 N Railroad Ave, Suite 400, Northlake, IL Date ofinspection: May 15, 2019 D Announced Inspection OPENING CONFERENCE IZJ Credentials Presented IZJ CBI warning to facility provided The following information was obtained verbally from facility personnel. Company Ownership: The facility has had the same ownership since at least 2012, although Ascent used to be part of a larger facility that has since been taken over by Digital Realty. Digital Realty owns the remaining six suites at the 505 N Railroad location. Process Description: The Ascent LLC (Ascent) facility stores and maintains data servers. This involves cooling the servers, so the facility has chillers that use R-41 0a coolant. The servers are air cooled, so once the refrigerant is cooled outside, it is exchanged with air that provides cooling to the servers. The facility was unaware of any coolant recharge that had been necessary since the facility began operation. Ascent has three diesel-powered 2-megawatt generators (GenSets) that can supply all required electrical needs for the servers in the event of power intem1ption. These Gen Sets are typically run for less than 10 hours per year. TOUR INFORMATION EPA toured the facility: Yes Data Collected and Observations: Photos were taken during the facility tour. EPA toured the facility and observed all processes. The facility appeared to be in nonnal operations. The chillers were operating and none of GenSets were operating. Field Measurements: were not taken during this inspection. RECORDS REVIEW Facility layout. CLOSING CONFERENCE Requested documents: None Page 2 of 4 Facility Name: Ascent LLC Facility Location: 505 N Railroad Ave, Suite 400, Northlake, IL Date of Inspection: May 15, 2019 SIGNATURES -.. Lead Inspector: ~ a t e : {;- 2 J- )0/Cl f Section Chief: ....-..~------~~~~---~--- Date:02/ s/ ; 7 I Page 3 of 4 Facility Name: Ascent LLC Facility Location: 505 N Railroad Ave, Suite 400, Northlake, IL Date oflnspection: May 15, 2019 DlGITAL IMAGE LOG* 1. Photographer: Gregory Gehrig 3. Company/Facility Name: Ascent LLC 5. Number of Images: 4 2. Date(s) of Inspection: May 15, 2019 4. Street Address, City, State: 505 N Railroad Ave, Suite 400, Northlake, IL 6. Archival Record Location: CD-R labeled Ascent Images 5.15.2019 Date and Time* Image name IMG 0213.JPG (CDT) 5/15/2019 11:08 Description Indoor liquid to air heat exchangers IMG 0214.JPG 5/15/2019 11:11 GenSet exterior IMG 0215.JPG 5/15/2019 11:11 Chillers IMG 0216.JPG 5/15/2019 11:12 2 MW diesel fired GenSet *time stamp on photos is one hour ahead. Page 4 of 4