Wednesday, August 10. 1994 / Rules and Regulations 41141
(B) Performing tests of the material containing PACM which demonstrate that no asbestos is present in the material. Such tests shall inciude analysis of 3 bulk samples of each homogeneous area of PACM collected in a randomly distributed manner. The tests, evaluation and sample coilecuon shall be conducted by an accredited inspector or by a CIH. Analysis of samples snail be performed by persons or laboratories with proficiency demonstrated by current successful participation in a nationally recognized testing program such as the National Voluntary Laboratory Accreditation Program (NVLAP) of the National Institute for Standards and Technology (NIST) of the Round Robin for bulk samples administered by the American Industrial Hygiene Association (A1HA) or an equivalent nationally-recognized round robin testing program.
(5) At the entrance to mecnamcai rooms/areas in which employees reasonably can be expected to enter and which contain thermal system insulation and surfacing ACM/PACM. the building owner shall post signs which identify the material which is present, its location, and appropriate work practices which, if followed, will ensure that ACM and/or PACM will not be disturbed.
(6) Signs, (i) Warning signs that demarcate the regulated area shall be provided and displayed at each location where a regulated area is required to be established by paragraph (e) of this section. Signs shall be posted at such a distance from such a location that an employee may read the signs and take necessary protective steps before entering the area marked by the signs.
(ii) The warning signs required by !).)(6) of this section shall bear the following information.
DANGER ASBESTOS CANCER AND LUNG DISEASE HAZARD AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTION CLOTHING ARE REQUIRED IN THIS AREA
(7) Labels, (i) Labels shall be affixed to all products containing asbestos and to all containers containing such products, including waste containers. Where feasible, installed asbestos products shall contain a visible label.
(ii) Labels shall be printed in large, bold letters on a contrasting background.
(iii) Labels shall be usod in accordance with the requirements of 29 CFR 1910.1200(f) of OSHA's Hazard
Communication standard, and shall
providing a training course which
contain the following information:
includes as a minimum ail the elements
included in paragraph (k)(8)(vi) of this
DANGER CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD
section and in addition, the specific work practices and engineering controls set forth in paragraph (g) which specifically relate to that category. Such
(iv) [Reserved! (v) Labels shall contain a warning
course shall include "hands-on" training and shall i-iI-p at Ipast ft btun-
statement against breathing asbostos
" ' (Ivj Training lor CTass ill employees
fibers.
shall be the equivalent in curriculum
(vi) The provisions for labels required and training method to the 16-hour
by paragraphs (k)(2)(i) through (k)(2)(iii) Operations and Maintenance course
do not apply where: (A) Asoes'tos fibers have been
modified by a bonding agent, coating, binder, or other material, provided that the manufacturer can demonstrate that, during any reasonably foreseeable use. handling, storago. disposal, processing,
developed by EPA for maintenance and
custodial workers who conduct
activities that will result in the v disturbance of ACM. (See 40 CFR
' AJ
763.92(a)(2)]. Such course shall include
"hands-on" training in the use of
respiratory protection and work <xpf*rc'
or transportation, no airborne
practices and shall lake at least 16 Course,
concentrations of asbestos fibers in
hours.
,.
excess of the permissible exposure limit (v) Training for employees performing v
and/or excursion limit will be released, Class IV operations shall be the
'jsc (
or equivalent in curriculum and training (B) Asbestos is present in a product in method to the awareness training course
concentrations less than 1.0 percent by developed by EPA for maintenance and
weight. (vii) When a building owner/or
custodial workers who work in buildings containing asbestos-
employer identifies previously installed containing material. (See 40 CFR 7C3.92 PACM and/or ACM, labels or signs shall (a)(1)]. Such course shall include
be affixed or posted so that employees will be notified of what materials
available information concerning the locations of PACM and ACM, and
contain PA.CM and/or ACM. The employer shall attach such labels in
asbestos-containing flooring material, or flooring material where the absence of
areas where they will clearly be noticed asbestos has not been certified; and
by employees who are likely to be exposed, such as at the entrance to
instruction in recognition of damage, deterioration, and delamination of
mechanical room/areas. Signs required asbestos containing building materials.
by paragraph (k)(5) of this section may Such a course shall take at least 2 hours.
be posted in lieu of labels so long as
(vi) The training program shall be
they contain information required for
conducted in a manner that the
labelling. (8) Fmnlnvee information and
employee is able to understand. In addition to the content required by
`training, (i) The employer snail, at no
provisions in paragraph (k)(8)(iii) of this
cost to the employee, institute a training section, the employer shall ensure that
program for all employees who install each such employee is informed of the
asbestos containing products and for all following:
employees who perform Class 1 through
(A) Methods of recognizing asbestos,
IV asbestos operations, and shall ensure including the requirement in paragraph
their participation in the program.
(k)(l) of this section to presume that
(ii) Training shall be provided prior to certain building materials contain
or at the time of initial assignment and asbestos:
at least annually thereafter.
(B) The health effects assodatod with
(iii) Training for Class I and II operations shall be the equivalent in
asbestos exposure; (C) The relationship between smoking
curriculum, training method and length to the EPA Model Accreditation Plan (MAP) asbestos abatement worker
and asbestos in producing lung cancer; (O) The nature ofoperations that
could result in exposure to asbestos, tho
training (40 CFR Part 763. Subpart E. Appendix C.). For employers whose Class II work with asbestos-containing material involves only the removal and/
importance of necessary protective controls to minimize exposure including, as applicable, engineering controls, work practices, respirators,
or disturbance of one generic category of housekeeping procedures, hygiene
building material, such as roofing materials, flooring materials, siding materials or transite panels, instead, such employer is required to train employees who perform such work by
facilities, protective clothing, decontamination procedures, emergency procedures, and waste disposal procedures, and any necessary instruction in tho use of these controls
ASARCO ELP 0000796
l
, of .id
J <iion tan ; the d
Federal Uroster-V Vol. 59. No. 153 / Wednesday. August 10. 1994 / Rules and Regulations 41137
: It wnrtr chull ho
supervisea oy a competent person as defined in paragraph fb) of this section.
(ii) For all indoor Class II jobs, where the.employer has not produced a negative exposure assessment pursuant to paragraph (f)U)(iii) of this section, or j=-woere during the job changed V conditions indicate there may be f exposure above the PEL or where the""^ " employer does not remove the ACM in \
a substantially intact state, die employe! shall use one of the following methods to ensure that airborne asbestos does noi migrate from the regulated area:
(A) Critical barriers shail be placed over all openings to the regulated area; or, --^
(B) The employer shall use another barrier or isolation method which prevents the migration of airborne asbestos from the regulated area, as verified by perimeter area monitoring or clearance monitoring which meets the criteria set out in paragraph (g)(4)(i)(B)(2) of this section.
(iii) Impermeable dropcloths shall be placed on surfaces beneath all removal
delamination. Rip-up of resilient sheet to the ground via covered dust-tight
floor material is prohibited.
chute, crane or hoist, or placed in an
(D) All scraping of residual adhesive impervious waste bag or wrapped in
and/or backing shall be performed using plastic .sheeting and lowered to the
wet methods.
groundno later than the end of the work
(E) Dry sweeping is prohibited.
shift.
(F) Mechanical chipping is prohibited
(D) Nails shall be cut with flat, sharp
unless performed in a negative pressure instruments.
enclosure which meets the requirements (iv) When removing gaskets
of paragraph (g)(5)(iv) of this section.
containing ACM. the employer shall
(G) Tiles shall be removed intact,
ensure that the following work practices
unless the employer demonstrates that are followed;
intact removal is not possible.
(A) If a gasket is visibly deteriorated
(H) When tiles are heated and can be and unlikely to be removed intact,
removed intact, wetting may be omitted. removal shall be undertaken within a
(I) Resilient flooring material
glovebag as described in paragraph
including associated mastic and backing (g)(5)(H) of this section.
shall be assumed to be asbestos-
(B) The gasket shall be thoroughly
containing unless an industrial
wetted with amended water prior to its
hygienist determines that it is asbestos- removal.
free using recognized analytical
(C) The wet gasket shall be
techniques.
immediately placed in a disposal
(ii) For removing roofing material
container.
which contains ACM the employer shall (D) Any scraping to remove residue
ensure that the following work practices must be performed wet
are followed;
(v) When performing any other Class
(A) Roofing material shall be removed II removal of asbestos containing
in an intact state to the extent feasible. material for which specific controls
(B) Wet methods shall be used whore have not been listed in paragraph
feasible.
(gj(8)(iv) (A) through (D) of tbit section,
(C) Cutting machines shall be
the employer shell ensure that the
continuously misted during use, unless following work practices an complied
a competent person determines that
with.
misting substantially decreases worker
(A) The material shall be thoroughly
safety.
wetted with amended water prior and
(D) All loose dust left by the sawing during its removal.
operation must be HEPA vacuumed
(B) The material shall be removed In
immediately.
an intact state unless the employer
(E) Unwrapped or unbagged roofing demonstrates that intact removal la not
material shall be immediately lowered possible.
to the ground via covered, dust-tight
(C) Cutting, abrading or breaking the
chute, crane or hoist, or placed in an
material shall be prohibited unless the
impermeable waste bag or wrapped in employer can demonstrate that methods
plastic sheeting and lowered to ground less likely to result in asbestos fiber
no later than the end of the work shift. release are not feasible.
(F) Upon being lowered, unwrapped
() Asbestos-containing material
material shall be transferred to a closed removed, shall be immediately bagged
receptacle in such manner so as to
or wrapped, or kept wetted until
preclude the dispersion of dust.
transferred to a closed receptacle, no
(G) Roof level heating and ventilation later than the end of the work shift
air intake sources shall be isolated or
(vi) Alternative Work Practices and
the ventilation system shall be'shut
Controls. Instead of the wod practices
down.
and controls listed in paragraph (g)(8) (iT
(iii) When removing cemur.titious
through (v) of this section, the employer
asbestos-containing siding and shingles may use different or modified
or transits panels containing ACM. the engineering and work pracdcs controls
employer snail ensure that the following if the following provisions an complied
work practices are followed:
with.
(A) Cutting, abrading or breaking
(A) The employer shall demonstrate
siding, shingles, or transito panels, shall by data representing employee exposure
be prohibited unless the employer can during the use of such method under
demonstrate that methods less likely to conditions which closely reeemhls the
result in asbestos fiber release cannot bo conditions under which the method is
used.
to be used, that employee exposure will
(B) Each panel or shingle shall bo
not exceed the PELs under any .
sprayed with amended water prior to
anticipated circumstances.
removal.
(B) A competent person shill evaluato
(C) Unwrapped or unbagged panels or the work area, the projected work
shingles shall be immediately lowered practices and the engineering controls.
ASARCO ELP 0000797
JRN-30-1997 08:20
RSRRCO Tucson 3d Floor
520 798 7783 r.0<vlu
2. If the potentially friable areas are inside a section of A/C pipe, wrap and seal the outside ends of the pipe with plastic and then handle the pipe as ACM. See Section 1.3.S, Handling and Disposal of Nonfriable ACM.
3. If portions of the facility component or A/C pipe are still potentially friable after taking steps 1 and 2, adequately wet the facility component or section of pipe, and if possible, store the wet pieces in 55-gallon drums, covered roll-off boxes, plastic lined boxes, or an equivalent leak-tight container until a third party can remove the RaCM from the property. See Section 1.3.6, Handling and Disposal of Friable ACM / RACM.
Note: If the RACM created by or during an activity exceeds the threshold quantity, the NESllAP notification requirements apply. Sec Section 1.3.5, Threshold Quantities of RACM, and Section 1.4, NESHAJP Notification.
1.3.8 Handling and Disposal of Nonfriable ACM
ACM shall be handled carefully to avoid disturbing or creating RACM. During renovation or demolition of a pipeline, care must be taken not to intentionally "stab" or crush sections of A/C pipe with equipment. The Arizona Department of Environmental Quality has determined these actions are lilrely to create RACM.
The moving or dislodging of a pipeline does not require a notice of renovation unless the Building Inspector determines a threshold quantity is affected.
The disposal of ACM is not regulated under NESHA.P therefore the material may be treated as a solid waste and disposed of in on-site landfills. However, care must be taken not to crush ACM including A/C pipe during disposal. Obviously, the disposed ACM may crush when covered, but as long as it is not exposed to the air, this is acceptable.
In some cases, the Contractor / Supervisor or Building Inspector may determine that leaving an A/C pipeline buried is the most effective means of managing the ACM. This is acceptable provided the Contractor / Supervisor or Building Inspector contacts the Engineering / Planning Department and a determination is made that the burial site area will not be impacted in the foreseeable future.
Similarly, covering ACM floor and ceiling tiles may be preferable to replacement. In many cases, covering ACM will reduce potential asbestos exposure.
Installation of new or non-RACM A/C pipe does not require the presence of a certified Contractor / Supervisor. Nonetheless, necessary precautions shall be taken to prevent transite pipe from becoming RACM through improper handling procedures. Note: OSHA facilities require trained personnel for all ACM handling activies.
ACM shall H2I be disposed of in tailing, leach dump or waste dump facilities. Even though ACM is not regulated under NESHAP, it is still a solid waste and therefore prohibited in these facilities.
1.4 NESHAP NOTIFICATION
1.4.1 In General
In addition to the legal notification requirements outlined below, the Environmental Department at ^6 the ASARCO complex or unit should be notified prior to any planned on-site renovation or
demolition.
Page 6 of 7
ASARCO ELP 0000798
JAN-30-199? 08:20
ASARCO Tucson 3d Floor
r.520 ?98 ?783
08/Id
For activities at the Ray Complex (Pinal County), original notice must be sent to the Asbestos NESHAP Coordinator, Pinal County Air Quality Control District, P.O. Box 987, Florence, Arizona 85232, and a copy sent to the NESHAP Coordinator, ADEQ, 3033 N. Central Avenue, Phoenix, Arizona 85012.
For activities at the Mission Complex and Silver Bell Unit (Pima County), original notice must be sent to the Asbestos NESHAP Coordinator, Pima County Department of Environmental Quality (PDEQ), 130 W. Congress Street, 3rd Floor, Tucson. Arizona 86701, and a copy sent to the NESHAP Coordinator, ADEQ, 3033 N. Central Avenue, Phoenix. Arizona 85012.
For activities in Texas, original notice must be sent to
1.4.2 Requirements
If the Building Inspector determines the renovation activity will affect or has affected RACM in
excess of the threshold quantity, or if the_activity is a demolition, the following notification
requirements apply:
1,
1. Notice must be made on ADEQ's standardized NESHAP Notification of Demolition and Renovation form- ^be-Att2chmeni No. 1.
2. Notice must be postmarked or delivered:
at least ten (10) working days before the activity begins, or
by December 21 of the year preceding the year in- which the combined amounts from nonschcduled operations are expected to exceed a threshold
quantity (See Attachment No. 3, Draft Annual Renovation Notification letter), or
no later than the following working day if an emergency renovation is required and the operation exceeds a threshold quantity.
3. Notice must be updated if the quantity of RACM affected increases by 20%, or if the date of the activity changes from that reported on the original notice.
Page 7 of 7
ASARCO ELP 0000799
JAN-30-199? 08:21
ASARCO Tucson 3d Floor
Renovation J)
Inspection for Threshold Quantity of RACM
%
520 798 7783 r.03/10
Demolition
Inspection for Threshold Quantity of RACM
IfRACMis:
- less than 260 linear feet pipe, or
- less than 160 square feet facility components, or
- less than 35 cubic feet off facility components where the area could not be measured previously
IfRACMis:
- at least 260 linear feet pipe, or
at least 160 square feet facility components, or
- at least 35 cubic feet off facility components where the area could not be measured previously
IfRACMis:
- at least 260 linear feet pipe, or
- at least 160 square feet facility components, or
at least 35 cubic feet off facility components where the area could not be measured previously
IfRACMis:
less than 260 linear feet pipe, or
- less than 160 square feet facility components, or
- less than 35 cubic feet off facility components where the area could not be measured previously
IfN
RA( fou:
NOT RF/tTJLATFD
UMHEB.NESHAR
State, local or OSHA rules may still apply.
NOTIFICATION REQUIRED
- Use ADEQ's standardized NESHAP Notification of Demolition and Renovation form.
Have notice postmarked or delivered at least 10 working days before activity begins.
- Update notice if quantity of RACM affected increases by 20% or if date of activity changes.
EMISSION CONTROT. REQUIRED
- Remove RACM before activity begins.
- Wet or wrap exposed RACM during stripping, cutting or disjoining and off site removal.
- Avoid applying pressure which would disturb or create RACM.
Create no visible emissions to the outside air.
- Perform activitiy under the direct supervision of a certified Contractor / Supervisor.
- Use ADEQ's standardized NESH/ Notification of Demolition and Renovation form.
- Have notice postmarked or deliver at least 10 working days before acliv begins.
- Update notice if quantity of RAClv. affected increases by 20% or if date < activity changes.
ASARCO ELP 0000800