Document 5LgkEdMVN2OnRq22d2OyOZxMN

Wednesday, August 10. 1994 / Rules and Regulations 41141 (B) Performing tests of the material containing PACM which demonstrate that no asbestos is present in the material. Such tests shall inciude analysis of 3 bulk samples of each homogeneous area of PACM collected in a randomly distributed manner. The tests, evaluation and sample coilecuon shall be conducted by an accredited inspector or by a CIH. Analysis of samples snail be performed by persons or laboratories with proficiency demonstrated by current successful participation in a nationally recognized testing program such as the National Voluntary Laboratory Accreditation Program (NVLAP) of the National Institute for Standards and Technology (NIST) of the Round Robin for bulk samples administered by the American Industrial Hygiene Association (A1HA) or an equivalent nationally-recognized round robin testing program. (5) At the entrance to mecnamcai rooms/areas in which employees reasonably can be expected to enter and which contain thermal system insulation and surfacing ACM/PACM. the building owner shall post signs which identify the material which is present, its location, and appropriate work practices which, if followed, will ensure that ACM and/or PACM will not be disturbed. (6) Signs, (i) Warning signs that demarcate the regulated area shall be provided and displayed at each location where a regulated area is required to be established by paragraph (e) of this section. Signs shall be posted at such a distance from such a location that an employee may read the signs and take necessary protective steps before entering the area marked by the signs. (ii) The warning signs required by !).)(6) of this section shall bear the following information. DANGER ASBESTOS CANCER AND LUNG DISEASE HAZARD AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTION CLOTHING ARE REQUIRED IN THIS AREA (7) Labels, (i) Labels shall be affixed to all products containing asbestos and to all containers containing such products, including waste containers. Where feasible, installed asbestos products shall contain a visible label. (ii) Labels shall be printed in large, bold letters on a contrasting background. (iii) Labels shall be usod in accordance with the requirements of 29 CFR 1910.1200(f) of OSHA's Hazard Communication standard, and shall providing a training course which contain the following information: includes as a minimum ail the elements included in paragraph (k)(8)(vi) of this DANGER CONTAINS ASBESTOS FIBERS AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD section and in addition, the specific work practices and engineering controls set forth in paragraph (g) which specifically relate to that category. Such (iv) [Reserved! (v) Labels shall contain a warning course shall include "hands-on" training and shall i-iI-p at Ipast ft btun- statement against breathing asbostos " ' (Ivj Training lor CTass ill employees fibers. shall be the equivalent in curriculum (vi) The provisions for labels required and training method to the 16-hour by paragraphs (k)(2)(i) through (k)(2)(iii) Operations and Maintenance course do not apply where: (A) Asoes'tos fibers have been modified by a bonding agent, coating, binder, or other material, provided that the manufacturer can demonstrate that, during any reasonably foreseeable use. handling, storago. disposal, processing, developed by EPA for maintenance and custodial workers who conduct activities that will result in the v disturbance of ACM. (See 40 CFR ' AJ 763.92(a)(2)]. Such course shall include "hands-on" training in the use of respiratory protection and work <xpf*rc' or transportation, no airborne practices and shall lake at least 16 Course, concentrations of asbestos fibers in hours. ,. excess of the permissible exposure limit (v) Training for employees performing v and/or excursion limit will be released, Class IV operations shall be the 'jsc ( or equivalent in curriculum and training (B) Asbestos is present in a product in method to the awareness training course concentrations less than 1.0 percent by developed by EPA for maintenance and weight. (vii) When a building owner/or custodial workers who work in buildings containing asbestos- employer identifies previously installed containing material. (See 40 CFR 7C3.92 PACM and/or ACM, labels or signs shall (a)(1)]. Such course shall include be affixed or posted so that employees will be notified of what materials available information concerning the locations of PACM and ACM, and contain PA.CM and/or ACM. The employer shall attach such labels in asbestos-containing flooring material, or flooring material where the absence of areas where they will clearly be noticed asbestos has not been certified; and by employees who are likely to be exposed, such as at the entrance to instruction in recognition of damage, deterioration, and delamination of mechanical room/areas. Signs required asbestos containing building materials. by paragraph (k)(5) of this section may Such a course shall take at least 2 hours. be posted in lieu of labels so long as (vi) The training program shall be they contain information required for conducted in a manner that the labelling. (8) Fmnlnvee information and employee is able to understand. In addition to the content required by `training, (i) The employer snail, at no provisions in paragraph (k)(8)(iii) of this cost to the employee, institute a training section, the employer shall ensure that program for all employees who install each such employee is informed of the asbestos containing products and for all following: employees who perform Class 1 through (A) Methods of recognizing asbestos, IV asbestos operations, and shall ensure including the requirement in paragraph their participation in the program. (k)(l) of this section to presume that (ii) Training shall be provided prior to certain building materials contain or at the time of initial assignment and asbestos: at least annually thereafter. (B) The health effects assodatod with (iii) Training for Class I and II operations shall be the equivalent in asbestos exposure; (C) The relationship between smoking curriculum, training method and length to the EPA Model Accreditation Plan (MAP) asbestos abatement worker and asbestos in producing lung cancer; (O) The nature ofoperations that could result in exposure to asbestos, tho training (40 CFR Part 763. Subpart E. Appendix C.). For employers whose Class II work with asbestos-containing material involves only the removal and/ importance of necessary protective controls to minimize exposure including, as applicable, engineering controls, work practices, respirators, or disturbance of one generic category of housekeeping procedures, hygiene building material, such as roofing materials, flooring materials, siding materials or transite panels, instead, such employer is required to train employees who perform such work by facilities, protective clothing, decontamination procedures, emergency procedures, and waste disposal procedures, and any necessary instruction in tho use of these controls ASARCO ELP 0000796 l , of .id J <iion tan ; the d Federal Uroster-V Vol. 59. No. 153 / Wednesday. August 10. 1994 / Rules and Regulations 41137 : It wnrtr chull ho supervisea oy a competent person as defined in paragraph fb) of this section. (ii) For all indoor Class II jobs, where the.employer has not produced a negative exposure assessment pursuant to paragraph (f)U)(iii) of this section, or j=-woere during the job changed V conditions indicate there may be f exposure above the PEL or where the""^ " employer does not remove the ACM in \ a substantially intact state, die employe! shall use one of the following methods to ensure that airborne asbestos does noi migrate from the regulated area: (A) Critical barriers shail be placed over all openings to the regulated area; or, --^ (B) The employer shall use another barrier or isolation method which prevents the migration of airborne asbestos from the regulated area, as verified by perimeter area monitoring or clearance monitoring which meets the criteria set out in paragraph (g)(4)(i)(B)(2) of this section. (iii) Impermeable dropcloths shall be placed on surfaces beneath all removal delamination. Rip-up of resilient sheet to the ground via covered dust-tight floor material is prohibited. chute, crane or hoist, or placed in an (D) All scraping of residual adhesive impervious waste bag or wrapped in and/or backing shall be performed using plastic .sheeting and lowered to the wet methods. groundno later than the end of the work (E) Dry sweeping is prohibited. shift. (F) Mechanical chipping is prohibited (D) Nails shall be cut with flat, sharp unless performed in a negative pressure instruments. enclosure which meets the requirements (iv) When removing gaskets of paragraph (g)(5)(iv) of this section. containing ACM. the employer shall (G) Tiles shall be removed intact, ensure that the following work practices unless the employer demonstrates that are followed; intact removal is not possible. (A) If a gasket is visibly deteriorated (H) When tiles are heated and can be and unlikely to be removed intact, removed intact, wetting may be omitted. removal shall be undertaken within a (I) Resilient flooring material glovebag as described in paragraph including associated mastic and backing (g)(5)(H) of this section. shall be assumed to be asbestos- (B) The gasket shall be thoroughly containing unless an industrial wetted with amended water prior to its hygienist determines that it is asbestos- removal. free using recognized analytical (C) The wet gasket shall be techniques. immediately placed in a disposal (ii) For removing roofing material container. which contains ACM the employer shall (D) Any scraping to remove residue ensure that the following work practices must be performed wet are followed; (v) When performing any other Class (A) Roofing material shall be removed II removal of asbestos containing in an intact state to the extent feasible. material for which specific controls (B) Wet methods shall be used whore have not been listed in paragraph feasible. (gj(8)(iv) (A) through (D) of tbit section, (C) Cutting machines shall be the employer shell ensure that the continuously misted during use, unless following work practices an complied a competent person determines that with. misting substantially decreases worker (A) The material shall be thoroughly safety. wetted with amended water prior and (D) All loose dust left by the sawing during its removal. operation must be HEPA vacuumed (B) The material shall be removed In immediately. an intact state unless the employer (E) Unwrapped or unbagged roofing demonstrates that intact removal la not material shall be immediately lowered possible. to the ground via covered, dust-tight (C) Cutting, abrading or breaking the chute, crane or hoist, or placed in an material shall be prohibited unless the impermeable waste bag or wrapped in employer can demonstrate that methods plastic sheeting and lowered to ground less likely to result in asbestos fiber no later than the end of the work shift. release are not feasible. (F) Upon being lowered, unwrapped () Asbestos-containing material material shall be transferred to a closed removed, shall be immediately bagged receptacle in such manner so as to or wrapped, or kept wetted until preclude the dispersion of dust. transferred to a closed receptacle, no (G) Roof level heating and ventilation later than the end of the work shift air intake sources shall be isolated or (vi) Alternative Work Practices and the ventilation system shall be'shut Controls. Instead of the wod practices down. and controls listed in paragraph (g)(8) (iT (iii) When removing cemur.titious through (v) of this section, the employer asbestos-containing siding and shingles may use different or modified or transits panels containing ACM. the engineering and work pracdcs controls employer snail ensure that the following if the following provisions an complied work practices are followed: with. (A) Cutting, abrading or breaking (A) The employer shall demonstrate siding, shingles, or transito panels, shall by data representing employee exposure be prohibited unless the employer can during the use of such method under demonstrate that methods less likely to conditions which closely reeemhls the result in asbestos fiber release cannot bo conditions under which the method is used. to be used, that employee exposure will (B) Each panel or shingle shall bo not exceed the PELs under any . sprayed with amended water prior to anticipated circumstances. removal. (B) A competent person shill evaluato (C) Unwrapped or unbagged panels or the work area, the projected work shingles shall be immediately lowered practices and the engineering controls. ASARCO ELP 0000797 JRN-30-1997 08:20 RSRRCO Tucson 3d Floor 520 798 7783 r.0<vlu 2. If the potentially friable areas are inside a section of A/C pipe, wrap and seal the outside ends of the pipe with plastic and then handle the pipe as ACM. See Section 1.3.S, Handling and Disposal of Nonfriable ACM. 3. If portions of the facility component or A/C pipe are still potentially friable after taking steps 1 and 2, adequately wet the facility component or section of pipe, and if possible, store the wet pieces in 55-gallon drums, covered roll-off boxes, plastic lined boxes, or an equivalent leak-tight container until a third party can remove the RaCM from the property. See Section 1.3.6, Handling and Disposal of Friable ACM / RACM. Note: If the RACM created by or during an activity exceeds the threshold quantity, the NESllAP notification requirements apply. Sec Section 1.3.5, Threshold Quantities of RACM, and Section 1.4, NESHAJP Notification. 1.3.8 Handling and Disposal of Nonfriable ACM ACM shall be handled carefully to avoid disturbing or creating RACM. During renovation or demolition of a pipeline, care must be taken not to intentionally "stab" or crush sections of A/C pipe with equipment. The Arizona Department of Environmental Quality has determined these actions are lilrely to create RACM. The moving or dislodging of a pipeline does not require a notice of renovation unless the Building Inspector determines a threshold quantity is affected. The disposal of ACM is not regulated under NESHA.P therefore the material may be treated as a solid waste and disposed of in on-site landfills. However, care must be taken not to crush ACM including A/C pipe during disposal. Obviously, the disposed ACM may crush when covered, but as long as it is not exposed to the air, this is acceptable. In some cases, the Contractor / Supervisor or Building Inspector may determine that leaving an A/C pipeline buried is the most effective means of managing the ACM. This is acceptable provided the Contractor / Supervisor or Building Inspector contacts the Engineering / Planning Department and a determination is made that the burial site area will not be impacted in the foreseeable future. Similarly, covering ACM floor and ceiling tiles may be preferable to replacement. In many cases, covering ACM will reduce potential asbestos exposure. Installation of new or non-RACM A/C pipe does not require the presence of a certified Contractor / Supervisor. Nonetheless, necessary precautions shall be taken to prevent transite pipe from becoming RACM through improper handling procedures. Note: OSHA facilities require trained personnel for all ACM handling activies. ACM shall H2I be disposed of in tailing, leach dump or waste dump facilities. Even though ACM is not regulated under NESHAP, it is still a solid waste and therefore prohibited in these facilities. 1.4 NESHAP NOTIFICATION 1.4.1 In General In addition to the legal notification requirements outlined below, the Environmental Department at ^6 the ASARCO complex or unit should be notified prior to any planned on-site renovation or demolition. Page 6 of 7 ASARCO ELP 0000798 JAN-30-199? 08:20 ASARCO Tucson 3d Floor r.520 ?98 ?783 08/Id For activities at the Ray Complex (Pinal County), original notice must be sent to the Asbestos NESHAP Coordinator, Pinal County Air Quality Control District, P.O. Box 987, Florence, Arizona 85232, and a copy sent to the NESHAP Coordinator, ADEQ, 3033 N. Central Avenue, Phoenix, Arizona 85012. For activities at the Mission Complex and Silver Bell Unit (Pima County), original notice must be sent to the Asbestos NESHAP Coordinator, Pima County Department of Environmental Quality (PDEQ), 130 W. Congress Street, 3rd Floor, Tucson. Arizona 86701, and a copy sent to the NESHAP Coordinator, ADEQ, 3033 N. Central Avenue, Phoenix. Arizona 85012. For activities in Texas, original notice must be sent to 1.4.2 Requirements If the Building Inspector determines the renovation activity will affect or has affected RACM in excess of the threshold quantity, or if the_activity is a demolition, the following notification requirements apply: 1, 1. Notice must be made on ADEQ's standardized NESHAP Notification of Demolition and Renovation form- ^be-Att2chmeni No. 1. 2. Notice must be postmarked or delivered: at least ten (10) working days before the activity begins, or by December 21 of the year preceding the year in- which the combined amounts from nonschcduled operations are expected to exceed a threshold quantity (See Attachment No. 3, Draft Annual Renovation Notification letter), or no later than the following working day if an emergency renovation is required and the operation exceeds a threshold quantity. 3. Notice must be updated if the quantity of RACM affected increases by 20%, or if the date of the activity changes from that reported on the original notice. Page 7 of 7 ASARCO ELP 0000799 JAN-30-199? 08:21 ASARCO Tucson 3d Floor Renovation J) Inspection for Threshold Quantity of RACM % 520 798 7783 r.03/10 Demolition Inspection for Threshold Quantity of RACM IfRACMis: - less than 260 linear feet pipe, or - less than 160 square feet facility components, or - less than 35 cubic feet off facility components where the area could not be measured previously IfRACMis: - at least 260 linear feet pipe, or at least 160 square feet facility components, or - at least 35 cubic feet off facility components where the area could not be measured previously IfRACMis: - at least 260 linear feet pipe, or - at least 160 square feet facility components, or at least 35 cubic feet off facility components where the area could not be measured previously IfRACMis: less than 260 linear feet pipe, or - less than 160 square feet facility components, or - less than 35 cubic feet off facility components where the area could not be measured previously IfN RA( fou: NOT RF/tTJLATFD UMHEB.NESHAR State, local or OSHA rules may still apply. NOTIFICATION REQUIRED - Use ADEQ's standardized NESHAP Notification of Demolition and Renovation form. Have notice postmarked or delivered at least 10 working days before activity begins. - Update notice if quantity of RACM affected increases by 20% or if date of activity changes. EMISSION CONTROT. REQUIRED - Remove RACM before activity begins. - Wet or wrap exposed RACM during stripping, cutting or disjoining and off site removal. - Avoid applying pressure which would disturb or create RACM. Create no visible emissions to the outside air. - Perform activitiy under the direct supervision of a certified Contractor / Supervisor. - Use ADEQ's standardized NESH/ Notification of Demolition and Renovation form. - Have notice postmarked or deliver at least 10 working days before acliv begins. - Update notice if quantity of RAClv. affected increases by 20% or if date < activity changes. ASARCO ELP 0000800