Document 5LQm0bJrEQbJJv1Qd222kYjgV

Brown 7Root,Inc. Post Office Box Three, Houston. Texas 77001 December 17, 1979 Construction Services, Inc. P.0. Box 96407 Houston, Texas 77013 Attn: Don Burchfield Subject: Subcontract No. 27-4207-5003 "Provide & Install Insulation" Ethyl Corp. Pasadena, Texas Dear Mr. Burchfield: The attached fully executed copy of Subject Subcontract No. 27-4207-5003 is for your files. Very truly yours, Subcontracts Department Procurement Division (01-115) (676-8452) DLS/gl Enclosure bcc: R. Cadwell j~Kernan ' J. Morrow J. Brooks RF/RMB RF/CIRC FILE: S/C 27-4207-5003 FILE: Alpha 00006 Form P-1C0 (1-7) Brown crRoot.Inc. SUBCONTRACT Job Number -- Subcontract No. _______ ETHYL PLANT PROJECT (Project) PROVIDE AND INSTALL INSULATION (Sublet Work) NOVEMBER 19. 1979 (Effective Date) 27-4207 27-4207-5003 THIS SUBCONTRACT, by and between BROWN & ROOT, INC., a Texas Corporation. P. 0. BOX 3. HOUSTON, TEXAS 77001, "GENERAL CONTRACTOR" and, CONSTRUCTION SERVICES, INC. Corporation (Corporation, Proprietorship, Partnenhtp) .under laws of. Texas (State) whose address is. P. 0. Box 96407, Houston, Texas 77013 "SUBCONTRACTOR," whose contractor's license number under laws 0f tiot Applicable Not Applicable _ entered into as of the EFFECTIVE DATE stated above, * WITNESSETH: In consideration -of the mutual promises herein contained General Contractor and Subcontractor agree, promise, and obligate themselves as follows: 1. Subcontractor promises to perform the Sublet Work for The Protect in accordance with the Contract Documents. 2. Genera1 Contractor promises to pay Subcontractor, for full, accurate and timely performance of the Sublet Work in accordance herewith, the Price and other payments, and promises to perform all of the other obligations of General Contractor, as set forth in the Contract Documents. 3. The Contract Documents constituting this Subcontract consist o(: a. "Subcontract Terms" and exhibits thereto. b. "Special Conditions" and exhibits thereto. c. "General Conditions" p--5Q t --79 d- "Affidavit for Subcontractor" Project Account Code 3F68t' 9373 [S' Vendor Code No. 03 86U3CY______ Pigt ) of 2 Net Price;? 33, ?S~0- Terms: Jr-eirea r/i ///rfj 00007 Form F-1*0-01 (V7t) Subcontract No. 27--4207--,5003 The foregoing constitute) the entire contract, and supersede all prior proposals, negotiations, agreements, awards, letter of intent and written or oral statements, representations or agreements. 4. The Effective Date set forth above is the date as to which ail Contract Documents and provisions thereof have reference for purposes of coordination of their meaning and effect. The price relates to the Sublet Work as described m drawings, specifications and other Contract Documents m their condition or. that date. Changes after the effective date will be dealt with in accordance with the provision for changes. Any work commenced and any payment made pursuant to an Award or Letter of intent prior to the execution hereof shall be deemed to have been done and paid after the Effective Date under the terms of this Subcontract. GENERAL CONTRACTOR: BROWN & ROOT, INC. Bv: jht/j&n JAiJkJD /j*. D. E. Newton, Jr. Vice President - Procurement Date: SUBCONTRACTOR: _________ CONSTRUCTION SERVICES. INC. By:. Title:. Date: 57/A/4 7Z>/ls Page 2 o' 2 00008 Page 1 of 5 SUBCONTRACT TERMS SUBCONTRACT NO. 27-4207-5003 1. SUBLET WORK 1.1 The Sublet Work, in general, is to furnish, deliver and install in sulation as specified hereunder for Alcohol Tower C--708 and Reboiler E-724 in addition to all associated piping, heads, manways, filters and Alcohol Tower sump and piping at the Ethyl Corporation site in Pasadena, Texas. 1.2 More specifically, the Subcontractor agrees to perform the Sublet Work which consists of furnishing all labor, materials, tools, scaffolding, construction equipment, supervision, taxes, insurance and all accounting, management and administration, and all other things necessary (except for that described in Subcontract Term No. 3 herein) to perform the Sublet Work described herein for the Project at the above described location. All sublet Work shall be performed in accordance with and pursuant to the requirements of the drawings and specifications described in Subcontract Term No. 2 hereunder, and all other provisions of the Subcontract Documents. 2. DRAWINGS AND SPECIFICATIONS 2.1 The Sublet Work shall be performed in accordance with, and all Bill of Material quantities developed by the Subcontractor shall comply and conform to the requirements ofj the project drawings and specifications Identified hereunder, in addition to the Reboiler E-724 and associated piping drawings which are not identified herein but may be forthcoming; all of which are hereby incorporated into ' this Subcontract by reference: 2.1.1 All drawings listed on attached "Drawing List 2.1.2 Drawing Description Drawing Number Alcohol Tower (elevation) Alcohol Tower (Detail of skirt base, etc.) Alcohol Tower (Detail of sump, etc.) Vertical Manway Alcohol Tower (Detail of Chimney Tray, etc.) Alcohol Tower (Detail of Vessel, etc.) 79-2029-1A 79-2029-1C 79-2029-ID 79-2029-1E 79-2029-1H 79-2029-1J 2.1.3 Ethyl Corp. specification No. SP-92-1 "Hot Insulation". 00009 SUBCONTRACT TERMS -2- S/C No. 27-4207-5003 2. DRAWINGS AND SPECIFICATIONS - (Continued) 2.1 Continued 2.1.4 Sublet Work shall include the following in addition to those stated above: A. Manway covers shall be insulated in a manner to allow removal of covers without damaging insulation. B. Repair of three (3) linear feet of pipe insulation at all tie-in points. C. All risers shall be insulated after vessel is erected. D. Insulation of Tower shall be notched over steam tracing as necessary to allow insulation to maintain a flat exterior surface. E. In addition to being insulated with the specified calcium silicate insulation, Reboiler and Reboiler Heads shall be weatherproofed with sixteen (16) gage galvanized steel. Insulation and weatherproofing shall be installed such that heads may be removed without damaging insulation or weatherproofing. 2.1.5 Vessel support areas which, as a result of not being able to maneuver the vessels while on the ground, cannot be reached shall be insulated after the vessels have been erected. 2.1.6 Alcohol Tower C-708 is steam traced as follows: A. 1/2 inch steel tubing > B. 50 foot steel tubing lengths C. tubing joints are raised at a level to be outside the insulation D. sump of Alcohol Tower C-708 and associated piping is also steam.traced. 3. FURNISHED BY GENERAL CONTRACTOR General Contractor shall furnish to Subcontractor the following items: 3.1 Potable water and 110 volt electrical supply for small tools. 00010 SUBCONTRACT TERMS -4- S/C No. 27-4207-5003 5. SUBCONTRACT PRICE - (Continued) 5.2 Any Change Orders necessitated as a result of Scope Changes made by General Contractor shall be priced in accordance with subcontract No. 27-4060-5024 dated April 4, 1979 inclusive of Change Order No. Two (2) dated November 12, 1979. 6. PAYMENT AND PERFORMANCE BONDS As of the effective date of this Subcontract, Subcontractor is required to furnish separate 1002 Payment and Performance Bonds, each in the total amount of the Subcontract Price for the following reimbursable premium rate and from the following surety company: Bond Rate: $6.00 per $1000 Surety Company: United States Fidelity and Guarantee of Orange, Texas The Bond premiums must be invoiced separate from the Sublet Work and shall be accompanied by paid invoices from the surety company. 7. AFFIDAVITS Two copies of the General Contractor's "Affidavit for Subcontractor" (Form P-7) are attached for use in implementing the provisions of General Condition No. 32. Subcontractor shall execute and return one copy with his final or retainage invoice to the address shown in Subcontract Term No. 9. 8. PAYMENT 8.1 The following paragraph supplements Paragraph Number 32 of the General Conditions: Subcontractor shall be paid in monthly progress payments the value of the Sublet Work satisfactorily performed during the preceding month based upon the firm lump sum price detailed and described in Subcontract Term No. 5 less 102 of such value a6 retainage until final completion and acceptance of the Sublet Work by General Contractor. Subcontractor shall prepare and submit an invoice for the proposed monthly progress payments and shall submit supporting documents and proof of payment of all bills for labor and materials, as may be requested by General Contractor. Subcontractor's invoice for proposed monthly progress payments with requested supporting documents and proof of payment of all bills will be submitted for approval by General Contractor and when approved, payment shall be made within thirty days thereafter. Final payment and release of retainage shall be made when the Sublet Work has been satisfactorily completed and accepted and Subcontractor has submitted the affidavit as called for in Subcontract Term 7. 00012 SUBCONTRACT TERMS -5- S/C No. 27-4207-5003 9. INVOICES Subcontractor shall render all invoices to the following: Brown & Root, Inc. 209 N. Main Street Pasadena, Texas 77506 Attn: Accounts Payable 10. INSURANCE Subcontractor shall forward his Certificate of Insurance stating the names of its Insurance Carriers and certifying that its insurance coverages meet the requirements set forth in General Condition No. 12 herein to the following address: Brown & Root, Inc. P. 0. Box 3 Houston, Texas 77001 Attn: D. L. (Don) Seyfert (01-129G) 11. SUBCONTRACTOR * S REPRESENTATIVE Subcontractor shall designate a site representative to the General Con tractor. He or in his temporary absence, his designated assistant shall be "on call" at all hours and shall be in attendance at the work site during working hours from commencement of Sublet Work to completion. The Subcontractor's Representative shall be authorized to act in behalf of the Subcontractor, any instructions given to the Subcontractor's Repre sentative shall be considered as having been given to the Subcontractor. 12. LABOR RELATIONS The Subcontractor represents that its pre-hiring collective bargaining agreements, if any, contain or will contain provisions that, or Subcon tractor has entered into or will enter into a project agreement modifying such collective bargaining agreement to provide that, there shall be no strikes, slowdowns, picketing, secondary boycotts, or work stoppages during the performance of the Sublet Work. Subcontractor will further subcontract only to lower-tier subcontractors having similar provisions in their collective bargaining agreements, if any. 13. WAGE/PRICE GUIDELINES In accepting this Subcontract the Subcontractor warrants that the guide lines established by the President's council on wage and price stability have been adopted voluntarily and that the prices shown are in compliance therewith. 00013 Drawing List Job #35681 ED-30572-0 C-706 Oct. ' 79 ED-30573-0 C-706 Oct. 1 79 ED-30574-0 C-706 Oct. ' 79 ED-30575-0 C-706 Oct. '79 ED-30576-0 C-706 Oct. 1 79 ED-30577-0 C-708 Oct. ' 79 ED-30578-0 C-708 Oct. ' 79 ED-30579-0 C-708 Oct. '79 ED-30580-0 C-708 Oct. 1 79 ED-30581-0 C-708 Oct. ' 79 ED-30582-0 C-708 Oct. ' 79 ED-30583-0 . Pipe Supports Oct. ' 79 ED-30873-0 C-708 Oct. ' 79 ED-30874-0 C-708 Oct. ' 79 ED-30875-0 C-708 Oct. ' 79 ED-30876-0 C-708 Oct. ' 79 ED-30877-0 C-708 Oct. 1 79 ED-30878-0 C-708 Oct. ' 79 ED-30879-0 C-708 Oct. '79 ED-30880-0 C-708 Oct. ' 79 3771-3-50-2320-3 E-725 Foster Wheeler Corp. 3771-3-50-2322-5 E-724 Foster Wheeler Corp. 3771-3-50-2331-4 Install New Tower Foster Wheeler Corp. 3771-3-50-2336-4 Install New Tower Foster Wheeler Corp. 3771-3-50-2349-3 New Lines & Fittings Foster Wheeler Corp. 3771-3-50-2350-4 Install New Tower Foster Wheeler Corp. 3771-3-50-2353-4 New Lines & Fittings Foster Wheeler Corp. 3771-3-50-2362-5 Remove AD25-4 Foster Wheeler Corp. 3771-3-50-2365-5 Added Dim. for PSD'S Foster Wheeler Corp. 3771-3-50-2394-3 Added New Pipe & Fig's Foster Wheeler Corp. 3771-3-50-23108-2 Revised Piping Foster Wheeler Corp. u f T"ENGINEE^4G fctJwl eparTMent Ccxporotton Jf SPECII-' VvTJON SP-V? HOI IIir.lJl.ATIOM Page 1 of 17 Feb 77 ITEM CONTENTS PAGE, 1 GENERAL.................................................' . . 1.1 INTENT.............................................. 1.2 OSHA COMPLIANCE................. '. 1.3 SCOPE............................................. 1.4 LINE LIST ........................................... 1.5 EQUIPMENT LIST............................. 1.6 SPECIAL REQUIREMENTS .... 2 2. 2 2 2 2 2 2 PIPING.............................................. . . . 2.1 MATERIAL......................... .... 2.2 SECUREMENT................................. 2.3 WEATHERPROOFING..................... 2.4 FITTINGS......................... .... . . . 2.5 DETAILS........................ 2.6 HANGERS & SUPPORTS................. . 2.7 SINGLE LAYER................................... 2.8 DOUBLE LAYER................................ 2.9 SUPPORTS.......................................... 3 3 3 3 3 3 3 3 3 3 3 EQUIPMENT.................................................. 3.1 MATERIAL.......................................... 3.2 SECUREMENT...................................... 3.3 WEATHERPROOFING..................... 3.4 DETAILS.............................................. 3.5 IRREGULAR SURFACES................. 4 / 4 4 4 4 TABLE 1, THICKNESS..................................... 5 FIGURE 1 through 4 (Piping)......................... 6-9 FIGURE 5 through 12 (Equipment)................. 10-17 - v?T,5#~C- 00015 Ethyl eENGINEERING department Corporation -- Sf'I.CH-JCAriON SP-92-1 HOT insulation A" Fpeabse772 of .17 1 general A 1.1 INTENT. The intent of this specification is (1) to define the materials to be used for insulation of vessels, equipment, and piping in hot service, and (2) to define certain details of insulation application. The purpose of this insulation is to rbnserve heat (H) and/or to protect personnel (P). Any specific details not covered herein shall be in accordance with best area practice. y 1.2 OSHA COMPLIANCE. All design and construction done in the United States under this specification shall be in strict compliance with the Williams-Steiger Occupational Safety & Health Act of 1970 (84 Slot. 1593, 1600; 29 U.S.C. 655, 657) os revised. 1.3 SCOPE. This specification covers the design cind application of .heat insulation systems . . for piping and equipment (vessels, columns, pumps, etc). It is intended to serve os o basis for contractor's bidding and performance. It is olso intended to serve as a baste y engineering guide to standardize and simplify the solution of recurring insulation proble'msr151TM 1.4 LINE LIST. A separate document, the LINE LIST, indicates the pipe lines to be-insulated in accordance with this specification, insulation thickness will also be specified in the LINE LIST. ' 1 .5 EQUIPMENT LIST. A separate document, the EQUIPMENT LIST, indicates the equipment v Jto be insuloted in accordance with this specification. The insulation thickness will also V be specified in the EQUIPMENT LIST. 1.6 SPECIAL REQUIREMENTS Lower Limit. Surfaces normolly operating at less than 200F shall not be heot insulated unless specifically required for personnel protection or spe.ciol process reasons. b. Personnel Protection. Personnel protection insulotion shell be applied to piping and equipment operating above 150F which may be accidentally touched by personnel, Such hot surfaces shall be insulated to a height of 7* above or 3' to each side of *" " normal wolking or working areas (including platforms ond ladders) . Personnel pro tection insulotion shot! not be continued beyond normal working areas. Alternatively, guards of expanded metal may be used if specified by Ethyl. Volves, Flanges, & Fittings. Valves, flonges, ond fittings, except unions, in steam ond boiler feed writer service shall be insulated. Volves, flanges, and flanged fitting', in iiIIkm vtvi'>". snail i> t iir.i*lnt*'*I <>.< wl -1* |t>ii<*<I foi |x'r'.oniiel protection arial pu , \V<'ld"d ond m i*,\v>,.| linings, except uniuns, * in insuloted lines lill le insulated; exfxmsian |uint\ shrill not be insulated.' d. , Steam Tro;>s, Stuum Imps '.hall not be insuloted :xi.epl !<>r personnel .protection, . Inlet piping to steam hups shall be insulated. Discharge piping which returns to a condensate collection system shall be insulated. Piping which, discharges to o drain shall not be insula'tcd except for personnel protection. Steom Tracing. Steam traced, piping or equipment shall be covered with oversized insulation to inciudc the 'tjqccr dines. Insulation thickness shall be selected from Table j. :Steam traced systems -shrilI be completely insulated including equipment, -waives --jflonges/^ftttihgrjhsjnd "tVaettr'3ine~rloops. .......... U ~F. r .-Hy3rd :^^i^TLSjgul^iertr-3fca:nrbe^prC5tore^tested ^before'the -application of insulation.- .Nome.plates^t>laoKy3l.ntcs'^sJ_a3ii.^not^be--i.'jsuiatcd ...-4nsulntion .surrounding vessel - -- 00016 'ly'i DEPAj?TMENT( Coroaritton EQUIPMENT 3.1 MATERIAL ' i- /mi'm i ,>r-7Y-I JK 1 INSULATION^ I'-dyc '4 ul 1/ Feb, 77 r a. Small Cylindrical. Equipment to 1200F arid 24" and less in diameter shall be insu- Jated with calcium silicate or expanded perlite pipe covering; olJ products shall be asbestos free. Acceptable materials are Colsilite, Colsilite 1200 Keene, Thermasil Celotex, Carcytcmp 1500 Owens Coming, Koylo 10 Johns Manvilie, Thermo 12 Pabco, Super Caltemp NA. -Other materiols may he used with Ethyl Cor[>oration approve I. In periods of materiol shortage, equipment to 400F may be insulctod with Pittsburg Corning Foomglos. b. Large Cylindrical. Equipment to 1200F and larger than 24"-in diameter shall be in-Jjr sulated with curved block or beveled logs of the type and brand name specified in Para a.above, c. Flat. Flat surfaces to 1200F shall be insulated with flat block of the type and brand name specified in Paro 3.1a above. d. Thickness. Insulation thickness shall be os specified in the Equipment List. Insulotion* m thickness for equipment not shown in the Equipment List shall be per Table 1. 3.2 SECUREMENT. Bonds for equipment insulation shall be 3/4" x 0.020" 18-8 stnls stl with 18-8 stnls stl seals, A. J. Gerrord or equal. 12" on centers .* 3.3 WEATHERPROOFING a! Vertical Jacket. Verticol straight shells shall be weatherproofed with 0.016" thick x -1 1/4" corrugated- aluminum with factory ottocheo moisture borricr. b. Horizontal Jacket. Horizontal straight shells shall be weatherproofed with 0.016" thick smooth oluminum with factory attached moisture barrier. c. Vertical Seoms. Vertical scams in oluminum jacketing shall be secured with 2" long x *8 stnls stl sheet me to I screws on 6" centers. d. Circumferential Seams. Circumferential seoms in aluminum jacketing shall be secured with 0 3/4" x 0.070" 18-8 stnls stl band at each slum. Continue to opply bands circumferential ly "ii 18" ri'iih-f, . _e. "Z Clips. Z sup|xirl clip', imi't-: 'from 3/4" x 0.070" r.lnls stl .bund shall l>e installed ' -at the circumferential seams on 18" centers on vertical vessels. 7. Projection*. At all piojcctions. (nozzles, brackets, etc) the necessary cutouts shall be carefully made ond weatherproofed with heat resistant mastic, Foster 95-10 or approved equal up to 350F; above 350F use Eagle Picher Stolostic . g. Heads. Hoods shall be weatherproofed us detailed in Fig 6. ^Alternatively, if eco nomical, available, ond approved by Ethyl, 0 formed cover of 0.020" tnick smooth aluminum with foctory attached moisture barrier moy be used. / 3.4 OETAJLSi/rOeiajis^T equiprrcrrt-L'Jnsuiarion-dial!ie-assiiown in .Figures 5 through "32. ' . --'---43.-5 -TRREGIJCAiR'^SIgRFAC^^^wnj^/^yVfHhes^-ond--other-::wTegular--surfaces shall and weatherproofed'.*5ng~^5s~^esseT~3>eoqs.*' ' -- insulated -- 00018 iwi OEPAR TMENT^ At h*vf l* I- O^ty in lu |lf^ nd * Notf< (iftrn, 1*1 linl orr*Mwy #m fcCQ f. jprr; < Anoi i Jl' 1 H'.'SULAfJON ' fcb 77 V'V r 00020 tNCiN:l:.Wri*. DEPARTMENT 6 jfL( ' A HUN .IK II ISIJLAlK.M i V ru/e u oi i/ Tcb 77 ' i % r 3 !-* !* ' M ^ ?' It l**ff**, lf> oo qu )E>e 4. :.'CU**r jaexfT V> : ir r:0 ft S.tr.*i* $;. J.MI7I MtTAL SCHCwS U< *" CLMCKS. j rninH r.i'Ai Lfu nun ?' snii i me ii..<*!!> wj ti.-suL '.eaT'it :jvcc" a*vO lot H *TA. M'.K.-KI'-M i.3 A7GMM MASTIC (r03H.lt J!.-PI A! UM GRATOM AP.D fol t/lt"' r It 14 thiCici.i IS f l T T11105 l t AKGf.H SMALL hr. II.5U. ATCO W7 A liATfniAL CLMA-'AMAhLr 10 tMf IL'JACr.Nt niPI INSULATION h rAtncPBOOrtO ! cri MAST4C 1,14* CW ULM tilICKUESS 'ME MASTIC SMALL BE BEII.FONCEO "AT BCN Foster r.-trr-A I Ah Pkkt&MMLO ALUMINUM f IT ILNG COVENS A-AY |IE U5E0 IF ECONOMICAL AVAILABLE. < I I,'*' Iiii!>tlih (I. Ill I * <>. I p.,t '..T.l|, ......... ,.A.. U > . .. .. m f caii ;* (i -7. :+ i-- r.iv.t soi *I' ** I* u J ***** ]i *t n Imp) o*n<I 3* w^l*' jot^Al ft imifimtol licrt. typical imping INSULATION HOT SLKV1CC Jh. c. 00022 7, #qI !* # tt flmil (4ti< ( <49 rosTt* t*-to vp to jbor, sstr u*. USE ACLE PtCHl* CTALAS7IC I' M >* ^>1 *>v * Wc^t mi* r ||*| 5>l *M ttffIM /. %*! ir ^wvi # Apply incV r^` 25"CT Al f*y. Mm-r*Fb <fOo oc* 1/16* biul 4*y tiUm fKcfc**ti f ***KM t*l oitvfr*oof**9 veuf keo-H r*g. C. F#f >T>e . IK*-***-TM I iSetl a talKf*+i' 1*x *-* t t--r I iq. I.* r^.or1* ir- ir-u^i ;*wi iiiern K ^ii *. r . I I?' e t KWt fit itfiI jvlH f m r--ii IK- %-*! erkt ^ *">n<i<,, rOSTLH 'Jb*t(| i>th - All** I* **** Kv *t*imKiii iwl- *,f> \l jrUtil v-- > "t. M. . for v*f Iq. 7. ------------ - rif*TirQ^IJiio m I"Hi Wf Imul eo*oco. -- -<-- lA l)i I !< 4*Hy, Joel" "W^f *K**t 1-f M |1 11 iv Wyr. .i1i ir< insulation dltails VCRTICAI VLSSCLS t-Ob // *** ^ ** iti#* Sft p*r>*? ***>##*, f IW*^ ..* *4 JJj. 4t O.OIfr" tKifl j.K.L^i.nq ifV m*tmcK^W. *1^;^ Imttirt l-H IA Q W 4* * k^ A 3*m hofijmttl Afpljr K) > , | * ***** 5TllL5 STL iMtnl *'- U--f * (fAlfft * *.CJV le*?. nmi Q>t ** -wV. -1 *--'< If* p*r<, frt *Z t`-oi W( f*j. It. Am% .* i;t(^, Mttft K l* fW,<A I*n* /, <'*. I.KhM Kw V)*-r m *>f" K**J( rr r ir.SJLAtt Wl REMOVEA3Lt COtftK, if* t'FRSO'ItJEL P0ECH0. IS K*CSSAAY OTHLHt$E, 00 t.Of IKSULAtE. C 00024 MfctlWi K5*SniSrr| 1 ' * * <>r insula n-o nf%i i# Fcl> 77 r 1 r* ,rr **t Mrnl iv.lri ------ Sf> `A*. -- - < U -- !1 *.V***il A)lt (), 7-Clij..' -Hliit'. ' ' :.*: *.!h ^ fs ........... ;ur J* CLMLItT.JM.5S2 f-CK - y* I I , r 00026 vd-U m Ut^AKJ Mmi o (10) 01 (") 'l \t t--7--------- '1 11 . G>- -M ii 11 'f IWSULAJIO fcb 77 ":T6* r ,FOST* **M0 U TO 5^01, mr ur. use CA614 *+MCII STALASTIC 31 * inwl^fon. fm tfpt mm4 fKkkwn ir \ tvd./lr 3 d" .033" IR*t* *rrl inwt " iroerd tr *n (nlt*i *vrt kloct 0;.* ik*l <**v3**d ltM^ i rmtlftf hn*i *' , i d. tn<n in i**0rt *k*ll W 4" *n <0*1ll<el pw-1 *r }' ' ihmji Na, H I 7' SI HUS STt *i*l K>vt r iw #tlml yw\. i S. 3 * .P't1" ***! *! Mt^l *ntr i **mj *r` < *v ^r.p~\ n * I 2 tIfn f .* t) <* w <*k w (> i 1r>^ \0 >k |<Hf 7^*44, 7. t *i *f*wl f~*r m ii^ At pnvkW **4*l*% **M <r pti;, fntiwi *kn*. See) <0>**r> *"* tailtijn* . llv t***7~ 9t #*m f*tmi t> r-. . * rH p) l.< :* * l#ik ***i vnl o>*+**d fr-^r>fn *Uf r*fe*4H4 %*nj. fmrvt flvo**1") * --h}', **** t 4mirn c^wlo**** wjp f >m f | i | ' 10. )** n!r ***! **K*'-U * - Vcb*nfli 3 4' 0^' lpF V~~lei *%* *# ^xrd I ?* r 11. ;%*! J* '*? I iwt *4 JM sot *m**n *((*) all *?*< t"d rr^.*%. I?. P* *** V *4)( > AtlN M^llfll pi<wf fA.{ oylu.. . prr-*l * 7 .'^, !' U# V1*lF4 feii ^ on- la.n -f *S lu mhat*m Hi in ppir^, 13. All,* I* *1J# *. F.ry. f'at ,/** VFuK uirr**1. In u-- |n. II. kl w.ji I*/ (vJ **. -n4*<, M. **n*ry--I ** lu,* *KsiH I* H* vwi. I* **k * *T~n*{ (.<>..UM>**;nl|r nl 4<F.|bHWiUr. In^K l*)w hell lif w*raed *t iUi t*> n^l lr^* INMJ1AUON DI.1AILS HOT SIOIAOU TANKS FIG 9 !TT v2VrV^w/&JSf,*^4K,*!?11! f- 00028 .4"-cLLa.iy'i iji:-rr'r' C&pO'M'nn */. a xettK-AilUTN MQMNSULATl^l f-uge ,6 ot J? Feb 77' r^ i < m I } - - I - . I- . SJL k.THLS ,1 ;*j i ** ii r; / Cup C 'ij.*, I.. *- >|fi.ii| ...... . U~. lT Mt* HORIZONTAL SEAM DETAILS - -VERTICAL'VESSELS f IG. 'l1 00030 c ATTACHMENT* 71 MATERIAL PHICSS POP COfT PIUS 'fOSK I. Calciua Silicate or Expanded Perlite Insulation A. Piping - Price per foot. Thickness Pino Siso 3/1 1 ii z 3 4 6 8 10 12 1" Sl.ll 1.13 1.14 1,18 1.44 1.53 1.6l 1.88 2.19 H/A h/a h/a 1-S" 51.33 1.38 1.46 1.67 1.8/. 2.01 2.09 2.44 2.83 3.S3 5.10 6.00 2" $2.13 2.21 2.34 2.63 2.76 2.56 3.18 3.77 4.82 5.75 7.20 8.02 D. Clock - Price per square foot. (Flat) Thidainss Price 14" $1.14 2 1.52 2* 1.90 3 2.30 C. Scored Block - Price per square foot. Thickness 1-fi" 2 sb 3 Price $1.20 1.6l 2.00 2.40 II. Plain Fiborglas Insulation - Heavy Density A. Piping - Price per foot. Pino Tine i?tiW 3/4 1 1* A 2^ 3 1 6 8 10 1" $ .55 .61 .66 .00 .87 .98 1.08 1.42 1.74 2.52 2.55 3.45 l" 51.16 1.20 1.27 1.45 1.59 1.74 1.81 2.07 2.40 3,10 3.72 ; .25 2" 61.84 1.92 2.03 2.2S 2.40 2.57 2.76 3.19 3.70 4.59 2*50 6.20 00032 e > ** f\l X/tUlVtu4<l t! V. Accessories A* Stainless Steel 1. Tie-wire <5 $2,A0/Lb. 2. Banding a) -1" x ,015 or .020 0 $1.35Ab. b) 3/i" x .015 or .020 C $1.35/lb. 3. Seals a) i" x .020 O $21.30/-!. b) 3/V x .020 O S27.06A. A. ?3 x Sheet Metal Screws Q S17.85/-1. 3. Coatings, Adhesives, Sealants 1. P7A Mastic $7.02/Gal. (5-Gal. Pail) 2. Joint Sealer ? $10.50/Cal. (5-Gal. Fail) 3. Caulking Q ?2.05/i`ube (ll oa. Tube) C. Miscellaneous 1. Glass Hainforcing Fabric (150 bo. ft.) Q $23.86 2. Therron - Std, Grade (5-Gal. Pail) $18.35/Gal. TFK-4 Channels C $1.30 la. TFE-7 Channels O $2.00 Ea, 3. Insulation Cencnt (50? Bag) Q $7*05 4. Fiberglas Tape (l/8" x 2" x 100*) 3 $35.60 00034