Document 5LNr8q5DqOjVqxvJjjqK6nJ2J
ILLINOIS PAINT WORKS GRADS SPECIFICATIONS
AND COST ANALYSIS.
SERO-COTR HOUSE PAINT EXTERIOR HOUSE PAINT Y/HITE 243 3rd QUALITY
PIGMENT 60.89* Lithopone 35$ Leaded Zino Oxide Tltanox B Calcite Y/hiting Asbestine
VEHICLE 38.2$ law Linseed Oil Treated " Driers Mineral Spirits Calculated Yield Mfg. Loss 3$ Actual Yield
LB.
216 216
72 144 216
YIELD IN GALS. UNIT COST TOTAL COST
6.0 4.4 2.0 6.4
9*1
4.34. CWrt'l 6.89 ft 5.91 n
.73 n 1.09 n
9.37
14.88 4.26: 1105 2.35
303.4
59.9
39.4 149.5 1416.2
39.0
7.3
5.8
23.0 10370'
3.0
100.0
o
CD
10.67 i 1.14 Gal .34
t*
32.37 8.32 1.97 1.84
76.41
MaferiaT COa Per Gallon Direct Labor Factory O'Head Bulk Cost Package Cost
Factory C03t Per Gallon In Package
(A) TO A COMPANY OWNED OH CONTROLLED OUTLET (B) TO AN INDEPENDENT WHOLESALER (C) BY COMPANY OWNED OR CONTROLLED OUTLET TO RETAIL CUSTOMER (D) TO AN INDEPENDENT RETAILER (DEALER) (1) TO OTHER (SPECIFY) fh/t*r (Zv*rcxsrsaM CurLerj.
.764 .024 .117 75C5.183
1109
________ ________ ________ ________
/
S3AIHOHV 1VN0IIYN 3H1 1Y C30noOfcJ3a
Q 000251