Document 5LEaxjKQoka4R0gwy3d04EmZe

FILE NAME Caterpillar CAT DATE 1990 Sept 13 DOC CAT044 DOCUMENT DESCRIPTION Unpublished Internal Report - Asbestos Elimination September 13 1990 ASBESTOS ELIMINATION SCOPE Eliminate containing items from the worldwide Parts Distribution network no later than August 25 1994 and prevent a backflow of containing items into the network containing items shall be targeted for elimination in two phases 1 hand part numbers with less than a two 2 year time supply shall be targeted for elimination by August 25 1992 to avoid relabeling except where EPA relief may be granted 2 All other material shall be eliminated by the 1st Quarter of 1994 except where EPA relief may be granted OBJECTIVES The following objectives will be used to develop PDIS System specifications for the elimination of asbestos parts from the Parts Distribution network The following abbreviations are used in the list of objectives A ~ F - containing Asbestos Receive A material only from all sources o All U.S. facilities shall have the capability or resources to inspect receipts for asbestos and identify the material as C or F All facilities shall store A and A items in separate locations As much as possible all / material shall be exhausted from inventory rather than scrapped All production withdrawals from Parts Distribution facilities shall be F material only As of April 1 1990 this objective went into effect under manual controls CAT- 09801 1015420 015 ASBESTOS ELIMINATION -2- September 13 1990 o The flow of A material through the Parts Distribution network shall be in one direction only Effective date December 1. 1990 A. No allocation reallocation or returns of / material to Morton from other Parts Distribution facilities shall be permitted Departments B. No returns.by Depots back to U.S. be permitted shall All Dealer returns shall be inspected and properly identified as A or A Disposition of the material shall be made based on cost of the material and the facility's inventory status All material shall be identified as part number by facility as to asbestos status Appropriate status reports shall be provided to the U. S. Covernment as required by law GENERAL DESCRIPTION The following narrative attempts to describe the functional components of the asbestos elimination project The necessity and urgency of this project are the result of Governmental Regulations requiring the elimination of containing material from products in the U.S. by August 25 1994. These requirements impact the worldwide Parts Distribution network in that the one key aspect of the elimination project will be to prevent the backflow of containing items into any facility which has previously exhausted containing material from its inventory The elimination process will be controlled by part by facility The underlying principle to eliminating containing A items from the Parts Distribution networiks to become asbestos free A at MPDC and push the / material downward in the P.D. network After Morton is A on a given part number Parts Departments then Depots in turn will eliminate their A inventory An asbestos EPA indicator will be established on the P.D. Master file for each facility This indicator will indicate the current inventory status of asbestos candidate a part number as being A A inventory will attempt not A or not an to be eliminated by exhausting stock scrapping of inventory will be done only as a measure of last resort The succeeding topics will describe asbestos elimination efforts by major functional groups 1015421 015 ASBESTOS ELIMINATION 3 September 13 1990 RECEIVING INSPECTION The P.D. Master to indicate the planning indicator 2 field is presently being used receiving status of an asbestos part from source of supply An immediate objective A material at Morton from all of the project is to receive sources as soon as possible only All U.S. facilities must develop adequate inspection procedures for inspecting receipts to identify material as A or A Alternate sources of are unable supply will need to be developed for any or unwilling to provide F material suppliers who STORING LOCATING Another critical component of this project is the ability to maintain separate locations by part number for material known to be - A and material which is know to be / or has the potential of containing mixed stock Receiving systems will need to have the ability to route A receipts to a known A location until an A receipt generates a new A location at which time all subsequent receipts will be rerouted to the A location or set up additional multiple F locations Locations must be properly identified with C or / labels accordingly ORDERFILLING As long as the facility asbestos status indicator reflects the presence of / material at the facility all orderfilling will be done out of identified A locations Once an C location becomes empty a kill transaction should be generated to remove that location from the location file If all C locations have been eliminated the facility EPA indicator must be reset to reflect an A status for the part number All outbound material must also be properly identified with / or A stickers Also have been defined for the project which prohibit A being used to fill production withdrawal orders requirements material from RETURNS ALLOCATIONS REALLOCATIONS ad oe pro ail pro pro 4 ail pro a a) he oe vt Lo i / As mentioned previously one of the most critical requirements of the elimination project will be to prevent the backflow of / items in the P.D. network At Morton all Dealer returns of asbestos part numbers will be inspected for the presence of asbestos identified and dispositioned accordingly No Department or Depot returns will be accepted Likewise P.D. Departments will accept A material from Morton only No Depot returns of asbestos parts will be permitted to the U.S. Departments Once the U.S. Department facilities have exhausted / stock their appropriate inventory status indicators will be reset accordingly P.D. Depots will be the last link in the chain prior to Dealers for exhausting C material Throughout the network no allocation or reallocation of C parts will be allowed which violates the backflow restriction 1015422 015 ASBESTOS ELIMINATION -4&- September 13 1990 TARGET DATES GOVERNMENT REPORTING Two significant target dates have been identified as an integral part of the elimination project They are 1 1st Quarter 1994 - All other A items shall be eliminated this is a cushion to assure compliance with Federal Regulations requiring all A inventories be scrapped no later than February 25 relief may be granted 1995 except where EPA Finally certain reports will be required to be provided to the Federal Government The responsibility for generating the necessary reports will be determined during system requirements planning POIS ESTIMATES Information Services has addressed the elimination of asbestos and is providing the following estimates for the work involved based on the project scope and objectives SYSTEM CHANGE ESTIMATES PDLMS Add the asbestos EPA indicator to the DB2 database Establish separate locations for A material at Morton York and Denver 0 Pass transaction to update PDD master EPA indicator to A when applicable 0 Add EPA indicator to Morton Multiloc file for TICS tag processing ESTIMATED EFFORT - - - - 170 Staff Days Receiving System Morton 0 Identify asbestos type parts at receiving time fe) RTS will pass information to PDLMS which will determine the location Pass EPA indicator to TCAM Tag Print ESTIMATED EFFORT > - - - 7 Staff Days 1015423 015 ASBESTOS ELIMINATION 5 September 13 1990 ne id SYSTEM CHANGE ESTIMATES G^ NT^ Receiving System York & Denver Identify asbestos type parts at receiving time Use prelocation subroutine to determine A location 0 York and Denver transit tags need / identification 0 A secondary receipts must be identified via the Summary Run through SOP and Invoicing to prevent A material from being mixed at York and Denver (a) A production receipts must be identified via the Summary Run to prevent A material from being mixed at York and Denver ESTIMATED EFFORT - - - - 36 Staff Days Locating System York & Denver 2 Identify A locations on York and Denver SAS Overflow file Populate Overflow file with locations containing asbestos Modify relocations subroutine to determine asbestos disposition based on information passed from calling program cs) Produce Summary Run transactiotno set asbestos indicator to / ESTIMATED EFFORT - - - - 100 Staff Days Retrieval System ) Identify and employ FIFO logic for all asbestos parts Pass transactions to update PDD Master when A material is depleted to indicate / ESTIMATED EFFORT - - - - 50 Staff Days 1015424 015 ASBESTOS ELIMINATION 6 SYSTEM CHANGE ESTIMATES CONT'D September 13 1990 Summary Run Add an EPA indicator to the PDD Master for each parts facility to track the status of each asbestos part which is stocked - 0 Not an asbestos candidate 1 F Only : 2 Both A & A Parts - 3 / No Receipt on F Pass EPA indicator along with each Denver tag as a result of a receipt for processing in System and Denver Receiving System Department the SOP ESTIMATED EFFORT - - - - 25 Staff Days TICS Print / or facilities / The on all asbestos parts for nonrevenue EPA indicator would be used in conjunction with the location to identify when going from containing to free EPA indicator to be added to TICS TLOCFILE the part is would have Pass EPA indicator from Multiloc TICS TLOCFILE TLOCFILE must be the indicator and Overflow files to expanded to accommodate ESTIMATED EFFORT - - - - - 25 Staff Days Quality Control 9 Add asbestos sampling routines to existing QC and Met Lab sampling program ESTIMATED EFFORT - - - - 25 Staff Days Order Entry o Use the PDD Master planning indicator 2 EPA indicator once it is established to prevent production facilities from ordering asbestos parts ESTIMATED EFFORT - - -7 Staff Days 1015425 015 ASBESTOS ELIMINATION 7 September 13 1990 SYSTEM CHANGE ESTIMATES CONT D TCAM Tag Print 0 Print A on nonrevenue type 1 allocations when applicable Will require some reformatting of the tag to accommodate the size of the message ESTIMATED EFFORT - - - - 20 Staff Days New CICS Application fe} Develop a screen to allow Departments and Depots to easily update the PDD Master EPA indicator when a part becomes asbestos tape and disk master files ESTIMATED EFFORT - - - - 5 Staff Days New Reporting System 0 Develop a reporting system utilizing user programming SA5 to provide a status update on a periodic basis for the U.S. Government ESTIMATED EFFORT - - " - 10 Staff Days Project Administration Administrative effort to manage the overall project ESTIMATED EFFORT - - - - 30 Staff Days Unknowns 0 A 20 factor was added to cover unknown changes ESTIMATED EFFORT - - - - 95 Staff Days Months 30 Months 30 TOTAL ESTIMATED EFFORT - - 70/605 STAFF DAYS 70/605 against a checwkork work PROJECTED TARGET DATE - - - - FEBRUARY 1 1991 091390 Months 30 staff 3 mos Nov IS plan _ 10 people - Jan91 - 1015426 015 CONTA - CIONNTAIINNINGG PRODUCTION WITHDRAWALS All containing part numbers blocked effective September 1 1990 per administrative agreement DEALER RETURNS Inventory Control Willard Jackson is currently reviewing all returns on containing parts and is determining this action their disposition at approves a degree of our returns scrap facility This policy allows some asbestos parts Morton where our hand is deemed low exhaust within the EPA requirements to be received at and we expect to All asbestos Dealer returns should be blocked December 1 1991 This date is in union with program changes to store asbestos receipts separate from containing SECONDARY RECEIPTS When do we block the backflow of asbestos parts December 1 1991 SURPLUS RETURNS CIC FACILITY Surplus asbestos part numbers should be left at their respective backflow facilities to be exhausted Effective date December 1 thus preventing 1991 SUBSIDIARIES RETURNS NON FACILITY When do we block the backflow of asbestos parts December 1 1991 091390 1015427 015