PROJECT SCOPE REPORT PROJECT CEft-2417
MCS-1016 W. G. KRUMMRICH PLANT - SAUGET. ILLINOIS
DISTRIBUTION
Copy no. 1 2 3 4 5 6 7
8,9,10,11 12
Central Enqineerina R. M. Kountz N. B. Wolk 0. F. Bremer/P. K. Nunn W. R. Pritchard w. J. Burkett/W. Meyer F. P. LaBelle Central File R. D. McCullough R. L. Miller
Copy No. 13,14 15 16 17
orqanic Divisior R. M. McCutchan R. H. Munch j. R. Savage F. J. Holzapfel
Prepared by: A. J. Heinze August 4, 1970
Approved byi Approved byi
Approved by: Approved by: ^ ^
'CLt.L^. M
Thie report and the information contained herein is the property of
Monsanto Company. It is confidential and recipients are requested
not to disclose the information to unauthorized persons. The re
cipient is responsible for the safe custody of the report, which is
to be returned on request.
HONS 057310
DISTRIBUTION SUMMARY ONLY
O. R. Bailey P. F. Cunningham J. M. Depp R. E. Doerr M. Dmytryszyn R. E. Emling R. E. Howard J. L. Kern R. E. Lenz J. L. Mathews G. Ostroot C. L. Parish R. L. Sandotedt T. W. Shaw L. H. Todd
Organic Division
B. W. Corlew - WGK P. B. Hodges - WGK
HONS 0S7319
PROJECT SCOPE REPORT CEA 2417
MCS - 1016 W. G. Krumrich Plant
Sauget, Illinois
Byt A. J. Helnze August 4, 1970
HONS 057320
Table of Contents
1.1 Summary
1.2
Proceaa Technology 1.21 Process Description 1.22 Raw Materials and Usages 1.23 Products and By-Products 1.24 Waste Streams 1.25 Personnel, Property & Public Hazards
1.3
Manufacturing Facilities 1.31 Description 1.32 Design Capacity 1.33 Storage and Shipping Requirements 1.34 Flexibility and Future Expansion
1.4
Utilities 1.41 Utilities Summary 1.42 Utilities Facilities
1.5 Reference Reports
1.6 Appendix
A. Raw Material and Product Specifications
B. Equipment Information and Summary Sheets C. Utility Summary and Requirements Sheets
D. Plot Plan and Preliminary Equipment Layout
E. Process Flow Diagrams and Material Balance
F. instrument List
G. Scope of Work
MOMS 05 7321
CEA 2417 8/4/70 AJH Page 1
1.1 Summary
This scope report describes the facilities required to manu facture MCS-1016 at the W. G. Krummrich plant. The project essentially consists of a vacuum fractionation column system which produces MCS-1016 as an overhead product from the Aroclor 1142 feed using recently developed distillation technology.
The nominal design capacity of the new facility is 55 M pounds per year of MCS-1016 product. Assuming project ap proval by September 1970, the targeted completion date is June 1971.
The column feed (Aroclor 1142) will be produced via the exis ing manufacturing process in Dept. 246 at the WGK plant. This feed will be refined to the MCS-1016 product in a 30 plate fractionating column operating in a semi-continuous fashion. This material will be further refined in the exist ing department absorption columns prior to storage. The bottoms material from the fractionator will be distilled in an existing straight "take-over" still to remove montar and then chlorinated to Aroclor 1254 and 1260.
Recent pollution problems associated with polychlorinated biphenyls have created an urgent need for improved, biode gradable polychlorinated biphenyls for Aroclor. MCS-1016 is the improved biodegradable substitite product for Aroclor 1242. Accordingly, due to the ecological nature of this project, time is of the essence in completing the work and starting operation as soon as reasonably possible. Although no overtime engineering work is planned, the overall design and construction schedules will be tight and will be care fully followed and expedited as required to meet the tar geted completion date.
The expected capital cost of this project is $640,000.
l.,2 Process Technology
1.21 Process Description
Aroclor 1142 (column feed) will be produced via the existing manufacturing process in the existing con tinuous chlorination unit and in a new continuous line which will consist of three of the existing batch chlorinators piped together and equipped with a new Densitrol density controller. The combined 1142 streams will be air-blown in existing blow tank (Item 422) and then pumped to the existing 15,000 gallon intermediate storage tank (Item 424).
M0NS 057322
CEA 2417 8/4/70
AJH Page 2
The new column Bystem, which will be operated semicontinuously, will be fed from Item 424 storage tank. An initial 1142 charge, including lime, will be pumped into the column still pot. Vapors are then generated by pumping the still pot liquid thru the gas-fired reboiler and the column is put on total re flux. After temperatures have lined out, distillate product is cut forward, cooled and pumped thru absorp tion columns to storage. A column run will consist of approximately 40,000 gallons. At the end of a run, the still pot contents are "boiled down" to an end point temperature of approximately 300c and the pot
"residue" is transferred to the residue surge tank.
Residue from the surge tank is pumped to the existing #2 still system where "High Boilers" are taken over head and Montar is removed. The "High Boiler" stream is then batch chlorinated to Aroclor 1154 or 1160 in an existing chlorinator. Aroclor 1154 or 1160 is then refined in the existing #4 still system and pumped thru existing absorbers to storage. Residue from the #4 still is recycled back to the #2 still system for "boil down".
Organic Research have made several lab scale runs to determine the degree of fractionation required for the new MCS-1016 product. Research have also demonstrated at Anniston the feasibility of chlorinating high boilers (fractionator bottoms) to a salable Aroclor 1260 product. Additional work is currently being done to demonstrate the feasibility of chlorinating high boilers to Aroclor 1254.
1.22 Raw Materials and Usages
Raw materials for the project are Aroclor 1142 and Hydrated Lime. Raw material specification sheets as indicated below are attached in Appendix A.
Raw Material
Code No.
issue Date
Aroclor 1142
~ 10/21/68
Hydrated Lime
38,800
4/7/70
Lime usage is estimated at approximately 400 lbs./run or 160 lbs./day.
Aroclor 1142 usage is approximately 1.25 lbs./lb. MCS-1016.
MGNS 057323
1.23 products and By-Products
CEA 2417 8/4/70
AJH Page 3
The MCS-1016 product specification sheet is being developed by Organic Research. A "Typical Properties" sheet for MCS-1016 is attached in Appendix A.
MCS-1016 product will be stored in 3 sets of 6 aluminum storage tanks making a total of 126 M gallons. This method of storage is required to have reasonable run times and to retain the complete product component range for a column run. Tankage identity for 1016 storage is as follows:
Deot. item No.
117 118 119 558 559 (1-314)
M Gal 20 20 20 22 22 22
Present Usage Aroclor 1242 Storage Aroclor 1248 Storage Aroclor 1242 Storage Aroclor 1242 Storage Aroclor 1242 Storage New Tank
Total
126
Aroclor 1254 will be stored in 2 aluminum storage tanks as follows:
Dept. Item No. 560 562
M Gal 22 22
Present Usage Aroclor 1254 Aroclor 1254
Total
44
Aroclor 1260 will be stored in one 22 M gallon aluminum tank, presently used for 1260.
Aroclors 1248 and 1262 will ro longer be produced at WOK plant.
HONS 057324
CEA 2417 8/4/70 AJH Page 4
1.24 Waste Streams
One potential waste stream which will require dis posal is excess high boilers from the fractionator. One of the economic premises of this project is that all future Aroclor 1254 and 1260 will be made at WGK by chlorinating (and further refining) the fraction ator high boiler stream, assuming the availability of this material from MCS-1016 sales requirements. At the project design capacity of 55.5 M lbs./year of MCS-1016 (present 1974 sales forecast). The Aroclor 1254 and 1260 sales forecasts are such that all the high boilers are consumed for these require ments, leaving no excess. However, a product re quirement imbalance could occur such that excess high boilers (not needed for Aroclor 1254 or 1260) would have to be disposed of. Should this situa tion materialize, the excess high boilers would be burned in the proposed Aroclor incinerator at WGK.
1.25 Personnel, Property and Public Hazards
This project will not create any new hazards in Dept. 246 compared to the present manufacturing process. In the present operation, Aroclors are handled at elevated temperatures in a safe manner which is the only potential hazard for this pro ject.
One design objective, however, will be to develop a safe method of charging hydrated lime from 50# bags to the lime slurry tank prior to a column run.
M0NS 057325
CEA 2417 8/4/70 AJH Page 5
1.3 Manufacturing Facilities
The following information is included in the Appendix of this reports
Equipment Summary Sheets - Appendix B Plot Plan and Equipment Layout - Appendix D Process Flow Diagrams - Appendix E instrument List - Appendix F Scope of Work - Appendix G
1.31 Description
The major equipment items to be installed for the production of the MCS-1016 product are as follows:
a) Fractionating Column - a 30 plate, stainless steel, insulated, self-supported column.
b) Condenser - a 2400 sq.ft, stainless steel (tubes), shell-and-tube unit supported above the top of the column.
c) Still Pot - a 12,500 gallon, horizontal, steel vessel with a submerged circulating pump.
d) Residue Surge Tank - a 12,500 gallon, horizontal, steel vessel with a submerged pump.
e) Storage Tank - a 22,000 gallon, vertical, flat bottom, aluminum storage tank for MCS-1016.
1.32 Design Capacity
The nominal design capacity oJ[ the new MCS-1016 fractionation facility is 55 M lbs./year.
The anticipated fractionator operating cycle time
will be 60 hours/run, broken down as follows:
a) Charge initial Aroclor 1142 to Still Pot,
and charge lime slurry.
Hours 1.00
b) Attain total reflux and line out column temperatures
2.50
c) Start feed and product draw-off a) Boil down and pump out residue
54.25 2.25
Total
60.0
Overall on-stream time approximately 90%
M0NS 057326
CEA 2417 8/4/70 AJH Page 6
1.33 Storage and Shipping Requirements
Product storage facilities are noted in detail in Section 1.23 of this report. The loading facilities for the existing Aroclor products will be used with an additional loading arm assembly provided (at spot 3 on track 11) for increased MCS-1016 loading flexi bility. No extensions are anticipated to be made to the existing loading/unloading docks.
1.34 Flexibility and Future Expansion
Due to the expected limited sales life of the MCS-1016 product, no specific provisions for future expansion are included in the project.
One possible future replacement for MCS-1016 is Aroclor 1230 with the 4-4' dichlorobiphenyl removed. The 4-41 cut and can be separated using a batch distillation process. With the addition of three fractions receivers and some piping modifications, the MCS-1016 fractionator system could be converted over to produce the distilled Aroclor 1230 substitute product. The ultimate capacity of this product de pends on the results of current research work on this distillation process.
.4 Utilities
The utility requirements along with the various utility sources are discussed under Utilities Facilities below.
1.41 Utilities Summary
The utilities summary and requirements sheets are attached in Appendix C.
' 1.42 Utilities Facilities
a) 80 psig Saturated Steam - The design requirement for 80# steam is 350 lbs./hr. Tie in will be made to the existing department 80# system. The existing steam meter is adequate for this addi tional usage.
MOWS 057323
1.42 Utilities Facilities (Con't)
CEA 2417 8/4/70
AJH Page 7
b) 200 psig Saturated Steam - The design requirement for 200# steam is 230 lbs./hr. Connection will be made to the existing 2" 200# steam header. The existing steam meter is adequate for this additional usage.
c) City water - City water will be used in the column jet condenser and fume scrubber. The de sign requirement is 130 GPM. Connection will be made to the existing department city water break tank system.
d) Cooling Tower Water - The design cooling water requirement is 500 GPM. Water will be supplied from the No. 11 cooling tower. Use will be made of the existing cooling tower pumps. A new in tegrating type water flow meter is to be provided.
e) Natural Gas - The column reboiler furnace will be fired with either "interruptable" natural gas or with fuel oil (see f) below). The design require ment for gas is 1900 Therms per day. The 3" gas supply line will be extended from the SW corner of Dept. 254 to the meter in Dept. 246. A new in-line type gas meter is included.
f) Fuel Oil - A No. 2 heating oil back-up system will be provided for the column reboiler service. This Bystem will consist of a 10,000 gallon oil storage tank and feed pump. Fuel oil will be received from an oil shuttle truck about once per week (when operating on oil) delivered into the storage tank using the truck pump. The design fuel oil usage rate is 60 GPH.
g) Instrument Air - Design requirements are 15 CFM. This air will be supplied from the plant central ized instrument air system and connection will be made to the existing department air header.
h) Electrical - Electrical power for the required 116 connected HP load will be supplied via the No. 3 circuit at No. 8 sunstation. A new 500 MCM cable will be installed.
i) Nitrogen - Nitrogen will be used as an inert blanketing gas for the new MCS-1016 Btorage tank. Connection will be made to the existing Nj blanket ing piping system in the tank farm.
HONS 057328
CEA 2417 8/4/70 AJH Page 8 1.5 Reference Reports a) J. E. Silver, Suggested Procedure for Aroclor 1242b (MCS-1016), Report No. P-156S, April 30, 1970. b) G. L. Arnett (Anniston) memo to R. H. Munch dated July 17, 1970 regarding "high boiler" chlorination to Aroclor 1254 and Aroclor 1260.
M0NS 057329
Monsanto
ORSNIC CHEMICAL! DIVISION
W. G. Krummrich Plant RAW MATERIAL
SPECIFICATION
PRobueitON .. T. W. Dalton
__J. Leverle___________ SMCAAL OOCAIPTION
___B__
38800 WGK
|MATSRIAb
Lime, Hydrated
USINfl DCPTI.
287, 750, 246
APPROVALS NCSAARCH
M. E, Gibbs QUALITY CONTROL (CMW CArrIM)
R. Blowers
CHtMICAL POAMULA
Ca (OH)! 8/13/M
1 x 16 or. W.M, Bottle
IMUtD V Hiqgerson/Stites
Appearance
Assay (Ca(OH)t) Carbonates as (CaCOj) Magnesium Sulfates (as SOj)
Fine white or (lightly gray powder, free from lumps or gritty material
92.00%, min. 3, 00%, max. 0.50%, max, 0.30%, max.
10, 188
10.191 10.193 10.192 10,189
Supplier's certificate of analysis to be sent on day of shipment to: Chief Chemist, Monsanto Co., Sauget, Illinois
o \
'
(IV JtwtflM
All sAtfi Ainlf4 f ffwwt ity.
MN'IU
MONS 057330
Monsanto
OftSANIC CHfMICAll OIVIIION
FINISHED PRODUCT SPECIFICATION
PRODUCTION
J. W. Moilov ALII-----------------------------------------------------W. E. Ault
gpnoowcT
Aroclor 1142 Crude Commercial
TTw'f "
_ mi
unr
27 -Ann.
Anniston- WGK wnrnrnTmn r
10/21/68
iCTimr
Sales
1040-130-04/11/03/09
AkUIKFH.......... ..........
1
M. E. Gibbs qu.L.ry eoNT.ou rcwwci~mi.o G, w.
W. J. Gresham CMSMIC AU AOAMUkA
Miller,
Ann,
mi. wt 2/26/65
AMPbK red ANAL1111. i <U, DUl WGK 2. 16 oz. W.M. Bottle
CHAR AQTSNItTlC
UNRESTRICTED INFORMATION
E. McEntire/G. Stites
Anniston
WGK
(R) Appearance and Color
Brown to black Oily liquid
10084
(R) Sp. Gr. @25*/15.5*C.
1. 384 - 1. 394
14-49-54
10114
(R) Acid Number (mg. KOH/g.)
0. 7, max.
14-46-54
11532
RESTRICTED INFORMATION
(R)
Acid Number (mg. KOH/g. )
0. 2, max.
14-46-54
11532
* When stored in non-lacquered metal containers.
(RJ Routine Analytit, AU othmr An*lytd by
Only
MONS 057331
MCS-1016
TYPICAL PROPERTIES
COLOR (APHA) CONDITION SP. GR. 25/15.5C ACIDITY (Mg. KOH/g.) MOISTURE (PPM) REFRACTIVE INDEX 25C
INORGANIC (FREE) CHLORIDES (PPM) POUR POINT (C) DIELECTRIC CONSTANT (1000 CYCLES 100C) RESISTIVITY (500 VDC 100C, D.1",,GAP)
AS OHM-CM X 10a HYDROLYSIS STABILITY (PPM AS CHLORIDES) MONSANTO STABILITY (PPM AS CHLORIDES) DISTILLATION RANGE (ASTM D-20, CORRECTED)
1094 DISTILLED (BY WT.) C 90% DISTILLED (BY WT.) C DIELECTRIC STRENGTH 25C (KV) FLASH POINT (F)
FIRE POINT (UP TO B.P.) VISCOSITY 100F (SUS) FIXED CHLORIDE (%) (G-E) THERMAL CHEM. CHLORIDES (PPM) (WESTINGHOUSE) HYDROLIZABLE CHLORINE (PPM)
Appendix A-3
10 CLEAR 1.363 0.001 40 1.6210 0.02 -18 4.96 353X103 0.10 0.06
324 342 50 354 NONE 70.6 41.3 0.16 0.26
HONS 05733*
((
CENTRAL ENGINEERING DEPARTMENT
EQUIPMENT INFORMATION SUMMARY
PNOJICT MAMI
,
MCS-IOIfc FGAc.Tto*i ArtotJ- VJ&K
__________ Appevonc B-i
MRRARRO
CM* MO.
A*t
A. J. Hmiute
2477
1
WPROVIB NT
f-ea-7o
(
**
/ o*3
CEO EQUIPMENT IDENTIFICATION
MVJRMO ER i-^bi-ooo
description or
EQUIPMENT ITEM
Columm
l-ioi-oo i (-$02-000
Columw trays
C OLUM a/ Coa/OeV SffR.
QTT
SZE. MATmO. MODEL. ETC
MATERIAL OE CONSTRUCTION
1 S-6%6 a 43V 3 /6 t s-s.
25 3-
Steve sieve
24-00 Sr.ftt 3*j" SHALL (o' LON
3 /6 L s.i. 3o4 s.s.
Al. Tubes Steel Smell.
ORBKAT1MG
wboht
(POUNDS)
MKAfVCS
/g'SK/JCT ns,ooo SSo'Ft F.v.
&
K i
+OT
C*A 4E77 R ITE*
Cope Stamped AS-20I -- xiT._ifc2 * -- ' To Be testALLtE 1/ --
12,00O
3A` K lAGa.Toie
tT*\
4oo`F /PR
R TT-202
OIL COOLED
(-103-000
RSFLuk S pLtTTeH.
(o:i max. 1 R. R.
ALUM ItJuf*
--
S"o A>a/G DESI64 3ooF Dei.TtMp. H
(-$04 -OOO
Prod. Cooler
I-3O5-0OO
jSTtLL Pot
32 SA. Ft;
A4 0A/|
I U-ToA UMiT STFEL iHCLL.
--
Toes: Sopu4F-* WAIEX CooleD AOO'P OEStCfJ
--
12,500 <5al 1 Ii'-**4>a i6-o" Steel
Hoe/t. still 190,000 &>So`F / F. V.
ti
SADDLE Suppapr
--
PuMp1-306-000 Still CltfC.
65>o <5F*i 1
4s'tI>H
STAWiEif -sttel
Sub meReet>
R-- O w rr - mounted
ITE'A
im 3T)w- Pot.
PP-X03
1-306- ooi
Pump Morot
1 3o
--
--
12 00
R
1-30^000 1-308-000
Couj/maI !Ze ISoil ek.
Co L UMf4 EOFctor SMtem
I --3 O ?- o oo
TH ERMinol Surge tank
6 m Stu/hr 1
6 As. FiRro
5TE^L Tu&ES
/r LBs/nr (ha Monel /e.X. 1
Sucrio*/
300 Gal. 1 3V4a4-1"
STEEL
ZSjOoo --
CYL/mA.- Y72T too Pn 4 Te*.*/* R
DSI<a/
Tojo vrucr
/So f /Honrv/
d
3,000
SboaP Dtt.TtPop, JoPilC. * Ptv.\. a/
' * " ' 'to. / jj
--
--
--
ttOUMCC: N-.NI*
(s(IITlN
s TQ t.OCAflb
((
CENTRAL ENGINEERING DEPARTMENT
EQUIPMENT INFORMATION SUMMARY
PMjter RMit
M C s - lOifc FA act/o* at io*J-WEfC
PRVARte IT
A.U.
CEO EQUIPMENT IDENTIFICATION
NUMtER 1-3 IO-OOO I-JJO-OOI |-3 II-000
I- JI2-000
DESCRIPTION OF EQUIPMENT ITEM
QTY.
SIZE. MATING. MOOCt-. ETC
Trt famimol
<2. irc. Pump
1
PomP Moro/S.
THERMINOL do OLEfi.
l 1
Residue Surge ooti)
1
Soa QPM
7S` TOP
40 HP TEFC A-'m Brtu/H*. 1 GO SO FT. F XT3 I2,3oooal
U-6*G x |4-o*
MATERIAL OF CONSTRUCTION D.r.
-- Steel
Steel
1 -313-000
^ESibuc Tamil pUMP
100 5PM 1 So' TDM
P. X.
|_3i5-ooi \- 314-000
Po NAp MoTOIL IO/Co
Storage t~ahk
n`h. hp ( T E PC
--
22,OOO Gal.
Alum 1MuA
( 12-4."* 24-o"
EOS'2
J-315-OOO
/oic. Storage Pump
(So OPM 1 tlo'TDH
3 Us s.z.
1-315-000 1 - 3 /&-000
Pum p M otoa Fuel 0/ L Storage ta*j<
ZS-HP 1 /7So PPP\
10,000 Sal
1 llV^x 151
-- Stsfl.
1-317-000
FOEL OIL Supply Pump
too <5PH I So PS iq
D.X
1- 317-00/
Pump motoh.
f'/z. HP 1 TEFC-
--
APPEpJQ/X 8-2 (
AQC
S4/7
INITIAL tttut
ff-Zi-TO
I 2 0.3
IfVNO RCV tSSUCO
OPERATING HEIGHT
(POUNDS)
REMARKS
--
D/ /Process Pump 4*XL*
i
V *
401
fieA
1
R 4/r8e^*7i ppeot-A
-- /7-r ppm
N--
-KfAAJSlO*J Jo/Aff"
-- 3/*M ToerJ
A/
11 ' cpC
Mo/Z IBorJ rL
130,000 450 "A SOPiHi A/
SADOLE 3MAA9ET
</. GA4** *0:4
-- SmpL
/J
DUPCO
-- -- --
-- --
nfo /zp*1
IN SULATeD st. Went P**/et* 7/
-- --
-- -- -- --
J-CravE melm. sl Dufico 3X2-U
A/
ENCAPSULATED A/
VQtT. Flat firm. hTenm Hem-neO a/
AT/t*, Soa'P Dej,
VjoKTH IH&TOil GcAA Pump
uj/meck Seal
a/
-- --
-- /7J*0 >?P^ A/ --
C - 224
4 bounce:
msmch
e = cx<stin
= to i rclocateo
UTMATED WEIGHT FILLfO WITH NORMAL CONTENT! ON TilT MAffRIAk. OMICM
HONS 05733*
(
central engineering
PROJECT NAME
MCS-IOlC*
CD EQUIPMENT IDENTIFICATION
NUMBER
< __________ AppeHO/x. 8-3
E**CO
CEA *0
ARC*
department
equipment information summary A-0- He/Atge
24/ 7
^ kRRNOVCO Y
Tr&ACrrlOvI ATiOiJ ~ W ^ K
DESCRIPTION OF equipment ITEM
QTY.
SIZE, rating. MOOEL. ETC
MATERIAL OF CONSTRUCTION
1-27-70
1 m* OPERATING
WEIGHT
REMARKS
(POUNDS)
1
(
PACE
3 ' 3
R| ISMUKO
i ESTIMATED .
1 PRICE <S> .
Cot-iUAiN-"0ClT3---------UM P
1
3oo Gal.
4-3"
Steel
-- CACE-U-S> N
1-31 9- ooi
1- L320-000
ime S.tAy 7>ia/<
* .1-320-001 TWnK As it tor
1- 320-00 2 AsitAToR Motor.
Lime slurry /- 321-000 TRANSFER PomP
l~ 321-00 | 1- 322-000
Pump Motor.
ProDult Polish PtLTER.
3 23-ooo Fume ScauBBeP.
/ --3z4'0oo vc#r coEPEtfJZP:
/0 GrpM
l
So'TbAj
3LHP 1 Hfa RAM
oo Gal.
1 4-0'* S'-3"
L-BLADe (Futr)
1 TU*.gAi
7>.X.
--
6tetSteel
-- --
--
--
st*f>
1
/7T0 R.PM
--
--
3o GPMf e 1 4o' rOM
0. x:
--
S'HP
1
tyfo RPm
--
--
A LOO* HoCgj_
z pak tzs-s
3ic> s.s.
--
1
5^K IMODCL 10to *>/SB*IR*n>(
PuREfl
moel 7oAO
F/BSKOc/fSi
--
( /ao oq pr SVEU - STEEL TUBES- MoNEL
CAROLLLEO H
Cppe-ELLEP N
leu SuPpQEJTb
iijsula tve
30 /s Sao'p Dei.
A/
100 EPm
AJ
P/vcAPSulaTEO A/
C*JTKIPu6*L
MKK. Sent.
V
*JCftps,vumpo N
Ai ev.ToiAUu.MMi
p/am. mfd/><
4
ISoGpfii FLetAj
!Z "S/ie- /`D*AFT i S)KS AJOCZUT A/
//
(
1
[
1
NON S 057335
J----------------------------------------------------------------------------
* source: H'Hc*
e -1 aist'*io
.ro*t |i.oc'io
utilities Nummary
CENTRAL ENGINEERING DEPARTMENT_____________________
OJT At
MCS-IOK, FRA^tiomat iokI-\NGK
UTILITY
SERVICE
NATURAL GAS
INITIAL ISSUE UNITS *T n- 2 ?- 7o
OCSI6N
THERMS
DAY
tSio
J3oo
RRERARtO
A.J. Hams'
OAT|
REV. 1
*ROEO *1 oa'-s
APPE?/ChK C- I
CA MO
>AMCA
Dt((
"2417
1 | i .z
REV. 2
REV. 3 8TJ
AVCMACE
OCSICN
VRACE
OCSICY
AVERAC6
06*1 CN
(Fuel Oil)
GPH
4*?
60
Elect*.\cal
toNlJHP
--
1/4
SreAftA -%o P3i6 lbs/hr 260
3 so
STEAM-200 Pilfi lbs/h*. CoBLINfi
Towe*. fclATf*. GPM
City Water. SPW
300 445 HO
3.30 50o 130
Instrument Air C.FI*
N /taoseN
SCFO
JO 940
IS looo
Mniy c nt laiA
_______________________l_________ l____________
8'an* Soace Indicates This Utility Requiiemem Has Not Been Checked Since Last Revision
CENTRAL ENGINEERING ecRARTMENT
UTILITIES REQUIREMENTS
A. J. Hcixc 24 17
MCS-IOlt F-'K AC.Tio*J ATIOM -- ^,*6; j^.
Mature. Gas (TuEL oil) l6CTRc/U.
THE 6.MI/OAy
G PH
Owi/)ECtlG HP
$TERN| %opt Steivi, boP:*G 7omE1E Wate*
L8s/rtK
pm
UZ1-7o
C rr Wi'TgR
i-3o4 3Q&
l~3oT l-3og 1-3 10
pCfioooOtgt/C/t7*-
IStiluCiRc. Pum pi IGkumm Reefer. /4"$o
CocuMU gtfCToR C/lCC. Pu/.R
l-ill
1-313 t-3 1-4 1-3iS |.3U>
ftgitgug rg***e PUMP mC*/0/&
VraftRGg TASK
4Tortce Pomp /U4L *STtEA<g THWH.
i-3n t-3l3 ) - 320
OH S*TW>-ftwrj CfillCSUz&D t<Mf Slu**V
~TA/K A&tTJtT6fi.\
1-321 1-323 Fum6 Sfc/gi/eggft.
STf^At TufiCJA'G /-324 Iy#r ctppsdsssS
4?
40
SO
4o
V/z Vo /oo
zf 80
I Vs
Jtsi 40 4oo 440
85 SJT
1 2-2. H lTXr&*,i CCp/OstY
94o iooo
7brA43
/.ryo / goo ^9
6o
U4 24>o 35Q
4 45
//O I 30 74o (ooo
HONS 05733?
HONS 057338
in* v---e^
CMTAk D*ARTMINT
g</jrrM<i*M T- -Tu
N /vas to/e
fluAm UPJe.
*v
' A mA~ ||ci na. //?
tail HO.
n.T.g-/-3Q ...T .
r*i
IP * PClCyAATfe M - A/**J
F`P/em P P/mee
ia-jt.
mr As/-/ 0 //-! <s>
/W ?>
i//- ioJrt $ l/o-X. (P
Oexe/t//~rv o/i/
ST**** HtUJ.
SfAQ.
f*P4\ L*C burnt Sat
Muit/ fo>/Arr C?i.t4A1A/ ftOTTsHA' ci . TfAV /*>
/V -- KJ -
P _A -P
_
C^LU/rtAj T&P *t/ll A>r XeSon.CS srerssU
A/ -
fJ V-
p 'p
-p
-"-
--
Pcs/ear Since Tau*
A/' - - P - -
T/m/tmsMi. ChauCS-Tx/P
A
-p
-
&K4A0/tA/J CP - T*P*1iAO+- CtPT A- - "
-
~rCr**. &oite - TV**m. X// A'
r
A)Mt\ 'e'P.'Or/t'A T~ s
----
" *-
/a Pry.
A// ^ r ;t
Fje/y^; T*
Fa V*, " *
..
PJX S"l-y doeUM/v P*re<ra*e P*ap K. R
P -- -
rsc joi-'T CoLSAt/u XMPTu/tr 0/j<i.
" - --- - "
AtCU Sr
PK. iot-i Coee/ov P*txsy*e<Svfrrtoe /e >e AS P
nop let-/ Cv/uotuitS TenA. Ooaat.
y /</ p r
rx Joj -t tCsPtpp p~tue*; 3U- &.CMY*n A/ /C^ AS r
rise. Jcj-l. P/C9&, Fl&l> f&TP*-/mcm
Ay AS S* P
* / St-l.
V Stl
---
--
"-
_ Cfci* -'' frrut* fr- ^
nc
Pr0. TX*iP. Co/jr/qai.
/j A/ AS p AS 0. STL
ItcsrjbT-i. Gckdc rcca O/e/r/toe
A/ A/ AS r A /A. o-n_ *' t i-- Mister:
rm see-> #C94tt.CC Pk<K/
P*P/*n AS AS AS P
~ -- _t,<( > x y. > C/'
ft /oa-v. PcAwnt Om. i/*tur
- ~~ AS A /V 6"
1/*- K' Frf "Ty s.tj
>v *-* PltnefC 0PCW. FAlvt
ioy->
Fatts/pcc iSc*/rnoLT
TA Jel-X. fM/t/vAGf Tr*iP. Penr/n
"* AS P AS 3"
/ AS u r
~~
a/ Aj AA r " -
) tr.:. T- S>'. *
*-
pte jej-i fpx Piv UxrrAsa*-
A/ A/ V p A/' 2-
f/s Jo>-u
*/ A/ A/ p
/ i'T e.
ret/ joe-/ JV*v*/n PKCST. XmCHtSTOS
-- -* - -- y -a- Sr-L
joe-* X**Mav#*Uiae k/Ai*A PUmU A/
AS p -- --
~
l Jcf)-/ TWen*. Suiter Tamm Lev*/- */ - - p
-
*'
n 3/e-1
Pi*/U
A/ - AS F " -- -- <c.-' ^ ' JT^ %
TIC l//-t Tnxy/i/au. Tsa/A. lSwW'1. V yt/ AJ A a/
J-'i.
US MX-/ Per/An* Tam* Levee ues i/t-t *2Hu &t*r,r<*urm
/t/ A/ AS r /U AS AS r
-
---- / J*r*_
bI4/+'Lfaxi*SiL,.Mjrte.rAtHHT; PtSSCl MeAt4a;
L* 1/t-x. Z/vre/ttAtC LCvn AiA/t/K
M A/ - P - -- -- Zp r-r*te*rt ******
Lt 3*0-1 uauc SuetK* t})h,x Lem.
A/ - - r
- - <3avf v'm* rr
LI J li-l fi/et- <T/e fne TipuM Levee
A/
AS F - - -
PpITSPRC <$Mfrs ~ &
2~i/rtPS/tATVfi! i/z+tts - 6
S^i/P^/v T*/0-
0***1/^.* i- JW#A. &/*>***/.1^/0-
.V '
HONS 057341
CaNTRAk IN<INIII<IN<
AKJTiTayitAT
_________ lliaui* IDCNT NO _. . .
FtOS /&/C__________________________ l|ca NO.2t_2_____ o.
INNOA'DINT ____AKG^.U/K
Am A*A>
nivm
lav full A1t'AFF IlnAT* ff-
i/Kjr, A/**
rm /<=*--/ p/C /*"-* T"7* rtS<-/
r/cr/tf /-? -/ **7 rei-t. OUt- /<r>- j Ll& f/c /er-j K/C- l9-/ rie- rye- /
Jog-/
t/K-SCKir-l'**'
*/
Tjcaip.
0 JCMuoft, <?<-%.
" 1_ <TV^e, Tr/Vt. cSmo*"4m-j*Wts>K, Ct^_ FI-*/
*J CtttoK T**/r. CcvFTAPt
mJ CptaK. Ca.
Ftc-*/
*3Cam**. OctJ-r/rr Cnar.
C%(/r> Pxat>. C,trtr <2wr*--t-
S/PPMA/J/L Ft t'/t vJd T/Cc .' "cevso*.ASs#rC "J*-ruXA,, < ,'wVfi,
Agjy-*-8EP Fist* a a r'. / 7Sa>< kAiprtrP F*a*.-/c~reLK
frt ssve-rme
S&A4 `7fe*A A/ V
:--r
/7/ A >-C4< 7 Kr > / v. / E
*k* 4<Hv Svya y>*4
/V p
E
-
_ c
.
flLpL.P*S. i.
dT A/ F> SE A/ A/ P -
" PK^.~p- .** GeA'TK-'A.i.dK\ .
e A/ r> a A/ A/ p
rE AJ
// A> aJ p
A/ AJ A/ P
AV AS A/ P
e -- A'
/V
--
iJC
/%.
-S'-i.
s-.
A 'rai .1
. -- . .*f v ...
a
fi.it 7`
>.'<t
// A' A/ r />
/" i'r*_
rA" A*> A p A/
AL-
/t/ A,
A' r
--
"*
/V *"
A
MONS 057342
Appendix 6 Scope of Work
G-l
01 - Equipment items
Refer to the Equipment Information Summary Sheets, Appendix B. (3 sheets)
02 - Instrument Items
A new 4 foot control panel is required using pneumatic type instrumentation. As much existing column instru mentation as possible will be relocated with the phthalic column system. Refer to the Instrument List, Appendix F.
03 - Setting and Testing Equipment
No unusual difficulties are anticipated, it should be noted, however, that the new fractionator and auxiliary equipment will be erected inside Dept. 246 battery limits and that "tight" conditions will exist as far as the mobility of construction equipment (crane, pile driver, etc.) is concerned. Refer to the Preliminary Equipment Layout, Appendix D.
04 - Setting and Testing Instruments
No unusual circumstances are anticipated.
05 - Piling
The new fractionator, still pot and storage tank will be supported by pre-formed, concrete piles.
Item No. 1-301 1-305 1-314
Description MCS-1016 Fractionator Column Still Pot #6 MCS Storage Tank
No. Piles 12 2 7
Lenqth,ft 26 26 26
HONS 057343
G-2
06 - Excavation
The following excavation and backfill volumes will be required:
Item No.
Description
Cu. Yds. Excavation Backfill
1-301 1-305
MCS-1016 Fractionator Column Still Pot
43.0 10.0
5.0 6.0
1-307
Column Reboiler
6.7
4.3
1-309
Therminol Surge Tank
1.8
0.3
1-310
Therminol Circ. Pump
1.0
0.3
1-311
Therminol Cooler
1.5
0.4
1-312
Residue Surge Tank
10.0
6.0
1-314
#6 MCS-1016 Storage Tank 3.0
0.5
1-315
#6 MCS-1016 Storage pump
1.0
0.3
Pipe Supports and Miscellaneous
7.5
3.5
Totals
85.5
25.6
Allowance should be made for costs involved in removal of unforeseen underground obstructions.
Foundations
The following volume of concrete will be required.
Item No.
pescription
Concrete Cu. Yds.
1-301
Fractionator
42.7
1-305
Column Still Pot
6.6
1-307
Column Reboiler
2.6
1-309
Therminol Surge Tank
1.5
1-310
Therminol Circ. Pump
0.8
1-311
Therminol Cooler
1.3
1-312
Residue Surge Tank
6.6
1-314
#6 MCS-1016 Storage Tank
11.0
1-315
#6 MCS-1016 Storage 1pump
0.8
Miscellaneous pipe Supports
2.5
Process Area Paving and Curbs
40.0
Total
116.4
HOMS 057344
G-3
08 - Supports, Platforms and structures
Steel requirements are as follows:
a) Saddles for items 1-305 and 1-312 b) Tank Platforms c) Ladders and Stairways d) Handrail and Toeplate e) Pipe Supports and Brackets
All steel to be hot-dipped galvanized.
10 tons 4 tons
40 ft. 150 ft.
2 tons
09 - Other Building Items
None required.
10 - Sprinklers and Fire Protection
No automatic sprinkler protection is required for the new equipment. The existing fire hydrant protection in Dept. 246 is considered adequate for the expanded depart ment.
11 - Piping
Piping requirements for this project includes piping and valves for new process and utility requirements plus piping revision work around existing equipment.
a) C. Steel piping and valves required for new process and utility services follows. (List does not include small steam trap piping or valves.)
Size inches
24 8 6 4 3 2 1%
Total Lenqth, ft.
30 140 1400
85 330 410 200
Pipe Spec.
F41 P41 F41 Fll Fll Fll Fll
No. Valves None 5-Gate 5-Gate; 2 Butterfly 3-Plug 2-Gate; 5-Plug 14-Plug 4-Plug
HONS 057345
G-4
11 - Piping (Con't)
b) Aluminum piping and valves required for new process services follows:
Size inches
4 3 2
Total Length.ft.
120 240 350
Pipe Spec.
All All All
No. Valves
3-Plug ~
5-Plug
c) New fume scrubber piping includes 30 feet each of 8" and 12" Furan piping plus 40 feet of 12" Saran lined steel pipe.
(The following piping revisions and additions are needed to attain the intermediate product capacity in Dept. 246 required for this project.)
d) Revise piping around existing blow tank and inter mediate storage tank: 50 feet of 2" Fll pipe, traced and insulate.
e) Revise piping around absorbers 532 (Aroclor 1242) and 540 (Aroclor 12 54) : 25 feet of 1*5" A-ll pipe, trace and insulate. Also requires new Flow controller and automatic control valve.
f) Revise piping around 534 and 542 Product Tanks: 30 feet of IV All pipe, trace and insulate.
g) Install "high boiler" line to biphenyl head tank for batch chlorinators> 100 feet of 2" Fll pipe, trace and insulate.
h) Pipe up 3 batch chlorinators to make a new continuous line: the following are needed:
1) 130 feet of l*s" Fll pipe + 3 plug valves.
2) 40 feet of 2" Fll pipe + 2 plug valves.
3) 20 feet of 4" Fll pipe; trace and insulate all pipe.
In addition to the above piping, also required is a new Densitrol density controller, a new level con troller and automatic control valve.
i) Install new "condensate" line from 429 storage to #1 chlorinator: 20 feet of l*s" Fll pipe + 2 plug valves; trace and insulate pipe.
HONS 057346
G-5
j) Install line from #2 Blend Tank to #2 Receiving pump! 30 feet of 3" Fll pipe + 1 Plug valve; trace and
. insulate.
k) Install new overflow line from 103 head tank to 143 Blend Tank: 100 feet of 3" Fll pipe; trace and insulate.
Liberal allowance should be made for tubing for steam tracing; the majority of the above process piping will be steam traced. A liberal number of steam trap assemblies should also be included.
One steam-water-air hose station is included.
Allowance should be made for the installation of approxi mately 10 automatic control valves.
l) install 5 - 316 S.S. mixing eductors per tank (S&K type 258 or equivalent) - total of 30 - in each MCS-1016 storage tank to assure adequate mixing of product for each column run.
12 - Ductwork
The only ductwork will be that required to fabricate a chute for hydrated lime on the lime slurry tank. This small chute will be made of 10 gauge, galvanized sheet metal.
13 - Electrical
The electrical classification to which the electrical systems apply is watertight.
The lighting requirements for the new process area are 6-175 watt mercury vapor fixtures. The lighting re quirements for the new storage tank are 2-175 watt mercury vapor fixtures.
Electrical power will be supplied from circuit No. 3 at the No. 8 substation. 200 feet of 500 MCM cable will be installed (rings and saddles) from No. 3 circuit at the NE corner of Bldg. CT to the existing MCC building.
A lighting transformer and small lighting panel will be required for the low voltage lighting.
The new motor control center shall be installed in the existing MCC building. The new MCC shall consist of 3 vertical NEMA 1 front-mounting sections. New starters are required for motors as indicated:
HONS 057347
13 - Electrical - (Con't)
Item No.
Description
1-306-001 1-310-001 1-311-001 1-315-001 1-317-001
Still Circ. Pump Motor Therminol Pump Motor Residue Pump Motor Storage Tank Pump Motor Fuel Oil Pump Motor
G-6
Remote Inter
HP P.B.
Lock
30 yes 40 yes ih no 25 no 1*5 yes
yes no no no
yes
1-320-002 1-321-001
Slurry Agitator Motor Slurry Tank Pump Motor
5 no 5 yes
A new 15-point annunciator panel iB also included.
no no
14 - Site Preparation
None required.
15 - Sewers - Drains and Plumbing
The new process equipment will be installed within the Dept. 246 battery limits on an area approximately 30 ft. wide ah3 70 ft. long.
A 10" wide trench will be installed lengthwise down the center of this new process area. The process area pad shall be sloped toward the trench. The effluent stream from the fractionator ejector condenser will flow to a barometric sump tank. The water overflow from this tank will discharge into the trench sewer. This new area will be completely enclosed by a curb to contain any spills. The trench will be covered with about 60 ft2 of grating. This new trench will be extended north and then east about 70 ft. and tie into the existing storage tank area trench system. This extension will also be covered with about 60 ft2 of grating. The total volume of excavation required for the process area trench and the trench ex tension is about 8 cu.yds.
16 - Underground Mains
None required.
HONS 057348
G-7
17 - Yards, Roads and Fencing
Ths area in the existing tank farm where the new product storage tank is to be set will be paved and provided with a curb.
Estimated concrete required
- 5 cu.yds.
Estimated excavation required - 8 cu.yds.
Estimated backfill required
- 1 cu.yds.
18 - Railroads
None required.
19 - Insulation
The thermal insulation system for elevated temperatures will be calcium silicate. Spec. 100. For insulated piping, asbestos felt jacketing (Spec. 50) will be used. For in sulated vessels, PVC-coated steel jacketing (Spec. 65X) will be used.
Approximately 75% of the steel and aluminum piping shown under Code 11 (Piping) will be insulated.
The new equipment to be insulated is as follows:
Item No.
Description
Spec.
Surface sa.ft.
1-301-000 Column
190*
1-302-000 col. Condenser
- Exist. Insul
1-305-000 Still Pot
3%"-100-65X
790
1-309-000 Therminol Surge Tank
2"-100-65X
65
1-310-000 Therminol Pump
1"-100-15
5
1-312-000 Residue Surge Tank
3*5"-100-6 5X
790
1-314-000 Prod. Storage Tank
2"-100-65X
940
1-315-000 Storage Pump
1"-100-15
5
1-316-000 Fuel Storage Tank
1"-100-65X
520
1-317-000 1-320-000 1-321-000 1-324-000
Fuel Oil Pump Lime Slurry Tank Slurry Pump Vent Condenser
1"-100-15 1*5"-100-65X
1"-100-15 1"-100-15
5 90
5 30
Allowance should be made for instrument metering applications, insulation will also be required on steam and condensate lines of steam trap assemblies.
*Insulation for new straight wall section added; See Code 92 for insulation repairs to Items 301 and 302.
HGNS 057349
G-8
20 - Painting
The following protective coatings are to be provided, using the WOK local interest standards as a guide.
Pump bases (5 total) Product Cooler, 1-304 Still Pot, 1-305 Therminol Tank, 1-309 Therminol Cooler, 1-311 Residue Surge Tank, 1-312 Fuel Oil Stg. Tank, 1-316 VentCondenser 1-324 Lime Slurry Tank, 1-320
Coal Tar Epoxy Inorg. Zinc Inorg. Zinc Inorg. Zinc Inorg. Zinc Inorg. Zinc Inorg. Zinc Inorg. Zinc Inorg. Zinc.
K1.3 Std 601 K1.3 Std 1300 K1.3 Std 1320 K1.3 Std 1300 K1.3 Std 1300 K1.3 Std 1320 K1.3 Std 1300 Kl.3 Std 1300 K1.3 Std 1300
Equipment items such as pumps, motors, speed reducers, etc., will be painted by manufacturer using mfg. std. paint system. All piping 3" and above (uninsulated) shall be painted.
21 - Walls, Masonry, Roofs and Roofing
None required.
22 - Spares
None required.
90 - Dismantling
The following equipment items will be dismantled at the Chocolate Bayou plant for transfer to the WGK plant for use on this project.
a) Item 1-301 Fractionating column and Skirt
Notes
The column condenser supporting structure, 24" aluminum overhead vapor duct plus all ladders, catwalks and platforms are to be relocated with the column for reuse at wgk.
b) item 1-302 Column Condenser
c) Item 1-306 Still Circulating Pump and Motor
d) Item 1-310 Therminol Circulating Pump
(Refer to the equipment information summary sheets Appendix B - for equipment sizes.)
Dismantle approximately 5 feet of the existing Dept. 246 (old) control panel to make room for the new panel.
M0NS 053350
G-9
92 - Repairs Expense Allowance should be made for repairs to the column (1-301) and condenser (1-302) insofar as insulation is concerned. It is anticipated that part of the insulation on these items will be damaged during the dismantling procedure. Also repair existing controls for reboiler furnace.
93 - Relocation and Modification Expense The following equipment modifications and relocations are included: a) Install 1 new nozzle (for overflow line) on the top head of 143 blend tank. b) install 1 new overflow nozzle on existing biphenyl head tank to accommodate a larger "high boiler" charge volume to the batch chlorinator. c) install 4 new nozzles (1 on #1, 2 on #2 and 1 on #3 chlorinator) on the batch chlorinators to accommodate the new "continuous line" piping additions. d) install blanking strips on approximately 18 of the existing 25 sieve trays in fractionator 1-301. This is required to prevent these trays from weeping at the anticipated column operating conditions. e) Relocate the existing hydrogen lines around the new reboiler furnace: 100 feet of 6" - F41 pipe for the low pressure line; 100 feet of 1" - F62 pipe for the high pressure line. f) Modify the relocated 24" aluminum vapor duct from the fractionator to the overhead condenser. 2 g) Break out approximately 500 ft of old concrete pad to make room for foundations in the new process area.
MGNS 051351