Document 5DX3grp0OoN44GjMq9NeZo8B8
INTEROFFICE
MEMORANDUM
Date: From:
Dept: Tel No:
fccj-sssO*r
cC--O (-"35p'1
-o o
vO
t -''O
55 o r
27-Feb-1997 04:04pm Roger J. Zipfel ZIPFEL
o c vD
a.#
fO
Fluoroproducts
304-863-2567
RJZ004777
TO: David E . Ellis, Ph.D TO: JOHN M. MIGLIORE, P.E. TO: DANIEL A. WEBER
( ELLISDE AT Al AT CSOC ) ( MIGLIOJM AT Al AT CSOC ( WEBERDA )
CC: Gregory A Chapman CC: CAREY E. COLE
CHAPMAGA ) COLECE )
Subject: Bio-fate of C-8
Dave Ellis, John Migliore, Dan Weber, and Roger Zipfel held a phone conference on 2/26/97 to discuss the program to obtain bio-fate data for C-8.
The minutes of this meeting follow:
We pursued Dave E l l i s 1 and Martin Odom's suggestion to sample the Parkersburg site for the detection of any C-8 decomposition products.
* Zipfel reported that 3M has agreed to do the analytical support for this sampling program.
* Zipfel checked on the availability of test wells BO-1 and BO-2. Inspection c :: the area where these wells are shown on Figure 6, did not show a n y active well areas. There did appear to be evidence on one well, but it was plugged solid with firm soil.
* Zipfel to send Ellis a copy of UofD study of the supernate ponds. This has been complete.
The team agreed on the following basic plan.
1) Collect data taken from the following wells
T W -33, T W - 2 , TW-27, TW-1, TW-W-1, TW-P12, LLMW-4, LLMW-5, LLMW-6, the Ranney Well, and the Lubeck Wells.
Resp. Dan Weber
Timing - by 3/15
2) Review above data plus ground water i n f o r m a t i o n .in VI to de te rm in e current level of understanding.
Resp. Dave Ellis Timing - 4/1
EID932600
000045
3) Develop test protocol for additional samples and job completion. To include timing and costs.
Resp. Dave Ellis
Timing - 3/1
4) Get 3M to define sample size, sample procedure, and shipping procedure.
Resp. Roger Zipfel
Timing - 3/15 5) First round of sampling to 3M to begin to develop analytical capability. This will include one water (TW-33) and one soil sample.
Resp. Dan Weber
Timing - 3/15 6) Send 3M samples of waters from wells, TW-33, TW-2, TW-27, TW-M-4, TW-W-1, TW-P12.
Resp. Dan Weber
Timing - 4/15
7) Sample 6 additional water wells, and 8 soil samples (from one bori ng locatec at old supernate ponds - ne ar where previous borings were made) at sites to be specified by Dave Ellis. Send samples to 3M for analysis.
Resp. - DERS , samples sent to 3M by Roger Zipfel
Timing - 5/1
8) 3M completes data analysis Resp. - 3M Timing - 6/1
9) Biofate calculations completed Resp. - Dave Ellis Timing - 6/15
10) Examine alternate biofate methods if above fails Resp. Dave Ellis Timing - 6/15-7/1.
EID932601 C00046
That's it. Team members please comment on accuracy by Monday as I will use this chart in presentation to PACE teams. Roger.
EID932602
000047
R.IX004779