Document 5DN79Og1Rr1jvYdLL1BLzwkv0

November 5> 1962 CC: R. Davis R. E. Draper - Chicago L. E. Klein K. L. McHugh T. M. Patrick T. P. Sands/REH/DJM L. R Stark J. D. Sullivan E. Wheeler R. S. Wobus DEVELOPMENT DEPARTMENT CALL REPORT NO. FF-672 General Mills, Inc. Kankakee, Illinois Date of Call: For General Mills: For Monsanto: November 1, 1962 Claude Brown R. L. Scheribel/SSenior Process Engineer R. L. Winters, Supervisor, Process Development D. E. Roush J. D. Sullivan L. R. Stark K. L. McHugh M. McEwen This call was made to discuss the use at General Mills of our new high temperature industrial heat transfer fluid, MCS 177. Because of their urgent need for a hat transfer fluid operable at temperatures higher than our Hierminols can be used and our interest in having a field test run on MCS 177, we loaned General Mills 200 gallons of this fluid in September for a pilot plant application. To date, they have subjected MCS 177 to 670F. operating tempera tures for about 300 hours, to 500F. for 150 hours, and 200F. for the remainder of the four week period. The fluid is being used in a small pilot plant operation in which General Mills conducts proprietary new process development work. The temperature demand in the fluid varies considerably in these operations but it is subjected to temperature over 600F. enough of the time for us to get a reasonably good assess ment of performance. Because of the experimental nature of the MCS 177 > they appear to have kept pretty close watch on its behavior. In general, the fluid was behaving as anticipated although they were somewhat surprised at the high viscosity of new fluid. They have been taking weekly samples from their system and have been monitoring the fluid condition by determining the viscosity of these samples. Only very slight viscosity increases have been noted after 300 hours at 670F. We obtained past DSW 343280 STLCOPCB4096591 Development Department Call Report No. FF-672 Page 2 samples and arranged to have 100 hour (at 670F.) samples sent to us routinely. We promised to send them our analysis of the condition of these samples and to pass on information obtained from our loop studies of this fluid. ' Claude Brown was concerned about the future availability of this pro duct not only for this pilot plant unit but for production units / that could be built any time. He also asked us to send him any toxi city information we had on this product. v ^7. M. McEwen ac NOTE TO E. WHEELER: Please handle last paragraph. Thanks. OS'N ^ STLCOPCB4096592