Document 5DJm92dm9JMmavkqrqpyE80k4

chg 01611 Arkwr it-Boston Insurance Mutual Boiler and Machinery Division 225 Wyman Street, Waltham, Massachusetts 02154 LOSS PREVENTION REPORT BOILER AND MACHINERY for CHAMPLIN PETROLEUM COMPANY 6700 & 7350 1-37 Corpus Christi, Texas 78408 index A/C 74661.62 by T. E. Hughes account 26-21486 conference Mr. Richard Arey, Chief Inspector WITH on Dec.12,1986 The purpose of this report is to assist you in minimizing loss from boiler and machinery accidents to the extent feasible. When referring to this report, Dlease use Index Number and Date of Inspection. SCOPE OF INSPECTION External Inspection of W.T. Boilers TX 122968 0/N 561-B-l, TX 122967 0/N 561-B-2, TX 122966 0/N 561-B-3, Unfired Steam Boilers TX 124632 0/N 553-B-1B, TX 124637 0/N 553-B-1B, TX 124636 0/N 553-E-5B, TX 124638 0/N 553-E-5A, TX 124642 0/N 521-E-ll, TX 124639 0/N 554-E-l, and Steam Drums TX 124643 0/N 521-V-13 and TX 124640 0/N 527-V-12 General Inspection of Production Pressure Vessels, Centrifugal Compressors, and Power Transformers RECOMMENDATION B85-6-1 It is recommended that alternate methods of supplying the 4,160 V buses in this plant be provided. Comments: The 4,160 V buses for the Coker, No. 5 Platformer, and the Hydrotreater each supply the recycle compressor and charge pumps for the train. These supplies are each by one transformer. There are no cross connects, spare transformers, or backup supplies provided. The potential loss of either of these three buses could provide a significant amount of unscheduled downtime in the affected unit. These alternate methods include, but are not limited to, a spare transformer or installed bus cross connect devices. A reliability study performed by the plant confirms that the 4,160 V transformers mentioned in Recommendation No. B85-6-1 provide a (over) Prepared by Factory Mutual Engineering Association CH/W-002579 *^0 rfB 12 WT * L0 GEP This report is intended to assist you in reducing the possibility of loss to the property insured with Arkwright-Boston Manufacturers Mutual Insurance Company by bringing to your attention hazards and lack of protection which need prompt consideration to prevent such loss to property. It is not intended to imply that all other hazards and conditions are under control at the time of this inspection. The liability of Arkwright-Boston Manufacturers Mutual Insurance Company is limited to that covered by their insurance policies. No other liability is assumed by reason of this report as it is only advisory in nature and the final decisions must be made by you. PRINTED IN USA ;CHG ''01612 FOR Arkwr^M-Boston Insurance Mutual Boiler and Machinery Division 225 Wyman Street. Waltham. Massachusetts 02154 LOSS PREVENTION REPORT BOILER AND MACHINERY CHAMPLIN PETROLEUM COMPANY "OLD REFINERY & NEW REFINERY EXPANSION COMPLEX" 1801 Nueces Bay Blvd. Corpus Christi, Texas 78408 GAYria..-....... . PE.JkYMA HA,>K:i.O i<CT?N #660-87 A/C BY T. E Hughes SA/E:Y & LOSS Cjim ,0l ACCOUNT r 2oJ21486 CONFERENCE WITH Mr. Gary Westbrook, Mgr. Inspection Eng. on Dec.12,1986 The purpose of this report Is to assist you In minimizing loss from boiler and machinery accidents to the extent feasible. When referring to this report, please use Index Number and Date of Inspection. SCOPE OF INSPECTION External and Certificate Inspection of W.T. Boilers TX 34821 O/N 5 and TX 100602 0/N 61-B-1C Internal and Certificate Inspection of W.T. Boiler TX 107509 O/N 61-B-1A COMMENTS Examination of the fireside, waterside and external surfaces of W.T. Boiler TX 107509 revealed no evidence of defects or adverse conditions. Examination of W.T. Boilers TX 34821 and TX 100602, while in service, revealed no evidence of defects or adverse conditions about the accessible pressure parts, piping, valves or safety devices. Review of records indicate the low water fuel cutoff devices are manually tested by the quick drain method on a daily basis. Records also indicate the safety valves are removed and bench tested on an annual basis. Overall boiler conditions appear satisfactory for continued operations. Certificates were issued. PRINTEO IN USA RFCt-'-rr, Prepared by Factory Mutual Engineering Association CHAW-002581 JAN 15 '987 SAFETY 8. LOSS CONTROL DEPt This report is intended to assist you in reducing the possibility of loss to the property insured with Arkwright-Boston Manufacturers Mutual Insurance Company by bringing to your attention hazards and lack of protection which need prompt consideration to prevent such loss to property. It is not intended to imply that all other hazards and conditions are under control at the time of this inspection. The liability of Arkwright-Boston Manufacturers Mutual Insurance Company is limited to that covered by their insurance policies. No other liability is assumed by reason of this report as it is only advisory in nature and the final decisions must be made by you. Arkwr^Jit-Boston Insurance Mutual Boiler and Machinery Division 225 Wyman Street. Waltham, Massachusetts 02154 LOSS PREVENTION REPORT BOILER AND MACHINERY FOR CHAMPLIN PETROLEUM COMPANY "OLD REFINERY & NEW REFINERY EXPANSION COMPLEX" 1801 Nueces Bay Blvd. Corpus Christ!, Texas 78408 index A/c 74660.87 BY T. E. Hughes account 26-21486 conference WITH Mr, Gary Westbrook, Mgr. Inspection Eng. 0N Dec.12,1986 The purpose of this report Is to assist you In minimizing loss from boiler and machinery accidents to the extent feasible. When referring to this report, please use Index Number and Date of Inspection. SCOPE OF INSPECTION External and Certificate Inspection of W.T. Boilers TX 34821 0/N 5 and TX 100602 0/N 61-B-1C Internal and Certificate Inspection of W.T. Boiler TX 107509 0/N 61-B-1A COMMENTS Examination of the fireside, waterside and external surfaces of W.T. Boiler TX 107509 revealed no evidence of defects or adverse conditions. Examination of W.T. Boilers TX 34821 and TX 100602, while in service, revealed no evidence of defects or adverse conditions about the accessible pressure parts, piping, valves or safety devices. Review of records indicate the low water fuel cutoff devices are manually tested by the quick drain method on a daily basis. Records also indicate the safety valves are removed and bench tested on an annual basis. Overall boiler conditions appear satisfactory for continued operations. Certificates were issued. PRINTED IN USA Prepared by Factory Mutual Engineering Association CH/W-002582 This report is intended to assist you in reducing the possibility of loss to the property insured with Arkwright-Boston Manufacturers Mutual Insurance Company by bringing to your attention hazards and lack of protection which need prompt consideration to prevent such loss to property. It is not intended to imply that all other hazards and conditions are under control at the time of this inspection. The liability of Arkwright-Boston Manufacturers Mutual Insurance Company is limited to that covered by their insurance policies. No other liability is assumed by reason of this report as it is only advisory in nature and the final decisions must be made by you. Arkuvnaht-Boston Insurance Mutual Boiler and Machinery Division 225 Wyman Street, Waltham. Massachusetts 02154 LOSS PREVENTION REPORT BOILER AND MACHINERY FOR CHAMPLIN PETROLEUM COMPANY "OLD REFINERY & NEW REFINERY EXPANSION COMPLEX" 1801 Nueces Bay Blvd. Corpus Christ!, Texas 78408 index A/c 74660.87 BY T. E. Hughes account 26-21486 CONFERENCE WITH Mr, Gary Westbrook, Mgr. Inspection Eng. 0N Dec.12,1986 The purpose of this report Is to assist you In minimizing loss from boiler and machinery accidents to the extent feasible. When referring to this report, please use Index Number and Date of Inspection. SCOPE OF INSPECTION External and Certificate Inspection of W.T. Boilers TX 34821 0/N 5 and TX 100602 0/N 61-B-1C Internal and Certificate Inspection of W.T. Boiler TX 107509 0/N 61-B-1A COMMENTS Examination of the fireside, waterside and external surfaces of W.T. Boiler TX 107509 revealed no evidence of defects or adverse conditions. Examination of W.T. Boilers TX 34821 and TX 100602, while in service, revealed no evidence of defects or adverse conditions about the accessible pressure parts, piping, valves or safety devices. Review of records indicate the low water fuel cutoff devices are manually tested by the quick drain method on a daily basis. Records also indicate the safety valves are removed and bench tested on an annual basis. Overall boiler conditions appear satisfactory for continued operations. Certificates were issued. PR IN TED IN USA Prepared by Factory Mutual Engineering Association CH/W-002583 This report is intended to assist you in reducing the possibility of loss to the property insured with Arkwright-Boston Manufacturers Mutual Insurance Company by bringing to your attention hazards and lack of protection which need prompt consideration to prevent such loss to property. It is not intended to imply that all other hazards and conditions are under control at the time of this inspection. The liability of Arkwright-Boston Manufacturers Mutual Insurance Company is limited to that covered by their insurance policies. No other liability is assumed by reason of this report as it is only advisory in nature and the final decisions must be made by you.